Contract ID: | 120144 | Estimate Number: | 0003 | Contract No: | 711068 | |||
Residency: | TULSA (08100) | Estimate Type: | Progressive | Account No: | 404800 | |||
Project Number(s): | SSP-272C(017)SS | ||||||||||||
Primary Job Piece No: | 23185(09) | ||||||||||||
Contract Description: | BRIDGE WATER PROOF SEAL VARIOUS LOCATIONS IN DIVISION VIII. | ||||||||||||
Primary County: | TULSA | ||||||||||||
Name of Road: | MULTIPLE LOCATIONS | ||||||||||||
Prime Contractor: | JLT CONTRACTING, LLC | ||||||||||||
106 1/2 N. HARRISON, SUITE 203 | |||||||||||||
CUSHING , OK 74023 | |||||||||||||
Surety Company: | GRANITE RE, INC. | ||||||||||||
Date Let: | 03/15/2012 | NTP Effective Date: | 05/14/2012 | Pay Period: | 07/01/2012 TO 08/12/2014 |
Date Awarded: | 04/02/2012 | Date Work Began: | 05/14/2012 | Original Contract Time: | 60 |
Date Contract Executed: | 04/13/2012 | Date Time Stopped: | 07/29/2014 | Current Time Charged: | 42.00 |
Date NTP Issued: | 04/18/2012 | Completion Date: | 07/29/2014 | Current Time Allowed: | 60.00 |
General Liability Expires: | 08/10/2014 | Workman's Comp Expires: | 04/01/2015 | Percent Time Used: | 70.00 % |
Specification Year: | 2009 | Date Approved: | |||
Bid Amount: | $334,119.40 | Total to Date | Prev to Date | This Estimate | |||
Funds Available (Bid + Positive C/O): | $416,172.15 | Participating: | $0.00 | $0.00 | $0.00 | ||
Percent Complete: | 77.33 % | Non Participating: | $363,871.06 | $302,253.24 | $61,617.82 | ||
Unearned Balance: | $94,344.01 | Total Earnings: | $363,871.06 | $302,253.24 | $61,617.82 | ||
Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||||
Gross Earnings: | $363,871.06 | $302,253.24 | $61,617.82 | ||||
Other Adjustments: | $-42,042.92 | $0.00 | $-42,042.92 | ||||
Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
TOTAL: | $321,828.14 | $302,253.24 | $19,574.90 |
Contract ID: | 120144 | Estimate Number: | 0003 | Primary JP: | 23185(09) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | Overrun Crack Prep. & Sealer | Approved | 11/06/2012 | 0.0 | $82,052.75 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
No material stockpiles have been created for this contract. | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | |||||||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
No liquidated damages have been assessed on this contract. | Subtotals For Liquidated Damages | $ |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
23185(09) | 0001 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-1,820.23 |
23185(09) | 0004 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $73.87 |
23185(09) | 0007 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $239.32 |
23185(09) | 0013 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-2,849.29 |
23185(09) | 0019 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-1,924.93 |
23185(09) | 0022 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-1,660.89 |
23185(09) | 0025 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-144.89 |
23185(09) | 0028 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-1,301.54 |
23185(09) | 0031 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-32.82 |
23185(09) | 0034 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-1,213.64 |
23185(09) | 0037 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $688.02 |
23185(09) | 0040 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-670.64 |
23185(09) | 0043 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $132.94 |
