Fed/State Project Number: IMY-0035-1(161)003 |
Project: 28584(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$47,000.00 |
$0.00 |
$47,000.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
18,198.000 |
18,198.000 |
10,999.800 |
18,198.000 |
$5.00 |
$54,999.00 |
$90,990.00 |
0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
12,723.000 |
12,723.000 |
1,662.000 |
12,723.000 |
$10.00 |
$16,620.00 |
$127,230.00 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.200 |
1.000 |
$52,000.00 |
$10,400.00 |
$52,000.00 |
0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
4,311.000 |
4,311.000 |
|
4,388.000 |
$1.32 |
$0.00 |
$5,792.16 |
0006 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
192.000 |
192.000 |
|
217.000 |
$10.44 |
$0.00 |
$2,265.48 |
0007 |
TEMPORARY ROCK FILTER DAM TYPE 2 |
221(G) 0151 |
CY |
9.000 |
9.000 |
|
0.000 |
$76.39 |
$0.00 |
$0.00 |
0008 |
(PL)TEMPORARY INLET SEDIMENT FILTER |
221(H) 0450 |
EA |
3.000 |
3.000 |
|
0.000 |
$228.98 |
$0.00 |
$0.00 |
0009 |
DITCH LINER PROTECTION |
229 4318 |
LF |
100.000 |
100.000 |
|
0.000 |
$8.52 |
$0.00 |
$0.00 |
0010 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
42,042.000 |
42,042.000 |
80,904.930 |
80,904.930 |
$1.35 |
$109,221.66 |
$109,221.66 |
0011 |
SEEDING METHOD A |
232(A) 2813 |
AC |
1.000 |
1.000 |
|
0.000 |
$765.74 |
$0.00 |
$0.00 |
0012 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
8.000 |
8.000 |
|
0.000 |
$604.92 |
$0.00 |
$0.00 |
0013 |
MOWING |
241 2832 |
AC |
18.000 |
18.000 |
|
0.000 |
$100.11 |
$0.00 |
$0.00 |
0014 |
CEMENT KILN DUST |
307(B) 4210 |
TON |
1,164.000 |
0.000 |
|
0.000 |
$32.00 |
$0.00 |
$0.00 |
0015 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
26,424.000 |
26,424.000 |
284.440 |
22,159.060 |
$1.90 |
$540.44 |
$42,102.22 |
0016 |
PRIME COAT |
408 5774 |
GAL |
7,770.000 |
7,770.000 |
|
0.000 |
$2.50 |
$0.00 |
$0.00 |
0017 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
5,574.000 |
22.000 |
|
0.000 |
$58.33 |
$0.00 |
$0.00 |
0018 |
SUPERPAVE, TYPE S4(PG 70-28 OK) |
411(C) 5955 |
TON |
274.000 |
33.000 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0019 |
RUMBLE STRIP-METHOD PCC-CON |
413(C) 4868 |
LF |
1,476.000 |
1,476.000 |
1,360.000 |
1,360.000 |
$1.49 |
$2,026.40 |
$2,026.40 |
0020 |
P.C.CONCRETE PAVEMENT(PLACEMENT) |
414(A) 0210 |
SY |
6,476.000 |
7,306.540 |
|
7,285.500 |
$9.00 |
$0.00 |
$65,569.50 |
0021 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) |
414(B) 5725 |
SY |
15,361.000 |
16,606.810 |
0.000 |
16,049.580 |
$14.00 |
$0.00 |
$224,694.12 |
0022 |
P.C. CONCRETE FOR PAVEMENT |
414(G) 5275 |
CY |
6,361.000 |
6,361.000 |
|
6,109.520 |
