| Fed/State Project Number: STP-142C(119)AG |
Project: 23018(04) |
Category: 0100/ROADWAY |
| 0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
0.050 |
1.000 |
$6,000.00 |
$300.00 |
$6,000.00 |
| 0002 |
EARTHWORK |
202(H) 0185 |
LSUM |
1.000 |
1.000 |
|
0.950 |
$88,000.00 |
$0.00 |
$83,600.00 |
| 0003 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.800 |
$7,400.00 |
$0.00 |
$5,920.00 |
| 0004 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
600.000 |
600.000 |
|
1,550.000 |
$2.00 |
$0.00 |
$3,100.00 |
| 0005 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
600.000 |
600.000 |
|
112.000 |
$6.00 |
$0.00 |
$672.00 |
| 0006 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
14,774.000 |
14,774.000 |
|
0.000 |
$1.80 |
$0.00 |
$0.00 |
| 0007 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
2.270 |
2.270 |
|
0.000 |
$750.00 |
$0.00 |
$0.00 |
| 0008 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
6,050.000 |
6,050.000 |
3,073.610 |
5,401.670 |
$5.00 |
$15,368.05 |
$27,008.35 |
| 0009 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
325.000 |
325.000 |
|
0.000 |
$35.00 |
$0.00 |
$0.00 |
| 0010 |
TACK COAT |
407(B) 0250 |
GAL |
290.000 |
290.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
| 0011 |
PRIME COAT |
408 5774 |
GAL |
1,300.000 |
1,300.000 |
|
0.000 |
$7.50 |
$0.00 |
$0.00 |
| 0012 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
1,170.000 |
1,170.000 |
767.850 |
767.850 |
$69.85 |
$53,634.32 |
$53,634.32 |
| 0013 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
570.000 |
570.000 |
|
0.000 |
$84.85 |
$0.00 |
$0.00 |
| 0014 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
20.000 |
20.000 |
|
0.000 |
$250.00 |
$0.00 |
$0.00 |
| 0015 |
TYPE I PLAIN RIPRAP |
601(A) 0297 |
TON |
310.000 |
310.000 |
|
228.260 |
$39.00 |
$0.00 |
$8,902.14 |
| 0016 |
36" CORR. GALV. STEEL PIPE |
613(B) 0692 |
LF |
86.000 |
86.000 |
|
86.000 |
$38.00 |
$0.00 |
$3,268.00 |
| 0017 |
28" X 20" CORR. GALV. STEEL PIPE ARCH |
613(B) 4528 |
LF |
92.000 |
92.000 |
|
92.000 |
$27.00 |
$0.00 |
$2,484.00 |
| 0018 |
TYPE B4 CULVERT END TREATMENT |
613(M) 7187 |
EA |
4.000 |
4.000 |
4.000 |
4.000 |
$850.00 |
$3,400.00 |
$3,400.00 |
| 0019 |
TYPE D4 CULVERT END TREATMENT |
613(M) 7189 |
EA |
2.000 |
2.000 |
2.000 |
2.000 |
$600.00 |
$1,200.00 |
$1,200.00 |
| 0020 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.950 |
$3,000.00 |
$0.00 |
$2,850.00 |
| 0021 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
3,601.000 |
3,601.000 |
|
3,601.000 |
$2.50 |
$0.00 |
$9,002.50 |
| 0022 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
45.000 |
45.000 |
|
0.000 |
$8.00 |
$0.00 |
$0.00 |
| 0023 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
200.000 |
200.000 |
|
0.000 |
$16.00 |
$0.00 |
$0.00 |
| 0024 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
4.000 |
4.000 |
|
0.000 |
$2,100.00 |
$0.00 |
$0.00 |
| 0025 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
4.000 |
4.000 |
|
0.000 |
$1,985.00 |
$0.00 |
$0.00 |
| 0026 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
5.180 |