23185(09) | 0046 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-4,127.01 |
23185(09) | 0049 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $93.94 |
23185(09) | 0052 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $89.75 |
23185(09) | 0055 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $254.66 |
23185(09) | 0058 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-250.52 |
23185(09) | 0061 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-399.80 |
23185(09) | 0064 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $116.81 |
23185(09) | 0070 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-1,145.61 |
23185(09) | 0073 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-10,944.93 |
23185(09) | 0076 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-2,924.43 |
23185(09) | 0079 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-4,847.55 |
23185(09) | 0091 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-2,134.66 |
23185(09) | 0094 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-954.89 |
23185(09) | 0097 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-26.69 |
23185(09) | 0100 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-714.83 |
23185(09) | 0103 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-1,620.51 |
23185(09) | 0106 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-295.25 |
23185(09) | 0109 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-346.03 |
23185(09) | 0112 | WATER REPELLENT (PERFORMANCE TESTED) | * PENETRATION | 0003 | 0.00 | $0.00 | $-1,380.65 | Subtotals For Line Item Adjustments | $-42,042.92 | * = User applied Line Item Adjustments |
MILESTONE INFORMATION | |||||||||
Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
No milestones exist for this contract. |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total | ||||||
No milestones adjustments exist for this contract. | Subtotals For Milestones | $ |
Contract ID: | 120144 | Estimate Number: | 0003 | Primary JP: | 23185(09) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0200/BRIDGE 'A' I-44 OVER 163RD EAST AVE. | ||||||||
0001 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 3,816.000 | 3,816.000 | 764.000 | 3,816.000 | $3.60 | $2,750.40 | $13,737.60 |
0002 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 268.000 | 3,026.300 | 0.100 | 3,026.400 | $1.50 | $0.15 | $4,539.60 |
0003 | SEALER RESIN | 523(B) 6560 | GAL | 1.800 | 4.000 | 4.000 | $58.00 | $0.00 | $232.00 | |
Subtotals For Category 0200/BRIDGE 'A' I-44 OVER 163RD EAST AVE. | $2,750.55 | $18,509.20 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0201/BRIDGE 'B' I-44 OVER 193RD EAST AVE. | ||||||||
0004 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 6,156.000 | 6,156.000 | 1,231.760 | 6,155.760 | $3.60 | $4,434.34 | $22,160.74 |
0005 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 431.000 | 1,233.500 | 2,654.600 | $1.50 | $0.00 | $3,981.90 | |
0006 | SEALER RESIN | 523(B) 6560 | GAL | 2.900 | 2.900 | 2.000 | 3.500 | $58.00 | $116.00 | $203.00 |
Subtotals For Category 0201/BRIDGE 'B' I-44 OVER 193RD EAST AVE. | $4,550.34 | $26,345.64 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0202/BRIDGE 'C' US-60 OVER SAND CREEK | ||||||||
0007 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,900.000 | 1,900.000 | 380.330 | 1,899.330 | $3.60 | $1,369.19 | $6,837.59 |
0008 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 133.000 | 1,976.800 | 1,976.800 | $1.50 | $0.00 | $2,965.20 | |
0009 | SEALER RESIN | 523(B) 6560 | GAL | 0.900 | 3.500 | 3.500 | $58.00 | $0.00 | $203.00 | |
