Contract ID: | 120269 | Estimate Number: | 0017 , Final | Spec Year: | 2009 | |||
Primary JP: | 28932(04) | Residency: | TETRA TECH (08002) | Contract No: | 810383 | |||
Date Created: | 10/16/2015 | Contractor FEI: | 731452899 | Account No: | 400800 |
Project Number(s): | BRFY-219C(005) | ||||||||
Contract Description: | JOINT SEAL/REPAIR US-75/SH-11/SH-18/SH-99: AT MULTIPLE LOCATIONS IN DIVISION VIII. | ||||||||
Primary County: | CREEK | ||||||||
Name of Road: | MULTIPLE LOCATIONS | ||||||||
Prime Contractor: | PBX CORPORATION | Time Charged: | 165.00 | ||||||
P.O. BOX 644 | Time Allowed: | 111.00 | |||||||
SAPULPA , OK 74067 | Percent Time: | 148.65 % |
Paid To Date: | $1,618,678.21 | Payable This Statement: | $2,000.00 |
CONTRACTOR AFFIDAVIT |
STATE OF ___________________ | ) | |
) § | ||
COUNTY OF __________________ | ) |
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct. |
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or |
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid. |
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them. |
Further affiant sayeth not. |
PBX CORPORATION |
_________________________________________________ |
Affiant Signature |
_________________________________________________ |
Affiant Printed Name |
PE Seal |
_________________________________________________ |
Affiant Company Position |
Subscribed and sworn to before me this ______ day of ____________, 20____ |
My Commission Number: ____________ My Commission Expires: ______________ |
_________________________________________________ |
_________________________________________________ |
Professional Engineer Signature |
Oklahoma Department of Transportation |
Corporate Seal |
Notary Seal |
Contract ID: | 120269 | Estimate Number: | 0017 | Contract No: | 810383 | |||
Residency: | TETRA TECH (08002) | Estimate Type: | Final | Account No: | 400800 | |||
Project Number(s): | BRFY-219C(005) | ||||||||||||
Primary Job Piece No: | 28932(04) | ||||||||||||
Contract Description: | JOINT SEAL/REPAIR US-75/SH-11/SH-18/SH-99: AT MULTIPLE LOCATIONS IN DIVISION VIII. | ||||||||||||
Primary County: | CREEK | ||||||||||||
Name of Road: | MULTIPLE LOCATIONS | ||||||||||||
Prime Contractor: | PBX CORPORATION | ||||||||||||
P.O. BOX 644 | |||||||||||||
SAPULPA , OK 74067 | |||||||||||||
Surety Company: | WESTFIELD INSURANCE COMPANY | ||||||||||||
Date Let: | 08/16/2012 | NTP Effective Date: | 02/18/2013 | Pay Period: | 09/01/2015 TO 09/10/2015 |
Date Awarded: | 09/10/2012 | Date Work Began: | 01/09/2013 | Original Contract Time: | 90 |
Date Contract Executed: | 09/27/2012 | Date Time Stopped: | 09/15/2014 | Current Time Charged: | 165.00 |
Date NTP Issued: | 10/02/2012 | Completion Date: | 09/15/2014 | Current Time Allowed: | 111.00 |
General Liability Expires: | 10/05/2016 | Workman's Comp Expires: | 10/05/2016 | Percent Time Used: | 148.65 % |
Specification Year: | 2009 | ||||
Bid Amount: | $1,683,521.80 | Total to Date | Prev to Date | This Estimate | |||
Funds Available (Bid + Positive C/O): | $1,683,521.80 | Participating: | $1,659,178.21 | $1,657,178.21 | $2,000.00 | ||
Percent Complete: | 96.15 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
Unearned Balance: | $64,843.59 | Total Earnings: | $1,659,178.21 | $1,657,178.21 | $2,000.00 | ||
Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||||
Gross Earnings: | $1,659,178.21 | $1,657,178.21 | $2,000.00 | ||||
Other Adjustments: | $0.00 | $0.00 | $0.00 | ||||
