Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    09/19/2012
Contract ID: 110527   Estimate Number: 0015     Contract No: 710565
Residency: ARDMORE (07200)   Estimate Type: Progressive     Account No: 400700

Project Number(s): BRIY-0035-1(151)015
Primary Job Piece No: 27166(05)
Contract Description: GRADE, DRAIN, SURFACE, AND BRIDGE I-35: OVER SH-32. PROJECT LENGTH = 0.065 MILES
Primary County: LOVE              
Name of Road: I-35              
Prime Contractor: MERIDIAN CONTRACTING, INC.              
    17500 S SOONER ROAD              
    NORMAN , OK   73701              
Surety Company: SAFECO INSURANCE COMPANY              

Date Let: 10/20/2011 NTP Effective Date: 01/09/2012 Pay Period: 09/01/2012  TO  09/15/2012
Date Awarded: 11/07/2011 Date Work Began: 01/09/2012 Original Contract Time: 270
Date Contract Executed: 11/29/2011 Date Time Stopped: Current Time Charged: 240.00
Date NTP Issued: 12/08/2011 Completion Date: Current Time Allowed: 270.00
General Liability Expires: 04/01/2013 Workman's Comp Expires: 04/01/2013 Percent Time Used: 88.89 %
Specification Year: 2009     Date Approved:

Current Contract Amount: $5,141,923.65 Total to Date Prev to Date This Estimate
Bid Amount: $5,141,923.65 Participating: $3,995,009.01 $3,559,442.86 $435,566.15
Percent Complete: 76.95 % Non Participating: $0.00 $0.00 $0.00
Funds Available: $1,185,073.45 Total Earnings: $3,995,009.01 $3,559,442.86 $435,566.15
Unearned Balance: $1,185,073.45 Stockpiled Materials: $0.00 $0.00 $0.00
Gross Earnings: $3,995,009.01 $3,559,442.86 $435,566.15
Other Adjustments: $-38,158.81 $-30,627.05 $-7,531.76
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $3,956,850.20 $3,528,815.81 $428,034.39

Estimate Adjustment Detail

Contract ID: 110527   Estimate Number: 0015     Primary JP: 27166(05)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
No change orders have been created for this contract.


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
No material stockpiles have been created for this contract.
Subtotals For Stockpile Payments $0.00


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.
Subtotals For Liquidated Damages $


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
Smoothness Deduction 0011 $-30,000.00
Subtotals For Contract Adjustments $-30,000.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
27166(05) 0019 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0002 220.69 $-0.03 $-8.57
27166(05) 0019 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0008 610.39 $0.56 $344.17
27166(05) 0020 SUPERPAVE, TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0002 64.59 $-0.04 $-2.87
27166(05) 0021 SUPERPAVE, TYPE S4(PG 64-22 OK) Asphalt Binder Adjustment 0011 228.87 $0.88 $202.41
27166(05) 0054 CLASS AA CONCRETE * Material Discrepancy Adjustments 0010 0.00 $0.00 $-1,162.19
27166(05) 0080 CLASS AA CONCRETE * Material Discrepancy Adjustments 0015 0.00 $0.00 $-1,380.96
27166(05) 0080 CLASS AA CONCRETE * Material Discrepancy Adjustments 0015 0.00 $0.00 $-1,150.80
27166(05) 0080 CLASS AA CONCRETE * Material Discrepancy Adjustments 0015 0.00 $0.00 $-5,000.00
Subtotals For Line Item Adjustments $-8,158.81
* = User applied Line Item Adjustments


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
01 Incentive/Disincentive for Early/Late Completion Labor Day NOT ENTERED NOT ENTERED Complete By 08/30/2012 $0.00 N
02 Incentive/Disincentive for Early/Late Completion OU/TX wknd NOT ENTERED NOT ENTERED Complete By 10/04/2012 $2,000.00 N


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
No milestones adjustments exist for this contract.
Subtotals For Milestones $

