Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    10/17/2012
Contract ID: 120140   Estimate Number: 0005     Contract No: 711072
Residency: PERRY (04100)   Estimate Type: Progressive     Account No: 404400

Project Number(s): SBR-136N(211)SB
Primary Job Piece No: 28315(04)
Contract Description: BRIDGE REHABILITATION US-60B/US-177: OVER US-60 IN TONKAWA. PROJECT LENGTH = 0.062 MILES.
Primary County: KAY              
Name of Road: US-60B / US-177              
Prime Contractor: K & R BUILDERS, INC.              
    P.O. BOX 656              
    WHEATLAND , OK   73097              
Surety Company: OHIO CASUALTY INSURANCE COMPANY              

Date Let: 03/15/2012 NTP Effective Date: 08/06/2012 Pay Period: 10/01/2012  TO  10/15/2012
Date Awarded: 04/02/2012 Date Work Began: 08/06/2012 Original Contract Time: 90
Date Contract Executed: 04/13/2012 Date Time Stopped: Current Time Charged: 64.00
Date NTP Issued: 04/18/2012 Completion Date: Current Time Allowed: 90.00
General Liability Expires: 05/01/2013 Workman's Comp Expires: 07/01/2013 Percent Time Used: 71.11 %
Specification Year: 2009     Date Approved:

Current Contract Amount: $1,228,814.77 Total to Date Prev to Date This Estimate
Bid Amount: $1,228,814.77 Participating: $0.00 $0.00 $0.00
Percent Complete: 68.00 % Non Participating: $827,620.53 $577,642.18 $249,978.35
Funds Available: $393,176.80 Total Earnings: $827,620.53 $577,642.18 $249,978.35
Unearned Balance: $393,176.80 Stockpiled Materials: $8,017.44 $10,160.08 $-2,142.64
Gross Earnings: $835,637.97 $587,802.26 $247,835.71
Other Adjustments: $0.00 $0.00 $0.00
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $835,637.97 $587,802.26 $247,835.71

Estimate Adjustment Detail

Contract ID: 120140   Estimate Number: 0005     Primary JP: 28315(04)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 ACCEPT PLAN QUANTITY FOR UNCLASSIFIED EXCAVATION Approved 08/17/2012 0.0 $0.00


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
28315(04) 0021 Approach Slab Epoxy Reinf.Steel Stockpiled Material Initial Payment 0002 $1,997.67
28315(04) 0021 Approach Slab Epoxy Reinf.Steel Stockpiled Material Adjustment 0003 $-1,997.67
28315(04) 0024 Epoxy Reinf.Steel for Parapet walls Stockpiled Material Initial Payment 0002 $2,888.28
28315(04) 0024 Epoxy Reinf.Steel for Parapet walls Stockpiled Material Adjustment 0003 $-1,532.28
28315(04) 0027 Slope Wall Reinf.Steel Stockpiled Material Adjustment 0004 $-1,244.77
28315(04) 0027 Slope Wall Reinf.Steel Stockpiled Material Initial Payment 0002 $10,033.27
28315(04) 0027 Slope Wall Reinf.Steel Stockpiled Material Adjustment 0005 $-2,142.64
28315(04) 0028 Reinf.Steel for Abut.2 Encapsulation Stockpiled Material Initial Payment 0002 $351.00
28315(04) 0028 Reinf.Steel for Abut.2 Encapsulation Stockpiled Material Adjustment 0002 $-335.42
28315(04) 0029 Epoxy Reinf.Steel for Bridge Deck - phase 1 Stockpiled Material Initial Payment 0001 $21,535.00
28315(04) 0029 Epoxy Reinf.Steel for Bridge Deck - phase 1 Stockpiled Material Adjustment 0002 $-21,535.00
28315(04) 0029 Epoxy Reinf.Steel for Barrier Slab Stockpiled Material Adjustment 0002 $-4,213.19
28315(04) 0029 Epoxy Reinf.Steel for Barrier Slab Stockpiled Material Initial Payment 0002 $4,213.19
Subtotals For Stockpile Payments $8,017.44


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.
Subtotals For Liquidated Damages $


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
No line item adjustments have been created on this contract.
Subtotals For Line Item Adjustments $0.00


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
01 Incentive/Disincentive for Early/Late Completion 08/06/2012 NOT ENTERED 75.00 DYS $2,000.00 N


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
No milestones adjustments exist for this contract.
Subtotals For Milestones $