Liq Dam/Disincentive: | $-40,500.00 | $-40,500.00 | $0.00 | ||||
TOTAL: | $1,618,678.21 | $1,616,678.21 | $2,000.00 |
Contract ID: | 120269 | Estimate Number: | 0017 | Primary JP: | 28932(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | Add'l Time, CLSM, Grooving | Approved | 04/15/2013 | 14.0 | $-333.02 |
002 | Finger Joints | Approved | 09/06/2013 | 7.0 | $-211.26 |
003 | FQCO | Approved | 09/03/2015 | 0.0 | $-23,799.32 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
No material stockpiles have been created for this contract. | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | ||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount |
System Application of Liquidated Damages | 0009 | --6.0 | $750.00 | $-4,500.00 |
System Application of Liquidated Damages | 0010 | --1.0 | $750.00 | $-750.00 |
System Application of Liquidated Damages | 0011 | --5.0 | $750.00 | $-3,750.00 |
System Application of Liquidated Damages | 0012 | --13 | $750.00 | $-9,750.00 |
System Application of Liquidated Damages | 0013 | --18 | $750.00 | $-13,500.00 |
System Application of Liquidated Damages | 0014 | --7.0 | $750.00 | $-5,250.00 |
System Application of Liquidated Damages | 0015 | --4.0 | $750.00 | $-3,000.00 | Subtotals For Liquidated Damages | $-40,500.00 |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
No line item adjustments have been created on this contract. | Subtotals For Line Item Adjustments | $0.00 |
MILESTONE INFORMATION | |||||||||
Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
No milestones exist for this contract. |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total | ||||||
No milestones adjustments exist for this contract. | Subtotals For Milestones | $ |
Contract ID: | 120269 | Estimate Number: | 0017 | Primary JP: | 28932(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0200/BRIDGE 'A' SH 99 OVER CIMARRON RIVER | ||||||||
0001 | FOG SEAL | 407(A) 4659 | GAL | 250.000 | 250.000 | 0.000 | 250.000 | $6.00 | $0.00 | $1,500.00 |
0002 | TACK COAT | 407(B) 0250 | GAL | 375.000 | 375.000 | 0.000 | 375.000 | $8.00 | $0.00 | $3,000.00 |
0003 | CLSM BACKFILL | 501(G) 6309 | CY | 4.600 | 9.000 | 0.000 | 9.000 | $350.00 | $0.00 | $3,150.00 |
0004 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 56.000 | 56.000 | 56.000 | $20.00 | $0.00 | $1,120.00 | |
0005 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 9.400 | 9.400 | 9.400 | $500.00 | $0.00 | $4,700.00 | |
0006 | SILICONE CONSTRUCTION JOINT | 509 6386 | LF | 924.000 | 924.000 | 924.000 | $8.00 | $0.00 | $7,392.00 | |
0007 | CLASS AA CONCRETE | 509(A) 1326 | CY | 1.000 | 1.000 | 0.000 | 1.000 | $2,000.00 | $0.00 | $2,000.00 |
0008 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 0.000 | 0.000 | $25.00 | $0.00 | $0.00 | |
0009 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.000 | 0.000 | $70.00 | $0.00 | $0.00 | |
0010 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 220.000 | 173.870 | 173.870 | $480.00 | $0.00 | $83,457.60 | |
0011 | MASTIC ASPHALT JOINT MATERIAL | 535 6410 | CF | 11.000 | 11.000 | 11.000 | $600.00 | $0.00 | $6,600.00 | |
0012 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $500.00 | $0.00 | $500.00 | |
0013 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4520 | LSUM | 1.000 | 1.000 | 1.000 | $30,000.00 | $0.00 | $30,000.00 | |
0014 | (PL)REPLACE BRIDGE ITEM (TYPE A) | 545 4815 | EA | 6.000 | 6.000 | 6.000 | $800.00 | $0.00 | $4,800.00 | |
