Information source is the ODOT Programs Division Job Piece system - Wed 4/1/2009 4:43:12 PM
Note: This potential project list has been compiled in support of ARRA project preparations. All data should be considered preliminary and will be subject to change without notice. The completion of the encompassed projects on an accelerated schedule is entirely dependent upon the subsequent availability of ARRA funding. The projects may be ultimately financed with multiple funding sources.




State Highway System Project List - As Planned for the Bid Opening shown


County Bid
Opening
Job
Piece
Project Hwy.
No
Work Type
Description
Job
Description
Length Estimated
Cost
Fund
Code
ARRA
Funds
Federal
Funds
State
Funds
Other
Funds

LEFLORE 04/2009 1712705 NH -STIM (169) US059 GRADE,DRAINING,BRIDGE & SURFACE US 59 FROM SH 9 EXTEND NORTH 5 MILES 5 $21,200,000.00 0C200 $20,000,000.00 $0.00 $0.00 $0.00
0LZ20 $0.00 $1,200,000.00 $0.00 $0.00
Project Total $21,200,000.00   $20,000,000.00 $1,200,000.00 $0.00 $0.00

NOBLE 04/2009 2028404 IM -STIM (237) IS035 RESURFACE I-35: FROM MILE MARKER 198 TO 203(RESURFACE) 5 $14,306,289.00 0SSP0 $0.00 $0.00 $5,047,912.00 $0.00
0L010 $0.00 $858,377.00 $0.00 $0.00
0C200 $8,400,000.00 $0.00 $0.00 $0.00
Project Total $14,306,289.00   $8,400,000.00 $858,377.00 $5,047,912.00 $0.00

WASHITA 04/2009 1712604 NH -STIM (240) SS US183 GRADE,DRAINING,BRIDGE & SURFACE US183: FROM APPROX 2.8 MI SOUTHWEST OF SH-152, NORTHEAST APPROX 2.5 MI(RECON TO 4-LN DIVIDED)(DEL FR 03-09, ADD TO 04-09; AS PER O.E) 2.5 $7,276,577.00 0SSP0 $0.00 $0.00 $3,058,983.00 $0.00
0L050 $0.00 $436,594.00 $0.00 $0.00
0C200 $3,781,000.00 $0.00 $0.00 $0.00
Project Total $7,276,577.00   $3,781,000.00 $436,594.00 $3,058,983.00 $0.00