Oklahoma Department of Transportation
Final Estimate Affidavit

Contract ID: 110526   Estimate Number: 0008 , Final     Spec Year: 2009
Primary JP: 27633(04)   Residency: TULSA (08100)     Contract No: 710885
Date Created: 05/15/2018   Contractor FEI: 731316732     Account No: 404800

Project Number(s): SBR-172A(515)SB, SBR-272A(005)SB
Contract Description: BRIDGE REHABILITATION SH-51: OVER PITTSBURG AVE 0.5 MI E OF HARVARD AVE, AND OVER MK&T RAILROAD 0.7 MI E OF YALE AVE IN THE CITY OF TULSA. PROJECT LENGTH = 0.051 MILES
Primary County: TULSA              
Name of Road: SH-51              
Prime Contractor: BECCO CONTRACTORS, INC.           Time Charged: 198.00
    P.O. BOX 9159           Time Allowed: 240.00
    TULSA , OK   74157           Percent Time: 82.50 %

  Paid To Date: $2,596,246.29 Payable This Statement: $9,705.67

CONTRACTOR AFFIDAVIT
STATE OF ___________________ )  
  )     §  
COUNTY OF __________________ )  
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct.
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid.
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them.
Further affiant sayeth not.                                
BECCO CONTRACTORS, INC.                               
 
_________________________________________________
Affiant Signature
 
_________________________________________________
Affiant Printed Name
                          PE Seal
_________________________________________________
Affiant Company Position
Subscribed and sworn to before me this ______ day of ____________, 20____
My Commission Number: ____________ My Commission Expires: ______________
   
_________________________________________________              
_________________________________________________
                    Professional Engineer Signature
              Oklahoma Department of Transportation
Corporate Seal
Notary Seal                  

Oklahoma Department of Transportation
Final Estimate Summary
Created:    05/15/2018
Contract ID: 110526   Estimate Number: 0008     Contract No: 710885
Residency: TULSA (08100)   Estimate Type: Final     Account No: 404800

Project Number(s): SBR-172A(515)SB, SBR-272A(005)SB
Primary Job Piece No: 27633(04)
Contract Description: BRIDGE REHABILITATION SH-51: OVER PITTSBURG AVE 0.5 MI E OF HARVARD AVE, AND OVER MK&T RAILROAD 0.7 MI E OF YALE AVE IN THE CITY OF TULSA. PROJECT LENGTH = 0.051 MILES
Primary County: TULSA              
Name of Road: SH-51              
Prime Contractor: BECCO CONTRACTORS, INC.              
    P.O. BOX 9159              
    TULSA , OK   74157              
Surety Company: MID-CONTINENT CASUALTY COMPANY              

Date Let: 01/19/2012 NTP Effective Date: 04/23/2012 Pay Period: 03/01/2013  TO  04/15/2018
Date Awarded: 02/06/2012 Date Work Began: 04/23/2012 Original Contract Time: 240
Date Contract Executed: 02/21/2012 Date Time Stopped: 03/27/2013 Current Time Charged: 198.00
Date NTP Issued: 03/22/2012 Completion Date: 03/27/2013 Current Time Allowed: 240.00
General Liability Expires: 03/01/2019 Workman's Comp Expires: 02/01/2019 Percent Time Used: 82.50 %
Specification Year: 2009        

Bid Amount: $2,680,788.96 Total to Date Prev to Date This Estimate
Funds Available (Bid + Positive C/O): $2,738,424.11 Participating: $0.00 $0.00 $0.00
Percent Complete: 94.81 % Non Participating: $2,604,562.87 $2,603,526.30 $1,036.57
Unearned Balance: $142,177.82 Total Earnings: $2,604,562.87 $2,603,526.30 $1,036.57
Stockpiled Materials: $0.00 $0.00 $0.00
Gross Earnings: $2,604,562.87 $2,603,526.30 $1,036.57
Other Adjustments: $-8,316.58 $-16,985.68 $8,669.10
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $2,596,246.29 $2,586,540.62 $9,705.67

Estimate Adjustment Detail

Contract ID: 110526   Estimate Number: 0008     Primary JP: 27633(04)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
002 Removable pavement marking (tape) Approved 05/12/2015 0.0 $41,235.15
003 Milestone adjustment, Incentive pay Approved 11/20/2017 4.0 $16,400.00
004 Final Quantity Change Order Approved 04/09/2018 0.0 $-133,861.24


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
No material stockpiles have been created for this contract.
Subtotals For Stockpile Payments $0.00


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.
Subtotals For Liquidated Damages $


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
Smoothness Deduction 0008 $-8,878.90
Subtotals For Contract Adjustments $-8,878.90