8010 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4520 | LSUM | 0.000 | 1.000 | 1.000 | $13,188.74 | $0.00 | $13,188.74 | |
Subtotals For Category 0200/BRIDGE 'A' SH 99 OVER CIMARRON RIVER | $0.00 | $161,408.34 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0201/BRIDGE 'B' US 75 OVER HARVARD & RR (EB) | ||||||||
0015 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 665.000 | 665.000 | 665.000 | $20.00 | $0.00 | $13,300.00 | |
0016 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 37.000 | 37.000 | 37.000 | $650.00 | $0.00 | $24,050.00 | |
0017 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 5.000 | 9.110 | 9.110 | $480.00 | $0.00 | $4,372.80 | |
0018 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $90,000.00 | $0.00 | $90,000.00 | |
0019 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4520 | LSUM | 1.000 | 1.000 | 1.000 | $185,000.00 | $0.00 | $185,000.00 | |
Subtotals For Category 0201/BRIDGE 'B' US 75 OVER HARVARD & RR (EB) | $0.00 | $316,722.80 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0202/BRIDGE 'C' US 75 OVER HARVARD & RR (WB) | ||||||||
0020 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 550.000 | 550.000 | 550.000 | $20.00 | $0.00 | $11,000.00 | |
0021 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 61.000 | 61.000 | 61.000 | $500.00 | $0.00 | $30,500.00 | |
0022 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 5.000 | 2.550 | 2.550 | $480.00 | $0.00 | $1,224.00 | |
0023 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4515 | EA | 1.000 | 1.000 | 1.000 | $35,000.00 | $0.00 | $35,000.00 | |
0024 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4520 | LSUM | 1.000 | 1.000 | 1.000 | $185,000.00 | $0.00 | $185,000.00 | |
0025 | (PL)REPAIR BRIDGE ITEM (TYPE C) | 540 4535 | EA | 1.000 | 1.000 | 1.000 | $2,000.00 | $0.00 | $2,000.00 | |
Subtotals For Category 0202/BRIDGE 'C' US 75 OVER HARVARD & RR (WB) | $0.00 | $264,724.00 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0203/BRIDGE 'D' SH 11 GILCREASE OVER US 75 | ||||||||
0026 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 315.000 | 315.000 | 315.000 | $20.00 | $0.00 | $6,300.00 | |
0027 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 25.000 | 25.000 | 25.000 | $500.00 | $0.00 | $12,500.00 | |
0028 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 60.750 | 60.750 | $25.00 | $0.00 | $1,518.75 | |
0029 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 1.000 | 1.000 | $70.00 | $0.00 | $70.00 | |
0030 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 2.000 | 0.260 | 0.260 | $480.00 | $0.00 | $124.80 | |
0031 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $85,000.00 | $0.00 | $85,000.00 | |
Subtotals For Category 0203/BRIDGE 'D' SH 11 GILCREASE OVER US 75 | $0.00 | $105,513.55 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0204/BRIDGE 'E' US 75 RAMP N-E OVER SH 11 | ||||||||
0032 | CLSM BACKFILL | 501(G) 6309 | CY | 1.200 | 0.000 | 0.000 | $550.00 | $0.00 | $0.00 | |
0033 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 208.000 | 208.000 | 208.000 | $20.00 | $0.00 | $4,160.00 | |
0034 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 5.800 | 5.800 | 5.800 | $550.00 | $0.00 | $3,190.00 | |
0035 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 30.000 | 30.000 | 30.000 | $25.00 | $0.00 | $750.00 | |
0036 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 1.000 | 1.000 | $70.00 | $0.00 | $70.00 | |
