| Fed/State Project Number: STP-158B(182)UR |
Project: 27812(04) |
Category: 0100/ROADWAY |
| 0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
0.250 |
$12,000.00 |
$0.00 |
$3,000.00 |
| 0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
1,940.000 |
1,940.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
| 0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
9,660.000 |
9,660.000 |
|
1,908.000 |
$12.00 |
$0.00 |
$22,896.00 |
| 0004 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
2,270.000 |
2,270.000 |
|
1,921.000 |
$2.75 |
$0.00 |
$5,282.75 |
| 0005 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
250.000 |
250.000 |
|
0.000 |
$7.00 |
$0.00 |
$0.00 |
| 0006 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
6,210.000 |
6,210.000 |
|
0.000 |
$1.95 |
$0.00 |
$0.00 |
| 0007 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
2.600 |
2.600 |
|
0.000 |
$695.00 |
$0.00 |
$0.00 |
| 0008 |
STABILIZED SUBGRADE |
307(K) 4300 |
SY |
3,685.000 |
3,685.000 |
|
0.000 |
$7.75 |
$0.00 |
$0.00 |
| 0009 |
TACK COAT |
407(B) 0250 |
GAL |
472.000 |
472.000 |
|
0.000 |
$2.53 |
$0.00 |
$0.00 |
| 0010 |
PRIME COAT |
408 5774 |
GAL |
774.000 |
774.000 |
|
0.000 |
$5.27 |
$0.00 |
$0.00 |
| 0011 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
880.000 |
880.000 |
|
0.000 |
$74.00 |
$0.00 |
$0.00 |
| 0012 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
360.000 |
360.000 |
|
0.000 |
$80.00 |
$0.00 |
$0.00 |
| 0013 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
10.000 |
10.000 |
|
0.000 |
$350.00 |
$0.00 |
$0.00 |
| 0014 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) |
609(B) 1513 |
LF |
2,052.000 |
2,052.000 |
|
0.000 |
$15.00 |
$0.00 |
$0.00 |
| 0015 |
6" CONCRETE SIDEWALK |
610(A) 0605 |
SY |
975.000 |
975.000 |
|
0.000 |
$33.00 |
$0.00 |
$0.00 |
| 0016 |
6" CONCRETE DRIVEWAY |
610(B) 0604 |
SY |
17.000 |
17.000 |
|
0.000 |
$150.00 |
$0.00 |
$0.00 |
| 0017 |
TACTILE WARNING DEVICE-NEW |
610(I) 4610 |
SF |
36.000 |
36.000 |
|
0.000 |
$40.00 |
$0.00 |
$0.00 |
| 0018 |
INLET CI DES. 2 (STD) |
611(G) 5112 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,900.00 |
$0.00 |
$0.00 |
| 0019 |
ADDITIONAL DEPTH IN INLET |
611(H) 5196 |
VF |
1.660 |
1.660 |
|
0.000 |
$300.00 |
$0.00 |
$0.00 |
| 0020 |
MANHOLES ADJUST TO GRADE |
612(A) 0641 |
EA |
1.000 |
1.000 |
|
0.000 |
$300.00 |
$0.00 |
$0.00 |
| 0021 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
58.000 |
58.000 |
|
0.000 |
$38.00 |
$0.00 |
$0.00 |
| 0022 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
64.000 |
64.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
| 0023 |
18" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5726 |
EA |
2.000 |
2.000 |
|
0.000 |
$400.00 |
$0.00 |
$0.00 |
| 0024 |
TYPE B4 CULVERT END TREATMENT |
613(M) 7187 |
EA |
1.000 |
1.000 |
|
0.000 |
$700.00 |
$0.00 |
$0.00 |
| 0025 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.100 |
$2,500.00 |
$0.00 |
$250.00 |
| 0026 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
3,615.000 |
3,615.000 |
2,958.340 |
2,958.340 |
$3.85 |
$11,389.61 |
$11,389.61 |
| 0027 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
100.000 |
100.000 |
|
0.000 |
$16.00 |
$0.00 |
$0.00 |
| 0028 |
GUARDRAIL ANCHOR UNIT (TYPE B) |
623(F) 4447 |
EA |
2.000 |
2.000 |
|
0.000 |
$500.00 |
$0.00 |
$0.00 |
| 0029 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) |
623(F) 5686 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,250.00 |
$0.00 |
$0.00 |
| Subtotals For Category 0100/ROADWAY |
$11,389.61 |
$42,818.36 |
|
| Fed/State Project Number: STP-158B(182)UR |
Project: 27812(04) |
Category: 0200/BRIDGE 'A' |
| 0030 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
