Fed/State Project Number: NHY-022N(157) |
Project: 21733(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$25,000.00 |
$0.00 |
$25,000.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
62,102.000 |
62,102.000 |
0.000 |
50,735.000 |
$6.65 |
$0.00 |
$337,387.75 |
0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
28,666.000 |
28,666.000 |
0.000 |
8,000.000 |
$0.75 |
$0.00 |
$6,000.00 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.500 |
$15,000.00 |
$0.00 |
$7,500.00 |
0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
1,650.000 |
1,650.000 |
0.000 |
635.000 |
$1.29 |
$0.00 |
$819.15 |
0006 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
238.000 |
238.000 |
|
0.000 |
$11.66 |
$0.00 |
$0.00 |
0007 |
TEMPORARY ROCK FILTER DAM TYPE 1 |
221(G) 0150 |
CY |
6.000 |
6.000 |
|
0.000 |
$112.00 |
$0.00 |
$0.00 |
0008 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
43,619.000 |
43,619.000 |
|
0.000 |
$1.22 |
$0.00 |
$0.00 |
0009 |
WATERING |
230(F) 2812 |
KGAL |
3,490.000 |
3,490.000 |
|
0.000 |
$4.92 |
$0.00 |
$0.00 |
0010 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
17.000 |
17.000 |
|
0.000 |
$682.00 |
$0.00 |
$0.00 |
0011 |
FERTILIZING (10-20-10) |
234(A) 2824 |
TON |
5.000 |
5.000 |
|
0.000 |
$788.00 |
$0.00 |
$0.00 |
0012 |
FERTILIZING (18-46-0) |
234(A) 4409 |
TON |
1.000 |
1.000 |
|
0.000 |
$788.00 |
$0.00 |
$0.00 |
0013 |
MOWING |
241 2832 |
AC |
17.000 |
17.000 |
|
0.000 |
$96.12 |
$0.00 |
$0.00 |
0014 |
AGGREGATE BASE TYPE B |
303(B) 2110 |
CY |
6,067.000 |
6,067.000 |
1,932.330 |
1,932.330 |
$42.00 |
$81,157.86 |
$81,157.86 |
0015 |
SEPARATOR FABRIC |
325 5271 |
SY |
22,396.000 |
22,396.000 |
7,280.800 |
7,280.800 |
$1.00 |
$7,280.80 |
$7,280.80 |
0016 |
GEOGRID REINFORCEMENT |
326(B) 0100 |
SY |
19,994.000 |
19,994.000 |
6,499.670 |
6,499.670 |
$1.50 |
$9,749.51 |
$9,749.51 |
0017 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
2,720.000 |
2,720.000 |
1,084.360 |
1,084.360 |
$22.00 |
$23,855.92 |
$23,855.92 |
0018 |
TACK COAT |
407(B) 0250 |
GAL |
3,297.000 |
3,297.000 |
|
0.000 |
$4.50 |
$0.00 |
$0.00 |
0019 |
PRIME COAT |
408 5774 |
GAL |
8,311.000 |
8,311.000 |
|
0.000 |
$7.25 |
$0.00 |
$0.00 |
0020 |
SUPERPAVE, TYPE S3(PG 76-28 OK) |
411(B) 5935 |
TON |
1,453.000 |
1,453.000 |
|
0.000 |
$94.00 |
$0.00 |
$0.00 |
0021 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
6,867.000 |
6,867.000 |
|
0.000 |
$82.50 |
$0.00 |
$0.00 |
0022 |
SUPERPAVE, TYPE S4(PG 76-28 OK) |
411(C) 5950 |
TON |
969.000 |
969.000 |
|
0.000 |
$103.50 |
$0.00 |
$0.00 |
0023 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
1,581.000 |
1,581.000 |
|
0.000 |
$96.50 |
$0.00 |
$0.00 |
0024 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
331.000 |
331.000 |
|
0.000 |
$225.00 |
$0.00 |
$0.00 |
0025 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
310.000 |
310.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
0026 |
24" CORR. GALV. STEEL PIPE |
613(B) 0690 |
LF |
420.000 |
420.000 |
|
0.000 |
$25.00 |
$0.00 |
$0.00 |
0027 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 0450 |
LF |
988.000 |
988.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0028 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1096 |
LF |
330.000 |
330.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0029 |
TYPE B4 CULVERT END TREATMENT |
613(M) 7187 |
EA |
1.000 |
1.000 |
|
0.000 |
$900.00 |
$0.00 |
$0.00 |
0030 |
TYPE A6 CULVERT END TREATMENT |
613(M) 7196 |
EA |
4.000 |
4.000 |
|
0.000 |
$900.00 |
$0.00 |
$0.00 |
0031 |
TYPE B6 CULVERT END TREATMENT |
613(M) 7197 |
EA |
13.000 |
13.000 |
|
0.000 |
$850.00 |
$0.00 |
$0.00 |
