Oklahoma Department of Transportation
Final Estimate Affidavit

Contract ID: 120049   Estimate Number: 0014 , Final     Spec Year: 2009
Primary JP: 24029(04)   Residency: TETRA TECH (03002)     Contract No: 710889
Date Created: 02/05/2015   Contractor FEI: 731204879     Account No: 400350

Project Number(s): ACSTP-114A(184)AG, STP-114C(292)AG
Contract Description: GRADE, DRAIN, AND SURFACE I-35, FRONTAGE ROAD (INTERSTATE DRIVE): I-35 NORTHBOUND RAMPS AT ROBINSON STREET, AND INTERSTATE DRIVE FROM ROBINSON STREET, EXTEND NORTH IN NORMAN. PROJECT LENGTH = 0.907 MILE.
Primary County: CLEVELAND              
Name of Road: I-35 FRONTAGE ROAD              
Prime Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.           Time Charged: N/A
    2401 S. BROADWAY           Time Allowed: N/A
    MOORE , OK   73160           Percent Time: N/A

  Paid To Date: $2,740,237.94 Payable This Statement: $36,903.35

CONTRACTOR AFFIDAVIT
STATE OF ___________________ )  
  )     §  
COUNTY OF __________________ )  
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct.
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid.
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them.
Further affiant sayeth not.                                
SILVER STAR CONSTRUCTION COMPANY, INC.                               
 
_________________________________________________
Affiant Signature
 
_________________________________________________
Affiant Printed Name
                          PE Seal
_________________________________________________
Affiant Company Position
Subscribed and sworn to before me this ______ day of ____________, 20____
My Commission Number: ____________ My Commission Expires: ______________
   
_________________________________________________              
_________________________________________________
                    Professional Engineer Signature
              Oklahoma Department of Transportation
Corporate Seal
Notary Seal                  

Oklahoma Department of Transportation
Final Estimate Summary
Created:    02/05/2015
Contract ID: 120049   Estimate Number: 0014     Contract No: 710889
Residency: TETRA TECH (03002)   Estimate Type: Final     Account No: 400350

Project Number(s): ACSTP-114A(184)AG, STP-114C(292)AG
Primary Job Piece No: 24029(04)
Contract Description: GRADE, DRAIN, AND SURFACE I-35, FRONTAGE ROAD (INTERSTATE DRIVE): I-35 NORTHBOUND RAMPS AT ROBINSON STREET, AND INTERSTATE DRIVE FROM ROBINSON STREET, EXTEND NORTH IN NORMAN. PROJECT LENGTH = 0.907 MILE.
Primary County: CLEVELAND              
Name of Road: I-35 FRONTAGE ROAD              
Prime Contractor: SILVER STAR CONSTRUCTION COMPANY, INC.              
    2401 S. BROADWAY              
    MOORE , OK   73160              
Surety Company: OHIO CASUALTY INSURANCE COMPANY              

Date Let: 01/19/2012 NTP Effective Date: 07/25/2012 Pay Period: 10/08/2014  TO  12/08/2014
Date Awarded: 02/06/2012 Date Work Began: 04/02/2012 Original Contract Time: N/A
Date Contract Executed: 02/23/2012 Date Time Stopped: 09/06/2013 Current Time Charged: N/A
Date NTP Issued: 02/29/2012 Completion Date: 09/06/2013 Current Time Allowed: N/A
General Liability Expires: 05/19/2015 Workman's Comp Expires: 05/19/2015 Percent Time Used: N/A
Specification Year: 2009 FIXED COMPLETION DATE: 09/06/2013    

Bid Amount: $2,730,900.00 Total to Date Prev to Date This Estimate
Funds Available (Bid + Positive C/O): $2,890,379.05 Participating: $2,735,923.15 $2,701,671.40 $34,251.75
Percent Complete: 94.81 % Non Participating: $0.00 $0.00 $0.00
Unearned Balance: $150,141.11 Total Earnings: $2,735,923.15 $2,701,671.40 $34,251.75
Stockpiled Materials: $0.00 $0.00 $0.00
Gross Earnings: $2,735,923.15 $2,701,671.40 $34,251.75
Other Adjustments: $4,314.79 $1,663.19 $2,651.60
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $2,740,237.94 $2,703,334.59 $36,903.35

Estimate Adjustment Detail

Contract ID: 120049   Estimate Number: 0014     Primary JP: 24029(04)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 Lime to CKD & Fly Ash Approved 11/04/2013 0.0 $-3,212.06
002 New Items & Overrun Items Approved 03/05/2013 272.0 $50,733.76
003 Final Inspection overrun items Approved 03/05/2013 0.0 $83,575.00
004 Sign Brackets mount panel signs to Overhead Sign Structure. Approved 11/04/2013 0.0 $15,697.63
005 Extention of Contract Time & Plan Quantity Dirt Approved 10/09/2013 129.0 $0.00
006 Pay Plan Quantity Unclassified Excavation Approved 05/27/2014 0.0 $0.00
007 Increase Plan Quantity 2" Conduit. New 2" Bored ACSTP Approved 10/06/2014 0.0 $9,472.66
008 FQCO Approved 11/21/2014 0.0 $-151,243.96


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
No material stockpiles have been created for this contract.
Subtotals For Stockpile Payments $0.00


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
System Application of Liquidated Damages 0009 --14 $750.00 $-10,500.00
System Application of Liquidated Damages 0010 --16 $750.00 $-12,000.00
System Application of Liquidated Damages 0011 --15 $750.00 $-11,250.00
System Application of Liquidated Damages 0013 -45.0 $750.00 $33,750.00
Subtotals For Liquidated Damages $0.00