Line Item Detail

Contract ID: 120140   Estimate Number: 0005     Primary JP: 28315(04)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    SBR-136N(211)SB Project:    28315(04) Category:    0100/ROADWAY
0001 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 200.000 200.000   100.000 $11.00 $0.00 $1,100.00
0002 UNCLASSIFIED BORROW 202(D) 0184 CY 2,200.000 2,200.000 1,192.000 2,200.000 $12.99 $15,484.08 $28,578.00
0003 TEMPORARY SILT FENCE 221(C) 2801 LF 1,000.000 1,000.000 0.000 765.000 $1.95 $0.00 $1,491.75
0004 SOLID SLAB SODDING 230(A) 2806 SY 4,000.000 4,000.000   0.000 $2.40 $0.00 $0.00
0005 AGGREGATE BASE TYPE A 303(A) 2100 CY 152.000 152.000 11.240 97.220 $72.00 $809.28 $6,999.84
0006 FOG SEAL 407(A) 4659 GAL 49.360 49.360   0.000 $25.00 $0.00 $0.00
0007 TACK COAT 407(B) 0250 GAL 185.130 185.130   0.000 $4.00 $0.00 $0.00
0008 PRIME COAT 408 5774 GAL 392.000 392.000   0.000 $10.00 $0.00 $0.00
0009 SUPERPAVE, TYPE S4(PG 64-22 OK) 411(C) 5960 TON 660.370 660.370   0.000 $125.00 $0.00 $0.00
0010 COLD MILLING PAVEMENT 412 5267 SY 2,468.400 2,468.400   1,590.910 $11.00 $0.00 $17,500.01
0011 CLASS AA CONCRETE 509(A) 0319 CY 53.800 53.800   0.000 $495.00 $0.00 $0.00
0012 CLASS C CONCRETE 509(D) 0325 CY 17.300 17.300 3.750 3.750 $525.00 $1,968.75 $1,968.75
0013 EPOXY COATED REINFORCING STEEL 511(B) 4269 LB 7,496.000 7,496.000   0.000 $1.05 $0.00 $0.00
0014 REMOVAL OF GUARDRAIL 619(B) 4780 LF 510.000 510.000   510.000 $3.50 $0.00 $1,785.00
0015 SAWING PAVEMENT 619(C) 0924 LF 910.000 910.000 378.000 1,114.000 $5.75 $2,173.50 $6,405.50
0016 (PL)GUARDRAIL CURBING 623 0100 EA 4.000 4.000   0.000 $657.00 $0.00 $0.00
0017 BEAM GUARDRAIL W-BEAM SINGLE 623(A) 0932 LF 945.500 945.500 212.500 212.500 $18.00 $3,825.00 $3,825.00
0018 GUARDRAIL ANCHOR UNIT (TYPE B) 623(F) 4447 EA 2.000 2.000 1.000 1.000 $775.00 $775.00 $775.00
0019 GUARDRAIL END TREATMENT (GET) 623(G) 8571 EA 4.000 4.000 1.000 1.000 $2,500.00 $2,500.00 $2,500.00
0020 GUARDRAIL BRIDGE CONNECTION-TYPE A 623(I) 8675 EA 6.000 6.000 2.000 2.000 $1,500.00 $3,000.00 $3,000.00
Subtotals For Category     0100/ROADWAY    $30,535.61 $75,928.85
Fed/State Project Number:    SBR-136N(211)SB Project:    28315(04) Category:    0200/BRIDGE A
0021 APPROACH SLAB 504(A) 1304 SY 204.400 204.400 102.180 204.400 $205.00 $20,946.90 $41,902.00
0022 SAW-CUT GROOVING 504(B) 1305 SY 1,078.200 1,078.200   0.000 $4.00 $0.00 $0.00
0023 SEALED EXPANSION JOINT 504(C) 6250 LF 92.000 92.000 46.000 92.000 $305.00 $14,030.00 $28,060.00
0024 CONCRETE PARAPET 504(E) 1381 LF 652.000 652.000 0.000 226.000 $95.00 $0.00 $21,470.00
0025 STRUCTURAL STEEL 506(A) 1322 LB 1,280.000 1,280.000 0.000 820.260 $5.50 $0.00 $4,511.43
0026 CLASS AA CONCRETE 509(A) 1326 CY 241.800 241.800 98.300 240.300 $780.00 $76,674.00 $187,434.00
0027 SLOPE WALL (4") 510(C) 6137 SY 2,983.100 2,983.100 313.710 495.960 $65.50 $20,548.01 $32,485.39
0028 REINFORCING STEEL 511(A) 1332 LB 622.000 622.000   621.140 $1.05 $0.00 $652.20
0029 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 78,845.000 78,845.000 39,422.500 78,845.000 $1.09 $42,970.53 $85,941.06
0030 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   1.000 $33,500.00 $0.00 $33,500.00
0031 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000 0.250 0.750 $4,500.00 $1,125.00 $3,375.00
0032 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 340.200 340.200   0.000 $4.60 $0.00 $0.00
