Fed/State Project Number: STP-114B(222)AG |
Project: 25648(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
0.050 |
0.300 |
$20,000.00 |
$1,000.00 |
$6,000.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
41,884.000 |
41,884.000 |
8,376.710 |
8,376.800 |
$5.50 |
$46,071.91 |
$46,072.41 |
0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
28,413.000 |
28,413.000 |
|
0.000 |
$7.00 |
$0.00 |
$0.00 |
0004 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
12,053.000 |
12,053.000 |
0.000 |
8,557.000 |
$1.86 |
$0.00 |
$15,916.02 |
0005 |
TEMPORARY SEDIMENT FILTER |
221(D) 2803 |
EA |
52.000 |
52.000 |
|
0.000 |
$206.35 |
$0.00 |
$0.00 |
0006 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
490.000 |
490.000 |
63.000 |
63.000 |
$8.25 |
$519.75 |
$519.75 |
0007 |
TEMPORARY ROCK FILTER DAM TYPE 3 |
221(G) 0152 |
CY |
68.000 |
68.000 |
|
0.000 |
$154.76 |
$0.00 |
$0.00 |
0008 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
75,900.000 |
75,900.000 |
|
0.000 |
$1.34 |
$0.00 |
$0.00 |
0009 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
17.500 |
17.500 |
|
0.000 |
$515.88 |
$0.00 |
$0.00 |
0010 |
LIME |
307(D) 4230 |
TON |
2,438.000 |
2,438.000 |
|
0.000 |
$165.00 |
$0.00 |
$0.00 |
0011 |
LIME MODIFIED SUBGRADE |
307(I) 4280 |
SY |
84,630.000 |
84,630.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0012 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
1,832.000 |
1,832.000 |
139.730 |
308.530 |
$32.00 |
$4,471.36 |
$9,872.96 |
0013 |
TACK COAT |
407(B) 0250 |
GAL |
7,490.000 |
7,490.000 |
700.000 |
700.000 |
$1.03 |
$721.00 |
$721.00 |
0014 |
PRIME COAT |
408 5774 |
GAL |
18,406.000 |
18,406.000 |
|
0.000 |
$1.03 |
$0.00 |
$0.00 |
0015 |
SUPERPAVE, TYPE S3(PG 70-28 OK) |
411(B) 5940 |
TON |
9,576.000 |
9,576.000 |
|
0.000 |
$62.94 |
$0.00 |
$0.00 |
0016 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
27,185.000 |
27,185.000 |
3,354.550 |
3,354.550 |
$52.62 |
$176,516.42 |
$176,516.42 |
0017 |
SUPERPAVE, TYPE S4(PG 70-28 OK) |
411(C) 5955 |
TON |
7,212.000 |
7,212.000 |
|
0.000 |
$77.38 |
$0.00 |
$0.00 |
0018 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
4,330.000 |
4,330.000 |
1,253.440 |
1,253.440 |
$58.81 |
$73,714.81 |
$73,714.81 |
0019 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) |
414(B) 5725 |
SY |
17,618.000 |
17,618.000 |
|
0.000 |
$17.00 |
$0.00 |
$0.00 |
0020 |
P.C. CONCRETE FOR PAVEMENT |
414(G) 5275 |
CY |
3,916.000 |
3,916.000 |
|
0.000 |
$95.00 |
$0.00 |
$0.00 |
0021 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
570.000 |
570.000 |
|
0.000 |
$8.00 |
$0.00 |
$0.00 |
0022 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
1,483.000 |
1,483.000 |
98.270 |
98.270 |
$275.00 |
$27,024.25 |
$27,024.25 |
0023 |
CLASS A CONCRETE |
509(B) 0321 |
CY |
581.000 |
581.000 |
|
0.000 |
$250.00 |
$0.00 |
$0.00 |