Subtotals For Category 0202/BRIDGE 'C' US-60 OVER SAND CREEK | $1,369.19 | $10,005.79 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0203/BRIDGE 'D' SH-16 OVER TURKEY CREEK | ||||||||
0010 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 660.000 | 660.000 | 132.000 | 660.000 | $3.60 | $475.20 | $2,376.00 |
0011 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 47.000 | 861.500 | 861.500 | $1.50 | $0.00 | $1,292.25 | |
0012 | SEALER RESIN | 523(B) 6560 | GAL | 0.400 | 2.000 | 1.000 | 2.000 | $58.00 | $58.00 | $116.00 |
Subtotals For Category 0203/BRIDGE 'D' SH-16 OVER TURKEY CREEK | $533.20 | $3,784.25 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0204/BRIDGE 'E' SH-66 OVER I-44 (TURNER TURNPIKE) | ||||||||
0013 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 2,827.000 | 2,827.000 | 566.670 | 2,826.670 | $3.60 | $2,040.01 | $10,176.01 |
0014 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 227.000 | 925.700 | 925.700 | $1.50 | $0.00 | $1,388.55 | |
0015 | SEALER RESIN | 523(B) 6560 | GAL | 1.600 | 2.500 | 2.500 | $58.00 | $0.00 | $145.00 | |
Subtotals For Category 0204/BRIDGE 'E' SH-66 OVER I-44 (TURNER TURNPIKE) | $2,040.01 | $11,709.56 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0205/BRIDGE 'F' WEST 111TH ST. OVER US-75 | ||||||||
0016 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 3,941.000 | 3,941.000 | 788.560 | 3,940.560 | $3.60 | $2,838.82 | $14,186.02 |
0017 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 276.000 | 2,797.700 | 2,797.700 | $1.50 | $0.00 | $4,196.55 | |
0018 | SEALER RESIN | 523(B) 6560 | GAL | 1.900 | 7.000 | 7.000 | $58.00 | $0.00 | $406.00 | |
Subtotals For Category 0205/BRIDGE 'F' WEST 111TH ST. OVER US-75 | $2,838.82 | $18,788.57 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0206/BRIDGE 'G' US-75 NB OVER MOOSER CREEK AND SKELLY DR. | ||||||||
0019 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 947.000 | 947.000 | 189.380 | 946.380 | $3.60 | $681.77 | $3,406.97 |
0020 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 67.000 | 2,032.600 | 2,032.600 | $1.50 | $0.00 | $3,048.90 | |
0021 | SEALER RESIN | 523(B) 6560 | GAL | 0.500 | 3.500 | 3.500 | $58.00 | $0.00 | $203.00 | |
Subtotals For Category 0206/BRIDGE 'G' US-75 NB OVER MOOSER CREEK AND SKELLY DR. | $681.77 | $6,658.87 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0207/BRIDGE 'H' US-75 SB OVER MOOSER CREEK AD SKELLY DR. | ||||||||
0022 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 947.000 | 947.000 | 189.380 | 946.380 | $3.60 | $681.77 | $3,406.97 |
0023 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 67.000 | 932.100 | 932.100 | $1.50 | $0.00 | $1,398.15 | |
0024 | SEALER RESIN | 523(B) 6560 | GAL | 0.500 | 1.500 | 1.500 | $58.00 | $0.00 | $87.00 | |
Subtotals For Category 0207/BRIDGE 'H' US-75 SB OVER MOOSER CREEK AD SKELLY DR. | $681.77 | $4,892.12 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0208/BRIDGE 'I' US-75 RAMP OVER MOOSER CREEK AND SKELLY DR. | ||||||||
0025 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 738.000 | 738.000 | 146.770 | 731.770 | $3.60 | $528.37 | $2,634.37 |
0026 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 52.000 | 215.200 | 215.200 | $1.50 | $0.00 | $322.80 | |
0027 | SEALER RESIN | 523(B) 6560 | GAL | 0.400 | 0.500 | 0.500 | $58.00 | $0.00 | $29.00 | |
Subtotals For Category 0208/BRIDGE 'I' US-75 RAMP OVER MOOSER CREEK AND SKELLY DR. | $528.37 | $2,986.17 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0209/BRIDGE 'J' US-75 RAMP OVER MOOSER CREEK AND SKELLY DR. | ||||||||
