Fed/State Project Number: STPY-110B(181)SS |
Project: 20231(07) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$40,000.00 |
$0.00 |
$40,000.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
40,508.000 |
40,508.000 |
0.000 |
36,457.200 |
$4.90 |
$0.00 |
$178,640.29 |
0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
42,812.000 |
42,812.000 |
|
38,530.800 |
$5.40 |
$0.00 |
$208,066.32 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
|
0.900 |
$37,000.00 |
$0.00 |
$33,300.00 |
0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
1,360.000 |
1,360.000 |
582.000 |
1,793.000 |
$1.80 |
$1,047.60 |
$3,227.40 |
0006 |
TEMPORARY SEDIMENT FILTER |
221(D) 2803 |
EA |
4.000 |
4.000 |
|
4.000 |
$185.00 |
$0.00 |
$740.00 |
0007 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
322.000 |
322.000 |
70.000 |
140.000 |
$8.25 |
$577.50 |
$1,155.00 |
0008 |
TEMPORARY ROCK FILTER DAM TYPE 4 |
221(G) 0153 |
CY |
4.000 |
4.000 |
|
0.000 |
$205.00 |
$0.00 |
$0.00 |
0009 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
55,747.000 |
55,747.000 |
|
0.000 |
$1.55 |
$0.00 |
$0.00 |
0010 |
MULCH SODDING |
230(B) 2807 |
SY |
53,541.000 |
53,541.000 |
|
0.000 |
$1.80 |
$0.00 |
$0.00 |
0011 |
SEEDING METHOD B |
232(B) 2814 |
AC |
14.000 |
14.000 |
|
0.000 |
$465.00 |
$0.00 |
$0.00 |
0012 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
14.000 |
14.000 |
|
9.470 |
$465.00 |
$0.00 |
$4,403.55 |
0013 |
MOWING |
241 2832 |
AC |
28.000 |
28.000 |
|
0.000 |
$90.00 |
$0.00 |
$0.00 |
0014 |
CEMENT KILN DUST |
307(B) 4210 |
TON |
3,554.000 |
3,554.000 |
|
3,048.180 |
$46.00 |
$0.00 |
$140,216.28 |
0015 |
LIME |
307(D) 4230 |
TON |
772.000 |
772.000 |
|
414.790 |
$155.00 |
$0.00 |
$64,292.45 |
0016 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
83,793.000 |
83,793.000 |
|
84,792.890 |
$2.45 |
$0.00 |
$207,742.58 |
0017 |
LIME PRETREATMENT |
307(G) 4260 |
SY |
33,647.000 |
33,647.000 |
|
40,617.050 |
$1.80 |
$0.00 |
$73,110.68 |
0018 |
TRAFFIC BOUND SURFACE COURSE TYPE A |
402(A) 0217 |
TON |
2,053.000 |
2,053.000 |
133.060 |
1,089.370 |
$18.00 |
$2,395.08 |
$19,608.66 |
0019 |
TACK COAT |
407(B) 0250 |
GAL |
12,701.000 |
12,701.000 |
|
11,402.500 |
$2.40 |
$0.00 |
$27,366.00 |
0020 |
PRIME COAT |
408 5774 |
GAL |
19,722.000 |
19,722.000 |
|
0.000 |
$4.25 |
$0.00 |
$0.00 |
0021 |
SUPERPAVE, TYPE S3(PG 76-28 OK) |
411(B) 5935 |
TON |
11,084.000 |
11,084.000 |
|
10,463.250 |
$64.00 |
$0.00 |
$669,648.00 |
0022 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
31,684.000 |
31,684.000 |
|
31,956.560 |
$57.00 |
$0.00 |
$1,821,523.92 |
0023 |
SUPERPAVE, TYPE S4(PG 76-28 OK) |
411(C) 5950 |
TON |
7,111.000 |
7,111.000 |
|
7,603.210 |
$79.50 |
$0.00 |
$604,455.21 |
0024 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
2,395.000 |
2,395.000 |
|
2,612.570 |
$69.50 |
$0.00 |
$181,573.62 |