0024 |
CLASS A CONCRETE, SMALL STRUCTURES |
509(C) 0322 |
CY |
44.000 |
44.000 |
|
0.000 |
$500.00 |
$0.00 |
$0.00 |
0025 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
20.000 |
20.000 |
|
0.000 |
$500.00 |
$0.00 |
$0.00 |
0026 |
REINFORCING STEEL |
511(A) 0332 |
LB |
322,333.000 |
322,333.000 |
22,612.850 |
22,612.850 |
$0.94 |
$21,256.08 |
$21,256.08 |
0027 |
TYPE I PLAIN RIPRAP |
601(A) 0297 |
TON |
483.000 |
483.000 |
|
0.000 |
$50.49 |
$0.00 |
$0.00 |
0028 |
CONCRETE CURB (8" BARRIER-INTEGRAL) |
609(A) 0380 |
LF |
4,909.000 |
4,909.000 |
|
0.000 |
$4.79 |
$0.00 |
$0.00 |
0029 |
1'-8" COMB. CURB & GUTTER (8" BARRIER) |
609(B) 1514 |
LF |
21,228.000 |
21,228.000 |
|
0.000 |
$16.00 |
$0.00 |
$0.00 |
0030 |
4" CONCRETE SIDEWALK |
610(A) 0602 |
SY |
6,970.000 |
6,970.000 |
|
0.000 |
$30.82 |
$0.00 |
$0.00 |
0031 |
6" CONCRETE DRIVEWAY |
610(B) 0604 |
SY |
4,123.000 |
4,123.000 |
|
0.000 |
$48.70 |
$0.00 |
$0.00 |
0032 |
TACTILE WARNING DEVICE-NEW |
610(I) 4610 |
SF |
640.000 |
640.000 |
|
0.000 |
$21.67 |
$0.00 |
$0.00 |
0033 |
MANHOLE (4' DIAMETER) |
611(A) 2657 |
EA |
9.000 |
9.000 |
|
0.000 |
$1,444.78 |
$0.00 |
$0.00 |
0034 |
MANHOLE (6' DIAMETER) |
611(A) 2659 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,714.53 |
$0.00 |
$0.00 |
0035 |
SPECIAL INLET DRAIN |
611(G) 4012 |
EA |
9.000 |
9.000 |
|
0.000 |
$1,579.02 |
$0.00 |
$0.00 |
0036 |
INLET CI DES. 2 (STD) |
611(G) 5112 |
EA |
6.000 |
6.000 |
|
0.000 |
$2,090.80 |
$0.00 |
$0.00 |
0037 |
INLET CI DES. 2 (B) |
611(G) 5113 |
EA |
17.000 |
17.000 |
|
0.000 |
$2,991.13 |
$0.00 |
$0.00 |
0038 |
INLET CI DES. 2 (D) |
611(G) 5115 |
EA |
12.000 |
12.000 |
|
0.000 |
$3,796.35 |
$0.00 |
$0.00 |
0039 |
INLET CI DES. 2 (2B) |
611(G) 5117 |
EA |
8.000 |
8.000 |
|
0.000 |
$3,805.36 |
$0.00 |
$0.00 |
0040 |
INLET CI DES. 2 (B-D) |
611(G) 5118 |
EA |
1.000 |
1.000 |
|
0.000 |
$4,647.68 |
$0.00 |
$0.00 |
0041 |
INLET CI DES. 2 (2D) |
611(G) 5119 |
EA |
1.000 |
1.000 |
|
0.000 |
$5,418.20 |
$0.00 |
$0.00 |
0042 |
INLET GPI TYPE 2 (DES. 11) |
611(G) 5337 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,530.60 |
$0.00 |
$0.00 |
0043 |
ADD'L DEPTH IN INLET CI DES. 2 |
611(H) 5325 |
VF |
86.000 |
86.000 |
|
0.000 |
$253.27 |
$0.00 |
$0.00 |
0044 |
JUNCTION BOXES |
611(L) 0487 |
CF |
736.000 |
736.000 |
|
0.000 |
$27.09 |
$0.00 |
$0.00 |
0045 |
18" R.C.PIPE CLASS III |
613(A) 0491 |
LF |
3,372.000 |
3,372.000 |
|
0.000 |
$31.12 |
$0.00 |
$0.00 |
0046 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
2,914.000 |
2,914.000 |
|
0.000 |
$36.11 |
$0.00 |
$0.00 |
0047 |
30" R.C.PIPE CLASS III |
613(A) 0493 |
LF |
656.000 |
656.000 |
|
0.000 |
$45.61 |
$0.00 |
$0.00 |
0048 |
36" R.C.PIPE CLASS III |
613(A) 0494 |
LF |
784.000 |
784.000 |
|
0.000 |
$58.57 |
$0.00 |
$0.00 |
0049 |
42" R.C.PIPE CLASS III |
613(A) 0495 |
LF |