Line Item Detail

Contract ID: 110527   Estimate Number: 0015     Primary JP: 27166(05)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    BRIY-0035-1(151)015 Project:    27166(05) Category:    0101/ROADWAY
0001 CLEARING AND GRUBBING 201(A) 0102 LSUM 1.000 1.000   1.000 $5,000.00 $0.00 $5,000.00
0002 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 42,143.000 42,143.000   10,488.000 $8.00 $0.00 $83,904.00
0003 UNCLASSIFIED BORROW 202(D) 0184 CY 500.000 500.000   0.000 $22.00 $0.00 $0.00
0004 TYPE A-SALVAGED TOPSOIL 205(A) 4229 LSUM 1.000 1.000 0.000 0.500 $27,000.00 $0.00 $13,500.00
0005 TEMPORARY SILT FENCE 221(C) 2801 LF 6,771.000 6,771.000   3,545.000 $1.25 $0.00 $4,431.25
0006 TEMPORARY SILT DIKE 221(F) 0100 LF 320.000 320.000   98.000 $8.00 $0.00 $784.00
0007 SOLID SLAB SODDING 230(A) 2806 SY 29,406.000 29,406.000   0.000 $1.50 $0.00 $0.00
0008 VEGETATIVE MULCHING 233(A) 2817 AC 6.000 6.000   0.000 $500.00 $0.00 $0.00
0009 MOWING 241 2832 AC 18.300 18.300   8.790 $70.00 $0.00 $615.30
0010 AGGREGATE BASE TYPE A 303(A) 2100 CY 3,473.000 3,473.000 105.810 3,096.350 $37.00 $3,914.97 $114,564.95
0011 CEMENT KILN DUST 307(B) 4210 TON 652.000 652.000   540.150 $47.00 $0.00 $25,387.05
0012 LIME 307(D) 4230 TON 165.000 165.000   150.950 $148.00 $0.00 $22,340.60
0013 CEMENTITIOUS STABILIZED SUBGRADE 307(E) 4240 SY 14,992.000 14,992.000   14,399.680 $3.00 $0.00 $43,199.04
0014 LIME PRETREATMENT 307(G) 4260 SY 14,992.000 14,992.000   14,399.680 $2.60 $0.00 $37,439.16
0015 SEPARATOR FABRIC 325 5271 SY 15,451.000 15,451.000   15,834.380 $3.00 $0.00 $47,503.14
0016 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 1,478.000 1,478.000 682.630 682.630 $30.00 $20,478.90 $20,478.90
0017 TACK COAT 407(B) 0250 GAL 114.000 114.000   0.000 $3.50 $0.00 $0.00
0018 PRIME COAT 408 5774 GAL 3,370.000 3,370.000   0.000 $3.00 $0.00 $0.00
0019 SUPERPAVE, TYPE S3(PG 64-22 OK) 411(B) 5945 TON 2,655.000 2,655.000   2,548.040 $80.00 $0.00 $203,843.20
0020 SUPERPAVE, TYPE S4(PG 70-28 OK) 411(C) 5955 TON 1,468.000 1,468.000 0.000 64.590 $80.00 $0.00 $5,167.20
0021 SUPERPAVE, TYPE S4(PG 64-22 OK) 411(C) 5960 TON 496.000 496.000 0.000 228.870 $80.00 $0.00 $18,309.60
0022 COLD MILLING PAVEMENT 412 5267 SY 12,943.000 12,943.000   0.000 $4.00 $0.00 $0.00
0023 RUMBLE STRIP-METHOD PCC-CON 413(C) 4868 LF 4,616.000 4,616.000   0.000 $0.70 $0.00 $0.00
0024 P.C.CONCRETE PAVEMENT(PLACEMENT) 414(A) 0210 SY 3,544.000 3,544.000 1,440.000 3,271.030 $23.00 $33,120.00 $75,233.69
0025 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(B) 5725 SY 6,670.000 6,670.000 1,649.560 6,453.780 $18.00 $29,692.08 $116,168.04
0026 P.C. CONCRETE FOR PAVEMENT 414(G) 5275 CY 3,381.000 3,381.000 1,029.850 3,225.090 $129.00 $132,850.65 $416,036.61
0027 CLASS C CONCRETE 509(D) 0325 CY 50.000 50.000   17.720 $419.00 $0.00 $7,424.68
0028 2'-8" COMB. CURB & GUTTER (6" BARRIER) 609(B) 1525 LF 440.000 440.000   0.000 $35.00 $0.00 $0.00
0029 24" R.C.PIPE CLASS III 613(A) 0492 LF 505.000 505.000   505.000 $123.00 $0.00 $62,115.00