0028 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 754.000 | 754.000 | 143.610 | 741.610 | $3.60 | $517.00 | $2,669.80 |
0029 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 53.000 | 307.100 | 307.100 | $1.50 | $0.00 | $460.65 | |
0030 | SEALER RESIN | 523(B) 6560 | GAL | 0.400 | 0.500 | 0.500 | $58.00 | $0.00 | $29.00 | |
Subtotals For Category 0209/BRIDGE 'J' US-75 RAMP OVER MOOSER CREEK AND SKELLY DR. | $517.00 | $3,159.45 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0210/BRIDGE 'K' I-244 RAMP TO 1ST. ST. OVER I-444 | ||||||||
0031 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,344.000 | 1,344.000 | 243.670 | 1,215.670 | $3.60 | $877.21 | $4,376.41 |
0032 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 88.000 | 588.800 | 588.800 | $1.50 | $0.00 | $883.20 | |
0033 | SEALER RESIN | 523(B) 6560 | GAL | 0.600 | 1.750 | 1.750 | $58.00 | $0.00 | $101.50 | |
Subtotals For Category 0210/BRIDGE 'K' I-244 RAMP TO 1ST. ST. OVER I-444 | $877.21 | $5,361.11 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0211/BRIDGE 'L' US-64/SH-51 OVER ST. LOUIS AVE. | ||||||||
0034 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 2,452.000 | 2,452.000 | 490.800 | 2,451.800 | $3.60 | $1,766.88 | $8,826.48 |
0035 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 172.000 | 2,584.600 | 2,584.600 | $1.50 | $0.00 | $3,876.90 | |
0036 | SEALER RESIN | 523(B) 6560 | GAL | 1.200 | 7.250 | 7.250 | $58.00 | $0.00 | $420.50 | |
Subtotals For Category 0211/BRIDGE 'L' US-64/SH-51 OVER ST. LOUIS AVE. | $1,766.88 | $13,123.88 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0212/BRIDGE 'M' I-44 OVER SOUTH HARVARD AVE. | ||||||||
0037 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 5,826.000 | 5,826.000 | 1,146.530 | 5,733.530 | $3.60 | $4,127.51 | $20,640.71 |
0038 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 408.000 | 7,874.000 | 7,874.000 | $1.50 | $0.00 | $11,811.00 | |
0039 | SEALER RESIN | 523(B) 6560 | GAL | 2.800 | 10.000 | 10.000 | $58.00 | $0.00 | $580.00 | |
Subtotals For Category 0212/BRIDGE 'M' I-44 OVER SOUTH HARVARD AVE. | $4,127.51 | $33,031.71 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0213/BRIDGE 'N' I-44 WB OVER SOUTH DARLINGTON AVE. | ||||||||
0040 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,656.000 | 1,656.000 | 330.890 | 1,655.890 | $3.60 | $1,191.20 | $5,961.20 |
0041 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 116.000 | 2,218.000 | 2,218.000 | $1.50 | $0.00 | $3,327.00 | |
0042 | SEALER RESIN | 523(B) 6560 | GAL | 0.800 | 2.500 | 2.500 | $58.00 | $0.00 | $145.00 | |
Subtotals For Category 0213/BRIDGE 'N' I-44 WB OVER SOUTH DARLINGTON AVE. | $1,191.20 | $9,433.20 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0214/BRIDGE 'O' I-44 EB OVER DARLINGTON AVE. | ||||||||
0043 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,478.000 | 1,478.000 | 295.960 | 1,477.060 | $3.60 | $1,065.46 | $5,317.42 |
0044 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 104.000 | 2,357.800 | 2,357.800 | $1.50 | $0.00 | $3,536.70 | |
0045 | SEALER RESIN | 523(B) 6560 | GAL | 0.700 | 2.500 | 2.500 | $58.00 | $0.00 | $145.00 | |
Subtotals For Category 0214/BRIDGE 'O' I-44 EB OVER DARLINGTON AVE. | $1,065.46 | $8,999.12 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0215/BRIDGE '4' I-444 RAMP OVER S.W. BLVD. | ||||||||
0046 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,680.000 | 1,680.000 | 333.440 | 1,661.440 | $3.60 | $1,200.38 | $5,981.18 |