0032 |
OUTLET LATERAL HEADWALL |
613(Q) 5946 |
EA |
1.000 |
1.000 |
|
0.000 |
$600.00 |
$0.00 |
$0.00 |
0033 |
PIPE UNDERDRAIN COVER MAT'L. |
613(U) 1100 |
CY |
113.000 |
113.000 |
|
0.000 |
$32.50 |
$0.00 |
$0.00 |
0034 |
TRENCH EXCAVATION |
613(V) 1180 |
CY |
396.000 |
396.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0035 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$10,500.00 |
$0.00 |
$10,500.00 |
0036 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
12,641.000 |
12,641.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0037 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
12,641.000 |
12,641.000 |
|
0.000 |
$1.40 |
$0.00 |
$0.00 |
0038 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
1,500.000 |
1,500.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0039 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
1,944.000 |
1,944.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0040 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
963.000 |
963.000 |
|
0.000 |
$12.85 |
$0.00 |
$0.00 |
0041 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
4.000 |
4.000 |
|
0.000 |
$1,900.00 |
$0.00 |
$0.00 |
0042 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
4.000 |
4.000 |
|
0.000 |
$1,750.00 |
$0.00 |
$0.00 |
0043 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
3,210.000 |
3,210.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
0044 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
2.000 |
2.000 |
|
0.000 |
$75.00 |
$0.00 |
$0.00 |
0045 |
MAILBOX |
629(C) 4960 |
EA |
2.000 |
2.000 |
|
0.000 |
$25.00 |
$0.00 |
$0.00 |
0046 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
2.000 |
2.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0047 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) |
853 9069 |
EA |
26.000 |
26.000 |
|
0.000 |
$15.00 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$122,044.09 |
$509,250.99 |
|
Fed/State Project Number: NHY-022N(157) |
Project: 21733(04) |
Category: 0200/BRIDGE 'A' |
0048 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
190.000 |
190.000 |
|
190.000 |
$12.00 |
$0.00 |
$2,280.00 |
0049 |
CLSM BACKFILL |
501(G) 6309 |
CY |
283.600 |
283.600 |
141.800 |
283.600 |
$140.00 |
$19,852.00 |
$39,704.00 |
0050 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) |
503(A) 1313 |
LF |
2,990.000 |
2,990.000 |
0.000 |
2,491.500 |
$212.00 |
$0.00 |
$528,198.00 |
0051 |
APPROACH SLAB |
504(A) 1304 |
SY |
313.400 |
313.400 |
|
0.000 |
$170.00 |
$0.00 |
$0.00 |
0052 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
2,930.500 |
2,930.500 |
|
0.000 |
$3.60 |
$0.00 |
$0.00 |
0053 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
96.000 |
96.000 |
|
0.000 |
$250.00 |
$0.00 |
$0.00 |
0054 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
1,323.400 |
1,323.400 |
|
0.000 |
$65.00 |
$0.00 |
$0.00 |
0055 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
3,140.000 |
3,140.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0056 |
STAINLESS STEEL FIXED BEARING ASSEMBLY |
507(A) 6170 |
EA |
20.000 |
20.000 |
0.000 |
20.000 |
$2,000.00 |
$0.00 |
$40,000.00 |
0057 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY |
507(B) 6174 |
EA |
40.000 |
40.000 |
0.000 |
40.000 |
$2,000.00 |
$0.00 |
$80,000.00 |
0058 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
768.000 |
768.000 |
100.000 |
100.000 |
$420.00 |
$42,000.00 |
$42,000.00 |
0059 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
379.800 |
379.800 |
0.000 |
253.000 |
$350.00 |
$0.00 |
$88,550.00 |
0060 |
REINFORCING STEEL |
511(A) 1332 |
LB |
2,840.000 |
2,840.000 |
4,383.000 |
7,223.000 |