0030 24" PREFAB. CULVERT END SECTION, ROUND 613(L) 5730 EA 4.000 4.000   4.000 $1,380.00 $0.00 $5,520.00
0031 TYPE B4 SLOPED CONCRETE END SECTION 613(N) 7501 EA 2.000 2.000   0.000 $2,300.00 $0.00 $0.00
0032 REMOVAL OF STRUCTURES & OBSTRUCTIONS 619(A) 0920 LSUM 1.000 1.000   0.500 $2,000.00 $0.00 $1,000.00
0033 REMOVAL OF CURB AND GUTTER 619(B) 4726 LF 440.000 440.000 444.000 444.000 $3.00 $1,332.00 $1,332.00
0034 REMOVAL OF CONCRETE PAVEMENT 619(B) 4727 SY 7,474.000 7,474.000   608.340 $12.00 $0.00 $7,300.08
0035 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 2,753.000 2,753.000   4,048.000 $5.00 $0.00 $20,240.00
0036 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY 619(B) 4763 SY 6,615.000 6,615.000   6,479.990 $16.00 $0.00 $103,679.84
0037 REMOVAL OF GUARDRAIL 619(B) 4780 LF 3,219.000 3,219.000 -2,385.000 3,224.000 $3.00 $-7,155.00 $9,672.00
0038 REMOVAL OF BRICK CHATTER MEDIAN 619(B) 5150 SY 200.000 200.000   0.000 $5.00 $0.00 $0.00
0039 SAWING PAVEMENT 619(C) 0924 LF 1,570.000 1,570.000   220.000 $4.00 $0.00 $880.00
0040 BEAM GUARDRAIL W-BEAM SINGLE 623(A) 0932 LF 1,649.000 1,649.000   975.000 $15.00 $0.00 $14,625.00
0041 GUARDRAIL END TREATMENT (GET) 623(G) 8571 EA 7.000 7.000   3.000 $2,000.00 $0.00 $6,000.00
0042 GUARDRAIL BRIDGE CONNECTION-TYPE A 623(I) 8675 EA 7.000 7.000   3.000 $1,400.00 $0.00 $4,200.00
Subtotals For Category     0101/ROADWAY    $214,233.60 $1,497,894.33
Fed/State Project Number:    BRIY-0035-1(151)015 Project:    27166(05) Category:    0200/BRIDGE "A"
0043 SUBSTRUCTURE EXCAVATION COMMON 501(B) 1307 CY 80.000 80.000   80.000 $39.00 $0.00 $3,120.00
0044 GRANULAR BACKFILL 501(F) 6352 CY 47.000 47.000   47.000 $87.00 $0.00 $4,089.00
0045 CLSM BACKFILL 501(G) 6309 CY 134.000 134.000   134.000 $148.00 $0.00 $19,832.00
0046 PRESTRESSED CONCRETE BEAMS (TYPE II) 503(A) 1311 LF 1,023.300 1,023.300   1,023.000 $181.00 $0.00 $185,163.00
0047 APPROACH SLAB 504(A) 1304 SY 182.200 182.200   182.200 $142.00 $0.00 $25,872.40
0048 SAW-CUT GROOVING 504(B) 1305 SY 1,040.700 1,040.700   1,040.700 $4.00 $0.00 $4,162.80
0049 42" F-SHAPED PARAPET 504(E) 6190 LF 493.000 493.000   493.000 $65.00 $0.00 $32,045.00
0050 STRUCTURAL STEEL 506(A) 1322 LB 1,520.000 1,520.000   1,520.000 $5.00 $0.00 $7,600.00
0051 WEATHERING STEEL FIXED BEARING ASSEMBLY 507(A) 6172 EA 10.000 10.000   10.000 $600.00 $0.00 $6,000.00
0052 STAINLESS STEEL EXPANSION BEARING ASSEMBLY 507(B) 6174 EA 30.000 30.000   30.000 $2,800.00 $0.00 $84,000.00
0053 ELASTOMERIC BEARING PADS 507(C) 6282 EA 30.000 30.000   30.000 $400.00 $0.00 $12,000.00
0054 CLASS AA CONCRETE 509(A) 1326 CY 400.400 400.400   256.240 $548.00 $0.00 $140,419.52
0055 CLASS A CONCRETE 509(B) 1328 CY 161.800 161.800   161.800 $617.00 $0.00 $99,830.60
0056 SLOPE WALL (5") 510(C) 6138 SY 574.000 574.000   574.000 $71.00 $0.00 $40,754.00
0057 REINFORCING STEEL 511(A) 1332 LB 1,260.000 1,260.000   1,260.000 $1.00 $0.00 $1,260.00
0058 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 97,720.000 97,720.000   79,677.000 $1.00 $0.00 $79,677.00
0059 PILES, FURNISHED (HP 10X42) 514(A) 6010 LF 378.000 378.000   378.000 $30.00 $0.00 $11,340.00