5.180 |
|
0.000 |
$35.00 |
$0.00 |
$0.00 |
| 0027 |
2 1/4" SQUARE TUBE POST |
851(C) 8327 |
LF |
12.500 |
12.500 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
| 0028 |
TRAFFIC STRIPE(PAINT)(4" WIDE) |
854(A) 8800 |
LF |
3,200.000 |
3,200.000 |
|
0.000 |
$0.62 |
$0.00 |
$0.00 |
| Subtotals For Category 0100/ROADWAY |
$73,902.37 |
$211,041.31 |
|
| Fed/State Project Number: STP-142C(119)AG |
Project: 23018(04) |
Category: 0200/BRIDGE 'A' |
| 0029 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
84.000 |
84.000 |
|
84.000 |
$10.00 |
$0.00 |
$840.00 |
| 0030 |
UNCLASSIFIED BACKFILL |
501(D) 6353 |
CY |
80.000 |
80.000 |
|
80.000 |
$12.00 |
$0.00 |
$960.00 |
| 0031 |
PRESTRESSED CONCRETE BEAMS (TYPE III) |
503(A) 1312 |
LF |
890.000 |
890.000 |
|
890.000 |
$164.25 |
$0.00 |
$146,182.50 |
| 0032 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
828.000 |
828.000 |
828.000 |
828.000 |
$5.05 |
$4,181.40 |
$4,181.40 |
| 0033 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
35.420 |
35.420 |
|
35.420 |
$260.00 |
$0.00 |
$9,209.20 |
| 0034 |
CONCRETE RAIL (TR1) |
504(E) 1380 |
LF |
507.000 |
507.000 |
|
507.000 |
$48.00 |
$0.00 |
$24,336.00 |
| 0035 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
734.000 |
734.000 |
|
734.000 |
$1.95 |
$0.00 |
$1,431.30 |
| 0036 |
WEATHERING STEEL FIXED BEARING ASSEMBLY |
507(A) 6172 |
EA |
12.000 |
12.000 |
|
12.000 |
$625.00 |
$0.00 |
$7,500.00 |
| 0037 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY |
507(B) 6176 |
EA |
12.000 |
12.000 |
|
12.000 |
$625.00 |
$0.00 |
$7,500.00 |
| 0038 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
204.900 |
204.900 |
|
204.900 |
$420.00 |
$0.00 |
$86,058.00 |
| 0039 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
103.500 |
103.500 |
|
103.500 |
$420.00 |
$0.00 |
$43,470.00 |
| 0040 |
REINFORCING STEEL |
511(A) 1332 |
LB |
69,240.000 |
18,920.000 |
|
18,710.000 |
$1.02 |
$0.00 |
$19,084.20 |
| 0041 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
977.000 |
977.000 |
|
977.000 |
$29.00 |
$0.00 |
$28,333.00 |
| 0042 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
977.000 |
977.000 |
|
977.000 |
$10.00 |
$0.00 |
$9,770.00 |
| 0043 |
DRILLED SHAFTS 54" DIAMETER |
516(A) 6095 |
LF |
197.000 |
197.000 |
|
227.380 |
$465.00 |
$0.00 |
$105,731.70 |
| 0044 |
TYPE I-A PLAIN RIPRAP |
601(B) 1353 |
TON |
2,753.000 |
2,753.000 |
|
2,091.060 |
$39.00 |
$0.00 |
$81,551.34 |
| 0045 |
TYPE I-A FILTER BLANKET |
601(C) 1355 |
TON |
596.000 |
596.000 |
|
447.910 |
$34.00 |
$0.00 |
$15,228.94 |
| 0046 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$25,000.00 |
$0.00 |
$25,000.00 |
| 0047 |
CONSTRUCTION TRAFFIC CONTROL |
880(J) 8905 |
LSUM |
1.000 |
1.000 |
|
0.996 |
$3,700.00 |
$0.00 |
$3,685.20 |
| 8000 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
0.000 |
50,320.000 |
|
50,320.000 |
$1.16 |
$0.00 |
$58,371.20 |
| 8001 |
REMOVAL OF EXISTING RIPRAP |
619(B) 6364 |
LSUM |
0.000 |
1.000 |
0.100 |
1.000 |
$9,600.00 |
$960.00 |
$9,600.00 |
| Subtotals For Category 0200/BRIDGE 'A' |
$5,141.40 |
$688,023.98 |
|