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
LD Adjustment (Prog. Est. Only) 0009 $10,500.00
LD Adjustment (Prog. Est. Only) 0010 $12,000.00
LD Adjustment (Prog. Est. Only) 0011 $11,250.00
LD Adjustment (Prog. Est. Only) 0013 $-33,750.00
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
24029(04) 0003 TYPE A-SALVAGED TOPSOIL * Missing Material Certification 0006 -0.25 $39,700.00 $-9,925.00
24029(04) 0003 TYPE A-SALVAGED TOPSOIL * Missing Material Certification 0008 0.25 $39,700.00 $9,925.00
24029(04) 0004 TEMPORARY SILT FENCE * Missing Material Certification 0004 -442.00 $1.55 $-685.10
24029(04) 0004 TEMPORARY SILT FENCE * Missing Material Certification 0014 442.00 $1.55 $685.10
24029(04) 0009 AGGREGATE BASE TYPE B * Material Discrepancy Adjustments 0004 -138.30 $92.00 $-12,723.60
24029(04) 0009 AGGREGATE BASE TYPE B * Material Discrepancy Adjustments 0005 138.30 $92.00 $12,723.60
24029(04) 0010 LIME * Material Discrepancy Adjustments 0009 -180.39 $120.00 $-21,646.80
24029(04) 0010 LIME * Material Discrepancy Adjustments 0010 180.39 $120.00 $21,646.80
24029(04) 0015 PRIME COAT * Missing Material Certification 0003 -450.80 $5.00 $-2,254.00
24029(04) 0015 PRIME COAT * Missing Material Certification 0004 -138.10 $5.00 $-690.50
24029(04) 0015 PRIME COAT * Material Discrepancy Adjustments 0005 588.90 $5.00 $2,944.50
24029(04) 0016 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0005 23.93 $1.53 $36.63
24029(04) 0016 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0007 78.06 $1.53 $119.50
24029(04) 0016 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0008 101.10 $1.53 $154.77
24029(04) 0016 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0013 -0.03 $1.84 $-0.06
24029(04) 0017 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0002 419.36 $0.48 $201.67
24029(04) 0017 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0003 437.75 $1.32 $578.22
24029(04) 0017 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0004 91.11 $1.32 $120.35
24029(04) 0017 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0005 63.83 $1.53 $97.72
24029(04) 0017 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0006 164.09 $1.53 $251.21
24029(04) 0017 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0007 182.13 $1.53 $278.82
24029(04) 0017 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0008 238.75 $1.53 $365.50
24029(04) 0017 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0010 1.20 $0.48 $0.58
24029(04) 0017 SUPERPAVE, TYPE S3(PG 64-22 OK) * QAQC 0012 -23.33 $50.00 $-1,166.53
24029(04) 0018 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0005 44.63 $1.74 $78.09
24029(04) 0018 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0007 44.75 $1.74 $78.30
24029(04) 0018 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0008 115.70 $1.74 $202.43
24029(04) 0018 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0010 25.93 $0.54 $14.25
24029(04) 0020 P.C.CONCRETE PAVEMENT(PLACEMENT) * Material Discrepancy Adjustments 0004 -1,278.78 $24.15 $-30,882.54
24029(04) 0020 P.C.CONCRETE PAVEMENT(PLACEMENT) * Material Discrepancy Adjustments 0005 1,278.78 $24.15 $30,882.54
24029(04) 0021 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) * Material Discrepancy Adjustments 0004 -2,354.83 $19.25 $-45,330.48
24029(04) 0021 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) * Material Discrepancy Adjustments 0005 2,354.83 $19.25 $45,330.48
24029(04) 0030 EDGE DRAIN CONDUIT-PERFORATED * Missing Material Certification 0004 -135.00 $7.00 $-945.00
24029(04) 0030 EDGE DRAIN CONDUIT-PERFORATED * Material Discrepancy Adjustments 0005 135.00 $7.00 $945.00
24029(05) 0082 TYPE A-SALVAGED TOPSOIL * Missing Material Certification 0006 -0.10 $19,670.00 $-1,967.00
24029(05) 0082 TYPE A-SALVAGED TOPSOIL * Missing Material Certification 0008 0.10 $19,670.00 $1,967.00
24029(05) 0083 TEMPORARY SILT FENCE * Missing Material Certification 0004 -1,435.27 $1.55 $-2,224.67
24029(05) 0083 TEMPORARY SILT FENCE * Missing Material Certification 0012 1,435.27 $1.55 $2,224.67
24029(05) 0089 LIME * Material Discrepancy Adjustments 0009 -216.75 $120.00 $-26,010.00
24029(05) 0089 LIME * Material Discrepancy Adjustments 0010 216.75 $120.00 $26,010.00
24029(05) 0092 TACK COAT * Missing Material Certification 0003 -111.00 $5.00 $-555.00
24029(05) 0092 TACK COAT * Material Discrepancy Adjustments 0005 111.00 $50.00 $5,550.00
24029(05) 0092 TACK COAT * Material Discrepancy Adjustments 0012 -111.00 $50.00 $-5,550.00
24029(05) 0092 TACK COAT * Missing Material Certification 0012 111.00 $5.00 $555.00
24029(05) 0093 PRIME COAT * Missing Material Certification 0003 -1,005.20 $4.00 $-4,020.80
24029(05) 0093 PRIME COAT * Missing Material Certification 0004 -870.90 $4.00 $-3,483.60
24029(05) 0093 PRIME COAT * Material Discrepancy Adjustments 0005 1,876.10 $4.00 $7,504.40
24029(05) 0094 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0003 89.67 $1.32 $118.45
24029(05) 0094 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0006 50.03 $1.53 $76.59
24029(05) 0094 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0007 171.22 $1.53 $262.12
24029(05) 0094 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0008 36.10 $1.53 $55.27
24029(05) 0094 SUPERPAVE, TYPE S3(PG 76-28 OK) Asphalt Binder Adjustment 0013 -7.04 $1.84 $-13.00
24029(05) 0095 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0002 379.88 $0.48 $182.68
24029(05) 0095 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0003 543.26 $1.32 $717.59
24029(05) 0095 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0004 606.60 $1.32 $801.26
24029(05) 0095 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0006 347.29 $1.53 $531.67
24029(05) 0095 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0008 203.42 $1.53 $311.42
24029(05) 0095 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0010 16.07 $0.48 $7.73
24029(05) 0095 SUPERPAVE, TYPE S3(PG 64-22 OK) * QAQC 0012 -6.78 $54.40 $-369.18
24029(05) 0096 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0003 60.14 $1.50 $90.79
24029(05) 0096 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0006 44.75 $1.74 $78.30
24029(05) 0096 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0008 26.87 $1.74 $47.01
24029(05) 0096 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0010 8.45 $0.54 $4.64
24029(05) 0109 INLET CI DES. 2 (STD) * Missing Material Certification 0004 -1.00 $4,140.00 $-4,140.00
24029(05) 0109 INLET CI DES. 2 (STD) * Missing Material Certification 0010 1.00 $4,140.00 $4,140.00
24029(05) 0110 INLET CI DES. 3 (2B) * Missing Material Certification 0004 -2.00 $4,140.00 $-8,280.00
24029(05) 0110 INLET CI DES. 3 (2B) * Missing Material Certification 0010 2.00 $4,140.00 $8,280.00
24029(05) 0111 INLET (SMD-TYPE 1) * Missing Material Certification 0004 -3.00 $2,590.00 $-7,770.00
24029(05) 0111 INLET (SMD-TYPE 1) * Missing Material Certification 0010 3.00 $2,590.00 $7,770.00
24029(05) 0113 JUNCTION BOXES * Missing Material Certification 0004 -82.59 $51.80 $-4,278.16
24029(05) 0113 JUNCTION BOXES * Missing Material Certification 0012 82.59 $51.80 $4,278.16
24029(05) 0113 JUNCTION BOXES * Missing Material Certification 0014 1.00 $1,966.50 $1,966.50
24029(05) 0204 CONSTRUCTION STAKING LEVEL II * Missing Material Certification 0012 -1.00 $1,966.50 $-1,966.50
24029(05) 0205 SWPPP DOCUMENTATION AND MANAGEMENT * Material Discrepancy Adjustments 0004 -0.25 $17,945.00 $-4,486.25
24029(05) 0205 SWPPP DOCUMENTATION AND MANAGEMENT * Material Discrepancy Adjustments 0012 0.25 $17,945.00 $4,486.25
Subtotals For Line Item Adjustments $4,314.79
* = User applied Line Item Adjustments