0060 PILES, DRIVEN (HP 10X42) 514(B) 6292 LF 378.000 378.000   292.300 $97.00 $0.00 $28,353.10
0061 (PL)PILOT HOLES 514(K) 6260 LF 291.100 291.100   291.120 $112.00 $0.00 $32,605.44
0062 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 1,018.000 1,018.000   1,018.000 $4.00 $0.00 $4,072.00
0063 DRILLED SHAFTS 54" DIAMETER 516(A) 6095 LF 108.000 108.000   108.000 $780.00 $0.00 $84,240.00
0064 SEALER CRACK PREPARATION 523(A) 6550 LF 246.000 246.000   246.000 $7.00 $0.00 $1,722.00
0065 SEALER RESIN 523(B) 6560 GAL 5.000 5.000   5.000 $100.00 $0.00 $500.00
0066 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 6204 LF 180.000 180.000   180.000 $40.00 $0.00 $7,200.00
0067 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 6207 LF 52.000 52.000   0.000 $40.00 $0.00 $0.00
0068 REMOVAL OF EXISTING BRIDGE STRUCTURE 619(D) 1397 LSUM 1.000 1.000   1.000 $78,000.00 $0.00 $78,000.00
Subtotals For Category     0200/BRIDGE "A"    $0.00 $993,857.86
Fed/State Project Number:    BRIY-0035-1(151)015 Project:    27166(05) Category:    0201/BRIDGE "B"
0069 SUBSTRUCTURE EXCAVATION COMMON 501(B) 1307 CY 80.000 80.000   80.000 $39.00 $0.00 $3,120.00
0070 GRANULAR BACKFILL 501(F) 6352 CY 47.000 47.000   47.000 $87.00 $0.00 $4,089.00
0071 CLSM BACKFILL 501(G) 6309 CY 134.000 134.000 67.000 67.000 $148.00 $9,916.00 $9,916.00
0072 PRESTRESSED CONCRETE BEAMS (TYPE II) 503(A) 1311 LF 1,023.300 1,023.300   1,023.300 $181.00 $0.00 $185,217.30
0073 APPROACH SLAB 504(A) 1304 SY 182.200 182.200   0.000 $142.00 $0.00 $0.00
0074 SAW-CUT GROOVING 504(B) 1305 SY 1,040.700 1,040.700   0.000 $4.00 $0.00 $0.00
0075 42" F-SHAPED PARAPET 504(E) 6190 LF 493.000 493.000   0.000 $65.00 $0.00 $0.00
0076 STRUCTURAL STEEL 506(A) 1322 LB 1,520.000 1,520.000   1,520.000 $5.00 $0.00 $7,600.00
0077 WEATHERING STEEL FIXED BEARING ASSEMBLY 507(A) 6172 EA 10.000 10.000   10.000 $600.00 $0.00 $6,000.00
0078 STAINLESS STEEL EXPANSION BEARING ASSEMBLY 507(B) 6174 EA 30.000 30.000   30.000 $2,800.00 $0.00 $84,000.00
0079 ELASTOMERIC BEARING PADS 507(C) 6282 EA 30.000 30.000   30.000 $400.00 $0.00 $12,000.00
0080 CLASS AA CONCRETE 509(A) 1326 CY 400.400 400.400 245.250 271.770 $548.00 $134,397.00 $148,929.96
0081 CLASS A CONCRETE 509(B) 1328 CY 161.800 161.800 11.900 161.800 $617.00 $7,342.30 $99,830.60
0082 SLOPE WALL (5") 510(C) 6138 SY 574.000 574.000   574.000 $71.00 $0.00 $40,754.00
0083 REINFORCING STEEL 511(A) 1332 LB 1,260.000 1,260.000   1,260.000 $1.00 $0.00 $1,260.00
0084 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 97,490.000 97,490.000 54,160.000 92,730.000 $1.00 $54,160.00 $92,730.00
0085 PILES, FURNISHED (HP 10X42) 514(A) 6010 LF 336.000 336.000   360.800 $30.00 $0.00 $10,824.00
0086 PILES, DRIVEN (HP 10X42) 514(B) 6292 LF 336.000 336.000   360.800 $97.00 $0.00 $34,997.60
0087 (PL)PILOT HOLES 514(K) 6260 LF 253.400 253.400   303.380 $112.00 $0.00 $33,978.56
0088 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 1,018.000 1,018.000   0.000 $4.00 $0.00 $0.00