$122.00 |
$0.00 |
$745,361.44 |
0023 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
100.000 |
100.000 |
|
100.000 |
$12.12 |
$0.00 |
$1,212.00 |
0024 |
CLSM BACKFILL |
501(G) 6315 |
CY |
311.000 |
311.000 |
|
292.000 |
$107.33 |
$0.00 |
$31,340.36 |
0025 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
369.000 |
369.000 |
|
379.780 |
$375.00 |
$0.00 |
$142,417.50 |
0026 |
CLASS A CONCRETE, SMALL STRUCTURES |
509(C) 0322 |
CY |
8.000 |
8.000 |
|
8.000 |
$1,357.88 |
$0.00 |
$10,863.04 |
0027 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
33.000 |
33.000 |
36.810 |
36.810 |
$266.25 |
$9,800.66 |
$9,800.66 |
0028 |
REINFORCING STEEL |
511(A) 0332 |
LB |
71,377.000 |
71,377.000 |
|
72,966.800 |
$0.83 |
$0.00 |
$60,562.44 |
0029 |
CONCRETE CURB (6" BARRIER-INTEGRAL) |
609(A) 0300 |
LF |
170.000 |
170.000 |
|
222.000 |
$3.63 |
$0.00 |
$805.86 |
0030 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) |
609(B) 1525 |
LF |
131.000 |
131.000 |
|
122.000 |
$11.22 |
$0.00 |
$1,368.84 |
0031 |
MANHOLE (4' DIAMETER) |
611(A) 2657 |
EA |
2.000 |
2.000 |
|
2.000 |
$3,494.42 |
$0.00 |
$6,988.84 |
0032 |
MANHOLE (5' DIAMETER) |
611(A) 2658 |
EA |
1.000 |
1.000 |
|
1.000 |
$4,126.69 |
$0.00 |
$4,126.69 |
0033 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) |
611(B) 2680 |
VF |
2.000 |
2.000 |
|
1.900 |
$498.01 |
$0.00 |
$946.22 |
0034 |
ADD'L.DEPTH IN MANHOLE (5' DIAMETER) |
611(B) 2681 |
VF |
3.000 |
3.000 |
|
2.400 |
$544.51 |
$0.00 |
$1,306.82 |
0035 |
REPLACEMENT OF MANHOLE FRAME & COVER |
611(C) 4215 |
EA |
7.000 |
7.000 |
|
7.000 |
$376.34 |
$0.00 |
$2,634.38 |
0036 |
INLET (SMD-TYPE 2) |
611(G) 6002 |
EA |
3.000 |
3.000 |
|
3.000 |
$2,867.85 |
$0.00 |
$8,603.55 |
0037 |
JUNCTION BOXES |
611(L) 0487 |
CF |
253.000 |
253.000 |
|
252.900 |
$80.71 |
$0.00 |
$20,411.56 |
0038 |
18" R.C.PIPE CLASS III |
613(A) 0491 |
LF |
74.000 |
74.000 |
|
73.670 |
$61.07 |
$0.00 |
$4,499.03 |
0039 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
580.000 |
580.000 |
|
552.000 |
$70.40 |
$0.00 |
$38,860.80 |
0040 |
30" R.C.PIPE CLASS III |
613(A) 0493 |
LF |
619.000 |
619.000 |
|
618.540 |
$78.38 |
$0.00 |
$48,481.17 |
0041 |
36" R.C.PIPE CLASS III |
613(A) 0494 |
LF |
119.000 |
119.000 |
|
119.000 |
$91.99 |
$0.00 |
$10,946.81 |
0042 |
42" R.C.PIPE CLASS III |
613(A) 0495 |
LF |
487.000 |
487.000 |
|
484.620 |
$106.11 |
$0.00 |
$51,423.03 |
0043 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
200.000 |
200.000 |
|
0.000 |
$13.61 |
$0.00 |
$0.00 |
0044 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1096 |
LF |
50.000 |
50.000 |
|
0.000 |
$10.21 |
$0.00 |
$0.00 |
0045 |
24" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5730 |
EA |
4.000 |
4.000 |
|
4.000 |
$2,305.84 |
$0.00 |
$9,223.36 |
0046 |
TYPE CC4 CULVERT END TREATMENT |
613(M) 7193 |
EA |
2.000 |
2.000 |
|
2.000 |
$1,597.50 |
$0.00 |
$3,195.00 |
0047 |
TYPE D6 CULVERT END TREATMENT |
613(M) 7199 |
EA |
1.000 |
1.000 |
|
1.000 |
$1,171.50 |
$0.00 |
$1,171.50 |
0048 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$29,134.41 |
$0.00 |
$29,134.41 |
0049 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
9,333.000 |
9,333.000 |
|
8,792.440 |
$3.69 |
$0.00 |
$32,444.11 |
0050 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
1,455.000 |
1,455.000 |
|
1,539.120 |
$4.80 |
$0.00 |
$7,387.78 |
0051 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
878.000 |
878.000 |
|
879.000 |
$3.40 |
$0.00 |
$2,988.60 |
0052 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
5,545.000 |
5,545.000 |
|
5,413.000 |
$5.61 |
$0.00 |
$30,366.93 |
0053 |
FENCE-STYLE WWF |
624(A) 4281 |
LF |
5,624.000 |
5,624.000 |
3,413.000 |
5,326.000 |
$10.84 |
$36,996.92 |
$57,733.84 |
0054 |
GATE, GALVANIZED STEEL |
624(D) 4470 |
EA |
5.000 |
5.000 |
6.000 |
6.000 |
$724.20 |
$4,345.20 |
$4,345.20 |
8000 |
CEMENT TREATED BASE |
317 4270 |
SY |
0.000 |
24,052.000 |
|
21,425.280 |
$8.50 |
$0.00 |
$182,114.88 |
8002 |
P.C. CONCRETE FOR PAVEMENT |
414(G) 5275 |
CY |
0.000 |
463.700 |
490.170 |
490.170 |
$90.19 |
$44,208.43 |
$44,208.43 |
8003 |
PORTLAND CEMENT |
307(C) 4220 |
TON |
0.000 |
465.600 |
|
355.450 |
$80.00 |
$0.00 |
$28,436.00 |
8004 |
INCENTIVE FOR EARLY COMPLETION |
108 0174 |
LSUM |
0.000 |
1.000 |
1.000 |
1.000 |
$25,000.00 |
$25,000.00 |
$25,000.00 |
8005 |
INCENTIVE FOR EARLY COMPLETION |
108 0174 |
LSUM |
0.000 |
1.000 |
1.000 |
1.000 |
$25,000.00 |
$25,000.00 |
$25,000.00 |
Subtotals For Category 0100/ROADWAY |
$339,158.71 |
$2,454,602.62 |
|
Fed/State Project Number: IMY-0035-1(161)003 |
Project: 28584(04) |
Category: 0300/TRAFFIC SIGNALS |
0055 |
2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8310 |
LF |
305.000 |
305.000 |
|
302.000 |
$19.17 |
$0.00 |
$5,789.34 |
0056 |
2" PVC SCH.40 PLASTIC CONDUIT BORED |
802(B) 8340 |
LF |
450.000 |
450.000 |
|
205.000 |
$15.98 |
$0.00 |
$3,275.90 |
0057 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8342 |
LF |
1,185.000 |
1,185.000 |
|
1,365.000 |
$4.26 |
$0.00 |
$5,814.90 |
0058 |
3" PVC SCH.40 PLASTIC CONDUIT BORED |
802(B) 8344 |
LF |
180.000 |
180.000 |
|
171.000 |
$19.17 |
$0.00 |
$3,278.07 |
0059 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8346 |
LF |
55.000 |
55.000 |
|
50.000 |
$8.52 |
$0.00 |
$426.00 |
0060 |
JUNCTION BOX(6" X 6" X 4") |
802(E) 8370 |
