| Fed/State Project Number: BRFY-152C(068) |
Project: 21861(04) |
Category: 0100/ROADWAY |
| 0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$6,300.00 |
$0.00 |
$0.00 |
| 0002 |
EARTHWORK |
202(H) 0185 |
LSUM |
1.000 |
1.000 |
0.000 |
0.750 |
$22,000.00 |
$0.00 |
$16,500.00 |
| 0003 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$5,200.00 |
$0.00 |
$0.00 |
| 0004 |
TEMPORARY BALE BARRIER |
221(B) 2801 |
LF |
140.000 |
140.000 |
|
0.000 |
$6.00 |
$0.00 |
$0.00 |
| 0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
854.000 |
854.000 |
0.000 |
387.000 |
$2.50 |
$0.00 |
$967.50 |
| 0006 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
1,473.000 |
1,473.000 |
|
0.000 |
$2.50 |
$0.00 |
$0.00 |
| 0007 |
(PL)STABILIZED CONSTRUCTION EXIT |
242 0400 |
EA |
1.000 |
1.000 |
|
0.000 |
$3,000.00 |
$0.00 |
$0.00 |
| 0008 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
525.000 |
525.000 |
|
0.000 |
$68.00 |
$0.00 |
$0.00 |
| 0009 |
SUBGRADE, METHOD B |
310(B) 0149 |
SY |
2,499.000 |
2,499.000 |
|
0.000 |
$5.75 |
$0.00 |
$0.00 |
| 0010 |
SEPARATOR FABRIC |
325 5271 |
SY |
2,499.000 |
2,499.000 |
|
0.000 |
$3.50 |
$0.00 |
$0.00 |
| 0011 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
47.000 |
47.000 |
|
0.000 |
$32.00 |
$0.00 |
$0.00 |
| 0012 |
PRIME COAT |
408 5774 |
GAL |
306.000 |
306.000 |
|
0.000 |
$7.70 |
$0.00 |
$0.00 |
| 0013 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
674.000 |
674.000 |
|
0.000 |
$102.00 |
$0.00 |
$0.00 |
| 0014 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
275.000 |
275.000 |
|
0.000 |
$126.00 |
$0.00 |
$0.00 |
| 0015 |
REMOVAL OF FENCE |
619(B) 4725 |
LF |
498.000 |
498.000 |
|
0.000 |
$3.50 |
$0.00 |
$0.00 |
| 0016 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY |
619(B) 4763 |
SY |
1,045.000 |
1,045.000 |
|
1,395.780 |
$17.25 |
$0.00 |
$24,077.21 |
| 0017 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
601.000 |
601.000 |
|
601.000 |
$3.00 |
$0.00 |
$1,803.00 |
| 0018 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
512.500 |
512.500 |
|
0.000 |
$16.68 |
$0.00 |
$0.00 |
| 0019 |
GUARDRAIL ANCHOR UNIT (TYPE B) |
623(F) 4447 |
EA |
1.000 |
1.000 |
|
0.000 |
$795.00 |
$0.00 |
$0.00 |
| 0020 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
3.000 |
3.000 |
|
0.000 |
$2,300.00 |
$0.00 |
$0.00 |
| 0021 |
GUARDRAIL BRIDGE CONNECTION-TYPE B |
623(I) 8680 |
EA |
4.000 |
4.000 |
|
0.000 |
$892.00 |
$0.00 |
$0.00 |
| 0022 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
416.000 |
416.000 |
|
0.000 |
$6.00 |
$0.00 |
$0.00 |
| 8002 |
SEPARATOR FABRIC |
325 5271 |
SY |
0.000 |
-2,500.000 |
|
0.000 |
$0.62 |
$0.00 |
$0.00 |
| Subtotals For Category 0100/ROADWAY |
$0.00 |
$43,347.71 |
|
| Fed/State Project Number: BRFY-152C(068) |
Project: 21861(04) |
Category: 0200/BRIDGE 'A' |
| 0023 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
287.000 |
287.000 |
|
287.000 |
$7.00 |
$0.00 |
$2,009.00 |
| 0024 |
CLSM BACKFILL |
501(G) 6309 |
CY |
216.000 |
216.000 |
0.000 |
190.000 |
$135.00 |
$0.00 |
$25,650.00 |
| 0025 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) |
