INCOG (Tulsa Area) Project List - As Planned for the Bid Opening shown

Information source is the ODOT Programs Division Job Piece system - Sat 5/16/2009 4:33:32 PM
Note: This potential project list has been compiled in support of ARRA project preparations. All data should be considered preliminary and will be subject to change without notice. The completion of the encompassed projects on an accelerated schedule is entirely dependent upon the subsequent availability of ARRA funding. The projects may be ultimately financed with multiple funding sources.




County Bid
Opening
Job
Piece
Project Hwy.
No
Work Type
Description
Job
Description
Length Estimated
Cost
Fund
Code
ARRA
Funds
Federal
Funds
State
Funds
Other
Funds

TULSA / 2668604 STP -STIM (266) IG CT ST RESURFACE BROKEN ARROW ARRA: KENOSHA ST: MAIN ST TO SIXTH ST 0 $321,487.00 0C230 $321,000.00 $0.00 $0.00 $0.00
0L230 $0.00 $487.00 $0.00 $0.00
Project Total $321,487.00   $321,000.00 $487.00 $0.00 $0.00

TULSA / 2668704 STP -STIM (267) IG CT ST RESURFACE BROKEN ARROW ARRA: KENOSHA ST: HICKORY COURT TO ASPEN AVE (145TH E AVE) 0 $344,804.00 0C230 $344,000.00 $0.00 $0.00 $0.00
0L230 $0.00 $804.00 $0.00 $0.00
Project Total $344,804.00   $344,000.00 $804.00 $0.00 $0.00

TULSA / 2670004 STP -STIM (281) IG CT ST GRADE, DRAIN & SURFACE TULSA ARRA: MOHAWK BLVD - CINCINNATI TO HARTFORD 0 $1,910,000.00 0C230 $1,900,000.00 $0.00 $0.00 $0.00
0L230 $0.00 $10,000.00 $0.00 $0.00
Project Total $1,910,000.00   $1,900,000.00 $10,000.00 $0.00 $0.00

TULSA / 2670604 STP -STIM (287) IG CT ST PAVEMENT REHABILITATION TULSA ARRA: 31ST STREET S., FROM 129TH E. AVE TO 145TH E. AVE 0 $1,580,000.00 0C230 $1,500,000.00 $0.00 $0.00 $0.00
0L230 $0.00 $80,000.00 $0.00 $0.00
Project Total $1,580,000.00   $1,500,000.00 $80,000.00 $0.00 $0.00