0037 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 1,590.000 | 1,590.000 | 1,590.000 | $15.00 | $0.00 | $23,850.00 | |
0038 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $35,000.00 | $0.00 | $35,000.00 | |
Subtotals For Category 0204/BRIDGE 'E' US 75 RAMP N-E OVER SH 11 | $0.00 | $67,020.00 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0205/BRIDGE 'F' US 75 OVER MOHAWK BLVD. (NB) | ||||||||
0039 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 264.000 | 264.000 | 264.000 | $20.00 | $0.00 | $5,280.00 | |
0040 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 40.500 | 40.500 | 40.500 | $500.00 | $0.00 | $20,250.00 | |
0041 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 75.170 | 75.170 | $25.00 | $0.00 | $1,879.25 | |
0042 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 1.000 | 1.000 | $70.00 | $0.00 | $70.00 | |
0043 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 30.000 | 21.290 | 21.290 | $480.00 | $0.00 | $10,219.20 | |
0044 | (SP)CARBON FIBER-REINFORCED POLYMER | 524(A) 6610 | SF | 790.000 | 868.000 | 868.000 | $30.00 | $0.00 | $26,040.00 | |
0045 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $3,100.00 | $0.00 | $3,100.00 | |
Subtotals For Category 0205/BRIDGE 'F' US 75 OVER MOHAWK BLVD. (NB) | $0.00 | $66,838.45 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0206/BRIDGE 'G' US 75 OVER MOHAWK BLVD. (SB) | ||||||||
0046 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 264.000 | 264.000 | 264.000 | $20.00 | $0.00 | $5,280.00 | |
0047 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 40.500 | 40.500 | 40.500 | $500.00 | $0.00 | $20,250.00 | |
0048 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 66.420 | 66.420 | $25.00 | $0.00 | $1,660.50 | |
0049 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 1.000 | 1.000 | $70.00 | $0.00 | $70.00 | |
0050 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 20.000 | 36.340 | 36.340 | $480.00 | $0.00 | $17,443.20 | |
0051 | (SP)CARBON FIBER-REINFORCED POLYMER | 524(A) 6610 | SF | 152.000 | 152.000 | 152.000 | $30.00 | $0.00 | $4,560.00 | |
0052 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $4,000.00 | $0.00 | $4,000.00 | |
Subtotals For Category 0206/BRIDGE 'G' US 75 OVER MOHAWK BLVD. (SB) | $0.00 | $53,263.70 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0207/BRIDGE 'H' US 75 OVER FLAT ROCK CREEK (NB) | ||||||||
0053 | CLSM BACKFILL | 501(G) 6309 | CY | 10.000 | 0.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
0054 | APPROACH SLAB | 504(A) 1304 | SY | 156.000 | 175.540 | 0.000 | 175.540 | $300.00 | $0.00 | $52,662.00 |
0055 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 263.000 | 263.000 | 263.000 | $20.00 | $0.00 | $5,260.00 | |
0056 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 4.500 | 4.500 | 4.500 | $600.00 | $0.00 | $2,700.00 | |
0057 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 0.000 | 0.000 | $25.00 | $0.00 | $0.00 | |
0058 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.000 | 0.000 | $70.00 | $0.00 | $0.00 | |
0059 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 5.000 | 1.940 | 1.940 | $480.00 | $0.00 | $931.20 | |
0060 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 1,100.000 | 1,100.000 | 1,100.000 | $15.00 | $0.00 | $16,500.00 | |
0061 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4515 | EA | 1.000 | 0.000 | 0.000 | $400.00 | $0.00 | $0.00 | |
0062 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4520 | LSUM | 1.000 | 1.000 | 1.000 | $30,000.00 | $0.00 | $30,000.00 | |
