| Fed/State Project Number: STPY-242C(001) |
Project: 27729(04) |
Category: 0100/ROADWAY |
| 0001 |
UNCLASSIFIED BORROW (TOPSOIL) |
202(D) 4781 |
CY |
200.000 |
200.000 |
|
0.000 |
$18.00 |
$0.00 |
$0.00 |
| 0002 |
EARTHWORK |
202(H) 0185 |
LSUM |
1.000 |
1.000 |
0.500 |
0.500 |
$13,500.00 |
$6,750.00 |
$6,750.00 |
| 0003 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
700.000 |
700.000 |
|
0.000 |
$2.70 |
$0.00 |
$0.00 |
| 0004 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
100.000 |
100.000 |
|
0.000 |
$50.00 |
$0.00 |
$0.00 |
| 0005 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
100.000 |
100.000 |
|
88.470 |
$100.00 |
$0.00 |
$8,847.00 |
| 0006 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
3,800.000 |
3,800.000 |
2,918.000 |
3,682.180 |
$92.00 |
$268,456.00 |
$338,760.56 |
| 0007 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
9,000.000 |
9,000.000 |
|
8,644.450 |
$2.50 |
$0.00 |
$21,611.13 |
| 0008 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
32.000 |
32.000 |
|
0.000 |
$525.00 |
$0.00 |
$0.00 |
| 0009 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
5.000 |
5.000 |
2.640 |
2.640 |
$200.00 |
$528.00 |
$528.00 |
| 0010 |
REINFORCING STEEL |
511(A) 0332 |
LB |
4,000.000 |
4,000.000 |
|
0.000 |
$1.25 |
$0.00 |
$0.00 |
| 0011 |
CONCRETE CURB (6" BARRIER-DOWELLED) |
609(A) 5864 |
LF |
1,250.000 |
1,250.000 |
|
357.000 |
$7.00 |
$0.00 |
$2,499.00 |
| 0012 |
COMBINED CURB & GUTTER (6" BARRIER) |
609(B) 0383 |
LF |
150.000 |
150.000 |
421.000 |
1,207.000 |
$18.00 |
$7,578.00 |
$21,726.00 |
| 0013 |
4" CONCRETE SIDEWALK |
610(A) 0602 |
SY |
1,400.000 |
1,400.000 |
263.350 |
1,143.900 |
$36.00 |
$9,480.60 |
$41,180.40 |
| 0014 |
6" CONCRETE DRIVEWAY |
610(B) 0604 |
SY |
350.000 |
350.000 |
39.920 |
311.050 |
$45.00 |
$1,796.40 |
$13,997.25 |
| 0015 |
TACTILE WARNING DEVICE-NEW |
610(I) 4610 |
SF |
300.000 |
300.000 |
62.000 |
297.000 |
$27.00 |
$1,674.00 |
$8,019.00 |
| 0016 |
WATER METER RESET |
612(I) 0652 |
EA |
1.000 |
1.000 |
|
0.000 |
$150.00 |
$0.00 |
$0.00 |
| 0017 |
28" X 20" CORR. GALV. STEEL PIPE ARCH |
613(B) 4528 |
LF |
12.000 |
12.000 |
12.000 |
12.000 |
$45.00 |
$540.00 |
$540.00 |
| 0018 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH |
613(L) 4516 |
EA |
2.000 |
2.000 |
2.000 |
2.000 |
$260.00 |
$520.00 |
$520.00 |
| 0019 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$8,250.00 |
$0.00 |
$8,250.00 |
| 0020 |
REMOVAL OF CONCRETE DRIVEWAY |
619(B) 4766 |
SY |
300.000 |
300.000 |
|
234.040 |
$6.00 |
$0.00 |
$1,404.24 |
| 0021 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
200.000 |
200.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
| 0022 |
REMOVAL OF CURB |
619(B) 4791 |
LF |
1,050.000 |
1,050.000 |
358.000 |
1,038.000 |
$6.00 |
$2,148.00 |
$6,228.00 |
| 0023 |
REMOVAL OF SIDEWALK |
619(B) 4792 |
SY |
900.000 |
900.000 |
330.000 |
980.420 |
$6.00 |
$1,980.00 |
$5,882.52 |
| 0024 |
REMOVAL OF FIRE HYDRANT |
619(B) 5949 |
EA |
1.000 |
1.000 |
1.000 |
3.000 |
$300.00 |
$300.00 |
$900.00 |
| 0025 |
PIPE RAILING |
622(A) 4746 |
LF |
150.000 |
150.000 |
|
0.000 |
$45.00 |
$0.00 |
$0.00 |
| 0026 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
150.000 |
150.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
| 0027 |
GUARDRAIL ANCHOR UNIT (TYPE B) |
623(F) 4447 |
EA |
2.000 |
2.000 |
|
0.000 |
$800.00 |
$0.00 |
$0.00 |
| 0028 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,400.00 |
$0.00 |
$0.00 |
| 0029 |
CONSTRUCTION STAKING LEVEL II |
642(B) 0096 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$2,500.00 |
$0.00 |
$0.00 |
| Subtotals For Category 0100/ROADWAY |
$301,751.00 |
$487,643.10 |
|
| Fed/State Project Number: STPY-242C(001) |
Project: 27729(04) |
Category: 0300/TRAFFIC |
| 0030 |
(PL)REMOVE & RESET EXISTING SIGNS |
805(D) 8756 |
EA |
10.000 |
10.000 |
|
0.000 |
$125.00 |
$0.00 |
$0.00 |
| 0031 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) |
853 9069 |
EA |
12.000 |
12.000 |
|
0.000 |
$10.00 |
$0.00 |
$0.00 |
| 0032 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) |
855(A) 8812 |
LF |
30,000.000 |
30,000.000 |
|
0.000 |
$0.50 |
$0.00 |
$0.00 |
| 0033 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) |
855(A) 8814 |
LF |
600.000 |
600.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
| 0034 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) |
855(A) 8825 |
LF |
70.000 |
70.000 |
|
0.000 |
$7.00 |
$0.00 |
$0.00 |
| 0035 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) |
855(B) 8818 |
EA |
2.000 |
2.000 |
|
0.000 |
$90.00 |
$0.00 |
$0.00 |
| 0036 |
TRAFFIC STRIPE(PLASTIC)(WORDS) |
855(B) 8821 |
EA |
1.000 |
1.000 |
|
0.000 |
$200.00 |
$0.00 |
$0.00 |
| 0037 |
CONSTRUCTION TRAFFIC CONTROL |
880(J) 8905 |
LSUM |
1.000 |
1.000 |
0.400 |
0.700 |
$12,000.00 |
$4,800.00 |
$8,400.00 |
| Subtotals For Category 0300/TRAFFIC |
$4,800.00 |
$8,400.00 |
|
| Subtotals For Project STPY-242C(001) /27729(04) |
$306,551.00 |
$496,043.10 |