EA |
2.000 |
2.000 |
|
0.000 |
$532.50 |
$0.00 |
$0.00 |
0061 |
PULL BOX(SIZE I) |
803(A) 8065 |
EA |
11.000 |
11.000 |
|
11.000 |
$319.50 |
$0.00 |
$3,514.50 |
0062 |
PULL BOX(SIZE II) |
803(A) 8066 |
EA |
2.000 |
2.000 |
|
2.000 |
$372.75 |
$0.00 |
$745.50 |
0063 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
153.000 |
153.000 |
|
17.500 |
$426.00 |
$0.00 |
$7,455.00 |
0064 |
REINFORCING STEEL |
804(B) 2916 |
LB |
2,287.000 |
2,287.000 |
|
2,520.300 |
$1.33 |
$0.00 |
$3,352.00 |
0065 |
32'MH POLE 35'TS & 10'LMA(G.STL.) |
806(A) 8311 |
EA |
1.000 |
1.000 |
|
3.000 |
$6,207.89 |
$0.00 |
$18,623.67 |
0066 |
32'MH POLE 40'TS & 10'LMA(G.STL.) |
806(A) 8312 |
EA |
2.000 |
2.000 |
|
0.000 |
$7,033.26 |
$0.00 |
$0.00 |
0067 |
32'MH POLE 45'TS & 10'LMA(G.STL.) |
806(A) 8313 |
EA |
1.000 |
1.000 |
|
1.000 |
$8,646.74 |
$0.00 |
$8,646.74 |
0068 |
POLE & 20' TS MST.ARM(G.STL.) |
806(A) 8724 |
EA |
1.000 |
1.000 |
|
1.000 |
$3,084.24 |
$0.00 |
$3,084.24 |
0069 |
POLE & 35' TS MST.ARM(G.STL.) |
806(A) 8730 |
EA |
1.000 |
1.000 |
|
1.000 |
$5,301.57 |
$0.00 |
$5,301.57 |
0070 |
ROADWAY LUMINAIRE |
809(A) 8090 |
EA |
5.000 |
5.000 |
|
4.000 |
$372.75 |
$0.00 |
$1,491.00 |
0071 |
SERVICE POLE |
810(A) 3118 |
EA |
2.000 |
2.000 |
|
2.000 |
$532.50 |
$0.00 |
$1,065.00 |
0072 |
1/C NO.6 ELECTRICAL CONDUCTOR |
811 8040 |
LF |
2,175.000 |
2,175.000 |
|
907.000 |
$1.07 |
$0.00 |
$970.49 |
0073 |
1/C NO.10 ELECTRICAL CONDUCTOR |
811 8044 |
LF |
1,010.000 |
1,010.000 |
|
376.000 |
$0.43 |
$0.00 |
$161.68 |
0074 |
(SP)MASTER CONTROLLER |
824(A) 8340 |
EA |
1.000 |
1.000 |
|
1.000 |
$3,887.25 |
$0.00 |
$3,887.25 |
0075 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY |
825 8550 |
EA |
2.000 |
2.000 |
|
2.000 |
$26,897.64 |
$0.00 |
$53,795.28 |
0076 |
(PL)DETECTION SYSTEM (VIDEO) |
828 8132 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$35,007.62 |
$0.00 |
$35,007.62 |
0077 |
1WAY 3SEC. ADJ. SIG. HD. S-6 |
831 8231 |
EA |
11.000 |
11.000 |
|
12.000 |
$532.50 |
$0.00 |
$6,390.00 |
0078 |
1WAY 3SEC. ADJ. SIG. HD. S-10 |
831 8262 |
EA |
2.000 |
2.000 |
|
2.000 |
$553.80 |
$0.00 |
$1,107.60 |
0079 |
1WAY 5SEC. ADJ. SIG. HD. S-19 |
831 8286 |
EA |
1.000 |
1.000 |
|
1.000 |
$905.25 |
$0.00 |
$905.25 |
0080 |
BACKPLATE |
833 3030 |
EA |
14.000 |
14.000 |
|
14.000 |
$74.55 |
$0.00 |
$1,043.70 |
0081 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8207 |
LF |
290.000 |
290.000 |
|
997.000 |
$1.33 |
$0.00 |
$1,326.01 |
0082 |
9/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8209 |
LF |
245.000 |
245.000 |
|
297.000 |
$1.86 |
$0.00 |
$552.42 |
0083 |
12/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8210 |
