Pedestrian Improvement Project List - As Planned for the Bid Opening shown

Information source is the ODOT Programs Division Job Piece system - Tue 12/29/2009 8:19:59 PM
Note: This potential project list has been compiled in support of ARRA project preparations. All data should be considered preliminary and will be subject to change without notice. The completion of the encompassed projects on an accelerated schedule is entirely dependent upon the subsequent availability of ARRA funding. The projects may be ultimately financed with multiple funding sources.




County Bid
Opening
Job
Piece
Project Hwy.
No
Work Type
Description
Job
Description
Length Estimated
Cost
Fund
Code
ARRA
Funds
Federal
Funds
State
Funds
Other
Funds

ALFALFA / 2720604 STP -STIM (467) EH SH045 PEDESTRIAN IMPROVEMENTS GOLTRY ARRA SH-45 FROM 7TH ST SOUTH TO 1/4 MI SOUTH OF MAIN ST 0.1 $848,000.00 0C220 $800,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $48,000.00 $0.00 $0.00
Project Total $848,000.00   $800,000.00 $48,000.00 $0.00 $0.00

BEAVER / 2720704 STP -STIM (468) EH US064 PEDESTRIAN IMPROVEMENTS FORGAN ARRA US-270 FROM TEXAS ST TO MISSISSIPPI AVE 0.1 $954,000.00 0C220 $900,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $54,000.00 $0.00 $0.00
Project Total $954,000.00   $900,000.00 $54,000.00 $0.00 $0.00

BLAINE / 2720004 STP -STIM (461) EH SH051 PEDESTRIAN IMPROVEMENTS CANTON ARRA SH-51 FROM GRANT ST TO LINCOLN ST; SH-58 FROM MAIN ST TOPARK ST 0.1 $848,000.00 0L220 $0.00 $48,000.00 $0.00 $0.00
0C220 $800,000.00 $0.00 $0.00 $0.00
Project Total $848,000.00   $800,000.00 $48,000.00 $0.00 $0.00

BRYAN / 2718204 STP -STIM (443) EH SH022 PEDESTRIAN IMPROVEMENTS CADDO ARRA SH-22 FROM MAIN ST TO ARKANSAS ST 0.1 $424,000.00 0C220 $400,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $24,000.00 $0.00 $0.00
Project Total $424,000.00   $400,000.00 $24,000.00 $0.00 $0.00

CADDO / 2721304 STP -STIM (474) EH US277 PEDESTRIAN IMPROVEMENTS CEMENT ARRA US-277(SH-19) FROM "F" AVE WEST TO ONE BLK WEST OF MAIN ST 0.1 $795,000.00 0C220 $750,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $45,000.00 $0.00 $0.00
Project Total $795,000.00   $750,000.00 $45,000.00 $0.00 $0.00

CARTER / 2721404 STP -STIM (475) EH SH053A PEDESTRIAN IMPROVEMENTS GENE AUTRY ARRA SH-53A FROM GRANT AVE TO MILL ST (WEST SIDE ONLY) 0.1 $318,000.00 0L220 $0.00 $18,000.00 $0.00 $0.00
0C220 $300,000.00 $0.00 $0.00 $0.00
Project Total $318,000.00   $300,000.00 $18,000.00 $0.00 $0.00

CHEROKEE / 2717204 STP -STIM (434) EH SH051 PEDESTRIAN IMPROVEMENTS HULBERT ARRA: SH-51 RIDER LN TO HALF BLOCK EAST OF THE POST OFFICE 0.1 $530,000.00 0C220 $500,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $30,000.00 $0.00 $0.00
Project Total $530,000.00   $500,000.00 $30,000.00 $0.00 $0.00

COTTON / 2721004 STP -STIM (471) EH SH065 PEDESTRIAN IMPROVEMENTS TEMPLE ARRA SH-65 FROM OREGON ST SOUTH TO OKLAHOMA ST 0.1 $636,000.00 0C220 $600,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $36,000.00 $0.00 $0.00
Project Total $636,000.00   $600,000.00 $36,000.00 $0.00 $0.00