503(A) 1313 |
LF |
876.000 |
876.000 |
0.000 |
876.000 |
$215.00 |
$0.00 |
$188,340.00 |
| 0026 |
APPROACH SLAB |
504(A) 1304 |
SY |
379.000 |
379.000 |
|
0.000 |
$159.00 |
$0.00 |
$0.00 |
| 0027 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
1,248.600 |
1,248.600 |
|
0.000 |
$4.14 |
$0.00 |
$0.00 |
| 0028 |
CONCRETE RAIL (TR4) |
504(D) 6245 |
LF |
610.300 |
610.300 |
|
0.000 |
$70.00 |
$0.00 |
$0.00 |
| 0029 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,350.000 |
1,350.000 |
1,350.000 |
1,350.000 |
$3.25 |
$4,387.50 |
$4,387.50 |
| 0030 |
STAINLESS STEEL FIXED BEARING ASSEMBLY |
507(A) 6170 |
EA |
16.000 |
16.000 |
16.000 |
16.000 |
$2,900.00 |
$46,400.00 |
$46,400.00 |
| 0031 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY |
507(B) 6174 |
EA |
8.000 |
8.000 |
8.000 |
8.000 |
$2,900.00 |
$23,200.00 |
$23,200.00 |
| 0032 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
263.900 |
263.900 |
254.400 |
263.900 |
$542.00 |
$137,884.80 |
$143,033.80 |
| 0033 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
212.800 |
212.800 |
|
212.800 |
$510.00 |
$0.00 |
$108,528.00 |
| 0034 |
CLASS C CONCRETE |
509(D) 1331 |
CY |
25.000 |
25.000 |
|
0.000 |
$455.00 |
$0.00 |
$0.00 |
| 0035 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
113,750.000 |
113,750.000 |
80,275.000 |
113,750.000 |
$1.09 |
$87,499.75 |
$123,987.50 |
| 0036 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
204.000 |
204.000 |
|
200.000 |
$25.90 |
$0.00 |
$5,180.00 |
| 0037 |
PILES, FURNISHED (HP 12X53) |
514(A) 6011 |
LF |
846.000 |
846.000 |
|
846.000 |
$29.40 |
$0.00 |
$24,872.40 |
| 0038 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
204.000 |
204.000 |
|
0.000 |
$11.10 |
$0.00 |
$0.00 |
| 0039 |
PILES, DRIVEN (HP 12X53) |
514(B) 6294 |
LF |
846.000 |
846.000 |
0.000 |
754.920 |
$12.60 |
$0.00 |
$9,511.99 |
| 0040 |
PILE LOAD TEST (DYNAMIC) |
514(F) 6354 |
EA |
18.000 |
18.000 |
|
0.000 |
$600.00 |
$0.00 |
$0.00 |
| 0041 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
1,201.000 |
1,201.000 |
|
0.000 |
$4.03 |
$0.00 |
$0.00 |
| 0042 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
208.600 |
208.600 |
0.000 |
208.600 |
$550.00 |
$0.00 |
$114,730.00 |
| 0043 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
47.800 |
47.800 |
|
0.000 |
$4.60 |
$0.00 |
$0.00 |
| 0044 |
SEALER RESIN |
523(B) 6560 |
GAL |
0.500 |
0.500 |
|
0.000 |
$172.50 |
$0.00 |
$0.00 |
| 0045 |
TYPE I-A PLAIN RIPRAP |
601(B) 1353 |
TON |
1,127.000 |
1,127.000 |
170.290 |
881.540 |
$31.90 |
$5,432.25 |
$28,121.13 |
| 0046 |
TYPE I-A FILTER BLANKET |
601(C) 1355 |
TON |
218.000 |
218.000 |
20.380 |
229.660 |
$27.27 |
$555.76 |
$6,262.83 |
| 0047 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
96.000 |
96.000 |
|
0.000 |
$25.00 |
$0.00 |
$0.00 |
| 0048 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 6207 |
LF |
64.000 |
64.000 |
|
0.000 |
$33.59 |
$0.00 |
$0.00 |
| 0049 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$40,000.00 |
$0.00 |
$40,000.00 |
| Subtotals For Category 0200/BRIDGE 'A' |
$305,360.06 |
$894,214.15 |
|