Fed/State Project Number: BRIY-0035-1(151)015 |
Project: 27166(05) |
Category: 0101/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$5,000.00 |
$0.00 |
$5,000.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
42,143.000 |
42,143.000 |
2,107.150 |
42,143.000 |
$8.00 |
$16,857.20 |
$337,144.00 |
0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
500.000 |
0.000 |
|
0.000 |
$22.00 |
$0.00 |
$0.00 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$27,000.00 |
$0.00 |
$27,000.00 |
0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
6,771.000 |
3,545.000 |
|
3,545.000 |
$1.25 |
$0.00 |
$4,431.25 |
0006 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
320.000 |
98.000 |
|
98.000 |
$8.00 |
$0.00 |
$784.00 |
0007 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
29,406.000 |
63,113.260 |
1,984.080 |
63,113.260 |
$1.50 |
$2,976.12 |
$94,669.90 |
0008 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
6.000 |
0.000 |
|
0.000 |
$500.00 |
$0.00 |
$0.00 |
0009 |
MOWING |
241 2832 |
AC |
18.300 |
8.790 |
|
8.790 |
$70.00 |
$0.00 |
$615.30 |
0010 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
3,473.000 |
2,941.530 |
|
2,941.530 |
$37.00 |
$0.00 |
$108,836.61 |
0011 |
CEMENT KILN DUST |
307(B) 4210 |
TON |
652.000 |
540.160 |
0.010 |
540.160 |
$47.00 |
$0.47 |
$25,387.52 |
0012 |
LIME |
307(D) 4230 |
TON |
165.000 |
150.950 |
|
150.950 |
$148.00 |
$0.00 |
$22,340.60 |
0013 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
14,992.000 |
14,392.000 |
-7.680 |
14,392.000 |
$3.00 |
$-23.04 |
$43,176.00 |
0014 |
LIME PRETREATMENT |
307(G) 4260 |
SY |
14,992.000 |
14,392.000 |
-7.680 |
14,392.000 |
$2.60 |
$-19.97 |
$37,419.19 |
0015 |
SEPARATOR FABRIC |
325 5271 |
SY |
15,451.000 |
15,540.300 |
-294.080 |
15,540.300 |
$3.00 |
$-882.24 |
$46,620.90 |
0016 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
1,478.000 |
1,604.270 |
|
1,604.270 |
$30.00 |
$0.00 |
$48,128.10 |
0017 |
TACK COAT |
407(B) 0250 |
GAL |
114.000 |
850.000 |
|
850.000 |
$3.50 |
$0.00 |
$2,975.00 |
0018 |
PRIME COAT |
408 5774 |
GAL |
3,370.000 |
0.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0019 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
2,655.000 |
2,548.040 |
|
2,548.040 |
$80.00 |
$0.00 |
$203,843.20 |
0020 |
SUPERPAVE, TYPE S4(PG 70-28 OK) |
411(C) 5955 |
TON |
1,468.000 |
1,519.430 |
|
1,519.430 |
$80.00 |
$0.00 |
$121,554.40 |
0021 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
496.000 |
483.290 |
|
483.290 |
$80.00 |
$0.00 |
$38,663.20 |
0022 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
12,943.000 |
13,827.330 |
|
13,827.330 |
$4.00 |
$0.00 |
$55,309.32 |
0023 |
RUMBLE STRIP-METHOD PCC-CON |
413(C) 4868 |
LF |
4,616.000 |
4,616.000 |
|
4,616.000 |
$0.70 |
$0.00 |
$3,231.20 |
0024 |
P.C.CONCRETE PAVEMENT(PLACEMENT) |
414(A) 0210 |
SY |
3,544.000 |
3,369.690 |
|
3,369.690 |
$23.00 |
$0.00 |
$77,502.87 |
0025 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) |
414(B) 5725 |
SY |
6,670.000 |
6,667.560 |
|
6,667.560 |
$18.00 |
$0.00 |
$120,016.08 |
0026 |
P.C. CONCRETE FOR PAVEMENT |
414(G) 5275 |
CY |
3,381.000 |
3,329.240 |
|
3,329.240 |
$129.00 |
$0.00 |
$429,471.96 |
0027 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
50.000 |
57.400 |