CREEK / 2721504 STP -STIM (476) EH US075A PEDESTRIAN IMPROVEMENTS MOUNDS ARRA US-75A FROM 9TH ST TO 14TH ST 0.2 $795,000.00 0C220 $750,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $45,000.00 $0.00 $0.00
Project Total $795,000.00   $750,000.00 $45,000.00 $0.00 $0.00

DEWEY / 2719904 STP -STIM (460) EH US060 PEDESTRIAN IMPROVEMENTS VICI ARRA SH-51 FROM SPECK ST EAST TO BROWN ST 0.1 $636,000.00 0L220 $0.00 $36,000.00 $0.00 $0.00
0C220 $600,000.00 $0.00 $0.00 $0.00
Project Total $636,000.00   $600,000.00 $36,000.00 $0.00 $0.00

ELLIS / 2720404 STP -STIM (465) EH US283 PEDESTRIAN IMPROVEMENTS SHATTUCK ARRA US-283 FROM GRAND AVE SOUTH TO 10TH ST 0.1 $530,000.00 0L220 $0.00 $30,000.00 $0.00 $0.00
0C220 $500,000.00 $0.00 $0.00 $0.00
Project Total $530,000.00   $500,000.00 $30,000.00 $0.00 $0.00

ELLIS / 2720504 STP -STIM (466) EH SH046 PEDESTRIAN IMPROVEMENTS GAGE ARRA SH-46 FROM NORTH ST SOUTH TO SH-46/SH-15 JCT 0.1 $636,000.00 0C220 $600,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $36,000.00 $0.00 $0.00
Project Total $636,000.00   $600,000.00 $36,000.00 $0.00 $0.00

GARVIN / 2718804 STP -STIM (449) EH SH019 PEDESTRIAN IMPROVEMENTS MAYSVILLE ARRA SH-19/SH-74 EAST TO PINE ALLEY 0.1 $530,000.00 0C220 $500,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $30,000.00 $0.00 $0.00
Project Total $530,000.00   $500,000.00 $30,000.00 $0.00 $0.00

GRADY / 2720904 STP -STIM (470) EH US081 PEDESTRIAN IMPROVEMENTS POCASSET ARRA US-81 FROM 1ST ST SOUTH TO 5TH ST 0.1 $371,000.00 0C220 $350,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $21,000.00 $0.00 $0.00
Project Total $371,000.00   $350,000.00 $21,000.00 $0.00 $0.00

GRADY / 2721104 STP -STIM (472) EH SH017 PEDESTRIAN IMPROVEMENTS RUSH SPRINGS ARRA SH-17/SH-81B JCT TO SH-81 0.1 $1,060,000.00 0C220 $1,000,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $60,000.00 $0.00 $0.00
Project Total $1,060,000.00   $1,000,000.00 $60,000.00 $0.00 $0.00

GREER / 2720104 STP -STIM (462) EH SH034 PEDESTRIAN IMPROVEMENTS MANGUM ARRA SH-34 FROM EAST JACKSON ST TO EAST SOUTH ST 0.1 $848,000.00 0L220 $0.00 $48,000.00 $0.00 $0.00
0C220 $800,000.00 $0.00 $0.00 $0.00
Project Total $848,000.00   $800,000.00 $48,000.00 $0.00 $0.00

HARMON / 2719704 STP -STIM (458) EH US062 PEDESTRIAN IMPROVEMENTS HOLLIS ARRA US-62 FROM MAIN ST EAST TO 1ST ST 0.1 $424,000.00 0L220 $0.00 $24,000.00 $0.00 $0.00
0C220 $400,000.00 $0.00 $0.00 $0.00
Project Total $424,000.00   $400,000.00 $24,000.00 $0.00 $0.00

HASKELL / 2717704 STP -STIM (439) EH SH031 PEDESTRIAN IMPROVEMENTS KINTA ARRA SH-31 FROM HOYT TO MAIN; SH-2 FROM 4TH ST TO NORTH OF 2ND ST 0.1 $530,000.00 0C220 $500,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $30,000.00 $0.00 $0.00
Project Total $530,000.00   $500,000.00 $30,000.00 $0.00 $0.00

JEFFERSON / 2721204 STP -STIM (473) EH SH005 PEDESTRIAN IMPROVEMENTS HASTINGS ARRA SH-5 FROM COMMERCIAL AVE TO 4TH ST 0.1 $424,000.00 0L220 $0.00 $24,000.00 $0.00 $0.00
0C220 $400,000.00 $0.00 $0.00 $0.00
Project Total $424,000.00   $400,000.00 $24,000.00 $0.00 $0.00