0025 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
310.000 |
310.000 |
|
214.880 |
$17.00 |
$0.00 |
$3,652.96 |
0026 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
193.000 |
193.000 |
16.300 |
216.120 |
$420.00 |
$6,846.00 |
$90,770.40 |
0027 |
CLASS A CONCRETE, SMALL STRUCTURES |
509(C) 0322 |
CY |
2.000 |
2.000 |
|
2.600 |
$1,100.00 |
$0.00 |
$2,860.00 |
0028 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
511.000 |
511.000 |
357.800 |
496.970 |
$330.00 |
$118,074.00 |
$164,000.10 |
0029 |
REINFORCING STEEL |
511(A) 0332 |
LB |
30,592.000 |
30,592.000 |
3,150.000 |
36,037.500 |
$1.05 |
$3,307.50 |
$37,839.38 |
0030 |
COMBINED CURB & GUTTER (6" BARRIER) |
609(B) 0383 |
LF |
4,875.000 |
4,875.000 |
|
4,819.000 |
$19.00 |
$0.00 |
$91,561.00 |
0031 |
4" CONCRETE SIDEWALK |
610(A) 0602 |
SY |
817.000 |
817.000 |
|
712.010 |
$60.00 |
$0.00 |
$42,720.60 |
0032 |
6" CONCRETE DRIVEWAY |
610(B) 0604 |
SY |
1,026.000 |
1,026.000 |
|
859.210 |
$50.00 |
$0.00 |
$42,960.50 |
0033 |
MANHOLE (4' DIAMETER) |
611(A) 2657 |
EA |
9.000 |
9.000 |
|
9.000 |
$1,800.00 |
$0.00 |
$16,200.00 |
0034 |
ADD'L.DEPTH IN MANHOLE (4' DIAMETER) |
611(B) 2680 |
VF |
12.000 |
12.000 |
|
11.090 |
$190.00 |
$0.00 |
$2,107.10 |
0035 |
INLET CI DES. 2 (B) |
611(G) 5113 |
EA |
6.000 |
6.000 |
|
6.000 |
$3,500.00 |
$0.00 |
$21,000.00 |
0036 |
INLET CI DES. 3 (B) |
611(G) 5121 |
EA |
2.000 |
2.000 |
|
2.000 |
$4,800.00 |
$0.00 |
$9,600.00 |
0037 |
INLET CI DES. 3 (D) |
611(G) 5122 |
EA |
6.000 |
6.000 |
|
6.000 |
$5,500.00 |
$0.00 |
$33,000.00 |
0038 |
INLET CDI RCB DES. 5 |
611(G) 5391 |
EA |
1.000 |
1.000 |
|
1.000 |
$3,500.00 |
$0.00 |
$3,500.00 |
0039 |
INLET (SMD-TYPE 1) |
611(G) 6000 |
EA |
4.000 |
4.000 |
|
5.000 |
$2,500.00 |
$0.00 |
$12,500.00 |
0040 |
ADD'L DEPTH IN INLET CDI RCB DES. 5 |
611(H) 5540 |
VF |
3.000 |
3.000 |
|
3.000 |
$400.00 |
$0.00 |
$1,200.00 |
0041 |
JUNCTION BOXES |
611(L) 0487 |
CF |
205.000 |
205.000 |
0.000 |
52.130 |
$135.00 |
$0.00 |
$7,037.55 |
0042 |
18" R.C.PIPE CLASS III |
613(A) 0491 |
LF |
1,406.000 |
1,406.000 |
|
1,302.000 |
$52.00 |
$0.00 |
$67,704.00 |
0043 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
542.000 |
542.000 |
|
386.000 |
$66.00 |
$0.00 |
$25,476.00 |
0044 |
30" R.C.PIPE CLASS III |
613(A) 0493 |
LF |
204.000 |
204.000 |
|
80.000 |
$120.00 |
$0.00 |
$9,600.00 |
0045 |
48" R.C.PIPE CLASS III |
613(A) 0496 |
LF |
56.000 |
56.000 |
|
48.000 |
$180.00 |
$0.00 |
$8,640.00 |
0046 |
26" X 15" R.C.PIPE ARCH CLASS A-III |
613(A) 4404 |
LF |
64.000 |
64.000 |
|
64.000 |
$70.00 |
$0.00 |
$4,480.00 |
0047 |
28 1/2" X 18" R.C.PIPE ARCH CLASS A-III |
613(A) 4410 |
LF |
54.000 |
54.000 |
|
53.000 |
$84.00 |
$0.00 |
$4,452.00 |
0048 |
22" X 13" R.C.PIPE ARCH CLASS A-III |
613(A) 4495 |
LF |
784.000 |
784.000 |
|
670.000 |
$58.00 |
$0.00 |
$38,860.00 |
0049 |
36" X 22" R.C.PIPE ARCH CLASS A-III |
613(A) 4497 |