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
No milestones exist for this contract.


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
No milestones adjustments exist for this contract.
Subtotals For Milestones $

Line Item Detail

Contract ID: 120049   Estimate Number: 0014     Primary JP: 24029(04)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    ACSTP-114A(184)AG Project:    24029(04) Category:    0100/ROADWAY - ACSTP-114A(184)AG
0001 CLEARING AND GRUBBING 201(A) 0102 LSUM 1.000 1.000   1.000 $9,300.00 $0.00 $9,300.00
0002 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 12,681.000 12,681.000   12,681.000 $5.00 $0.00 $63,405.00
0003 TYPE A-SALVAGED TOPSOIL 205(A) 4229 LSUM 1.000 1.000   1.000 $39,700.00 $0.00 $39,700.00
0004 TEMPORARY SILT FENCE 221(C) 2801 LF 1,299.000 442.000 0.000 442.000 $1.55 $0.00 $685.10
0005 TEMPORARY SEDIMENT FILTER 221(D) 2803 EA 6.000 0.000   0.000 $155.00 $0.00 $0.00
0006 SOLID SLAB SODDING 230(A) 2806 SY 25,383.000 46,487.930   46,487.930 $1.15 $0.00 $53,461.12
0007 VEGETATIVE MULCHING 233(A) 2817 AC 5.240 0.000   0.000 $207.00 $0.00 $0.00
0008 MOWING 241 2832 AC 10.480 0.000   0.000 $105.00 $0.00 $0.00
0009 AGGREGATE BASE TYPE B 303(B) 2110 CY 211.000 233.960   233.960 $92.00 $0.00 $21,524.32
0010 LIME 307(D) 4230 TON 155.000 0.000   0.000 $120.00 $0.00 $0.00
0011 LIME STABILIZED SUBGRADE 307(H) 4270 SY 7,045.000 0.000   0.000 $6.50 $0.00 $0.02
0012 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 20.000 0.000   0.000 $40.00 $0.00 $0.00
0013 PERMEABLE FRICTION COURSE 405 5200 TON 304.000 0.000   0.000 $100.00 $0.00 $0.00
0014 TACK COAT 407(B) 0250 GAL 190.000 73.120   73.120 $5.00 $0.00 $365.60
0015 PRIME COAT 408 5774 GAL 1,560.000 423.290   423.290 $5.00 $0.00 $2,116.45
0016 SUPERPAVE, TYPE S3(PG 76-28 OK) 411(B) 5935 TON 260.000 203.090   203.090 $53.00 $0.00 $10,763.77
0017 SUPERPAVE, TYPE S3(PG 64-22 OK) 411(B) 5945 TON 1,256.000 1,598.250   1,598.250 $50.00 $0.00 $79,912.50
0018 SUPERPAVE, TYPE S4(PG 76-28 OK) 411(C) 5950 TON 201.000 231.010   231.010 $90.00 $0.00 $20,790.90
0019 COLD MILLING PAVEMENT 412 5267 SY 1,419.000 838.170   838.170 $3.00 $0.00 $2,514.51
0020 P.C.CONCRETE PAVEMENT(PLACEMENT) 414(A) 0210 SY 1,809.000 1,930.760   1,930.760 $24.15 $0.00 $46,627.85
0021 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(B) 5725 SY 4,500.000 4,323.670   4,323.670 $19.25 $0.00 $83,230.66
0022 P.C. CONCRETE FOR PAVEMENT 414(G) 5275 CY 1,750.000 1,737.340   1,737.340 $82.90 $0.00 $144,025.49
0023 CLASS C CONCRETE 509(D) 0325 CY 25.000 17.490   17.490 $290.00 $0.00 $5,072.10
0024 SLOPE WALL (5") 510(C) 6135 SY 59.000 38.500   38.500 $65.00 $0.00 $2,502.50
0025 CONCRETE CURB (6" MNTBLE-INTEGRAL) 609(A) 0288 LF 322.000 341.510   341.510 $30.00 $0.00 $10,245.30
0026 18" R.C.PIPE CLASS III 613(A) 0491 LF 74.000 184.000   184.000 $36.30 $0.00 $6,679.20
0027 43" X 26" R.C.PIPE ARCH CLASS A-III 613(A) 4498 LF 296.000 336.000   336.000 $176.00 $0.00 $59,136.00
0028 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 0450 LF 225.000 363.000   363.000 $11.00 $0.00 $3,993.00
0029 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 1096 LF 75.000 32.000   32.000 $9.00 $0.00 $288.00
0030 EDGE DRAIN CONDUIT-PERFORATED 613(J) 5915 LF 1,000.000 0.000   0.000 $7.00 $0.00 $0.00
0031 43" X 26" PREFAB. CULVERT END SECTION, ARCH 613(L) 4531 EA 8.000 8.000   8.000 $3,105.00 $0.00 $24,840.00
0032 18" PREFAB. CULVERT END SECTION, ROUND 613(L) 5726 EA 2.000 4.000   4.000 $1,550.00 $0.00 $6,200.00
0033 STANDARD BEDDING MATERIAL, CLASS C 613(T) 1187 CY 183.000 218.370   218.370 $41.50 $0.00 $9,062.36
0034 PIPE UNDERDRAIN COVER MAT'L. 613(U) 1100 CY 45.000 39.010   39.010 $41.50 $0.00 $1,618.93
0035 TRENCH EXCAVATION 613(V) 1180 CY 282.000 446.800   446.800 $10.40 $0.00 $4,646.72
0036 REMOVAL OF STRUCTURES & OBSTRUCTIONS 619(A) 0920 LSUM 1.000 1.000   1.000 $12,100.00 $0.00 $12,100.00
0037 REMOVAL OF CONCRETE PAVEMENT 619(B) 4727 SY 4,680.000 4,795.470   4,795.470 $5.20 $0.00 $24,936.45
0038 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 1,751.000 847.220   847.220 $4.00 $0.00 $3,388.88
0039 SAWING PAVEMENT 619(C) 0924 LF 460.000 188.000   188.000 $3.80 $0.00 $714.40
0040 FENCE-STYLE CLF (5'HIGH, CLASS A) 624(E) 4290 LF 612.000 0.000   0.000 $11.00 $0.00 $0.00
8000 CEMENT KILN DUST 307(B) 4210 TON 0.000 327.750   327.750 $56.56 $0.00 $18,537.54
8001 CEMENTITIOUS STABILIZED SUBGRADE 307(E) 4240 SY 0.000 8,079.610   8,079.610 $6.35 $0.00 $51,305.52
8002 JUNCTION BOXES 611(L) 0487 CF 0.000 424.440   424.440 $25.61 $0.00 $10,869.91
Subtotals For Category     0100/ROADWAY - ACSTP-114A(184)AG    $0.00 $834,560.10
Fed/State Project Number:    ACSTP-114A(184)AG Project:    24029(04) Category:    0300/LIGHTING - ACSTP-114A(184)AG
0041 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8342 LF 5,555.000 5,949.000   5,949.000 $3.62 $0.00 $21,535.38
0042 PULL BOX(SIZE I) 803(A) 8065 EA 35.000 35.000   35.000 $238.00 $0.00 $8,330.00