KAY / 2719104 STP -STIM (452) EH US077 PEDESTRIAN IMPROVEMENTS TONKAWA ARRA US-77/US-60 FROM GRAND AVE TO PARK AVE & MAIN ST TOPUBLIC ST 0.1 $795,000.00 0L220 $0.00 $45,000.00 $0.00 $0.00
0C220 $750,000.00 $0.00 $0.00 $0.00
Project Total $795,000.00   $750,000.00 $45,000.00 $0.00 $0.00

KINGFISHER / 2719204 STP -STIM (453) EH US081 PEDESTRIAN IMPROVEMENTS OKARCHE ARRA US-81 FROM IOWA ST NORTH TO MISSOURI (EAST SIDE ONLY) &MEMORIAL (WEST SIDE) 0.1 $424,000.00 0L220 $0.00 $24,000.00 $0.00 $0.00
0C220 $400,000.00 $0.00 $0.00 $0.00
Project Total $424,000.00   $400,000.00 $24,000.00 $0.00 $0.00

KINGFISHER / 2719304 STP -STIM (454) EH US081 PEDESTRIAN IMPROVEMENTS HENNESSEY ARRA US-81 FROM IOWA ST SOUTH TO 6TH ST 0.1 $848,000.00 0C220 $800,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $48,000.00 $0.00 $0.00
Project Total $848,000.00   $800,000.00 $48,000.00 $0.00 $0.00

KINGFISHER / 2719604 STP -STIM (457) EH US081 PEDESTRIAN IMPROVEMENTS KINGFISHER ARRA US-81 NORTH OF SH-33 RECONSTRUCTION OF THREE INTERSECTIONS 0.87 $318,000.00 0L220 $0.00 $18,000.00 $0.00 $0.00
0C220 $300,000.00 $0.00 $0.00 $0.00
Project Total $318,000.00   $300,000.00 $18,000.00 $0.00 $0.00

KIOWA / 2720204 STP -STIM (463) EH US183 PEDESTRIAN IMPROVEMENTS HOBART ARRA US-183 1 $848,000.00 0C220 $800,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $48,000.00 $0.00 $0.00
Project Total $848,000.00   $800,000.00 $48,000.00 $0.00 $0.00

LEFLORE / 2717904 STP -STIM (441) EH US271 PEDESTRIAN IMPROVEMENTS TALIHINA ARRA US-271 FROM 1ST ST TO DUKE ST 1/2 BLOCK NORTH ON SH-1 0.1 $530,000.00 0C220 $500,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $30,000.00 $0.00 $0.00
Project Total $530,000.00   $500,000.00 $30,000.00 $0.00 $0.00

LINCOLN / 2718504 STP -STIM (446) EH SH018 PEDESTRIAN IMPROVEMENTS AGRA ARRA SH-18 HAYES ST TO WASHINGTON ST 0.1 $530,000.00 0C220 $500,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $30,000.00 $0.00 $0.00
Project Total $530,000.00   $500,000.00 $30,000.00 $0.00 $0.00

LINCOLN / 2718604 STP -STIM (447) EH SH105 PEDESTRIAN IMPROVEMENTS TRYON ARRA SH-105 FROM OKLAHOMA ST TO 1ST ST 0.1 $424,000.00 0C220 $400,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $24,000.00 $0.00 $0.00
Project Total $424,000.00   $400,000.00 $24,000.00 $0.00 $0.00

LOGAN / 2719404 STP -STIM (455) EH SH074 PEDESTRIAN IMPROVEMENTS CRESCENT ARRA SH-74 FROM NORTH LOCUST ST SOUTH TO WEST ADAMS ST 0.1 $477,000.00 0L220 $0.00 $27,000.00 $0.00 $0.00
0C220 $450,000.00 $0.00 $0.00 $0.00
Project Total $477,000.00   $450,000.00 $27,000.00 $0.00 $0.00