20.000 |
20.000 |
|
0.000 |
$74.06 |
$0.00 |
$0.00 |
0050 |
28 1/2" X 18" R.C.PIPE ARCH CLASS A-III |
613(A) 4410 |
LF |
432.000 |
432.000 |
|
0.000 |
$66.36 |
$0.00 |
$0.00 |
0051 |
22" X 13" R.C.PIPE ARCH CLASS A-III |
613(A) 4495 |
LF |
46.000 |
46.000 |
|
0.000 |
$55.29 |
$0.00 |
$0.00 |
0052 |
36" X 22" R.C.PIPE ARCH CLASS A-III |
613(A) 4497 |
LF |
384.000 |
384.000 |
|
0.000 |
$61.64 |
$0.00 |
$0.00 |
0053 |
51" X 31" R.C.PIPE ARCH CLASS A-III |
613(A) 4499 |
LF |
92.000 |
92.000 |
|
0.000 |
$104.61 |
$0.00 |
$0.00 |
0054 |
43" X 68" R.C.PIPE ELLIPTICAL CLASS HE-III |
613(A) 4509 |
LF |
248.000 |
248.000 |
|
0.000 |
$123.57 |
$0.00 |
$0.00 |
0055 |
24" CORR. GALV. STEEL PIPE |
613(B) 0690 |
LF |
906.000 |
906.000 |
331.000 |
844.000 |
$27.01 |
$8,940.31 |
$22,796.44 |
0056 |
8" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 0500 |
LF |
1,000.000 |
1,000.000 |
|
0.000 |
$7.97 |
$0.00 |
$0.00 |
0057 |
8" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1097 |
LF |
100.000 |
100.000 |
|
0.000 |
$17.16 |
$0.00 |
$0.00 |
0058 |
28 1/2" X 18" PREFAB. CULVERT END SECTION, ARCH |
613(L) 4584 |
EA |
1.000 |
1.000 |
|
0.000 |
$867.79 |
$0.00 |
$0.00 |
0059 |
18" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5726 |
EA |
7.000 |
7.000 |
|
0.000 |
$581.72 |
$0.00 |
$0.00 |
0060 |
30" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5732 |
EA |
2.000 |
2.000 |
|
0.000 |
$787.55 |
$0.00 |
$0.00 |
0061 |
36" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5734 |
EA |
2.000 |
2.000 |
|
0.000 |
$998.89 |
$0.00 |
$0.00 |
0062 |
TYPE BB6 CULVERT END TREATMENT |
613(M) 7202 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,776.07 |
$0.00 |
$0.00 |
0063 |
SPECIAL END SECTION OF 43" X 68" RCP ELLIPTICAL |
613(O) 5101 |
EA |
1.000 |
1.000 |
|
0.000 |
$2,407.44 |
$0.00 |
$0.00 |
0064 |
STANDARD BEDDING MATERIAL, CLASS B |
613(S) 1186 |
CY |
685.000 |
685.000 |
|
0.000 |
$51.53 |
$0.00 |
$0.00 |
0065 |
STANDARD BEDDING MATERIAL, CLASS C |
613(T) 1187 |
CY |
2,571.000 |
2,571.000 |
|
0.000 |
$18.75 |
$0.00 |
$0.00 |
0066 |
TRENCH EXCAVATION |
613(V) 1180 |
CY |
6,217.000 |
6,217.000 |
|
0.000 |
$6.25 |
$0.00 |
$0.00 |
0067 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
0.100 |
0.250 |
$55,000.00 |
$5,500.00 |
$13,750.00 |
0068 |
REMOVAL OF FENCE |
619(B) 4725 |
LF |
3,692.000 |
3,692.000 |
450.000 |
1,715.000 |
$1.71 |
$769.50 |
$2,932.65 |
0069 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
59,939.000 |
59,939.000 |
|
0.000 |
$0.52 |
$0.00 |
$0.00 |
0070 |
REMOVAL OF CONCRETE DRIVEWAY |
619(B) 4766 |
SY |
2,394.000 |
2,394.000 |
203.970 |
835.860 |
$5.70 |
$1,162.63 |
$4,764.40 |
0071 |
REMOVAL OF ASPHALT DRIVEWAY |
619(B) 4767 |
SY |
4,190.000 |
4,190.000 |
431.700 |
461.700 |
$0.52 |
$224.48 |
$240.08 |
0072 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