0063 | (PL)REPAIR BRIDGE ITEM (TYPE C) | 540 4530 | LSUM | 1.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
0064 | (PL)HIGH TENSION CABLE BARRIER - RE-TENSIONING | 628(F) 5185 | EA | 1.000 | 1.000 | 1.000 | $3,000.00 | $0.00 | $3,000.00 | |
8020 | SAW-CUT GROOVING | 504(B) 1305 | SY | 0.000 | 175.540 | 175.540 | $17.09 | $0.00 | $2,999.98 | |
Subtotals For Category 0207/BRIDGE 'H' US 75 OVER FLAT ROCK CREEK (NB) | $0.00 | $119,053.18 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0208/BRIDGE 'I' US 75 OVER FLAT ROCK CREEK (SB) | ||||||||
0065 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 215.000 | 215.000 | 215.000 | $20.00 | $0.00 | $4,300.00 | |
0066 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 8.500 | 8.500 | 8.500 | $500.00 | $0.00 | $4,250.00 | |
0067 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 30.000 | 0.000 | 0.000 | $25.00 | $0.00 | $0.00 | |
0068 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.000 | 0.000 | $70.00 | $0.00 | $0.00 | |
0069 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 900.000 | 900.000 | 900.000 | $15.00 | $0.00 | $13,500.00 | |
0070 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $3,000.00 | $0.00 | $3,000.00 | |
Subtotals For Category 0208/BRIDGE 'I' US 75 OVER FLAT ROCK CREEK (SB) | $0.00 | $25,050.00 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0209/BRIDGE 'J' SH 18 OVER COAL CREEK | ||||||||
0071 | STRUCTURAL STEEL | 506(A) 1322 | LB | 250.000 | 0.000 | 0.000 | $15.00 | $0.00 | $0.00 | |
0072 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 80.000 | 81.080 | 81.080 | $25.00 | $0.00 | $2,027.00 | |
0073 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 1.000 | 1.000 | 1.000 | $70.00 | $0.00 | $70.00 | |
0074 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 50.000 | 22.120 | 22.120 | $480.00 | $0.00 | $10,617.60 | |
0075 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4515 | EA | 1.000 | 1.000 | 1.000 | $2,100.00 | $0.00 | $2,100.00 | |
Subtotals For Category 0209/BRIDGE 'J' SH 18 OVER COAL CREEK | $0.00 | $14,814.60 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0210/BRIDGE 'K' SH 99 OVER PENN CREEK | ||||||||
0076 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 96.000 | 0.000 | 0.000 | $20.00 | $0.00 | $0.00 | |
0077 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 7.500 | 0.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0078 | STRUCTURAL STEEL | 506(A) 1322 | LB | 1,150.000 | 3,016.800 | 0.000 | 3,016.800 | $15.00 | $0.00 | $45,252.00 |
0079 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 27.330 | 27.330 | $25.00 | $0.00 | $683.25 | |
0080 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 1.000 | 0.000 | 1.000 | $70.00 | $0.00 | $70.00 |
0081 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 30.000 | 2.260 | 2.260 | $480.00 | $0.00 | $1,084.80 | |
0082 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 30.000 | 0.000 | 0.000 | $2.00 | $0.00 | $0.00 | |
0083 | SEALER RESIN | 523(B) 6560 | GAL | 0.500 | 0.000 | 0.000 | $50.00 | $0.00 | $0.00 | |
0084 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 503.000 | 503.000 | 503.000 | $15.00 | $0.00 | $7,545.00 | |
0085 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
0086 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4525 | EA | 1.000 | 1.000 | 1.000 | $8,000.00 | $0.00 | $8,000.00 | |
0087 | (PL)REPLACE BRIDGE ITEM (TYPE A) | 545 4810 | LSUM | 1.000 | 1.000 | 1.000 | $30,000.00 | $0.00 | $30,000.00 | |
