| Fed/State Project Number: STPY-152B(173) |
Project: 20311(07) |
Category: 0100/ROADWAY - STPY-152B(173) |
| 0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
0.400 |
$40,000.00 |
$0.00 |
$16,000.00 |
| 0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
294,535.000 |
294,535.000 |
0.000 |
3,007.500 |
$2.80 |
$0.00 |
$8,421.00 |
| 0003 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$40,000.00 |
$0.00 |
$0.00 |
| 0004 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
49,445.000 |
49,445.000 |
0.000 |
1,319.000 |
$1.12 |
$0.00 |
$1,477.28 |
| 0005 |
TEMPORARY SEDIMENT FILTER |
221(D) 2803 |
EA |
9.000 |
9.000 |
|
0.000 |
$239.00 |
$0.00 |
$0.00 |
| 0006 |
TEMPORARY SEDIMENT BASIN |
221(E) 2804 |
EA |
12.000 |
12.000 |
|
0.000 |
$369.00 |
$0.00 |
$0.00 |
| 0007 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
3,328.000 |
3,328.000 |
|
0.000 |
$7.19 |
$0.00 |
$0.00 |
| 0008 |
TEMPORARY ROCK FILTER DAM TYPE 3 |
221(G) 0152 |
CY |
386.000 |
386.000 |
|
0.000 |
$104.00 |
$0.00 |
$0.00 |
| 0009 |
DITCH LINER PROTECTION |
229 4318 |
LF |
3,265.000 |
3,265.000 |
|
0.000 |
$1.52 |
$0.00 |
$0.00 |
| 0010 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
239,649.000 |
239,649.000 |
|
0.000 |
$1.24 |
$0.00 |
$0.00 |
| 0011 |
WATERING |
230(F) 2812 |
KGAL |
9,586.000 |
9,586.000 |
|
0.000 |
$9.65 |
$0.00 |
$0.00 |
| 0012 |
SEEDING METHOD A |
232(A) 2813 |
AC |
9.000 |
9.000 |
|
0.000 |
$771.00 |
$0.00 |
$0.00 |
| 0013 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
72.000 |
72.000 |
|
0.000 |
$498.00 |
$0.00 |
$0.00 |
| 0014 |
MOWING |
241 2832 |
AC |
117.000 |
117.000 |
|
0.000 |
$96.21 |
$0.00 |
$0.00 |
| 0015 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
1,139.000 |
1,139.000 |
|
54.920 |
$26.50 |
$0.00 |
$1,455.38 |
| 0016 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
528.000 |
528.000 |
|
94.490 |
$7.00 |
$0.00 |
$661.43 |
| 0017 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
1,704.000 |
1,704.000 |
68.640 |
225.140 |
$270.00 |
$18,532.80 |
$60,787.80 |
| 0018 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
628.000 |
628.000 |
|
0.000 |
$200.00 |
$0.00 |
$0.00 |
| 0019 |
REINFORCING STEEL |
511(A) 0332 |
LB |
269,539.000 |
269,539.000 |
|
38,905.630 |
$0.75 |
$0.00 |
$29,179.23 |
| 0020 |
TYPE I-A PLAIN RIPRAP |
601(B) 0536 |
TON |
1,118.000 |
1,118.000 |
|
0.000 |
$40.00 |
$0.00 |
$0.00 |
| 0021 |
TYPE I-A FILTER BLANKET |
601(C) 0538 |
TON |
303.000 |
303.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
| 0022 |
INLET GPI TYPE 1 (DES. 1) |
611(G) 5327 |
EA |
3.000 |
3.000 |
|
0.000 |
$2,800.00 |
$0.00 |
$0.00 |
| 0023 |
INLET (SMD-TYPE 1) |
611(G) 6000 |
EA |
1.000 |
1.000 |
|
0.000 |
$2,400.00 |
$0.00 |
$0.00 |
| 0024 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
99.000 |
99.000 |
|
0.000 |
$42.00 |
$0.00 |
$0.00 |
| 0025 |
30" R.C.PIPE CLASS III |
613(A) 0493 |
LF |
279.000 |
279.000 |
|
0.000 |
$55.00 |
$0.00 |
$0.00 |
| 0026 |
36" R.C.PIPE CLASS III |
613(A) 0494 |
LF |
181.000 |
181.000 |
|
0.000 |
$72.00 |
$0.00 |
$0.00 |
| 0027 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
1,779.000 |
1,779.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
| 0028 |
24" CORR. GALV. STEEL PIPE |
613(B) 0690 |
LF |
89.000 |