13,963.000 |
13,963.000 |
54.670 |
241.480 |
$4.92 |
$268.98 |
$1,188.09 |
0073 |
PIPE RAILING |
622(A) 4746 |
LF |
580.000 |
580.000 |
|
0.000 |
$89.61 |
$0.00 |
$0.00 |
0074 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
13.000 |
13.000 |
|
0.000 |
$103.18 |
$0.00 |
$0.00 |
0075 |
MAILBOX INSTALLATION-MULTIPLE |
629(B) 4959 |
EA |
1.000 |
1.000 |
|
0.000 |
$154.76 |
$0.00 |
$0.00 |
0076 |
REMOVE AND RESET MAILBOX |
629(E) 5048 |
EA |
1.000 |
1.000 |
|
1.000 |
$51.59 |
$0.00 |
$51.59 |
Subtotals For Category 0100/ROADWAY |
$368,161.48 |
$423,336.95 |
|
Fed/State Project Number: STP-114B(222)AG |
Project: 25648(04) |
Category: 0300/TRAFFIC SIGNAL |
0082 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
600.000 |
600.000 |
|
0.000 |
$1.34 |
$0.00 |
$0.00 |
0083 |
1" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8334 |
LF |
1,005.000 |
1,005.000 |
|
0.000 |
$2.99 |
$0.00 |
$0.00 |
0084 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT BORED |
802(B) 8336 |
LF |
130.000 |
130.000 |
|
0.000 |
$12.38 |
$0.00 |
$0.00 |
0085 |
1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8338 |
LF |
3,570.000 |
3,570.000 |
|
0.000 |
$3.10 |
$0.00 |
$0.00 |
0086 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8342 |
LF |
730.000 |
730.000 |
|
0.000 |
$4.13 |
$0.00 |
$0.00 |
0087 |
3" PVC SCH.40 PLASTIC CONDUIT BORED |
802(B) 8344 |
LF |
900.000 |
900.000 |
|
0.000 |
$15.48 |
$0.00 |
$0.00 |
0088 |
3" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8346 |
LF |
210.000 |
210.000 |
|
0.000 |
$5.16 |
$0.00 |
$0.00 |
0089 |
PULL BOX(SIZE I) |
803(A) 8065 |
EA |
39.000 |
39.000 |
|
0.000 |
$288.89 |
$0.00 |
$0.00 |
0090 |
PULL BOX(SIZE II) |
803(A) 8066 |
EA |
3.000 |
3.000 |
|
0.000 |
$340.48 |
$0.00 |
$0.00 |
0091 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
34.800 |
34.800 |
|
0.000 |
$428.18 |
$0.00 |
$0.00 |
0092 |
REINFORCING STEEL |
804(B) 2916 |
LB |
5,093.900 |
5,093.900 |
|
0.000 |
$1.24 |
$0.00 |
$0.00 |
0093 |
32'MH POLE 35'TS & 10'LMA(G.STL.) |
806(A) 8311 |
EA |
2.000 |
2.000 |
|
0.000 |
$5,674.70 |
$0.00 |
$0.00 |
0094 |
32'MH POLE,30'TS & 10'LMA(G.STL.) |
806(A) 8350 |
EA |
1.000 |
1.000 |
|
0.000 |
$5,041.19 |
$0.00 |
$0.00 |
0095 |
32'MH POLE 25',TS & 10'LMA(G.STL.) |
806(A) 8351 |
EA |
1.000 |
1.000 |
|
0.000 |
$4,866.82 |
$0.00 |
$0.00 |
0096 |
POLE & 25' TS MST.ARM(G.STL.) |
806(A) 8726 |
EA |
2.000 |
2.000 |
|
0.000 |
$4,039.35 |
$0.00 |
$0.00 |
0097 |
POLE & 35' TS MST.ARM(G.STL.) |
806(A) 8730 |
EA |
4.000 |
4.000 |
|
0.000 |
$5,238.26 |
$0.00 |
$0.00 |
0098 |
POLE & 40' TS MST.ARM(G.STL.) |
806(A) 8732 |
EA |
2.000 |
2.000 |
|
0.000 |
$5,906.84 |
$0.00 |
$0.00 |
0099 |
10' MTG.HT.TS PED.POLE(G.STL.) |
806(B) 8894 |
EA |
9.000 |
9.000 |
|
0.000 |
$402.39 |
$0.00 |
$0.00 |
0100 |
ROADWAY LUMINAIRE |
809(A) 8090 |
EA |