LF |
60.000 |
60.000 |
|
60.000 |
$104.00 |
$0.00 |
$6,240.00 |
0050 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
574.000 |
574.000 |
|
868.000 |
$31.00 |
$0.00 |
$26,908.00 |
0051 |
24" CORR. GALV. STEEL PIPE |
613(B) 0690 |
LF |
56.000 |
56.000 |
|
130.000 |
$36.00 |
$0.00 |
$4,680.00 |
0052 |
36" CORR. GALV. STEEL PIPE |
613(B) 0692 |
LF |
14.000 |
14.000 |
|
0.000 |
$64.00 |
$0.00 |
$0.00 |
0053 |
48" CORR. GALV. STEEL PIPE |
613(B) 0694 |
LF |
136.000 |
136.000 |
|
270.000 |
$81.00 |
$0.00 |
$21,870.00 |
0054 |
21" X 15" CORR. GALV. STEEL PIPE ARCH |
613(B) 4527 |
LF |
242.000 |
242.000 |
|
334.000 |
$42.00 |
$0.00 |
$14,028.00 |
0055 |
28" X 20" CORR. GALV. STEEL PIPE ARCH |
613(B) 4528 |
LF |
234.000 |
234.000 |
|
186.000 |
$47.00 |
$0.00 |
$8,742.00 |
0056 |
36" X 23" PREFAB. CULVERT END SECTION, ARCH |
613(L) 4528 |
EA |
1.000 |
1.000 |
|
1.000 |
$875.00 |
$0.00 |
$875.00 |
0057 |
30" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5732 |
EA |
2.000 |
2.000 |
|
0.000 |
$800.00 |
$0.00 |
$0.00 |
0058 |
48" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5738 |
EA |
1.000 |
1.000 |
|
1.000 |
$1,500.00 |
$0.00 |
$1,500.00 |
0059 |
TYPE A4 CULVERT END TREATMENT |
613(M) 7186 |
EA |
3.000 |
3.000 |
|
0.000 |
$1,050.00 |
$0.00 |
$0.00 |
0060 |
TYPE C4 CULVERT END TREATMENT |
613(M) 7188 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,250.00 |
$0.00 |
$0.00 |
0061 |
TYPE A6 CULVERT END TREATMENT |
613(M) 7196 |
EA |
56.000 |
56.000 |
|
57.000 |
$1,150.00 |
$0.00 |
$65,550.00 |
0062 |
TYPE B6 CULVERT END TREATMENT |
613(M) 7197 |
EA |
10.000 |
10.000 |
|
4.000 |
$1,350.00 |
$0.00 |
$5,400.00 |
0063 |
TYPE E6 CULVERT END TREATMENT |
613(M) 7200 |
EA |
2.000 |
0.000 |
|
0.000 |
$3,100.00 |
$0.00 |
$0.00 |
0064 |
TYPE AA6 CULVERT END TREATMENT |
613(M) 7201 |
EA |
2.000 |
2.000 |
|
2.000 |
$3,600.00 |
$0.00 |
$7,200.00 |
0065 |
TYPE BB6 CULVERT END TREATMENT |
613(M) 7202 |
EA |
2.000 |
2.000 |
|
2.000 |
$4,100.00 |
$0.00 |
$8,200.00 |
0066 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
0.100 |
1.000 |
$44,000.00 |
$4,400.00 |
$44,000.00 |
0067 |
REMOVAL OF HEADWALL |
619(B) 0291 |
EA |
5.000 |
5.000 |
|
5.000 |
$1,200.00 |
$0.00 |
$6,000.00 |
0068 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
1,026.000 |
1,026.000 |
|
621.240 |
$4.60 |
$0.00 |
$2,857.71 |
0069 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
29,234.000 |
29,234.000 |
|
52,882.790 |
$2.60 |
$0.00 |
$137,495.25 |
0070 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY |
619(B) 4763 |
SY |
18,450.000 |
18,450.000 |
|
61.920 |
$6.50 |
$0.00 |
$402.48 |
0071 |
REMOVAL OF CURB |
619(B) 4791 |
LF |
530.000 |
530.000 |
|
559.000 |
$5.00 |
$0.00 |
$2,795.00 |
0072 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
2,447.000 |
2,447.000 |
|
148.000 |
$3.74 |
$0.00 |
$553.52 |
0073 |
FENCE-STYLE WWF |