0.720 |
57.400 |
$419.00 |
$301.68 |
$24,050.60 |
0028 |
2'-8" COMB. CURB & GUTTER (6" BARRIER) |
609(B) 1525 |
LF |
440.000 |
444.000 |
4.000 |
444.000 |
$35.00 |
$140.00 |
$15,540.00 |
0029 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
505.000 |
513.000 |
|
513.000 |
$123.00 |
$0.00 |
$63,099.00 |
0030 |
24" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5730 |
EA |
4.000 |
4.000 |
|
4.000 |
$1,380.00 |
$0.00 |
$5,520.00 |
0031 |
TYPE B4 SLOPED CONCRETE END SECTION |
613(N) 7501 |
EA |
2.000 |
2.000 |
|
2.000 |
$2,300.00 |
$0.00 |
$4,600.00 |
0032 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$2,000.00 |
$0.00 |
$2,000.00 |
0033 |
REMOVAL OF CURB AND GUTTER |
619(B) 4726 |
LF |
440.000 |
444.000 |
|
444.000 |
$3.00 |
$0.00 |
$1,332.00 |
0034 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
7,474.000 |
7,559.940 |
-0.010 |
7,559.940 |
$12.00 |
$-0.12 |
$90,719.28 |
0035 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
2,753.000 |
2,430.000 |
|
2,430.000 |
$5.00 |
$0.00 |
$12,150.00 |
0036 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY |
619(B) 4763 |
SY |
6,615.000 |
6,479.990 |
|
6,479.990 |
$16.00 |
$0.00 |
$103,679.84 |
0037 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
3,219.000 |
3,224.000 |
|
3,224.000 |
$3.00 |
$0.00 |
$9,672.00 |
0038 |
REMOVAL OF BRICK CHATTER MEDIAN |
619(B) 5150 |
SY |
200.000 |
0.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0039 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
1,570.000 |
220.000 |
|
220.000 |
$4.00 |
$0.00 |
$880.00 |
0040 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
1,649.000 |
1,625.000 |
-104.000 |
1,625.000 |
$15.00 |
$-1,560.00 |
$24,375.00 |
0041 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
7.000 |
7.000 |
|
7.000 |
$2,000.00 |
$0.00 |
$14,000.00 |
0042 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
7.000 |
7.000 |
|
7.000 |
$1,400.00 |
$0.00 |
$9,800.00 |
Subtotals For Category 0101/ROADWAY |
$17,790.10 |
$2,235,538.32 |
|
Fed/State Project Number: BRIY-0035-1(151)015 |
Project: 27166(05) |
Category: 0200/BRIDGE "A" |
0043 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
80.000 |
80.000 |
|
80.000 |
$39.00 |
$0.00 |
$3,120.00 |
0044 |
GRANULAR BACKFILL |
501(F) 6352 |
CY |
47.000 |
47.000 |
|
47.000 |
$87.00 |
$0.00 |
$4,089.00 |
0045 |
CLSM BACKFILL |
501(G) 6309 |
CY |
134.000 |
134.000 |
|
134.000 |
$148.00 |
$0.00 |
$19,832.00 |
0046 |
PRESTRESSED CONCRETE BEAMS (TYPE II) |
503(A) 1311 |
LF |
1,023.300 |
1,023.300 |
0.300 |
1,023.300 |
$181.00 |
$54.30 |
$185,217.30 |
0047 |
APPROACH SLAB |
504(A) 1304 |
SY |
182.200 |
182.200 |
|
182.200 |
$142.00 |
$0.00 |
$25,872.40 |
0048 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
1,040.700 |
1,040.700 |
|
1,040.700 |
$4.00 |
$0.00 |
$4,162.80 |
0049 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
493.000 |
493.000 |
|
493.000 |
$65.00 |
$0.00 |
$32,045.00 |
0050 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,520.000 |
1,520.000 |
|
1,520.000 |
$5.00 |
$0.00 |
$7,600.00 |
0051 |
WEATHERING STEEL FIXED BEARING ASSEMBLY |
507(A) 6172 |
EA |
10.000 |
10.000 |
|
10.000 |
$600.00 |
$0.00 |
$6,000.00 |
0052 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY |
507(B) 6174 |