4.000 |
4.000 |
|
0.000 |
$355.96 |
$0.00 |
$0.00 |
0101 |
1/C NO.6 ELECTRICAL CONDUCTOR |
811 8040 |
LF |
600.000 |
600.000 |
|
0.000 |
$1.03 |
$0.00 |
$0.00 |
0102 |
1/C NO.10 ELECTRICAL CONDUCTOR |
811 8044 |
LF |
1,750.000 |
1,750.000 |
|
0.000 |
$0.83 |
$0.00 |
$0.00 |
0103 |
TRAFFIC SIGNAL CONTROLLER ASSEMBLY |
825 8550 |
EA |
3.000 |
3.000 |
|
0.000 |
$31,984.63 |
$0.00 |
$0.00 |
0104 |
VEHICLE LOOP DETECTOR |
828(A) 8142 |
EA |
22.000 |
22.000 |
|
0.000 |
$118.65 |
$0.00 |
$0.00 |
0105 |
LOOP DETECTOR WIRE |
828(B) 8136 |
LF |
11,710.000 |
11,710.000 |
|
0.000 |
$3.30 |
$0.00 |
$0.00 |
0106 |
PEDESTRIAN PUSH BUTTON |
830 8000 |
EA |
18.000 |
18.000 |
|
0.000 |
$560.25 |
$0.00 |
$0.00 |
0107 |
1WAY 3SEC. ADJ. SIG. HD. S-6 |
831 8231 |
EA |
22.000 |
22.000 |
|
0.000 |
$495.25 |
$0.00 |
$0.00 |
0108 |
1WAY 3SEC. ADJ. SIG. HD. S-9 |
831 8252 |
EA |
10.000 |
10.000 |
|
0.000 |
$490.09 |
$0.00 |
$0.00 |
0109 |
1WAY 5SEC. ADJ. SIG. HD. S-19 |
831 8286 |
EA |
2.000 |
2.000 |
|
0.000 |
$699.54 |
$0.00 |
$0.00 |
0110 |
1WAY 2SEC. ADJ. PED. SIG. HD. S-20 |
831 8295 |
EA |
18.000 |
18.000 |
|
0.000 |
$392.07 |
$0.00 |
$0.00 |
0111 |
BACKPLATE |
833 3030 |
EA |
34.000 |
34.000 |
|
0.000 |
$71.19 |
$0.00 |
$0.00 |
0112 |
5/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8207 |
LF |
8,100.000 |
8,100.000 |
|
0.000 |
$1.03 |
$0.00 |
$0.00 |
0113 |
7/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8208 |
LF |
100.000 |
100.000 |
|
0.000 |
$1.28 |
$0.00 |
$0.00 |
0114 |
21/C TRAFFIC SIGNAL ELECTRICAL CABLE |
834(A) 8213 |
LF |
2,605.000 |
2,605.000 |
|
0.000 |
$3.07 |
$0.00 |
$0.00 |
0115 |
2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE |
834(B) 8220 |
LF |
7,185.000 |
7,185.000 |
|
0.000 |
$0.80 |
$0.00 |
$0.00 |
0116 |
E.P.S. OPTICAL EMITTER |
840(A) 8592 |
EA |
5.000 |
5.000 |
|
0.000 |
$619.06 |
$0.00 |
$0.00 |
0117 |
E.P.S. OPTICAL DETECTOR |
840(B) 8593 |
EA |
10.000 |
10.000 |
|
0.000 |
$397.23 |
$0.00 |
$0.00 |
0118 |
E.P.S. OPTICAL DETECTOR CABLE |
840(C) 8594 |
LF |
2,805.000 |
2,805.000 |
|
0.000 |
$1.03 |
$0.00 |
$0.00 |
0119 |
E.P.S. 2 CHANNEL PHASE SELECTOR |
840(D) 8595 |
EA |
5.000 |
5.000 |
|
0.000 |
$1,129.78 |
$0.00 |
$0.00 |
0120 |
MAST ARM MOUNTED SIGNS(ALUMINUM) |
850(C) 8118 |
SF |
219.000 |
219.000 |
|
0.000 |
$30.44 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC SIGNAL |
$0.00 |
$0.00 |
|
Fed/State Project Number: STP-114B(222)AG |
Project: 25648(04) |
Category: 0301/TRAFFIC SIGNING AND STRIPING |
0121 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
1.560 |
1.560 |
|
0.000 |
$283.74 |
$0.00 |
$0.00 |
0122 |
REINFORCING STEEL |
804(B) 2916 |
LB |
72.000 |
72.000 |
|
0.000 |
$2.06 |
$0.00 |
$0.00 |
0123 |
(PL)REMOVAL OF EXISTING SIGNS |
805(A) 8724 |
EA |
21.000 |
21.000 |
|
0.000 |
$46.43 |
$0.00 |
$0.00 |
0124 |