LF |
225.000 |
225.000 |
|
186.000 |
$2.40 |
$0.00 |
$446.40 |
0084 |
UNDERGROUND COMMUNICATION CABLE |
834(C) 8359 |
LF |
1,120.000 |
1,120.000 |
1,183.000 |
1,183.000 |
$1.28 |
$1,514.24 |
$1,514.24 |
0085 |
MAST ARM MOUNTED SIGNS(ALUMINUM) |
850(C) 8118 |
SF |
69.000 |
69.000 |
|
69.000 |
$42.60 |
$0.00 |
$2,939.40 |
Subtotals For Category 0300/TRAFFIC SIGNALS |
$1,514.24 |
$181,910.77 |
|
Fed/State Project Number: IMY-0035-1(161)003 |
Project: 28584(04) |
Category: 0301/TRAFFIC SIGNING & STRIPING |
0086 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
14.000 |
14.000 |
|
11.600 |
$319.50 |
$0.00 |
$3,706.20 |
0087 |
REINFORCING STEEL |
804(B) 2916 |
LB |
1,996.000 |
1,996.000 |
|
1,738.000 |
$1.28 |
$0.00 |
$2,224.64 |
0088 |
(PL)REMOVAL OF EXISTING SIGNS |
805(A) 8724 |
EA |
2.000 |
2.000 |
|
2.000 |
$69.23 |
$0.00 |
$138.46 |
0089 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
195.000 |
195.000 |
8.000 |
202.310 |
$14.91 |
$119.28 |
$3,016.44 |
0090 |
EXTRUDED ALUMINUM PANEL SIGNS |
850(B) 8112 |
SF |
377.000 |
377.000 |
|
376.500 |
$14.91 |
$0.00 |
$5,613.62 |
0091 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST |
851(A) 3206 |
LF |
45.000 |
45.000 |
|
33.000 |
$13.85 |
$0.00 |
$457.05 |
0092 |
6"@20 GALV.STEEL WIDE FLANGE BEAM POST |
851(A) 3208 |
LF |
260.000 |
260.000 |
|
168.168 |
$21.30 |
$0.00 |
$3,581.98 |
0093 |
2 1/2"@5.79 GALV.STEEL PIPE POST |
851(B) 3217 |
LF |
319.000 |
319.000 |
|
320.834 |
$14.91 |
$0.00 |
$4,783.63 |
0094 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) |
856(A) 8530 |
LF |
17,285.000 |
17,285.000 |
1,632.000 |
14,448.000 |
$0.66 |
$1,077.12 |
$9,535.68 |
0095 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) |
856(A) 8535 |
LF |
2,327.000 |
2,327.000 |
|
2,456.000 |
$1.07 |
$0.00 |
$2,627.92 |
0096 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) |
856(A) 8540 |
LF |
6,436.000 |
6,436.000 |
|
6,904.000 |
$1.49 |
$0.00 |
$10,286.96 |
0097 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) |
856(A) 8548 |
LF |
1,922.000 |
1,922.000 |
|
2,188.000 |
$2.13 |
$0.00 |
$4,660.44 |
0098 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) |
856(A) 8555 |
LF |
147.000 |
147.000 |
|
126.000 |
$4.15 |
$0.00 |
$522.90 |
0099 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) |
856(B) 8860 |
EA |
9.000 |
9.000 |
|
11.000 |
$213.00 |
$0.00 |
$2,343.00 |
0100 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
11,746.000 |
11,746.000 |
1,632.000 |
7,246.000 |
$0.53 |
$864.96 |
$3,840.38 |
0101 |
PAVEMENT MARKING REMOVAL(ARROWS) |
857(F) 8007 |
EA |
6.000 |
6.000 |
|
6.000 |
$37.28 |
$0.00 |
$223.68 |
0102 |
