| Fed/State Project Number: STPY-139C(094) |
Project: 00464(14) |
Category: 0100/ROADWAY |
| 0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$21,400.00 |
$0.00 |
$21,400.00 |
| 0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
206,378.000 |
206,378.000 |
|
203,423.300 |
$3.98 |
$0.00 |
$809,624.73 |
| 0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
30,000.000 |
30,000.000 |
|
0.000 |
$3.78 |
$0.00 |
$0.00 |
| 0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$28,890.00 |
$0.00 |
$28,890.00 |
| 0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
8,000.000 |
8,000.000 |
|
1,825.000 |
$1.34 |
$0.00 |
$2,445.50 |
| 0006 |
TEMPORARY SEDIMENT BASIN |
221(E) 2804 |
EA |
1.000 |
1.000 |
|
0.000 |
$535.00 |
$0.00 |
$0.00 |
| 0007 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
500.000 |
500.000 |
|
126.000 |
$7.49 |
$0.00 |
$943.74 |
| 0008 |
TEMPORARY ROCK FILTER DAM TYPE 1 |
221(G) 0150 |
CY |
6.000 |
6.000 |
|
0.000 |
$107.00 |
$0.00 |
$0.00 |
| 0009 |
DITCH LINER PROTECTION |
229 4318 |
LF |
1,475.000 |
1,475.000 |
|
0.000 |
$1.59 |
$0.00 |
$0.00 |
| 0010 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
107,835.000 |
107,835.000 |
17,760.000 |
29,280.000 |
$1.54 |
$27,350.40 |
$45,091.20 |
| 0011 |
SEEDING METHOD A |
232(A) 2813 |
AC |
14.000 |
14.000 |
|
0.000 |
$529.65 |
$0.00 |
$0.00 |
| 0012 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
30.200 |
30.200 |
|
0.000 |
$850.65 |
$0.00 |
$0.00 |
| 0013 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
9,202.000 |
9,202.000 |
|
5,878.100 |
$38.96 |
$0.00 |
$229,010.78 |
| 0014 |
SEPARATOR FABRIC |
325 5271 |
SY |
26,950.000 |
26,950.000 |
|
19,493.550 |
$1.37 |
$0.00 |
$26,706.16 |
| 0015 |
GEOGRID REINFORCEMENT |
326(B) 0100 |
SY |
26,950.000 |
26,950.000 |
|
18,830.560 |
$2.13 |
$0.00 |
$40,109.09 |
| 0016 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
1,120.000 |
1,120.000 |
655.640 |
1,251.300 |
$22.00 |
$14,424.08 |
$27,528.60 |
| 0017 |
TACK COAT |
407(B) 0250 |
GAL |
2,573.000 |
2,573.000 |
|
5,600.000 |
$3.26 |
$0.00 |
$18,256.00 |
| 0018 |
PRIME COAT |
408 5774 |
GAL |
9,466.000 |
9,466.000 |
|
7,350.000 |
$3.55 |
$0.00 |
$26,092.50 |
| 0019 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
8,213.000 |
8,213.000 |
|
6,855.440 |
$71.02 |
$0.00 |
$486,873.35 |
| 0020 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
3,244.000 |
3,244.000 |
|
3,041.620 |
$77.70 |
$0.00 |
$236,333.87 |
| 0021 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
3,383.000 |
3,383.000 |
|
3,957.770 |
$2.30 |
$0.00 |
$9,102.87 |
| 0022 |
RUMBLE STRIP-METHOD HMA-CON |
413(A) 4861 |
LF |
7,683.000 |
7,683.000 |
6,365.000 |
6,365.000 |
$0.86 |
$5,473.90 |
$5,473.90 |
| 0023 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
5.000 |
5.000 |
|
4.670 |
$26.75 |
$0.00 |
$124.92 |
| 0024 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
15.300 |
15.300 |
|
15.300 |
$786.45 |
$0.00 |
$12,032.69 |
| 0025 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
140.000 |
140.000 |
103.380 |
103.380 |
$251.45 |
$25,994.90 |
$25,994.90 |
| 0026 |
REINFORCING STEEL |
511(A) 0332 |
LB |
2,000.000 |
2,000.000 |
|
2,000.000 |
$2.14 |
$0.00 |
$4,280.00 |
| 0027 |
FILTER FABRIC |
602(C) 4155 |
SY |
1,920.000 |
1,920.000 |
|
2,502.230 |
$1.34 |
$0.00 |
$3,352.99 |
| 0028 |
INLET CDI RCB DES. 2 |
611(G) 5388 |
EA |
1.000 |
1.000 |
|
1.000 |
$3,424.00 |
$0.00 |
$3,424.00 |
| 0029 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
72.000 |
72.000 |
|
72.000 |
$25.24 |
$0.00 |
$1,817.28 |
| 0030 |
24" CORR. GALV. STEEL PIPE |
613(B) 0690 |
LF |
58.000 |
58.000 |
|
58.000 |
$29.82 |
$0.00 |
$1,729.56 |
| 0031 |
8" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 0500 |
LF |
1,150.000 |
1,150.000 |
|
1,240.000 |
$15.10 |