0089 DRILLED SHAFTS 54" DIAMETER 516(A) 6095 LF 114.000 114.000   114.000 $780.00 $0.00 $88,920.00
0090 SEALER CRACK PREPARATION 523(A) 6550 LF 246.000 246.000   0.000 $7.00 $0.00 $0.00
0091 SEALER RESIN 523(B) 6560 GAL 5.000 5.000   0.000 $100.00 $0.00 $0.00
0092 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 6204 LF 180.000 180.000 138.000 138.000 $40.00 $5,520.00 $5,520.00
0093 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 6207 LF 52.000 52.000   0.000 $40.00 $0.00 $0.00
0094 REMOVAL OF EXISTING BRIDGE STRUCTURE 619(D) 1397 LSUM 1.000 1.000   1.000 $78,000.00 $0.00 $78,000.00
Subtotals For Category     0201/BRIDGE "B"    $211,335.30 $947,687.02
Fed/State Project Number:    BRIY-0035-1(151)015 Project:    27166(05) Category:    0301/TRAFFIC OPERATIONS
0095 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 857(A) 8839 LF 15,200.000 15,200.000   0.000 $0.10 $0.00 $0.00
0096 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) 857(C) 8851 LF 1,000.000 1,000.000   0.000 $1.20 $0.00 $0.00
0097 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 857(E) 8890 EA 1,000.000 1,000.000   0.000 $1.60 $0.00 $0.00
0098 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 857(F) 8006 LF 1,500.000 1,500.000   1,275.000 $0.80 $0.00 $1,020.00
0099 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 22,140.000 22,140.000 540.000 8,640.000 $0.05 $27.00 $432.00
0100 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 4,320.000 4,320.000 510.000 8,368.000 $2.00 $1,020.00 $16,736.00
0101 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 6,480.000 6,480.000 315.000 4,964.000 $1.00 $315.00 $4,964.00
0102 CONSTRUCTION BARRICADES(TYPE III) 880(C) 8842 SD 4,320.000 4,320.000 285.000 4,532.000 $0.20 $57.00 $906.40
0103 WING BARRICADES 880(C) 8848 SD 1,080.000 1,080.000 60.000 936.000 $4.00 $240.00 $3,744.00
0104 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 14,040.000 14,040.000 825.000 13,548.000 $0.04 $33.00 $541.92
0105 DRUMS 880(F) 8878 SD 28,350.000 28,350.000 1,350.000 21,246.000 $0.20 $270.00 $4,249.20
Subtotals For Category     0301/TRAFFIC OPERATIONS    $1,962.00 $32,593.52
Fed/State Project Number:    BRIY-0035-1(151)015 Project:    27166(05) Category:    0302/TRAFFIC SIGNING
0106 CLASS C CONCRETE 509(D) 0325 CY 11.000 11.000   0.000 $638.00 $0.00 $0.00
0107 REINFORCING STEEL 511(A) 0332 LB 4,260.000 4,260.000   0.000 $1.00 $0.00 $0.00
0108 (PL)REMOVE & RESET EXISTING SIGNS 805(D) 8756 EA 15.000 15.000   0.000 $283.00 $0.00 $0.00
0109 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 9,070.000 9,070.000   0.000 $1.50 $0.00 $0.00
0110 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 856(A) 8530 LF 5,600.000 5,600.000   0.000 $1.50 $0.00 $0.00
0111 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) 856(A) 8535 LF 1,494.000 1,494.000   0.000 $2.20 $0.00 $0.00
0112 SAND FILLED IMPACT ATTENUATION MODULE 870(A) 8011 EA 30.000 30.000   0.000 $642.00 $0.00 $0.00
Subtotals For Category     0302/TRAFFIC SIGNING    $0.00 $0.00
Fed/State Project Number:    BRIY-0035-1(151)015 Project:    27166(05) Category:    0310/TRAFFIC CONTROL