0033 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 65.000 65.000 39.000 39.000 $55.00 $2,145.00 $2,145.00
0034 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 2.500 2.500 0.380 0.380 $55.00 $20.90 $20.90
0035 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 11.000 11.000   0.000 $650.00 $0.00 $0.00
0036 SEALER CRACK PREPARATION 523(A) 6550 LF 186.000 186.000   0.000 $4.00 $0.00 $0.00
0037 SEALER RESIN 523(B) 6560 GAL 1.900 1.900   0.000 $200.00 $0.00 $0.00
0038 (SP)CORROSION INHIBITOR(SURFACE APPLIED) 535 6130 SY 59.800 59.800   29.920 $25.00 $0.00 $748.00
0039 (PL)REPAIR BRIDGE ITEM (TYPE A) 540 4515 EA 4.000 4.000   0.000 $1,100.00 $0.00 $0.00
0040 (PL)REPAIR BRIDGE ITEM (TYPE B) 540 4525 EA 12.000 12.000 12.000 12.000 $1,800.00 $21,600.00 $21,600.00
0041 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000 0.050 1.000 $140,000.00 $7,000.00 $140,000.00
Subtotals For Category     0200/BRIDGE A    $207,060.34 $603,844.98
Fed/State Project Number:    SBR-136N(211)SB Project:    28315(04) Category:    0300/TRAFFIC
0042 (SP)PORTABLE TRAFFIC SIGNAL SYSTEM 823 8478 SD 90.000 90.000 15.000 71.000 $150.00 $2,250.00 $10,650.00
0043 TRAFFIC STRIPE(PAINT)(4" WIDE) 854(A) 8800 LF 14,000.000 14,000.000   0.000 $0.10 $0.00 $0.00
0044 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 857(A) 8839 LF 4,144.000 4,144.000   4,132.000 $0.12 $0.00 $495.84
0045 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 857(F) 8006 LF 10,000.000 10,000.000   1,845.000 $0.07 $0.00 $129.15
0046 (SP)CONST.ZONE IMPACT ATTEN. 871(B) 8705 SD 360.000 360.000   0.000 $2.40 $0.00 $0.00
0047 (PL)TRUCK MOUNTED ATTENUATOR 876(A) 8482 SD 180.000 180.000   0.000 $8.95 $0.00 $0.00
0048 DELIVER PORTABLE LONGITUDINAL BARRIER 877(B) 8484 LF 1,000.000 1,000.000   943.000 $26.50 $0.00 $24,989.50
0049 RELOCATION OF PORTABLE LONGITUDINAL BARRIER 877(C) 8486 LF 1,000.000 1,000.000   923.000 $3.60 $0.00 $3,322.80
0050 ARROW DISPLAY(TYPE C) 880(A) 8812 SD 180.000 180.000 30.000 132.000 $7.00 $210.00 $924.00
0051 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 6,120.000 6,120.000 915.000 4,331.000 $0.07 $64.05 $303.17
0052 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 720.000 720.000 915.000 4,331.000 $3.60 $3,294.00 $15,591.60
0053 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 3,960.000 3,960.000 720.000 3,408.000 $0.30 $216.00 $1,022.40
0054 CONSTRUCTION BARRICADES(TYPE III) 880(C) 8842 SD 14,520.000 14,520.000 1,080.000 5,112.000 $0.07 $75.60 $357.84
0055 WING BARRICADES 880(C) 8848 SD 720.000 720.000   0.000 $0.18 $0.00 $0.00
0056 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 2,790.000 2,790.000 2,880.000 13,580.000 $1.15 $3,312.00 $15,617.00
0057 DRUMS 880(F) 8878 SD 12,240.000 12,240.000 2,525.000 8,880.000 $0.43 $1,085.75 $3,818.40
Subtotals For Category     0300/TRAFFIC    $10,507.40 $77,221.70
Fed/State Project Number:    SBR-136N(211)SB Project:    28315(04) Category:    0600/STAKING
0058 CONSTRUCTION STAKING LEVEL I 642(A) 0095 LSUM 1.000 1.000 0.250 0.750 $7,500.00 $1,875.00 $5,625.00
Subtotals For Category     0600/STAKING    $1,875.00 $5,625.00
Fed/State Project Number:    SBR-136N(211)SB Project:    28315(04) Category:    0640/CONSTRUCTION
0059 MOBILIZATION 641 1552 LSUM 1.000 1.000   1.000 $65,000.00 $0.00 $65,000.00
Subtotals For Category     0640/CONSTRUCTION    $0.00 $65,000.00
Subtotals For Project SBR-136N(211)SB /28315(04) $249,978.35 $827,620.53