$1.00 |
$4,383.00 |
$7,223.00 |
0061 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
225,670.000 |
225,670.000 |
|
58,710.000 |
$1.05 |
$0.00 |
$61,645.50 |
0062 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
208.000 |
208.000 |
|
220.000 |
$25.00 |
$0.00 |
$5,500.00 |
0063 |
PILES, FURNISHED (HP 12X53) |
514(A) 6011 |
LF |
860.000 |
860.000 |
|
860.000 |
$30.00 |
$0.00 |
$25,800.00 |
0064 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
208.000 |
208.000 |
0.000 |
188.960 |
$15.00 |
$0.00 |
$2,834.40 |
0065 |
PILES, DRIVEN (HP 12X53) |
514(B) 6294 |
LF |
860.000 |
860.000 |
0.000 |
807.830 |
$18.00 |
$0.00 |
$14,540.94 |
0066 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
2,798.000 |
2,798.000 |
|
0.000 |
$3.20 |
$0.00 |
$0.00 |
0067 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
582.000 |
582.000 |
0.000 |
591.000 |
$525.00 |
$0.00 |
$310,275.00 |
0068 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
470.000 |
470.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0069 |
SEALER RESIN |
523(B) 6560 |
GAL |
3.200 |
3.200 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0070 |
TYPE I-A PLAIN RIPRAP |
601(B) 1353 |
TON |
890.000 |
890.000 |
472.010 |
889.620 |
$32.00 |
$15,104.32 |
$28,467.84 |
0071 |
TYPE I-A FILTER BLANKET |
601(C) 1355 |
TON |
185.000 |
185.000 |
101.750 |
177.480 |
$28.00 |
$2,849.00 |
$4,969.44 |
0072 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
96.000 |
96.000 |
96.000 |
96.000 |
$6.00 |
$576.00 |
$576.00 |
0073 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 6207 |
LF |
42.000 |
42.000 |
42.000 |
42.000 |
$6.00 |
$252.00 |
$252.00 |
0074 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$50,000.00 |
$0.00 |
$0.00 |
Subtotals For Category 0200/BRIDGE 'A' |
$85,016.32 |
$1,282,816.12 |
|
Fed/State Project Number: NHY-022N(157) |
Project: 21733(04) |
Category: 0300/TRAFFIC CONTROL |
0075 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
6,800.000 |
6,800.000 |
|
0.000 |
$0.25 |
$0.00 |
$0.00 |
0076 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
500.000 |
500.000 |
|
0.000 |
$1.25 |
$0.00 |
$0.00 |
0077 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
2,000.000 |
2,000.000 |
|
0.000 |
$0.50 |
$0.00 |
$0.00 |
0078 |
(PL)TRUCK MOUNTED ATTENUATOR |
876(A) 8482 |
SD |
400.000 |
400.000 |
|
0.000 |
$2.50 |
$0.00 |
$0.00 |
0079 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
2,200.000 |
2,200.000 |
180.000 |
1,520.000 |
$1.00 |
$180.00 |
$1,520.00 |
0080 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
2,000.000 |
2,000.000 |
180.000 |
1,601.000 |
$2.25 |
$405.00 |
$3,602.25 |
0081 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
6,000.000 |
6,000.000 |
225.000 |
1,887.000 |
$0.25 |
$56.25 |
$471.75 |
0082 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
2,000.000 |
2,000.000 |
|
0.000 |
$0.10 |
$0.00 |
$0.00 |
0083 |
WING BARRICADES |
880(C) 8848 |
SD |
400.000 |
400.000 |
60.000 |
504.000 |
$5.00 |
$300.00 |
$2,520.00 |
0084 |
VERTICAL PANELS |
880(D) 8854 |
SD |
3,000.000 |
3,000.000 |
|
0.000 |
$0.15 |
$0.00 |
$0.00 |
0085 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
6,800.000 |
6,800.000 |
195.000 |
1,673.000 |
$0.25 |
$48.75 |
$418.25 |
0086 |
DRUMS |
880(F) 8878 |
SD |
13,000.000 |
13,000.000 |
60.000 |
470.000 |
$0.15 |
$9.00 |
$70.50 |
0087 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
3,000.000 |
3,000.000 |
150.000 |
550.000 |
$0.15 |
$22.50 |
$82.50 |
0088 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
400.000 |
400.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC CONTROL |
$1,021.50 |
$8,685.25 |
|