0113 RUMBLE STRIP-METHOD PCC-CON 413(C) 4868 LF 16,040.000 16,040.000   0.000 $0.70 $0.00 $0.00
0114 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 857(A) 8839 LF 35,000.000 35,000.000   23,532.000 $0.10 $0.00 $2,353.20
0115 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 857(E) 8887 EA 2,000.000 2,000.000   270.000 $1.50 $0.00 $405.00
0116 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 857(F) 8006 LF 12,000.000 12,000.000   7,200.000 $0.10 $0.00 $720.00
0117 (PL)TRUCK MOUNTED ATTENUATOR 876(A) 8482 SD 810.000 810.000   0.000 $3.00 $0.00 $0.00
0118 DELIVER PORTABLE LONGITUDINAL BARRIER 877(B) 8484 LF 4,225.000 4,225.000   4,000.000 $27.00 $0.00 $108,000.00
0119 RELOCATION OF PORTABLE LONGITUDINAL BARRIER 877(C) 8486 LF 4,225.000 4,225.000   2,832.000 $4.00 $0.00 $11,328.00
0120 MODULAR GLARE SCREEN (TEMPORARY) 878(B) 8487 SD 48,330.000 48,330.000 2,370.000 39,026.000 $0.15 $355.50 $5,853.90
0121 ARROW DISPLAY(TYPE C) 880(A) 8812 SD 540.000 540.000 30.000 502.000 $20.00 $600.00 $10,040.00
0122 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 29,700.000 29,700.000 711.000 10,754.000 $0.05 $35.55 $537.70
0123 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 10,800.000 10,800.000 1,221.000 19,068.000 $2.00 $2,442.00 $38,136.00
0124 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 20,250.000 20,250.000 600.000 10,213.000 $1.00 $600.00 $10,213.00
0125 CONSTRUCTION BARRICADES(TYPE III) 880(C) 8842 SD 20,250.000 20,250.000 480.000 7,730.000 $0.20 $96.00 $1,546.00
0126 WING BARRICADES 880(C) 8848 SD 1,080.000 1,080.000 60.000 1,032.000 $4.00 $240.00 $4,128.00
0127 VERTICAL PANELS 880(D) 8854 SD 12,150.000 12,150.000 1,050.000 17,360.000 $0.20 $210.00 $3,472.00
0128 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 40,500.000 40,500.000 1,305.000 21,992.000 $0.04 $52.20 $879.68
0129 DRUMS 880(F) 8878 SD 17,550.000 17,550.000 2,040.000 34,184.000 $0.20 $408.00 $6,836.80
0130 CHANNELIZER CONES 880(G) 8890 SD 3,240.000 3,240.000   0.000 $0.50 $0.00 $0.00
0131 TRAFFIC SURVEILLANCE, POLICE 880(L) 8911 HOUR 200.000 200.000 43.700 43.700 $60.00 $2,622.00 $2,622.00
0132 PORT.CHANGEABLE MESSAGE SIGN 882(A) 8306 SD 3,240.000 3,240.000 34.000 1,355.000 $11.00 $374.00 $14,905.00
Subtotals For Category     0310/TRAFFIC CONTROL    $8,035.25 $221,976.28
Fed/State Project Number:    BRIY-0035-1(151)015 Project:    27166(05) Category:    0600/STAKING
0133 CONSTRUCTION STAKING LEVEL II 642(B) 0096 LSUM 1.000 1.000   0.750 $40,000.00 $0.00 $30,000.00
Subtotals For Category     0600/STAKING    $0.00 $30,000.00
Fed/State Project Number:    BRIY-0035-1(151)015 Project:    27166(05) Category:    0640/CONSTRUCTION
0134 SWPPP DOCUMENTATION AND MANAGEMENT 220 2800 LSUM 1.000 1.000   0.600 $10,000.00 $0.00 $6,000.00
0135 FIELD OFFICE 640(A) 1426 EA 1.000 1.000   1.000 $15,000.00 $0.00 $15,000.00
0136 MOBILIZATION 641 1552 LSUM 1.000 1.000   1.000 $250,000.00 $0.00 $250,000.00
Subtotals For Category     0640/CONSTRUCTION    $0.00 $271,000.00
Subtotals For Project BRIY-0035-1(151)015 /27166(05) $435,566.15 $3,995,009.01