LOGAN / 2719504 STP -STIM (456) EH SH000B PEDESTRIAN IMPROVEMENTS LANGSTON ARRA SH-OB FROM WASHINGTON ST EAST TO MARTIN LUTHER KING ST 0.01 $1,590,000.00 0L220 $0.00 $90,000.00 $0.00 $0.00
0C220 $1,500,000.00 $0.00 $0.00 $0.00
Project Total $1,590,000.00   $1,500,000.00 $90,000.00 $0.00 $0.00

MCCURTAIN / 2718104 STP -STIM (442) EH US070 PEDESTRIAN IMPROVEMENTS BROKEN BOW ARRA US-70 FROM PARK DR TO CHATA RD; US-259 FROM US-70 NORTH0.4 MI (WEST SIDE ONLY) 0.1 $530,000.00 0C220 $500,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $30,000.00 $0.00 $0.00
Project Total $530,000.00   $500,000.00 $30,000.00 $0.00 $0.00

MARSHALL / 2718404 STP -STIM (445) EH US070 PEDESTRIAN IMPROVEMENTS KINGSTON ARRA US-70 FROM MAYTUBBY ST TO HANEY ST; US-70B FROM US-70 TO1ST ST 0.1 $424,000.00 0C220 $400,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $24,000.00 $0.00 $0.00
Project Total $424,000.00   $400,000.00 $24,000.00 $0.00 $0.00

MAYES / 2721904 STP -STIM (480) EH US412A PEDESTRIAN IMPROVEMENTS LOCUST GROVE ARRA US-412A FROM BROADWAY EAST TO CHEROKEE ST 0.1 $636,000.00 0C220 $600,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $36,000.00 $0.00 $0.00
Project Total $636,000.00   $600,000.00 $36,000.00 $0.00 $0.00

MURRAY / 2740504 STP -STIM (516) EH SH007 PEDESTRIAN IMPROVEMENTS SULPHUR ARRA SH-7 FROM 9TH ST EAST 0.521 MI TO FIRST ST 0.521 $689,000.00 0L220 $0.00 $39,000.00 $0.00 $0.00
0C220 $650,000.00 $0.00 $0.00 $0.00
Project Total $689,000.00   $650,000.00 $39,000.00 $0.00 $0.00

MUSKOGEE / 2717304 STP -STIM (435) EH SH072 PEDESTRIAN IMPROVEMENTS COUNCIL HILL ARRA: SH-72 FROM 4TH ST TO 8TH ST (WEST SIDE ONLY) 0.1 $477,000.00 0L220 $0.00 $27,000.00 $0.00 $0.00
0C220 $450,000.00 $0.00 $0.00 $0.00
Project Total $477,000.00   $450,000.00 $27,000.00 $0.00 $0.00

MUSKOGEE / 2717404 STP -STIM (436) EH SH002 PEDESTRIAN IMPROVEMENTS PORUM ARRA SH-2 FROM HALF BLOCK NORTH OF OSAGE SOUTH TO CHEROKEE AVE 0.1 $636,000.00 0C220 $600,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $36,000.00 $0.00 $0.00
Project Total $636,000.00   $600,000.00 $36,000.00 $0.00 $0.00

MUSKOGEE / 2717604 STP -STIM (438) EH US062 PEDESTRIAN IMPROVEMENTS BOYNTON ARRA SH-72 FROM LUCILLE AVE NORTH TO NORTH OF KENEFICK AVE 0.1 $318,000.00 0C220 $300,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $18,000.00 $0.00 $0.00
Project Total $318,000.00   $300,000.00 $18,000.00 $0.00 $0.00

NOWATA / 2721604 STP -STIM (477) EH US060 PEDESTRIAN IMPROVEMENTS NOWATA ARRA US-60 FROM DELAWARE OAK ST 0.1 $636,000.00 0C220 $600,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $36,000.00 $0.00 $0.00
Project Total $636,000.00   $600,000.00 $36,000.00 $0.00 $0.00

OKFUSKEE / 2718904 STP -STIM (450) EH SH027 PEDESTRIAN IMPROVEMENTS OKEMAH ARRA SH-27 FROM 200' NORTH OF I-40 NORTH TO SH-56/US-62 JCT(EAST SIDE ONLY) 0.75 $636,000.00 0L220 $0.00 $36,000.00 $0.00 $0.00
0C220 $600,000.00 $0.00 $0.00 $0.00
Project Total $636,000.00   $600,000.00 $36,000.00 $0.00 $0.00