0047 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 118.000 | 549.400 | -46.000 | 549.400 | $1.50 | $-69.00 | $824.10 |
0048 | SEALER RESIN | 523(B) 6560 | GAL | 0.800 | 1.500 | 1.500 | $58.00 | $0.00 | $87.00 | |
Subtotals For Category 0215/BRIDGE '4' I-444 RAMP OVER S.W. BLVD. | $1,131.38 | $6,892.28 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0216/BRIDGE '40' US-64 OVER DENVER AVE. | ||||||||
0049 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 825.000 | 825.000 | 169.000 | 842.000 | $3.60 | $608.40 | $3,031.20 |
0050 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 58.000 | 508.200 | 508.200 | $1.50 | $0.00 | $762.30 | |
0051 | SEALER RESIN | 523(B) 6560 | GAL | 0.400 | 1.250 | 1.250 | $58.00 | $0.00 | $72.50 | |
Subtotals For Category 0216/BRIDGE '40' US-64 OVER DENVER AVE. | $608.40 | $3,866.00 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0217/BRIDGE '41' TISDALE EXPRESSWAY OVER I-244 | ||||||||
0052 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,644.000 | 1,644.000 | 346.950 | 1,661.950 | $3.60 | $1,249.02 | $5,983.02 |
0053 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 116.000 | 592.500 | 0.020 | 592.520 | $1.50 | $0.03 | $888.78 |
0054 | SEALER RESIN | 523(B) 6560 | GAL | 0.800 | 1.500 | 1.500 | $58.00 | $0.00 | $87.00 | |
Subtotals For Category 0217/BRIDGE '41' TISDALE EXPRESSWAY OVER I-244 | $1,249.05 | $6,958.80 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0218/BRIDGE '45' I-244 OVER BIKE PATH & ABANDONED RR | ||||||||
0055 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,402.000 | 1,402.000 | 293.760 | 1,414.760 | $3.60 | $1,057.54 | $5,093.14 |
0056 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 99.000 | 784.700 | 784.700 | $1.50 | $0.00 | $1,177.05 | |
0057 | SEALER RESIN | 523(B) 6560 | GAL | 0.700 | 1.500 | 1.500 | $58.00 | $0.00 | $87.00 | |
Subtotals For Category 0218/BRIDGE '45' I-244 OVER BIKE PATH & ABANDONED RR | $1,057.54 | $6,357.19 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0219/BRIDGE '46' I-244 RAMP OVER BIKE PATH & ABANDONED RR | ||||||||
0058 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 942.000 | 942.000 | 174.830 | 927.830 | $3.60 | $629.39 | $3,340.19 |
0059 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 66.000 | 1,645.200 | -0.030 | 1,645.170 | $1.50 | $-0.05 | $2,467.75 |
0060 | SEALER RESIN | 523(B) 6560 | GAL | 0.500 | 2.750 | 2.750 | $58.00 | $0.00 | $159.50 | |
Subtotals For Category 0219/BRIDGE '46' I-244 RAMP OVER BIKE PATH & ABANDONED RR | $629.34 | $5,967.44 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0220/BRIDGE '49N' I-244 OVER BRADY ST. | ||||||||
0061 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,362.000 | 1,362.000 | 299.180 | 1,388.180 | $3.60 | $1,077.05 | $4,997.45 |
0062 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 96.000 | 644.900 | 644.900 | $1.50 | $0.00 | $967.35 | |
0063 | SEALER RESIN | 523(B) 6560 | GAL | 0.700 | 1.500 | 1.500 | $58.00 | $0.00 | $87.00 | |
Subtotals For Category 0220/BRIDGE '49N' I-244 OVER BRADY ST. | $1,077.05 | $6,051.80 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0221/BRIDGE '50' I-244 OVER ARCHER ST. | ||||||||
0064 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,297.000 | 1,297.000 | 259.920 | 1,297.920 | $3.60 | $935.71 | $4,672.51 |
0065 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 91.000 | 3,778.800 | -200.000 | 3,578.800 | $1.50 | $-300.00 | $5,368.20 |
0066 | SEALER RESIN | 523(B) 6560 | GAL | 0.700 | 9.000 | 9.000 | $58.00 | $0.00 | $522.00 | |