624(A) 4281 |
LF |
725.000 |
725.000 |
|
622.000 |
$5.00 |
$0.00 |
$3,110.00 |
0074 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
1,854.000 |
1,854.000 |
|
1,754.000 |
$4.35 |
$0.00 |
$7,629.90 |
0075 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
12.000 |
12.000 |
60.000 |
60.000 |
$104.00 |
$6,240.00 |
$6,240.00 |
0076 |
MAILBOX INSTALLATION-MULTIPLE |
629(B) 4959 |
EA |
4.000 |
4.000 |
|
0.000 |
$205.00 |
$0.00 |
$0.00 |
0077 |
MAILBOX |
629(C) 4960 |
EA |
27.000 |
27.000 |
60.000 |
60.000 |
$5.20 |
$312.00 |
$312.00 |
0078 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
16.000 |
16.000 |
|
0.000 |
$10.25 |
$0.00 |
$0.00 |
8001 |
TYPE EE6 CULVERT END TREATMENT |
613(M) 7205 |
EA |
0.000 |
2.000 |
|
2.000 |
$4,990.00 |
$0.00 |
$9,980.00 |
Subtotals For Category 0100/ROADWAY |
$143,199.68 |
$5,413,360.41 |
|
Fed/State Project Number: STPY-110B(181)SS |
Project: 20231(07) |
Category: 0300/TRAFFIC (SIGNING, STRIPING, & LIGHTING) |
0079 |
2" PVC SCH.40 PLASTIC CONDUIT BORED |
802(B) 8340 |
LF |
525.000 |
525.000 |
|
115.000 |
$14.00 |
$0.00 |
$1,610.00 |
0080 |
2" PVC SCH.40 PLASTIC CONDUIT TRENCHED |
802(B) 8342 |
LF |
2,166.000 |
2,166.000 |
|
1,567.000 |
$4.20 |
$0.00 |
$6,581.40 |
0081 |
PULL BOX(SIZE I) |
803(A) 8065 |
EA |
3.000 |
3.000 |
|
0.000 |
$275.00 |
$0.00 |
$0.00 |
0082 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
9.310 |
9.310 |
|
7.760 |
$525.00 |
$0.00 |
$4,074.00 |
0083 |
REINFORCING STEEL |
804(B) 2916 |
LB |
661.400 |
661.400 |
0.000 |
52.600 |
$1.55 |
$0.00 |
$81.53 |
0084 |
(PL)REMOVAL OF EXISTING SIGNS |
805(A) 8724 |
EA |
6.000 |
6.000 |
|
4.000 |
$46.00 |
$0.00 |
$184.00 |
0085 |
(PL)REMOVE & RESET LIGHT POLE |
805(D) 8744 |
EA |
12.000 |
12.000 |
|
6.000 |
$1,100.00 |
$0.00 |
$6,600.00 |
0086 |
(PL)REMOVE & RESET EXISTING SIGNS |
805(D) 8756 |
EA |
7.000 |
7.000 |
|
4.000 |
$155.00 |
$0.00 |
$620.00 |
0087 |
SERVICE POLE |
810(A) 3118 |
EA |
1.000 |
1.000 |
|
2.000 |
$4,200.00 |
$0.00 |
$8,400.00 |
0088 |
1/C NO.4 ELECTRICAL CONDUCTOR |
811 8038 |
LF |
5,878.000 |
5,878.000 |
|
0.000 |
$1.95 |
$0.00 |
$0.00 |
0089 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
1,440.000 |
1,440.000 |
|
0.000 |
$0.60 |
$0.00 |
$0.00 |
0090 |
SOLID STATE FLASHER CONTROLLER(TYPE II) |
827 8623 |
EA |
2.000 |
2.000 |
|
2.000 |
$1,600.00 |
$0.00 |
$3,200.00 |
0091 |
1WAY 1SEC. ADJ. SIG. HD. S-22 |
831 8301 |
EA |
4.000 |
4.000 |
|
4.000 |
$270.00 |
$0.00 |
$1,080.00 |
0092 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
319.800 |
319.800 |
|
189.160 |
$12.50 |
$0.00 |
$2,364.50 |
0093 |
2 1/2"@5.79 GALV.STEEL PIPE POST |
851(B) 3217 |
LF |
39.000 |
39.000 |
|
0.000 |
$14.50 |
$0.00 |
$0.00 |
0094 |
3"@7.58 GALV.STEEL PIPE POST |
851(B) 3218 |
LF |
90.500 |
90.500 |
|
0.000 |
$16.50 |
$0.00 |
$0.00 |
0095 |
4"@10.79 GALV.STEEL PIPE POST |
851(B) 3220 |
LF |
29.000 |