OSAGE / 2721704 STP -STIM (478) EH SH018 PEDESTRIAN IMPROVEMENTS FAIRFAX ARRA SH-18 FROM WALNUT ST TO MULBERRY ST 0.1 $636,000.00 0L220 $0.00 $36,000.00 $0.00 $0.00
0C220 $600,000.00 $0.00 $0.00 $0.00
Project Total $636,000.00   $600,000.00 $36,000.00 $0.00 $0.00

OTTAWA / 2721804 STP -STIM (479) EH US069 PEDESTRIAN IMPROVEMENTS QUAPAW ARRA US-69A FROM 1ST ST SOUTH TO 4TH ST 0.1 $795,000.00 0L220 $0.00 $45,000.00 $0.00 $0.00
0C220 $750,000.00 $0.00 $0.00 $0.00
Project Total $795,000.00   $750,000.00 $45,000.00 $0.00 $0.00

OTTAWA / 2724804 STP -STIM (489) EH US069 PEDESTRIAN IMPROVEMENTS MIAMI ARRA US-69 FROM C ST SW TO A ST SW 4 BLK; SH-10 FROM A ST SW EAST1.5 BLK 0.1 $1,060,000.00 0L220 $0.00 $60,000.00 $0.00 $0.00
0C220 $1,000,000.00 $0.00 $0.00 $0.00
Project Total $1,060,000.00   $1,000,000.00 $60,000.00 $0.00 $0.00

PITTSBURG / 2724404 STP -STIM (485) EH US069 PEDESTRIAN IMPROVEMENTS KIOWA ARRA US-69 START & END AT THE CURB & GUTTER BOTH SIDES OF ROAD 8/10MI LONG 0.8 $1,060,000.00 0C220 $1,000,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $60,000.00 $0.00 $0.00
Project Total $1,060,000.00   $1,000,000.00 $60,000.00 $0.00 $0.00

PUSHMATAHA / 2718304 STP -STIM (444) EH US271 PEDESTRIAN IMPROVEMENTS ANTLERS ARRA US-271 FROM SW "B" ST TO SE "E" ST 0.1 $848,000.00 0C220 $800,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $48,000.00 $0.00 $0.00
Project Total $848,000.00   $800,000.00 $48,000.00 $0.00 $0.00

SEMINOLE / 2718704 STP -STIM (448) EH SH056 PEDESTRIAN IMPROVEMENTS SASAKWA ARRA SH-56 FROM PINE ST TO CHESTNUT ST 0.1 $530,000.00 0C220 $500,000.00 $0.00 $0.00 $0.00
0L220 $0.00 $30,000.00 $0.00 $0.00
Project Total $530,000.00   $500,000.00 $30,000.00 $0.00 $0.00

SEMINOLE / 2719004 STP -STIM (451) EH SH039 PEDESTRIAN IMPROVEMENTS KONAWA ARRA SH-39 FROM 3RD ST TO SOUTH ST 0.1 $636,000.00 0L220 $0.00 $36,000.00 $0.00 $0.00
0C220 $600,000.00 $0.00 $0.00 $0.00
Project Total $636,000.00   $600,000.00 $36,000.00 $0.00 $0.00

SEQUOYAH / 2717504 STP -STIM (437) EH US064 PEDESTRIAN IMPROVEMENTS VIAN ARRA US-64 FROM BLACKSTONE TO KENNEDY; SH-82 FROM MAIN TO SEQUOYAH 0.1 $795,000.00 0L220 $0.00 $45,000.00 $0.00 $0.00
0C220 $750,000.00 $0.00 $0.00 $0.00
Project Total $795,000.00   $750,000.00 $45,000.00 $0.00 $0.00

WAGONER / 2724304 STP -STIM (484) EH SH051B PEDESTRIAN IMPROVEMENTS PORTER ARRA SH-51B FROM HALE ST SOUTH 6 BLK TO BELAIRE ST 0.5 $795,000.00 0L220 $0.00 $45,000.00 $0.00 $0.00
0C220 $750,000.00 $0.00 $0.00 $0.00
Project Total $795,000.00   $750,000.00 $45,000.00 $0.00 $0.00