Subtotals For Category 0221/BRIDGE '50' I-244 OVER ARCHER ST. | $635.71 | $10,562.71 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0222/BRIDGE '52' I-244 OVER STREET & RR | ||||||||
0067 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 5,885.000 | 5,885.000 | 0.000 | $3.60 | $0.00 | $0.00 | |
0068 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 530.000 | 530.000 | 0.000 | $1.50 | $0.00 | $0.00 | |
0069 | SEALER RESIN | 523(B) 6560 | GAL | 3.600 | 3.600 | 0.000 | $58.00 | $0.00 | $0.00 | |
Subtotals For Category 0222/BRIDGE '52' I-244 OVER STREET & RR | $0.00 | $0.00 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0223/BRIDGE '16' I-244 RAMP OVER US-75 | ||||||||
0070 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 670.000 | 670.000 | 130.440 | 649.440 | $3.60 | $469.58 | $2,337.98 |
0071 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 47.000 | 909.600 | 909.600 | $1.50 | $0.00 | $1,364.40 | |
0072 | SEALER RESIN | 523(B) 6560 | GAL | 0.400 | 3.000 | 3.000 | $58.00 | $0.00 | $174.00 | |
Subtotals For Category 0223/BRIDGE '16' I-244 RAMP OVER US-75 | $469.58 | $3,876.38 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0224/BRIDGE '19' I-244 EB OVER I-444 & RR | ||||||||
0073 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 4,564.000 | 4,564.000 | 914.820 | 4,571.820 | $3.60 | $3,293.35 | $16,458.55 |
0074 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 411.000 | 4,628.500 | 4,628.500 | $1.50 | $0.00 | $6,942.75 | |
0075 | SEALER RESIN | 523(B) 6560 | GAL | 2.800 | 10.250 | 10.250 | $58.00 | $0.00 | $594.50 | |
Subtotals For Category 0224/BRIDGE '19' I-244 EB OVER I-444 & RR | $3,293.35 | $23,995.80 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0225/BRIDGE '21' I-244 RAMP OVER ARCHER ST. & RR | ||||||||
0076 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,667.000 | 1,667.000 | 333.330 | 1,666.330 | $3.60 | $1,199.99 | $5,998.79 |
0077 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 117.000 | 2,093.800 | 2,093.800 | $1.50 | $0.00 | $3,140.70 | |
0078 | SEALER RESIN | 523(B) 6560 | GAL | 0.800 | 4.500 | 4.500 | $58.00 | $0.00 | $261.00 | |
Subtotals For Category 0225/BRIDGE '21' I-244 RAMP OVER ARCHER ST. & RR | $1,199.99 | $9,400.49 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0226/BRIDGE '22' I-244 OVER ARCHER ST. & RR | ||||||||
0079 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,857.000 | 1,857.000 | 372.290 | 1,857.290 | $3.60 | $1,340.24 | $6,686.24 |
0080 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 130.000 | 1,141.800 | -20.000 | 2,077.700 | $1.50 | $-30.00 | $3,116.55 |
0081 | SEALER RESIN | 523(B) 6560 | GAL | 0.900 | 3.750 | 3.750 | $58.00 | $0.00 | $217.50 | |
Subtotals For Category 0226/BRIDGE '22' I-244 OVER ARCHER ST. & RR | $1,310.24 | $10,020.29 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0227/BRIDGE '24' I-244 OVER GREENWOOD AVE. | ||||||||
0082 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,494.000 | 1,494.000 | 299.440 | 1,494.440 | $3.60 | $1,077.98 | $5,379.98 |
0083 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 105.000 | 1,362.300 | 6.000 | 1,368.300 | $1.50 | $9.00 | $2,052.45 |
0084 | SEALER RESIN | 523(B) 6560 | GAL | 0.700 | 3.750 | 3.750 | $58.00 | $0.00 | $217.50 | |
Subtotals For Category 0227/BRIDGE '24' I-244 OVER GREENWOOD AVE. | $1,086.98 | $7,649.93 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0228/BRIDGE '26' I-244 OVER ELGIN AVE. | ||||||||