0043 STRUCTURAL CONCRETE 804(A) 2915 CY 19.140 19.140   19.140 $520.00 $0.00 $9,952.80
0044 REINFORCING STEEL 804(B) 2916 LB 1,102.200 1,102.200   1,102.200 $1.25 $0.00 $1,377.75
0045 (PL)REMOVAL OF LIGHT POLE 805(A) 8712 EA 9.000 9.000   9.000 $310.00 $0.00 $2,790.00
0046 40' MTG.HT.POLE & 15' H.L.MST.ARM(G.STL.) 806(C) 8928 EA 33.000 33.000   33.000 $1,560.00 $0.00 $51,480.00
0047 BREAKAWAY BASE (DES. B) 807 8092 EA 33.000 33.000   33.000 $445.00 $0.00 $14,685.00
0048 ROADWAY LUMINAIRE 809(A) 8090 EA 33.000 33.000   33.000 $365.00 $0.00 $12,045.00
0049 1/C NO.4 ELECTRICAL CONDUCTOR 811 8038 LF 11,398.000 11,398.000   11,398.000 $1.35 $0.00 $15,387.30
0050 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 4,125.000 4,125.000   4,125.000 $0.80 $0.00 $3,300.00
8003 CONSTRUCTION MISCELLANEOUS 104 0600 EA 0.000 1.000   1.000 $8,247.00 $0.00 $8,247.00
8005 2" PVC SCH.40 PLASTIC CONDUIT BORED 802(B) 8340 LF 0.000 525.000   525.000 $15.60 $0.00 $8,190.00
Subtotals For Category     0300/LIGHTING - ACSTP-114A(184)AG    $0.00 $157,320.23
Fed/State Project Number:    ACSTP-114A(184)AG Project:    24029(04) Category:    0301/SIGNING & STRIPING - ACSTP-114A(184)AG
0051 STRUCTURAL CONCRETE 804(A) 2915 CY 6.040 6.040   6.040 $310.00 $0.00 $1,872.40
0052 REINFORCING STEEL 804(B) 2916 LB 828.000 828.000   828.000 $3.10 $0.00 $2,566.80
0053 (PL)REMOVE & RESET EXISTING SIGNS 805(D) 8756 EA 1.000 1.000   1.000 $520.00 $0.00 $520.00
0054 SHEET ALUMINUM SIGNS 850(A) 8110 SF 85.000 85.400   85.400 $16.70 $0.00 $1,426.18
0055 EXTRUDED ALUMINUM PANEL SIGNS 850(B) 8112 SF 218.250 218.250   218.250 $31.00 $0.00 $6,765.75
0056 EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) 850(B) 8114 SF 407.250 407.250   407.250 $40.00 $0.00 $16,290.00
0057 4"@13 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3206 LF 81.000 81.000   81.000 $27.00 $0.00 $2,187.00
0058 6"@15 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3207 LF 86.000 86.000   86.000 $31.00 $0.00 $2,666.00
0059 2"@3.65 GALV.STEEL PIPE POST 851(B) 3216 LF 70.000 70.000   70.000 $20.70 $0.00 $1,449.00
0060 2 1/2"@5.79 GALV.STEEL PIPE POST 851(B) 3217 LF 80.000 80.000   80.000 $22.80 $0.00 $1,824.00
0061 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 856(A) 8530 LF 5,670.000 4,077.700   4,077.700 $1.55 $0.00 $6,320.44
0062 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) 856(A) 8535 LF 630.000 0.000   0.000 $2.30 $0.00 $0.00
0063 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) 856(A) 8540 LF 1,970.000 1,218.600   1,218.600 $3.10 $0.00 $3,777.66
0064 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) 856(A) 8548 LF 660.000 882.600   882.600 $5.20 $0.00 $4,589.52
0065 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) 856(A) 8555 LF 15.000 15.000   15.000 $31.10 $0.00 $466.50
0066 TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) 856(B) 8525 EA 14.000 14.000   14.000 $362.00 $0.00 $5,068.00
0067 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 857(F) 8006 LF 1,000.000 216.000   216.000 $1.05 $0.00 $226.80
8004 CONSTRUCTION MISCELLANEOUS 104 0700 LSUM 0.000 1.000   1.000 $15,697.63 $0.00 $15,697.63
Subtotals For Category     0301/SIGNING & STRIPING - ACSTP-114A(184)AG    $0.00 $73,713.68
Fed/State Project Number:    ACSTP-114A(184)AG Project:    24029(04) Category:    0302/TRAFFIC CONTROL - ACSTP-114A(184)AG
0068 (SP)CONST.ZONE IMPACT ATTEN. 871(B) 8705 SD 15.000 65.000   65.000 $105.00 $0.00 $6,825.00
0069 PORTABLE LONGITUDINAL BARRIER 877(A) 8483 LF 500.000 0.000   0.000 $42.50 $0.00 $0.00
0070 DELIVER PORTABLE LONGITUDINAL BARRIER 877(B) 8484 LF 500.000 542.500   542.500 $4.90 $0.00 $2,658.25
0071 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 1,200.000 1,439.000   1,439.000 $1.05 $0.00 $1,510.95
0072 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 2,386.000 819.000   819.000 $2.10 $0.00 $1,719.90
0073 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 1,254.000 2,675.000   2,675.000 $4.15 $0.00 $11,101.25
0074 CONSTRUCTION BARRICADES(TYPE III) 880(C) 8842 SD 1,157.000 1,686.000   1,686.000 $1.05 $0.00 $1,770.30
0075 WING BARRICADES 880(C) 8848 SD 240.000 610.000   610.000 $1.05 $0.00 $640.50
0076 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 3,034.000 5,844.000   5,844.000 $0.70 $0.00 $4,090.80
0077 WARNING LIGHTS(TYPE C) 880(E) 8872 SD 9,274.000 750.000   750.000 $0.50 $0.00 $375.00
0078 DRUMS 880(F) 8878 SD 9,274.000 9,108.000   9,108.000 $0.50 $0.00 $4,554.00
0079 CHANNELIZER CONES 880(G) 8890 SD 36.000 3,044.000   3,044.000 $1.05 $0.00 $3,196.20
Subtotals For Category     0302/TRAFFIC CONTROL - ACSTP-114A(184)AG    $0.00 $38,442.15
Fed/State Project Number:    ACSTP-114A(184)AG Project:    24029(04) Category:    0900/FEDERAL NON PARTICIPATING
Subtotals For Category     0900/FEDERAL NON PARTICIPATING    $0.00 $0.00
Subtotals For Project ACSTP-114A(184)AG /24029(04) $0.00 $1,104,036.16


Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    STP-114C(292)AG Project:    24029(05) Category:    0100/ROADWAY - STP-114C(292)AG
0080 CLEARING AND GRUBBING 201(A) 0102 LSUM 1.000 1.000   1.000 $2,920.00 $0.00 $2,920.00
0081 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 6,739.000 6,739.000   6,739.000 $6.00 $0.00 $40,434.00
0082 TYPE A-SALVAGED TOPSOIL 205(A) 4229 LSUM 1.000 1.000   1.000 $19,670.00 $0.00 $19,670.00
0083 TEMPORARY SILT FENCE 221(C) 2801 LF 2,887.000 1,435.270   1,435.270 $1.55 $0.00 $2,224.67
0084 TEMPORARY SEDIMENT FILTER 221(D) 2803 EA 6.000 0.000   0.000 $155.00 $0.00 $0.00
0085 SOLID SLAB SODDING 230(A) 2806 SY 9,171.000 7,148.240   7,148.240 $1.15 $0.00 $8,220.48
0086 VEGETATIVE MULCHING 233(A) 2817 AC 2.000 0.000   0.000 $207.00 $0.00 $0.00
0087 MOWING 241 2832 AC 4.000 0.000   0.000 $105.00 $0.00 $0.00
0088 (PL)STABILIZED CONSTRUCTION EXIT 242 0400 EA 1.000 1.000   1.000 $4,050.00 $0.00 $4,050.00
0089 LIME 307(D) 4230 TON 230.000 0.000   0.000 $120.00 $0.00 $0.00
0090 LIME STABILIZED SUBGRADE 307(H) 4270 SY 12,605.000 0.000   0.000 $7.00 $0.00 $0.00
0091 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 20.000 171.800   171.800 $40.00 $0.00 $6,872.00
0092 TACK COAT 407(B) 0250 GAL 181.000 132.050   132.050 $5.00 $0.00 $660.25
0093 PRIME COAT 408 5774 GAL 2,630.000 1,876.100   1,876.100 $4.00 $0.00 $7,504.40
0094 SUPERPAVE, TYPE S3(PG 76-28 OK) 411(B) 5935 TON 293.000 175.800   175.800 $88.25 $0.00 $15,514.36
0095 SUPERPAVE, TYPE S3(PG 64-22 OK) 411(B) 5945 TON 2,606.000 2,274.310   2,274.310 $54.40 $0.00 $123,722.47
0096 SUPERPAVE, TYPE S4(PG 76-28 OK) 411(C) 5950 TON 195.000 131.760   131.760 $90.00 $0.00 $11,858.40
0097 P.C.CONCRETE PAVEMENT(PLACEMENT) 414(A) 0210 SY 1,233.000 1,381.740   1,381.740 $24.30 $0.00 $33,576.28
0098 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(B) 5725 SY 9,149.000 9,055.340   9,055.340 $18.55 $0.00 $167,976.56
0099 P.C. CONCRETE FOR PAVEMENT 414(G) 5275 CY 2,846.000 2,899.190   2,899.190 $82.90 $0.00 $240,342.86
0100 CLASS A CONCRETE(LONG. BAR. DES. 1-A) 509(B) 0325 CY 101.000 101.000   101.000 $415.00 $0.00 $41,915.00
0101 CLASS A CONCRETE, SMALL STRUCTURES 509(C) 0322 CY 3.000 3.380   3.380 $621.00 $0.00 $2,098.98
0102 CLASS C CONCRETE 509(D) 0325 CY 61.000 82.170   82.170 $310.00 $0.00 $25,472.70
0103 REINFORCING STEEL 511(A) 0332 LB 1,910.000 12,952.000   12,952.000 $1.05 $0.00 $13,599.60
0104 CONCRETE CURB (6" MNTBLE-INTEGRAL) 609(A) 0288 LF 228.000 222.710   222.710 $30.00 $0.00 $6,681.30
0105 CONCRETE CURB (8" BARRIER-INTEGRAL) 609(A) 0380 LF 2,741.000 2,367.870   2,367.870 $9.00 $0.00 $21,310.83
0106 4" CONCRETE SIDEWALK 610(A) 0602 SY 888.000 1,144.730   1,144.730 $31.50 $0.00 $36,059.00
0107 6" CONCRETE DRIVEWAY 610(B) 0604 SY 364.000 357.560   357.560 $49.00 $0.00 $17,520.44
0108 TACTILE WARNING DEVICE-NEW 610(I) 4610 SF 24.000 108.000   108.000 $16.00 $0.00 $1,728.00
0109 INLET CI DES. 2 (STD) 611(G) 5112 EA 1.000 1.000   1.000 $4,140.00 $0.00 $4,140.00
0110 INLET CI DES. 3 (2B) 611(G) 5123 EA 2.000 2.000   2.000 $4,140.00 $0.00 $8,280.00
0111 INLET (SMD-TYPE 1) 611(G) 6000 EA 2.000 3.000   3.000 $2,590.00 $0.00 $7,770.00
0112 ADD'L DEPTH IN INLET CI DES. 3 611(H) 5330 VF 2.000 2.590   2.590 $415.00 $0.00 $1,074.85
0113 JUNCTION BOXES 611(L) 0487 CF 116.000 82.590 0.000 82.590 $51.80 $0.00 $4,278.16
0114 MANHOLES ADJUST TO GRADE 612(A) 0641 EA 1.000 1.000   1.000 $520.00 $0.00 $520.00
0115 VALVE BOXES ADJUST TO GRADE 612(E) 0647 EA 2.000 0.000   0.000 $210.00 $0.00 $0.00