310.000 |
310.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
| 0031 |
CLSM BACKFILL |
501(G) 6309 |
CY |
120.000 |
120.000 |
120.000 |
120.000 |
$100.00 |
$12,000.00 |
$12,000.00 |
| 0032 |
PRESTRESSED CONCRETE BEAMS (TYPE II) |
503(A) 1311 |
LF |
920.000 |
920.000 |
920.000 |
920.000 |
$225.00 |
$207,000.00 |
$207,000.00 |
| 0033 |
BRIDGE TRAFFIC RAIL |
504 6179 |
LF |
502.900 |
502.900 |
|
0.000 |
$110.00 |
$0.00 |
$0.00 |
| 0034 |
APPROACH SLAB |
504(A) 1304 |
SY |
286.800 |
286.800 |
|
0.000 |
$190.00 |
$0.00 |
$0.00 |
| 0035 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
933.800 |
933.800 |
|
0.000 |
$4.05 |
$0.00 |
$0.00 |
| 0036 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
47.630 |
47.630 |
|
0.000 |
$450.00 |
$0.00 |
$0.00 |
| 0037 |
HANDRAILING |
504(F) 6006 |
LF |
209.750 |
209.750 |
|
0.000 |
$145.00 |
$0.00 |
$0.00 |
| 0038 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,590.000 |
1,590.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
| 0039 |
WEATHERING STEEL FIXED BEARING ASSEMBLY |
507(A) 6172 |
EA |
20.000 |
20.000 |
20.000 |
20.000 |
$1,250.00 |
$25,000.00 |
$25,000.00 |
| 0040 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY |
507(B) 6176 |
EA |
10.000 |
10.000 |
10.000 |
10.000 |
$1,250.00 |
$12,500.00 |
$12,500.00 |
| 0041 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
215.000 |
215.000 |
8.000 |
8.000 |
$500.00 |
$4,000.00 |
$4,000.00 |
| 0042 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
214.000 |
214.000 |
36.340 |
214.000 |
$500.00 |
$18,170.00 |
$107,000.00 |
| 0043 |
REINFORCING STEEL |
511(A) 1332 |
LB |
3,180.000 |
3,180.000 |
2,884.580 |
3,180.000 |
$1.00 |
$2,884.58 |
$3,180.00 |
| 0044 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
90,170.000 |
90,170.000 |
3,786.800 |
30,420.000 |
$1.00 |
$3,786.80 |
$30,420.00 |
| 0045 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
100.000 |
100.000 |
|
100.000 |
$34.50 |
$0.00 |
$3,450.00 |
| 0046 |
PILES, FURNISHED (HP 12X53) |
514(A) 6011 |
LF |
386.000 |
386.000 |
|
386.000 |
$42.00 |
$0.00 |
$16,212.00 |
| 0047 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
100.000 |
100.000 |
|
84.330 |
$23.00 |
$0.00 |
$1,939.59 |
| 0048 |
PILES, DRIVEN (HP 12X53) |
514(B) 6294 |
LF |
386.000 |
386.000 |
|
378.210 |
$23.00 |
$0.00 |
$8,698.83 |
| 0049 |
(PL)PILOT HOLES |
514(K) 6260 |
LF |
386.000 |
386.000 |
|
305.420 |
$186.00 |
$0.00 |
$56,808.12 |
| 0050 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
1,135.000 |
1,135.000 |
|
0.000 |
$3.80 |
$0.00 |
$0.00 |
| 0051 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
60.000 |
60.000 |
|
61.410 |
$2,600.00 |
$0.00 |
$159,666.00 |
| 0052 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
47.000 |
47.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
| 0053 |
SEALER RESIN |
523(B) 6560 |
GAL |
0.500 |
0.500 |
|
0.000 |
$150.00 |
$0.00 |
$0.00 |
| 0054 |
TYPE I-A PLAIN RIPRAP |
601(B) 1353 |
TON |
1,385.000 |
1,385.000 |
238.090 |
238.090 |
$28.00 |
$6,666.52 |
$6,666.52 |
| 0055 |
TYPE I-A FILTER BLANKET |
601(C) 1355 |
TON |
425.000 |
425.000 |
118.230 |
118.230 |
$27.00 |
$3,192.21 |
$3,192.21 |
| 0056 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
97.000 |
97.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
| 0057 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 6207 |
LF |
50.000 |
50.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
| 0058 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$35,000.00 |
$0.00 |
$35,000.00 |
| 0059 |
(PL) ORNAMENTAL FENCE |
624 4100 |
LF |
250.300 |
250.300 |
|
0.000 |
$300.00 |
$0.00 |
$0.00 |
| Subtotals For Category 0200/BRIDGE 'A' |
$295,200.11 |
$692,733.27 |
|