8011 | CLSM BACKFILL | 501(G) 6309 | CY | 0.000 | 8.000 | 0.000 | 8.000 | $350.00 | $0.00 | $2,800.00 |
Subtotals For Category 0210/BRIDGE 'K' SH 99 OVER PENN CREEK | $0.00 | $105,435.05 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0300/TRAFFIC | ||||||||
0088 | (SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 823 8478 | SD | 28.000 | 76.000 | 76.000 | $310.00 | $0.00 | $23,560.00 | |
0089 | TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 856(A) 8530 | LF | 2,500.000 | 1,574.000 | 1,574.000 | $2.00 | $0.00 | $3,148.00 | |
0090 | CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 857(A) 8839 | LF | 2,500.000 | 4,434.500 | 4,434.500 | $0.75 | $0.00 | $3,325.88 | |
0091 | REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 857(C) 8851 | LF | 5,000.000 | 288.000 | 288.000 | $1.00 | $0.00 | $288.00 | |
0092 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 857(E) 8887 | EA | 5,000.000 | 0.000 | 0.000 | $0.50 | $0.00 | $0.00 | |
0093 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 857(F) 8006 | LF | 2,500.000 | 237.000 | 237.000 | $0.60 | $0.00 | $142.20 | |
0094 | (SP)CONST.ZONE IMPACT ATTEN. | 871(B) 8705 | SD | 180.000 | 76.000 | 76.000 | $30.00 | $0.00 | $2,280.00 | |
0095 | (PL)TRUCK MOUNTED ATTENUATOR | 876(A) 8482 | SD | 30.000 | 56.000 | 56.000 | $85.00 | $0.00 | $4,760.00 | |
0096 | DELIVER PORTABLE LONGITUDINAL BARRIER | 877(B) 8484 | LF | 3,500.000 | 2,480.000 | 2,480.000 | $28.00 | $0.00 | $69,440.00 | |
0097 | RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 877(C) 8486 | LF | 35,000.000 | 16,720.000 | 1,000.000 | 16,720.000 | $2.00 | $2,000.00 | $33,440.00 |
0098 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 180.000 | 121.000 | 121.000 | $5.00 | $0.00 | $605.00 | |
0099 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 2,880.000 | 2,492.000 | 2,492.000 | $0.03 | $0.00 | $74.76 | |
0100 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 2,340.000 | 1,557.000 | 1,557.000 | $0.05 | $0.00 | $77.85 | |
0101 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 2,970.000 | 5,041.000 | 5,041.000 | $0.08 | $0.00 | $403.28 | |
0102 | CONSTRUCTION BARRICADES(TYPE III) | 880(C) 8842 | SD | 1,080.000 | 962.000 | 962.000 | $0.03 | $0.00 | $28.86 | |
0103 | WING BARRICADES | 880(C) 8848 | SD | 540.000 | 1,692.000 | 1,692.000 | $3.00 | $0.00 | $5,076.00 | |
0104 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 3,780.000 | 6,407.000 | 6,407.000 | $0.03 | $0.00 | $192.21 | |
0105 | DRUMS | 880(F) 8878 | SD | 2,250.000 | 4,873.000 | 4,873.000 | $2.50 | $0.00 | $12,182.50 | |
0106 | CHANNELIZER CONES | 880(G) 8890 | SD | 3,150.000 | 7,580.000 | 7,580.000 | $2.50 | $0.00 | $18,950.00 | |
0107 | FLAGGER | 880(I) 8902 | SD | 14.000 | 0.000 | 0.000 | $265.00 | $0.00 | $0.00 | |
0108 | TRAFFIC SURVEILLANCE, POLICE | 880(L) 8911 | HOUR | 500.000 | 909.000 | 909.000 | $60.00 | $0.00 | $54,540.00 | |
0109 | PORT.CHANGEABLE MESSAGE SIGN | 882(A) 8306 | SD | 180.000 | 162.000 | 162.000 | $6.00 | $0.00 | $972.00 | |
Subtotals For Category 0300/TRAFFIC | $2,000.00 | $233,486.54 | ||||||||
Fed/State Project Number: BRFY-219C(005) | Project: 28932(04) | Category: 0640/CONSTRUCTION | ||||||||
0110 | MOBILIZATION | 641 1399 | LSUM | 1.000 | 1.000 | 1.000 | $125,848.00 | $0.00 | $125,848.00 | |
Subtotals For Category 0640/CONSTRUCTION | $0.00 | $125,848.00 | ||||||||
Subtotals For Project BRFY-219C(005) /28932(04) | $2,000.00 | $1,659,178.21 |