0116 18" R.C.PIPE CLASS III 613(A) 0491 LF 190.000 280.000   280.000 $36.20 $0.00 $10,136.00
0117 36" R.C.PIPE CLASS III 613(A) 0494 LF 32.000 32.000   32.000 $144.90 $0.00 $4,636.80
0118 26" X 15" R.C.PIPE ARCH CLASS A-III 613(A) 4404 LF 240.000 264.000   264.000 $165.60 $0.00 $43,718.40
0119 28" X 18" R.C.PIPE ARCH CLASS A-III 613(A) 4496 LF 32.000 32.000   32.000 $165.60 $0.00 $5,299.20
0120 28" X 20" CORR. GALV. STEEL PIPE ARCH 613(B) 4528 LF 22.000 0.000   0.000 $32.10 $0.00 $0.00
0121 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 0450 LF 150.000 0.000   0.000 $6.85 $0.00 $0.00
0122 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 1096 LF 50.000 0.000   0.000 $5.75 $0.00 $0.00
0123 26" X 15" PREFAB. CULVERT END SECTION, ARCH 613(L) 4510 EA 2.000 3.000   3.000 $260.00 $0.00 $780.00
0124 28" X 20" PREFAB. CULVERT END SECTION, ARCH 613(L) 4516 EA 1.000 0.000   0.000 $260.00 $0.00 $0.00
0125 18" PREFAB. CULVERT END SECTION, ROUND 613(L) 5726 EA 2.000 2.000   2.000 $207.00 $0.00 $414.00
0126 36" PREFAB. CULVERT END SECTION, ROUND 613(L) 5734 EA 1.000 1.000   1.000 $520.00 $0.00 $520.00
0127 STANDARD BEDDING MATERIAL, CLASS C 613(T) 1187 CY 159.000 175.250   175.250 $42.00 $0.00 $7,360.50
0128 PIPE UNDERDRAIN COVER MAT'L. 613(U) 1100 CY 30.000 0.000   0.000 $42.00 $0.00 $0.00
0129 TRENCH EXCAVATION 613(V) 1180 CY 207.000 235.930   235.930 $10.50 $0.00 $2,477.28
0130 REMOVAL OF STRUCTURES & OBSTRUCTIONS 619(A) 0920 LSUM 1.000 1.000   1.000 $14,740.00 $0.00 $14,740.00
0131 REMOVAL OF CONCRETE PAVEMENT 619(B) 4727 SY 1,149.000 1,530.210   1,530.210 $8.00 $0.00 $12,241.68
0132 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 1,107.000 1,111.750   1,111.750 $4.00 $0.00 $4,447.00
0133 REMOVAL OF CURB 619(B) 4791 LF 577.000 587.300   587.300 $6.00 $0.00 $3,523.80
0134 SAWING PAVEMENT 619(C) 0924 LF 2,709.000 1,446.000   1,446.000 $3.70 $0.00 $5,350.20
0135 GUARDRAIL END TREATMENT (GET) 623(G) 8571 EA 1.000 1.000   1.000 $4,970.00 $0.00 $4,970.00
8001 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS 857(E) 8881 EA 0.000 0.000   0.000 $3.80 $0.00 $0.00
8002 CEMENT KILN DUST 307(B) 4210 TON 0.000 336.370   336.370 $56.56 $0.00 $19,025.09
8003 CEMENTITIOUS STABILIZED SUBGRADE 307(E) 4240 SY 0.000 11,948.820   11,948.820 $6.83 $0.00 $81,610.44
8004 FLY ASH 307(A) 4200 TON 0.000 222.250   222.250 $32.62 $0.00 $7,249.80
8007 SEPARATOR FABRIC 325 5271 SY 0.000 1,103.150   1,103.150 $2.40 $0.00 $2,647.56
Subtotals For Category     0100/ROADWAY - STP-114C(292)AG    $0.00 $1,109,143.34
Fed/State Project Number:    STP-114C(292)AG Project:    24029(05) Category:    0303/TRAFFIC SIGNAL - STP-114C(292)AG
0136 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8342 LF 890.000 890.000   890.000 $3.65 $0.00 $3,248.50
0137 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8346 LF 100.000 100.000   100.000 $7.25 $0.00 $725.00
0138 PULL BOX(SIZE I) 803(A) 8065 EA 2.000 2.000   2.000 $365.00 $0.00 $730.00
0139 GROUND BOX (GB36) 803(B) 8085 EA 1.000 1.000   1.000 $2,070.00 $0.00 $2,070.00
0140 STRUCTURAL CONCRETE 804(A) 2915 CY 9.100 9.100   9.100 $465.00 $0.00 $4,231.50
0141 REINFORCING STEEL 804(B) 2916 LB 1,333.600 1,333.600   1,333.600 $1.25 $0.00 $1,667.00
0142 REMOVAL OF PULL BOX 805(A) 8704 EA 3.000 3.000   3.000 $52.00 $0.00 $156.00
0143 (PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT 805(A) 8726 LSUM 1.000 1.000   1.000 $1,552.00 $0.00 $1,552.00
0144 (PL)RESET OF PULL BOX 805(B) 8728 EA 2.000 2.000   2.000 $207.00 $0.00 $414.00
0145 POLE & 25' TS MST.ARM(G.STL.) 806(A) 8726 EA 1.000 1.000   1.000 $3,892.00 $0.00 $3,892.00