EA |
30.000 |
30.000 |
|
30.000 |
$2,800.00 |
$0.00 |
$84,000.00 |
0053 |
ELASTOMERIC BEARING PADS |
507(C) 6282 |
EA |
30.000 |
30.000 |
|
30.000 |
$400.00 |
$0.00 |
$12,000.00 |
0054 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
400.400 |
400.400 |
0.000 |
400.400 |
$548.00 |
$0.00 |
$219,419.20 |
0055 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
161.800 |
161.800 |
|
161.800 |
$617.00 |
$0.00 |
$99,830.60 |
0056 |
SLOPE WALL (5") |
510(C) 6138 |
SY |
574.000 |
574.000 |
|
574.000 |
$71.00 |
$0.00 |
$40,754.00 |
0057 |
REINFORCING STEEL |
511(A) 1332 |
LB |
1,260.000 |
1,260.000 |
|
1,260.000 |
$1.00 |
$0.00 |
$1,260.00 |
0058 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
97,720.000 |
97,720.000 |
|
97,720.000 |
$1.00 |
$0.00 |
$97,720.00 |
0059 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
378.000 |
378.000 |
|
378.000 |
$30.00 |
$0.00 |
$11,340.00 |
0060 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
378.000 |
292.300 |
|
292.300 |
$97.00 |
$0.00 |
$28,353.10 |
0061 |
(PL)PILOT HOLES |
514(K) 6260 |
LF |
291.100 |
291.120 |
|
291.120 |
$112.00 |
$0.00 |
$32,605.44 |
0062 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
1,018.000 |
1,018.000 |
|
1,018.000 |
$4.00 |
$0.00 |
$4,072.00 |
0063 |
DRILLED SHAFTS 54" DIAMETER |
516(A) 6095 |
LF |
108.000 |
108.000 |
|
108.000 |
$780.00 |
$0.00 |
$84,240.00 |
0064 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
246.000 |
246.000 |
|
246.000 |
$7.00 |
$0.00 |
$1,722.00 |
0065 |
SEALER RESIN |
523(B) 6560 |
GAL |
5.000 |
5.000 |
|
5.000 |
$100.00 |
$0.00 |
$500.00 |
0066 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
180.000 |
180.000 |
|
180.000 |
$40.00 |
$0.00 |
$7,200.00 |
0067 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 6207 |
LF |
52.000 |
50.000 |
|
50.000 |
$40.00 |
$0.00 |
$2,000.00 |
0068 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$78,000.00 |
$0.00 |
$78,000.00 |
Subtotals For Category 0200/BRIDGE "A" |
$54.30 |
$1,092,954.84 |
|
Fed/State Project Number: BRIY-0035-1(151)015 |
Project: 27166(05) |
Category: 0201/BRIDGE "B" |
0069 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
80.000 |
80.000 |
|
80.000 |
$39.00 |
$0.00 |
$3,120.00 |
0070 |
GRANULAR BACKFILL |
501(F) 6352 |
CY |
47.000 |
47.000 |
|
47.000 |
$87.00 |
$0.00 |
$4,089.00 |
0071 |
CLSM BACKFILL |
501(G) 6309 |
CY |
134.000 |
134.000 |
|
134.000 |
$148.00 |
$0.00 |
$19,832.00 |
0072 |
PRESTRESSED CONCRETE BEAMS (TYPE II) |
503(A) 1311 |
LF |
1,023.300 |
1,023.300 |
|
1,023.300 |
$181.00 |
$0.00 |
$185,217.30 |
0073 |
APPROACH SLAB |
504(A) 1304 |
SY |
182.200 |
182.200 |
-0.020 |
182.200 |
$142.00 |
$-2.84 |
$25,872.40 |
0074 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
1,040.700 |
1,040.700 |
|
1,040.700 |
$4.00 |
$0.00 |
$4,162.80 |
0075 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
493.000 |
493.000 |
|
493.000 |
$65.00 |
$0.00 |
$32,045.00 |
0076 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,520.000 |
1,520.000 |
|
1,520.000 |
$5.00 |
$0.00 |
$7,600.00 |
0077 |
WEATHERING STEEL FIXED BEARING ASSEMBLY |
507(A) 6172 |
EA |
10.000 |
10.000 |
|
10.000 |
$600.00 |
$0.00 |
$6,000.00 |
0078 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY |
507(B) 6174 |