$0.00 |
$18,724.00 |
| 0032 |
8" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1097 |
LF |
24.000 |
24.000 |
|
244.000 |
$15.10 |
$0.00 |
$3,684.40 |
| 0033 |
18" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5726 |
EA |
2.000 |
2.000 |
|
2.000 |
$203.24 |
$0.00 |
$406.48 |
| 0034 |
24" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5730 |
EA |
2.000 |
2.000 |
|
2.000 |
$252.87 |
$0.00 |
$505.74 |
| 0035 |
PIPE UNDERDRAIN COVER MAT'L. |
613(U) 1100 |
CY |
383.000 |
383.000 |
|
558.850 |
$37.70 |
$0.00 |
$21,068.65 |
| 0036 |
TRENCH EXCAVATION |
613(V) 1180 |
CY |
770.000 |
770.000 |
|
1,005.490 |
$8.42 |
$0.00 |
$8,466.23 |
| 0037 |
REMOVAL OF FENCE |
619(B) 4725 |
LF |
2,300.000 |
2,300.000 |
|
1,200.000 |
$0.23 |
$0.00 |
$276.00 |
| 0038 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
18,810.000 |
18,810.000 |
|
12,241.730 |
$1.37 |
$0.00 |
$16,771.18 |
| 0039 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
777.000 |
777.000 |
|
253.000 |
$2.27 |
$0.00 |
$574.31 |
| 0040 |
REMOVAL OF CONCRETE DITCH LINER |
619(B) 5881 |
LF |
970.000 |
970.000 |
|
1,073.000 |
$2.27 |
$0.00 |
$2,435.71 |
| 0041 |
REMOVAL OF EXISTING PIPE |
619(B) 5918 |
LF |
33.000 |
33.000 |
|
108.000 |
$4.54 |
$0.00 |
$490.32 |
| 0042 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
104.000 |
104.000 |
0.000 |
3,377.000 |
$3.40 |
$0.00 |
$11,481.80 |
| 0043 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
2,923.000 |
2,923.000 |
|
1,100.000 |
$4.82 |
$0.00 |
$5,302.00 |
| 8000 |
TYPE I-A PLAIN RIPRAP |
601(B) 1353 |
TON |
0.000 |
300.000 |
|
306.800 |
$36.03 |
$0.00 |
$11,054.00 |
| Subtotals For Category 0100/ROADWAY |
$73,243.28 |
$2,167,879.45 |
|
| Fed/State Project Number: STPY-139C(094) |
Project: 00464(14) |
Category: 0300/TRAFFIC CONTROL |
| 0044 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
40,000.000 |
40,000.000 |
|
29,143.000 |
$0.11 |
$0.00 |
$3,205.73 |
| 0045 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
20,000.000 |
20,000.000 |
|
5,613.000 |
$0.27 |
$0.00 |
$1,515.51 |
| 0046 |
DELIVER PORTABLE LONGITUDINAL BARRIER |
877(B) 8484 |
LF |
1,800.000 |
1,800.000 |
|
1,600.000 |
$27.55 |
$0.00 |
$44,080.00 |
| 0047 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER |
877(C) 8486 |
LF |
1,800.000 |
1,800.000 |
|
0.000 |
$4.01 |
$0.00 |
$0.00 |
| 0048 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
600.000 |
600.000 |
|
0.000 |
$1.07 |
$0.00 |
$0.00 |
| 0049 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
8,100.000 |
8,100.000 |
270.000 |
4,776.000 |
$0.11 |
$29.70 |
$525.36 |
| 0050 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
3,900.000 |
3,900.000 |
165.000 |
3,845.000 |
$1.61 |
$265.65 |
$6,190.45 |
| 0051 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
3,900.000 |
3,900.000 |
285.000 |
6,900.000 |
$0.80 |
$228.00 |
$5,520.00 |
| 0052 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
4,800.000 |
4,800.000 |
45.000 |
1,135.000 |
$0.27 |
$12.15 |
$306.45 |
| 0053 |
WING BARRICADES |
880(C) 8848 |
SD |
1,200.000 |
1,200.000 |
30.000 |
588.000 |
$0.32 |
$9.60 |
$188.16 |
| 0054 |
VERTICAL PANELS |
880(D) 8854 |
SD |
9,000.000 |
9,000.000 |
|
0.000 |
$0.11 |
$0.00 |
$0.00 |
| 0055 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
14,700.000 |
14,700.000 |
285.000 |
6,819.000 |
$0.11 |
$31.35 |
$750.09 |
| 0056 |
DRUMS |
880(F) 8878 |
SD |
20,250.000 |
20,250.000 |
2,415.000 |
42,204.000 |
$0.09 |
$217.35 |
$3,798.36 |
| 0057 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
20,250.000 |
20,250.000 |
|
0.000 |
$0.09 |
$0.00 |
$0.00 |
| 0058 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
600.000 |
600.000 |
|
218.000 |
$10.70 |
$0.00 |
$2,332.60 |
| Subtotals For Category 0300/TRAFFIC CONTROL |
$793.80 |
$68,412.71 |
|