0146 40' MHP 35' TS & 10' LMA(G.STL.) 806(A) 8852 EA 1.000 1.000   1.000 $4,835.00 $0.00 $4,835.00
0147 40' MHP 55' TS & 10' LMA(G.STL.) 806(A) 8880 EA 1.000 1.000   1.000 $11,400.00 $0.00 $11,400.00
0148 10' MTG.HT.TS PED.POLE(G.STL.) 806(B) 8894 EA 2.000 2.000   2.000 $1,130.00 $0.00 $2,260.00
0149 ROADWAY LUMINAIRE 809(A) 8090 EA 2.000 2.000   2.000 $342.00 $0.00 $684.00
0150 SERVICE POLE 810(A) 3118 EA 1.000 1.000   1.000 $320.00 $0.00 $320.00
0151 1/C NO.6 ELECTRICAL CONDUCTOR 811 8040 LF 200.000 200.000   200.000 $2.07 $0.00 $414.00
0152 1/C NO.10 ELECTRICAL CONDUCTOR 811 8044 LF 640.000 640.000   640.000 $0.52 $0.00 $332.80
0153 (SP)FIBER OPTIC CABLE, 24 SMF 818(A) 8715 LF 700.000 700.000   700.000 $3.52 $0.00 $2,464.00
0154 (SP)FIBER OPTIC PATCH PANEL, 24 PORT 818(B) 8745 EA 1.000 1.000   1.000 $780.00 $0.00 $780.00
0155 (SP)FIBER OPTIC CABLE SPLICE 818(C) 8735 EA 24.000 0.000   0.000 $94.00 $0.00 $0.00
0156 (SP)FIBER OPTIC CABLE TERMINATION 818(D) 8740 EA 24.000 24.000   24.000 $110.00 $0.00 $2,640.00
0157 (SP)FIBER OPTIC ROUTE SIGN & INSTALLATION 818(G) 5570 EA 1.000 1.000   1.000 $210.00 $0.00 $210.00
0158 TRAFFIC SIGNAL CONTROLLER ASSEMBLY 825 8550 EA 2.000 2.000   2.000 $25,500.00 $0.00 $51,000.00
0159 (PL)DETECTION SYSTEM (VIDEO) 828 8132 LSUM 1.000 1.000   1.000 $28,000.00 $0.00 $28,000.00
0160 PEDESTRIAN PUSH BUTTON 830 8000 EA 8.000 8.000   8.000 $1,050.00 $0.00 $8,400.00
0161 1WAY 3SEC. ADJ. SIG. HD. S-6 831 8231 EA 2.000 2.000   2.000 $525.00 $0.00 $1,050.00
0162 1WAY 3SEC. ADJ. SIG. HD. S-9 831 8252 EA 3.000 3.000   3.000 $550.00 $0.00 $1,650.00
0163 1WAY 4SEC. ADJ. SIG. HD. S-16 831 8274 EA 4.000 4.000   4.000 $675.00 $0.00 $2,700.00
0164 1WAY 5SEC. ADJ. SIG. HD. S-19 831 8286 EA 3.000 3.000   3.000 $890.00 $0.00 $2,670.00
0165 1WAY 2SEC. ADJ. PED. SIG. HD. S-20 831 8295 EA 8.000 8.000   8.000 $530.00 $0.00 $4,240.00
0166 BACKPLATE 833 3030 EA 12.000 12.000   12.000 $73.00 $0.00 $876.00
0167 5/C TRAFFIC SIGNAL ELECTRICAL CABLE 834(A) 8207 LF 700.000 700.000   700.000 $1.25 $0.00 $875.00
0168 7/C TRAFFIC SIGNAL ELECTRICAL CABLE 834(A) 8208 LF 475.000 475.000   475.000 $1.45 $0.00 $688.75
0169 21/C TRAFFIC SIGNAL ELECTRICAL CABLE 834(A) 8213 LF 985.000 985.000   985.000 $3.10 $0.00 $3,053.50
0170 2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE 834(B) 8220 LF 25.000 25.000   25.000 $0.57 $0.00 $14.25
0171 E.P.S. OPTICAL DETECTOR 840(B) 8593 EA 1.000 1.000   1.000 $420.00 $0.00 $420.00
0172 E.P.S. OPTICAL DETECTOR CABLE 840(C) 8594 LF 450.000 450.000   450.000 $1.05 $0.00 $472.50
0173 E.P.S. 2 CHANNEL PHASE SELECTOR 840(D) 8595 EA 1.000 1.000   1.000 $1,560.00 $0.00 $1,560.00
0174 MAST ARM MOUNTED SIGNS(ALUMINUM) 850(C) 8118 SF 150.500 150.500   150.500 $192.00 $0.00 $28,896.00
Subtotals For Category     0303/TRAFFIC SIGNAL - STP-114C(292)AG    $0.00 $181,591.80
Fed/State Project Number:    STP-114C(292)AG Project:    24029(05) Category:    0304/LIGHTING - STP-114C(292)AG
0175 2" PVC SCH.40 PLASTIC CONDUIT BORED 802(B) 8340 LF 415.000 290.000   290.000 $15.60 $0.00 $4,524.00
0176 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8342 LF 2,245.000 2,744.000   2,744.000 $3.62 $0.00 $9,933.28
0177 PULL BOX(SIZE I) 803(A) 8065 EA 18.000 18.000   18.000 $240.00 $0.00 $4,320.00
0178 STRUCTURAL CONCRETE 804(A) 2915 CY 7.540 7.540   7.540 $520.00 $0.00 $3,920.80
0179 REINFORCING STEEL 804(B) 2916 LB 434.200 434.200   434.200 $1.25 $0.00 $542.75
0180 REMOVAL OF PULL BOX 805(A) 8704 EA 2.000 2.000   2.000 $52.00 $0.00 $104.00