29.000 |
|
29.000 |
$45.00 |
$0.00 |
$1,305.00 |
0096 |
2" SQUARE TUBE POST |
851(C) 8324 |
LF |
439.000 |
439.000 |
|
377.000 |
$6.10 |
$0.00 |
$2,299.70 |
0097 |
2 1/2" SQUARE TUBE POST |
851(C) 8330 |
LF |
17.000 |
17.000 |
|
0.000 |
$6.10 |
$0.00 |
$0.00 |
0098 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) |
855(A) 8812 |
LF |
43,470.000 |
43,470.000 |
|
52,035.000 |
$0.37 |
$0.00 |
$19,252.95 |
0099 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) |
855(A) 8814 |
LF |
605.000 |
605.000 |
|
1,057.000 |
$2.05 |
$0.00 |
$2,166.85 |
0100 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) |
855(A) 8825 |
LF |
184.000 |
184.000 |
|
216.000 |
$8.20 |
$0.00 |
$1,771.20 |
0101 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) |
855(B) 8818 |
EA |
42.000 |
42.000 |
|
42.000 |
$67.00 |
$0.00 |
$2,814.00 |
8000 |
BREAKAWAY BASE (DES. B) |
807 8092 |
EA |
0.000 |
12.000 |
|
12.000 |
$430.50 |
$0.00 |
$5,166.00 |
8002 |
MOBILIZATION |
641 1552 |
LSUM |
0.000 |
1.000 |
|
1.000 |
$1,500.00 |
$0.00 |
$1,500.00 |
Subtotals For Category 0300/TRAFFIC (SIGNING, STRIPING, & LIGHTING) |
$0.00 |
$71,071.13 |
|
Fed/State Project Number: STPY-110B(181)SS |
Project: 20231(07) |
Category: 0301/TRAFFIC CONTROL |
0102 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
46,500.000 |
46,500.000 |
|
59,880.000 |
$0.08 |
$0.00 |
$4,790.40 |
0103 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
1,000.000 |
1,000.000 |
|
1,818.000 |
$1.05 |
$0.00 |
$1,908.90 |
0104 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
46,500.000 |
46,500.000 |
|
21,166.000 |
$0.05 |
$0.00 |
$1,058.30 |
0105 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
200.000 |
200.000 |
|
58.000 |
$1.05 |
$0.00 |
$60.90 |
0106 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
3,200.000 |
3,200.000 |
|
3,394.000 |
$1.05 |
$0.00 |
$3,563.70 |
0107 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
1,600.000 |
1,600.000 |
|
3,161.000 |
$2.05 |
$0.00 |
$6,480.05 |
0108 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
6,200.000 |
6,200.000 |
|
4,422.000 |
$0.52 |
$0.00 |
$2,299.44 |
0109 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
4,000.000 |
4,000.000 |
|
2,074.000 |
$0.26 |
$0.00 |
$539.24 |
0110 |
WING BARRICADES |
880(C) 8848 |
SD |
800.000 |
800.000 |
|
714.000 |
$2.60 |
$0.00 |
$1,856.40 |
0111 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
13,000.000 |
13,000.000 |
|
7,629.000 |
$0.10 |
$0.00 |
$762.90 |
0112 |
DRUMS |
880(F) 8878 |
SD |
4,000.000 |
4,000.000 |
|
3,983.000 |
$0.26 |
$0.00 |
$1,035.58 |
0113 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
10,000.000 |
10,000.000 |
|
19,445.000 |
$0.15 |
$0.00 |
$2,916.75 |
0114 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
400.000 |
400.000 |
|
0.000 |
$13.00 |
$0.00 |
$0.00 |
Subtotals For Category 0301/TRAFFIC CONTROL |
$0.00 |
$27,272.56 |
|