0085 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,250.000 | 1,250.000 | 240.000 | 1,240.000 | $3.60 | $864.00 | $4,464.00 |
0086 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 88.000 | 1,889.600 | 1,889.600 | $1.50 | $0.00 | $2,834.40 | |
0087 | SEALER RESIN | 523(B) 6560 | GAL | 0.600 | 5.250 | 5.250 | $58.00 | $0.00 | $304.50 | |
Subtotals For Category 0228/BRIDGE '26' I-244 OVER ELGIN AVE. | $864.00 | $7,602.90 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0229/BRIDGE '28' I-244 OVER DETROIT AVE. | ||||||||
0088 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 684.000 | 684.000 | 133.560 | 680.560 | $3.60 | $480.82 | $2,450.02 |
0089 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 48.000 | 396.000 | 396.000 | $1.50 | $0.00 | $594.00 | |
0090 | SEALER RESIN | 523(B) 6560 | GAL | 0.400 | 0.750 | 0.750 | $58.00 | $0.00 | $43.50 | |
Subtotals For Category 0229/BRIDGE '28' I-244 OVER DETROIT AVE. | $480.82 | $3,087.52 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0230/BRIDGE '30' I-244 OVER CINCINNATI AVE. | ||||||||
0091 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 786.000 | 786.000 | 157.370 | 785.370 | $3.60 | $566.53 | $2,827.33 |
0092 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 56.000 | 716.800 | 716.800 | $1.50 | $0.00 | $1,075.20 | |
0093 | SEALER RESIN | 523(B) 6560 | GAL | 0.400 | 1.750 | 1.750 | $58.00 | $0.00 | $101.50 | |
Subtotals For Category 0230/BRIDGE '30' I-244 OVER CINCINNATI AVE. | $566.53 | $4,004.03 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0231/BRIDGE '32' I-244 OVER BOSTON AVE. | ||||||||
0094 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 857.000 | 857.000 | 170.350 | 855.350 | $3.60 | $613.26 | $3,079.26 |
0095 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 60.000 | 608.200 | 608.200 | $1.50 | $0.00 | $912.30 | |
0096 | SEALER RESIN | 523(B) 6560 | GAL | 0.400 | 1.750 | 1.750 | $58.00 | $0.00 | $101.50 | |
Subtotals For Category 0231/BRIDGE '32' I-244 OVER BOSTON AVE. | $613.26 | $4,093.06 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0232/BRIDGE '33' I-244 RAMP OVER BOSTON AVE. | ||||||||
0097 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 246.000 | 246.000 | 51.110 | 247.110 | $3.60 | $184.00 | $889.60 |
0098 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 18.000 | 149.800 | 149.800 | $1.50 | $0.00 | $224.70 | |
0099 | SEALER RESIN | 523(B) 6560 | GAL | 0.200 | 0.250 | 0.250 | $58.00 | $0.00 | $14.50 | |
Subtotals For Category 0232/BRIDGE '33' I-244 RAMP OVER BOSTON AVE. | $184.00 | $1,128.80 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0233/BRIDGE '34E' I-244 OVER MAIN ST. | ||||||||
0100 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 980.000 | 980.000 | 196.560 | 980.560 | $3.60 | $707.62 | $3,530.02 |
0101 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 69.000 | 937.100 | 937.100 | $1.50 | $0.00 | $1,405.65 | |
0102 | SEALER RESIN | 523(B) 6560 | GAL | 0.500 | 2.750 | 2.750 | $58.00 | $0.00 | $159.50 | |
Subtotals For Category 0233/BRIDGE '34E' I-244 OVER MAIN ST. | $707.62 | $5,095.17 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0234/BRIDGE '35E' I-244 OVER BOULDER AVE. | ||||||||
0103 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 910.000 | 910.000 | 181.380 | 909.380 | $3.60 | $652.97 | $3,273.77 |
0104 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 64.000 | 574.400 | 574.400 | $1.50 | $0.00 | $861.60 | |
0105 | SEALER RESIN | 523(B) 6560 | GAL | 0.500 | 1.000 | 1.000 | $58.00 | $0.00 | $58.00 | |