EA |
30.000 |
30.000 |
|
30.000 |
$2,800.00 |
$0.00 |
$84,000.00 |
0079 |
ELASTOMERIC BEARING PADS |
507(C) 6282 |
EA |
30.000 |
30.000 |
|
30.000 |
$400.00 |
$0.00 |
$12,000.00 |
0080 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
400.400 |
400.400 |
|
400.400 |
$548.00 |
$0.00 |
$219,419.20 |
0081 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
161.800 |
161.800 |
|
161.800 |
$617.00 |
$0.00 |
$99,830.60 |
0082 |
SLOPE WALL (5") |
510(C) 6138 |
SY |
574.000 |
574.000 |
|
574.000 |
$71.00 |
$0.00 |
$40,754.00 |
0083 |
REINFORCING STEEL |
511(A) 1332 |
LB |
1,260.000 |
1,260.000 |
|
1,260.000 |
$1.00 |
$0.00 |
$1,260.00 |
0084 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
97,490.000 |
97,490.000 |
|
97,490.000 |
$1.00 |
$0.00 |
$97,490.00 |
0085 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
336.000 |
360.800 |
|
360.800 |
$30.00 |
$0.00 |
$10,824.00 |
0086 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
336.000 |
360.800 |
|
360.800 |
$97.00 |
$0.00 |
$34,997.60 |
0087 |
(PL)PILOT HOLES |
514(K) 6260 |
LF |
253.400 |
304.630 |
1.250 |
304.630 |
$112.00 |
$140.00 |
$34,118.56 |
0088 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
1,018.000 |
1,018.000 |
|
1,018.000 |
$4.00 |
$0.00 |
$4,072.00 |
0089 |
DRILLED SHAFTS 54" DIAMETER |
516(A) 6095 |
LF |
114.000 |
114.000 |
|
114.000 |
$780.00 |
$0.00 |
$88,920.00 |
0090 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
246.000 |
246.000 |
|
246.000 |
$7.00 |
$0.00 |
$1,722.00 |
0091 |
SEALER RESIN |
523(B) 6560 |
GAL |
5.000 |
5.000 |
|
5.000 |
$100.00 |
$0.00 |
$500.00 |
0092 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
180.000 |
180.000 |
42.000 |
180.000 |
$40.00 |
$1,680.00 |
$7,200.00 |
0093 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 6207 |
LF |
52.000 |
50.000 |
|
50.000 |
$40.00 |
$0.00 |
$2,000.00 |
0094 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$78,000.00 |
$0.00 |
$78,000.00 |
8000 |
PILE SPLICE, H-PILE (NON-BIDDABLE) |
514(L) 6220 |
EA |
0.000 |
7.000 |
7.000 |
7.000 |
$400.00 |
$2,800.00 |
$2,800.00 |
Subtotals For Category 0201/BRIDGE "B" |
$4,617.16 |
$1,107,846.46 |
|
Fed/State Project Number: BRIY-0035-1(151)015 |
Project: 27166(05) |
Category: 0301/TRAFFIC OPERATIONS |
0095 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
15,200.000 |
0.000 |
|
0.000 |
$0.10 |
$0.00 |
$0.00 |
0096 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) |
857(C) 8851 |
LF |
1,000.000 |
0.000 |
|
0.000 |
$1.20 |
$0.00 |
$0.00 |
0097 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 |
857(E) 8890 |
EA |
1,000.000 |
1,500.000 |
1,500.000 |
1,500.000 |
$1.60 |
$2,400.00 |
$2,400.00 |
0098 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
1,500.000 |
1,275.000 |
|
1,275.000 |
$0.80 |
$0.00 |
$1,020.00 |
0099 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
22,140.000 |
9,684.000 |
72.000 |
9,684.000 |
$0.05 |
$3.60 |
$484.20 |
0100 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
4,320.000 |
9,496.000 |
174.000 |
9,496.000 |
$2.00 |
$348.00 |
$18,992.00 |
0101 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
6,480.000 |
5,586.000 |
16.000 |
5,586.000 |
$1.00 |
$16.00 |
$5,586.00 |
0102 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