PAVEMENT MARKING REMOVAL(WORDS) |
857(F) 8008 |
EA |
3.000 |
3.000 |
|
3.000 |
$69.23 |
$0.00 |
$207.69 |
8001 |
CONSTRUCTION TRAFF.STR.(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
0.000 |
8,000.000 |
9,526.000 |
9,526.000 |
$0.16 |
$1,524.16 |
$1,524.16 |
Subtotals For Category 0301/TRAFFIC SIGNING & STRIPING |
$3,585.52 |
$59,294.83 |
|
Fed/State Project Number: IMY-0035-1(161)003 |
Project: 28584(04) |
Category: 0303/TRAFFIC CONTROL |
0114 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) |
857(C) 8851 |
LF |
10,978.000 |
2,978.000 |
-9,526.000 |
0.000 |
$0.80 |
$-7,620.80 |
$0.00 |
0115 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
10,978.000 |
10,978.000 |
|
9,341.000 |
$0.37 |
$0.00 |
$3,456.17 |
0116 |
(SP)CONST.ZONE IMPACT ATTEN. |
871(B) 8705 |
SD |
225.000 |
225.000 |
14.000 |
280.000 |
$8.52 |
$119.28 |
$2,385.60 |
0117 |
(PL)TRUCK MOUNTED ATTENUATOR |
876(A) 8482 |
SD |
10.000 |
10.000 |
|
0.000 |
$42.60 |
$0.00 |
$0.00 |
0118 |
DELIVER PORTABLE LONGITUDINAL BARRIER |
877(B) 8484 |
LF |
5,600.000 |
5,600.000 |
1,112.000 |
5,560.000 |
$30.55 |
$33,971.60 |
$169,858.00 |
0119 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER |
877(C) 8486 |
LF |
825.000 |
825.000 |
|
825.000 |
$18.26 |
$0.00 |
$15,064.50 |
0120 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
150.000 |
150.000 |
|
38.000 |
$2.13 |
$0.00 |
$80.94 |
0121 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
3,975.000 |
3,975.000 |
|
3,372.000 |
$0.53 |
$0.00 |
$1,787.16 |
0122 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
2,100.000 |
2,100.000 |
|
2,155.000 |
$1.07 |
$0.00 |
$2,305.85 |
0123 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
4,575.000 |
4,575.000 |
|
4,778.000 |
$1.07 |
$0.00 |
$5,112.46 |
0124 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
2,025.000 |
2,025.000 |
|
2,764.000 |
$3.20 |
$0.00 |
$8,844.80 |
0125 |
WING BARRICADES |
880(C) 8848 |
SD |
675.000 |
675.000 |
|
1,416.000 |
$3.20 |
$0.00 |
$4,531.20 |
0126 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
2,175.000 |
2,175.000 |
|
8,557.000 |
$0.69 |
$0.00 |
$5,904.33 |
0127 |
DRUMS |
880(F) 8878 |
SD |
14,850.000 |
14,850.000 |
|
8,858.000 |
$0.05 |
$0.00 |
$442.90 |
0128 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
750.000 |
750.000 |
|
4,092.000 |
$0.02 |
$0.00 |
$81.84 |
0129 |
TRAFFIC SURVEILLANCE, POLICE |
880(L) 8911 |
HOUR |
300.000 |
300.000 |
|
37.000 |
$59.46 |
$0.00 |
$2,200.02 |
0130 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
750.000 |
750.000 |
21.000 |
448.000 |
$4.26 |
$89.46 |
$1,908.48 |
Subtotals For Category 0303/TRAFFIC CONTROL |
$26,559.54 |
$223,964.25 |
|