Subtotals For Category 0234/BRIDGE '35E' I-244 OVER BOULDER AVE. | $652.97 | $4,193.37 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0235/BRIDGE '36E' I-244 OVER CHEYENNE AVE. | ||||||||
0106 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 912.000 | 912.000 | 182.250 | 911.250 | $3.60 | $656.10 | $3,280.50 |
0107 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 64.000 | 637.000 | 637.000 | $1.50 | $0.00 | $955.50 | |
0108 | SEALER RESIN | 523(B) 6560 | GAL | 0.500 | 1.750 | 1.750 | $58.00 | $0.00 | $101.50 | |
Subtotals For Category 0235/BRIDGE '36E' I-244 OVER CHEYENNE AVE. | $656.10 | $4,337.50 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0236/BRIDGE '38' I-244 OVER DENVER AVE. | ||||||||
0109 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 936.000 | 936.000 | 189.760 | 937.760 | $3.60 | $683.14 | $3,375.94 |
0110 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 66.000 | 745.000 | 0.200 | 745.200 | $1.50 | $0.30 | $1,117.80 |
0111 | SEALER RESIN | 523(B) 6560 | GAL | 0.500 | 2.250 | 2.250 | $58.00 | $0.00 | $130.50 | |
Subtotals For Category 0236/BRIDGE '38' I-244 OVER DENVER AVE. | $683.44 | $4,624.24 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0237/BRIDGE '43' I-244 RAMP OVER US-64 RAMP | ||||||||
0112 | WATER REPELLENT (PERFORMANCE TESTED) | 515(B) 6014 | SY | 1,046.000 | 1,046.000 | 400.330 | 1,237.130 | $3.60 | $1,441.19 | $4,453.67 |
0113 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 74.000 | 825.600 | 825.600 | $1.50 | $0.00 | $1,238.40 | |
0114 | SEALER RESIN | 523(B) 6560 | GAL | 0.500 | 1.750 | 1.750 | $58.00 | $0.00 | $101.50 | |
Subtotals For Category 0237/BRIDGE '43' I-244 RAMP OVER US-64 RAMP | $1,441.19 | $5,793.57 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0300/TRAFFIC CONTROL | ||||||||
0115 | (PL)TRUCK MOUNTED ATTENUATOR | 876(A) 8482 | SD | 120.000 | 120.000 | 40.000 | $140.00 | $0.00 | $5,600.00 | |
0116 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 240.000 | 240.000 | 58.000 | $20.00 | $0.00 | $1,160.00 | |
0117 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 840.000 | 840.000 | 0.000 | 1.000 | $2.25 | $0.00 | $2.25 |
0118 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 1,560.000 | 1,560.000 | 0.000 | 18.000 | $2.25 | $0.00 | $40.50 |
0119 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 1,440.000 | 1,440.000 | 0.000 | 227.000 | $2.25 | $0.00 | $510.75 |
0120 | CONSTRUCTION BARRICADES(TYPE III) | 880(C) 8842 | SD | 360.000 | 360.000 | 0.000 | 20.000 | $2.25 | $0.00 | $45.00 |
0121 | WING BARRICADES | 880(C) 8848 | SD | 120.000 | 120.000 | 0.000 | $2.25 | $0.00 | $0.00 | |
0122 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 1,320.000 | 1,320.000 | 0.000 | 235.000 | $0.35 | $0.00 | $82.25 |
0123 | DRUMS | 880(F) 8878 | SD | 1,500.000 | 1,500.000 | 625.000 | $1.20 | $0.00 | $750.00 | |
0124 | CHANNELIZER CONES | 880(G) 8890 | SD | 1,500.000 | 1,500.000 | 0.000 | 952.000 | $1.20 | $0.00 | $1,142.40 |
0125 | PORT.CHANGEABLE MESSAGE SIGN | 882(A) 8306 | SD | 240.000 | 240.000 | 34.000 | $35.00 | $0.00 | $1,190.00 | |
Subtotals For Category 0300/TRAFFIC CONTROL | $0.00 | $10,523.15 | ||||||||
Fed/State Project Number: SSP-272C(017)SS | Project: 23185(09) | Category: 0640/CONSTRUCTION | ||||||||
0126 | MOBILIZATION | 641 1399 | LSUM | 1.000 | 1.000 | 0.500 | 1.000 | $31,000.00 | $15,500.00 | $31,000.00 |
Subtotals For Category 0640/CONSTRUCTION | $15,500.00 | $31,000.00 | ||||||||
Subtotals For Project SSP-272C(017)SS /23185(09) | $61,617.82 | $363,871.06 |