4,320.000 |
5,082.000 |
37.000 |
5,082.000 |
$0.20 |
$7.40 |
$1,016.40 |
0103 |
WING BARRICADES |
880(C) 8848 |
SD |
1,080.000 |
1,063.000 |
4.000 |
1,063.000 |
$4.00 |
$16.00 |
$4,252.00 |
0104 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
14,040.000 |
15,161.000 |
101.000 |
15,161.000 |
$0.04 |
$4.04 |
$606.44 |
0105 |
DRUMS |
880(F) 8878 |
SD |
28,350.000 |
23,778.000 |
102.000 |
23,778.000 |
$0.20 |
$20.40 |
$4,755.60 |
Subtotals For Category 0301/TRAFFIC OPERATIONS |
$2,815.44 |
$39,112.64 |
|
Fed/State Project Number: BRIY-0035-1(151)015 |
Project: 27166(05) |
Category: 0310/TRAFFIC CONTROL |
0113 |
RUMBLE STRIP-METHOD PCC-CON |
413(C) 4868 |
LF |
16,040.000 |
0.000 |
-4,616.000 |
0.000 |
$0.70 |
$-3,231.20 |
$0.00 |
0114 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
35,000.000 |
46,044.000 |
22,512.000 |
46,044.000 |
$0.10 |
$2,251.20 |
$4,604.40 |
0115 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
2,000.000 |
270.000 |
|
270.000 |
$1.50 |
$0.00 |
$405.00 |
0116 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
12,000.000 |
41,588.000 |
16,817.000 |
41,588.000 |
$0.10 |
$1,681.70 |
$4,158.80 |
0117 |
(PL)TRUCK MOUNTED ATTENUATOR |
876(A) 8482 |
SD |
810.000 |
0.000 |
|
0.000 |
$3.00 |
$0.00 |
$0.00 |
0118 |
DELIVER PORTABLE LONGITUDINAL BARRIER |
877(B) 8484 |
LF |
4,225.000 |
4,000.000 |
|
4,000.000 |
$27.00 |
$0.00 |
$108,000.00 |
0119 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER |
877(C) 8486 |
LF |
4,225.000 |
3,540.000 |
|
3,540.000 |
$4.00 |
$0.00 |
$14,160.00 |
0120 |
MODULAR GLARE SCREEN (TEMPORARY) |
878(B) 8487 |
SD |
48,330.000 |
43,292.000 |
|
43,292.000 |
$0.15 |
$0.00 |
$6,493.80 |
0121 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
540.000 |
556.000 |
|
556.000 |
$20.00 |
$0.00 |
$11,120.00 |
0122 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
29,700.000 |
12,053.000 |
|
12,053.000 |
$0.05 |
$0.00 |
$602.65 |
0123 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
10,800.000 |
21,339.000 |
|
21,339.000 |
$2.00 |
$0.00 |
$42,678.00 |
0124 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
20,250.000 |
11,317.000 |
|
11,317.000 |
$1.00 |
$0.00 |
$11,317.00 |
0125 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
20,250.000 |
8,864.000 |
|
8,864.000 |
$0.20 |
$0.00 |
$1,772.80 |
0126 |
WING BARRICADES |
880(C) 8848 |
SD |
1,080.000 |
1,176.000 |
|
1,176.000 |
$4.00 |
$0.00 |
$4,704.00 |
0127 |
VERTICAL PANELS |
880(D) 8854 |
SD |
12,150.000 |
19,250.000 |
|
19,250.000 |
$0.20 |
$0.00 |
$3,850.00 |
0128 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
40,500.000 |
24,341.000 |
|
24,341.000 |
$0.04 |
$0.00 |
$973.64 |
0129 |
DRUMS |
880(F) 8878 |
SD |
17,550.000 |
34,621.000 |
-3,235.000 |
34,621.000 |
$0.20 |
$-647.00 |
$6,924.20 |
0130 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
3,240.000 |
4,125.000 |
4,125.000 |
4,125.000 |
$0.50 |
$2,062.50 |
$2,062.50 |
0131 |
TRAFFIC SURVEILLANCE, POLICE |
880(L) 8911 |
HOUR |
200.000 |
43.700 |
|
43.700 |
$60.00 |
$0.00 |
$2,622.00 |
0132 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
3,240.000 |
608.000 |
41.000 |
608.000 |
$11.00 |
$451.00 |
$6,688.00 |
Subtotals For Category 0310/TRAFFIC CONTROL |
$2,568.20 |
$233,136.79 |
|