(PL)REMOVE & RESET EXISTING SIGNS |
805(D) 8756 |
EA |
3.000 |
3.000 |
|
0.000 |
$154.76 |
$0.00 |
$0.00 |
0125 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
108.440 |
108.440 |
|
0.000 |
$13.93 |
$0.00 |
$0.00 |
0126 |
2"@3.65 GALV.STEEL PIPE POST |
851(B) 3216 |
LF |
188.000 |
188.000 |
|
0.000 |
$12.38 |
$0.00 |
$0.00 |
0127 |
2 1/2"@5.79 GALV.STEEL PIPE POST |
851(B) 3217 |
LF |
39.000 |
39.000 |
|
0.000 |
$18.57 |
$0.00 |
$0.00 |
0128 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) |
855(A) 8812 |
LF |
42,700.000 |
42,700.000 |
|
0.000 |
$0.43 |
$0.00 |
$0.00 |
0129 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) |
855(A) 8814 |
LF |
1,432.000 |
1,432.000 |
|
0.000 |
$0.72 |
$0.00 |
$0.00 |
0130 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) |
855(A) 8825 |
LF |
455.000 |
455.000 |
|
0.000 |
$2.58 |
$0.00 |
$0.00 |
0131 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) |
855(B) 8818 |
EA |
26.000 |
26.000 |
|
0.000 |
$72.22 |
$0.00 |
$0.00 |
0132 |
TRAFFIC STRIPE(PLASTIC)(WORDS) |
855(B) 8821 |
EA |
10.000 |
10.000 |
|
0.000 |
$139.29 |
$0.00 |
$0.00 |
Subtotals For Category 0301/TRAFFIC SIGNING AND STRIPING |
$0.00 |
$0.00 |
|
Fed/State Project Number: STP-114B(222)AG |
Project: 25648(04) |
Category: 0302/TRAFFIC CONTROL |
0133 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
1,074.000 |
1,074.000 |
|
0.000 |
$0.26 |
$0.00 |
$0.00 |
0134 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 |
857(E) 8890 |
EA |
12,060.000 |
12,060.000 |
|
0.000 |
$0.42 |
$0.00 |
$0.00 |
0135 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
1,000.000 |
1,000.000 |
|
0.000 |
$0.52 |
$0.00 |
$0.00 |
0136 |
PORTABLE LONGITUDINAL BARRIER |
877(A) 8483 |
LF |
300.000 |
300.000 |
|
0.000 |
$9.26 |
$0.00 |
$0.00 |
0137 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
21,565.000 |
21,565.000 |
181.000 |
181.000 |
$0.04 |
$7.24 |
$7.24 |
0138 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
10,240.000 |
10,240.000 |
262.000 |
407.000 |
$1.29 |
$337.98 |
$525.03 |
0139 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
17,025.000 |
17,025.000 |
368.000 |
971.000 |
$0.10 |
$36.80 |
$97.10 |
0140 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
10,605.000 |
10,605.000 |
37.000 |
37.000 |
$0.77 |
$28.49 |
$28.49 |
0141 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
21,210.000 |
21,210.000 |
385.000 |
673.000 |
$0.26 |
$100.10 |
$174.98 |
0142 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
82,135.000 |
82,135.000 |
|
0.000 |
$0.03 |
$0.00 |
$0.00 |
0143 |
DRUMS |
880(F) 8878 |
SD |
82,135.000 |
82,135.000 |
|
0.000 |
$0.03 |
$0.00 |
$0.00 |
0144 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
3,675.000 |
3,675.000 |
2,709.000 |
5,887.000 |
$0.15 |
$406.35 |
$883.05 |
Subtotals For Category 0302/TRAFFIC CONTROL |
$916.96 |
$1,715.89 |
|