0181 (PL)REMOVAL OF LIGHT POLE 805(A) 8712 EA 1.000 1.000   1.000 $320.00 $0.00 $320.00
0182 40' MTG.HT.POLE & 15' H.L.MST.ARM(G.STL.) 806(C) 8928 EA 13.000 13.000   13.000 $1,560.00 $0.00 $20,280.00
0183 BREAKAWAY BASE (DES. B) 807 8092 EA 13.000 13.000   13.000 $445.00 $0.00 $5,785.00
0184 ROADWAY LUMINAIRE 809(A) 8090 EA 13.000 13.000   13.000 $365.00 $0.00 $4,745.00
0185 SERVICE POLE 810(A) 3118 EA 1.000 2.000   2.000 $3,630.00 $0.00 $7,260.00
0186 1/C NO.4 ELECTRICAL CONDUCTOR 811 8038 LF 5,570.000 5,570.000   5,570.000 $1.35 $0.00 $7,519.50
0187 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 1,625.000 1,625.000   1,625.000 $0.80 $0.00 $1,300.00
Subtotals For Category     0304/LIGHTING - STP-114C(292)AG    $0.00 $70,554.33
Fed/State Project Number:    STP-114C(292)AG Project:    24029(05) Category:    0305/SIGNING & STRIPING - STP-114C(292)AG
0188 STRUCTURAL CONCRETE 804(A) 2915 CY 4.060 4.060   4.060 $310.00 $0.00 $1,258.60
0189 REINFORCING STEEL 804(B) 2916 LB 496.000 496.000   496.000 $3.10 $0.00 $1,537.60
0190 (PL)REMOVAL OF EXISTING SIGNS 805(A) 8724 EA 2.000 2.000   2.000 $365.00 $0.00 $730.00
0191 (PL)REMOVE & RESET EXISTING SIGNS 805(D) 8756 EA 1.000 1.000   1.000 $940.00 $0.00 $940.00
0192 SHEET ALUMINUM SIGNS 850(A) 8110 SF 66.820 66.820   66.820 $17.00 $0.00 $1,135.94
0193 EXTRUDED ALUMINUM PANEL SIGNS 850(B) 8112 SF 144.000 144.000   144.000 $37.00 $0.00 $5,328.00
0194 6"@15 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3207 LF 95.000 95.000   95.000 $34.15 $0.00 $3,244.25
0195 1 1/2@2.72 GALV.STEEL PIPE POST 851(B) 3215 LF 9.000 9.000   9.000 $19.00 $0.00 $171.00
0196 2"@3.65 GALV.STEEL PIPE POST 851(B) 3216 LF 70.500 70.500   70.500 $21.00 $0.00 $1,480.50
0197 2 1/2"@5.79 GALV.STEEL PIPE POST 851(B) 3217 LF 45.000 45.000   45.000 $23.00 $0.00 $1,035.00
0198 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 856(A) 8530 LF 8,430.000 4,910.500   4,910.500 $1.55 $0.00 $7,611.28
0199 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) 856(A) 8535 LF 950.000 0.000   0.000 $2.28 $0.00 $0.00
0200 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) 856(A) 8540 LF 855.000 479.900   479.900 $3.10 $0.00 $1,487.69
0201 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) 856(A) 8555 LF 1,000.000 483.500   483.500 $8.28 $0.00 $4,003.38
0202 TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) 856(B) 8525 EA 25.000 20.000   20.000 $365.00 $0.00 $7,300.00
0203 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 857(F) 8006 LF 1,000.000 0.000   0.000 $1.05 $0.00 $0.00
Subtotals For Category     0305/SIGNING & STRIPING - STP-114C(292)AG    $0.00 $37,263.24
Fed/State Project Number:    STP-114C(292)AG Project:    24029(05) Category:    0600/STAKING - STP-114C(292)AG
0204 CONSTRUCTION STAKING LEVEL II 642(B) 0096 LSUM 1.000 1.000   1.000 $19,665.00 $0.00 $19,665.00
Subtotals For Category     0600/STAKING - STP-114C(292)AG    $0.00 $19,665.00
Fed/State Project Number:    STP-114C(292)AG Project:    24029(05) Category:    0640/CONSTRUCTION - STP-114C(292)AG
0205 SWPPP DOCUMENTATION AND MANAGEMENT 220 2800 LSUM 1.000 1.000   1.000 $17,945.00 $0.00 $17,945.00
0206 MOBILIZATION 641 1552 LSUM 1.000 1.000 0.175 1.000 $195,724.28 $34,251.75 $195,724.28
Subtotals For Category     0640/CONSTRUCTION - STP-114C(292)AG    $34,251.75 $213,669.28
Fed/State Project Number:    STP-114C(292)AG Project:    24029(05) Category:    0900/FEDERAL NON PARTICIPATING
Subtotals For Category     0900/FEDERAL NON PARTICIPATING    $0.00 $0.00
Subtotals For Project STP-114C(292)AG /24029(05) $34,251.75 $1,631,886.99