89.000 |
|
0.000 |
$23.00 |
$0.00 |
$0.00 |
| 0029 |
30" CORR. GALV. STEEL PIPE |
613(B) 0691 |
LF |
176.000 |
176.000 |
|
0.000 |
$27.00 |
$0.00 |
$0.00 |
| 0030 |
18" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5726 |
EA |
20.000 |
20.000 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
| 0031 |
30" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5732 |
EA |
7.000 |
7.000 |
|
0.000 |
$635.00 |
$0.00 |
$0.00 |
| 0032 |
36" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5734 |
EA |
4.000 |
4.000 |
|
0.000 |
$835.00 |
$0.00 |
$0.00 |
| 0033 |
TYPE A6 CULVERT END TREATMENT |
613(M) 7196 |
EA |
24.000 |
24.000 |
|
0.000 |
$900.00 |
$0.00 |
$0.00 |
| 0034 |
TYPE B6 CULVERT END TREATMENT |
613(M) 7197 |
EA |
1.000 |
1.000 |
|
0.000 |
$950.00 |
$0.00 |
$0.00 |
| 0035 |
TYPE C6 CULVERT END TREATMENT |
613(M) 7198 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,100.00 |
$0.00 |
$0.00 |
| 0036 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$5,000.00 |
$0.00 |
$0.00 |
| 0037 |
REMOVAL OF HEADWALL |
619(B) 0291 |
EA |
6.000 |
6.000 |
|
0.000 |
$900.00 |
$0.00 |
$0.00 |
| 0038 |
REMOVAL OF FENCE |
619(B) 4725 |
LF |
22,585.000 |
22,585.000 |
|
10,732.000 |
$0.40 |
$0.00 |
$4,292.80 |
| 0039 |
REMOVAL OF EXISTING PIPE |
619(B) 5918 |
LF |
143.000 |
143.000 |
|
60.620 |
$4.00 |
$0.00 |
$242.48 |
| 0040 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
25,031.000 |
25,031.000 |
1,357.000 |
3,432.000 |
$2.83 |
$3,840.31 |
$9,712.56 |
| 0041 |
REMOVE AND RESET MAILBOX |
629(E) 5048 |
EA |
3.000 |
3.000 |
|
0.000 |
$80.00 |
$0.00 |
$0.00 |
| Subtotals For Category 0100/ROADWAY - STPY-152B(173) |
$22,373.11 |
$132,229.96 |
|
| Fed/State Project Number: STPY-152B(173) |
Project: 20311(07) |
Category: 0300/TRAFFIC - STPY-152B(173) |
| 0042 |
(SP)CONST.ZONE IMPACT ATTEN. |
871(B) 8705 |
SD |
540.000 |
540.000 |
|
0.000 |
$19.00 |
$0.00 |
$0.00 |
| 0043 |
DELIVER PORTABLE LONGITUDINAL BARRIER |
877(B) 8484 |
LF |
600.000 |
600.000 |
|
0.000 |
$19.90 |
$0.00 |
$0.00 |
| 0044 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER |
877(C) 8486 |
LF |
800.000 |
800.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
| 0045 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
11,880.000 |
11,880.000 |
255.000 |
1,202.000 |
$0.02 |
$5.10 |
$24.04 |
| 0046 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
86,130.000 |
86,130.000 |
45.000 |
286.000 |
$0.02 |
$0.90 |
$5.72 |
| 0047 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
2,970.000 |
2,970.000 |
255.000 |
1,202.000 |
$5.00 |
$1,275.00 |
$6,010.00 |
| 0048 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
86,130.000 |
86,130.000 |
|
0.000 |
$0.02 |
$0.00 |
$0.00 |
| 0049 |
WING BARRICADES |
880(C) 8848 |
SD |
2,160.000 |
2,160.000 |
30.000 |
232.000 |
$0.02 |
$0.60 |
$4.64 |
| 0050 |
VERTICAL PANELS |
880(D) 8854 |
SD |
4,050.000 |
4,050.000 |
1,050.000 |
3,280.000 |
$0.30 |
$315.00 |
$984.00 |
| 0051 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
175,230.000 |
175,230.000 |
1,050.000 |
4,325.000 |
$0.02 |
$21.00 |
$86.50 |
| 0052 |
DRUMS |
880(F) 8878 |
SD |
9,180.000 |
9,180.000 |
|
0.000 |
$0.30 |
$0.00 |
$0.00 |
| Subtotals For Category 0300/TRAFFIC - STPY-152B(173) |
$1,617.60 |
$7,114.90 |
|