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
27633(04) 0002 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0003 114.03 $1.50 $172.14
27633(04) 0002 SUPERPAVE, TYPE S4(PG 76-28 OK) * Material Discrepancy Adjustments 0004 20.00 $200.00 $4,000.00
27633(04) 0002 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0004 223.01 $1.74 $390.18
27633(04) 0002 SUPERPAVE, TYPE S4(PG 76-28 OK) * Material Discrepancy Adjustments 0004 20.00 $200.00 $4,000.00
27633(04) 0002 SUPERPAVE, TYPE S4(PG 76-28 OK) * Material Discrepancy Adjustments 0006 -20.00 $200.00 $-4,000.00
27633(04) 0002 SUPERPAVE, TYPE S4(PG 76-28 OK) * Material Discrepancy Adjustments 0006 -20.00 $200.00 $-4,000.00
27633(04) 0009 CLSM BACKFILL * Material Discrepancy Adjustments 0003 -20.00 $200.00 $-4,000.00
27633(04) 0009 CLSM BACKFILL * Material Discrepancy Adjustments 0006 20.00 $200.00 $4,000.00
27633(04) 0012 SEALED EXPANSION JOINT * Missing Material Certification 0002 -23.00 $270.00 $-6,210.00
27633(04) 0012 SEALED EXPANSION JOINT * Missing Material Certification 0004 -27.60 $270.00 $-7,452.00
27633(04) 0012 SEALED EXPANSION JOINT * Missing Material Certification 0006 23.00 $270.00 $6,210.00
27633(04) 0012 SEALED EXPANSION JOINT * Missing Material Certification 0006 27.60 $270.00 $7,452.00
27633(04) 0014 STRUCTURAL STEEL * Missing Material Certification 0002 -108.00 $18.00 $-1,944.00
27633(04) 0014 STRUCTURAL STEEL * Missing Material Certification 0005 -108.00 $18.00 $-1,944.00
27633(04) 0014 STRUCTURAL STEEL * Missing Material Certification 0006 108.00 $18.00 $1,944.00
27633(04) 0014 STRUCTURAL STEEL * Missing Material Certification 0008 108.00 $18.00 $1,944.00
27633(04) 0025 SEALER RESIN * Missing Material Certification 0004 -2.00 $165.00 $-330.00
27633(04) 0025 SEALER RESIN * Missing Material Certification 0005 -2.00 $165.00 $-330.00
27633(04) 0025 SEALER RESIN * Missing Material Certification 0006 2.00 $165.00 $330.00
27633(04) 0025 SEALER RESIN * Missing Material Certification 0008 2.00 $165.00 $330.00
27633(04) 0030 CLSM BACKFILL * Material Discrepancy Adjustments 0003 -20.00 $200.00 $-4,000.00
27633(04) 0030 CLSM BACKFILL * Material Discrepancy Adjustments 0006 20.00 $200.00 $4,000.00
27633(04) 0033 SEALED EXPANSION JOINT * Missing Material Certification 0002 -23.00 $270.00 $-6,210.00
27633(04) 0033 SEALED EXPANSION JOINT * Missing Material Certification 0004 -27.60 $270.00 $-7,452.00
27633(04) 0033 SEALED EXPANSION JOINT * Missing Material Certification 0006 27.60 $270.00 $7,452.00
27633(04) 0033 SEALED EXPANSION JOINT * Missing Material Certification 0006 23.00 $270.00 $6,210.00
27633(04) 0035 STRUCTURAL STEEL * Missing Material Certification 0002 -108.00 $18.00 $-1,944.00
27633(04) 0035 STRUCTURAL STEEL * Missing Material Certification 0005 -108.00 $18.00 $-1,944.00
27633(04) 0035 STRUCTURAL STEEL * Missing Material Certification 0006 108.00 $18.00 $1,944.00
27633(04) 0035 STRUCTURAL STEEL * Missing Material Certification 0008 108.00 $18.00 $1,944.00
27633(04) 0044 PNEUMATICALLY PLACED MORTAR * Missing Material Certification 0004 -7.50 $600.00 $-4,500.00
27633(04) 0044 PNEUMATICALLY PLACED MORTAR * Missing Material Certification 0006 7.50 $600.00 $4,500.00
27633(04) 0046 SEALER RESIN * Missing Material Certification 0004 -2.00 $165.00 $-330.00
27633(04) 0046 SEALER RESIN * Missing Material Certification 0005 -2.00 $165.00 $-330.00
27633(04) 0046 SEALER RESIN * Missing Material Certification 0006 2.00 $165.00 $330.00
27633(04) 0046 SEALER RESIN * Missing Material Certification 0008 2.00 $165.00 $330.00
27633(04) 0054 SAND FILLED IMPACT ATTENUATION MODULE * Material Discrepancy Adjustments 0003 -570.00 $0.30 $-171.00
27633(04) 0054 SAND FILLED IMPACT ATTENUATION MODULE * Material Discrepancy Adjustments 0006 570.00 $0.30 $171.00
29053(04) 0076 CLSM BACKFILL * Material Discrepancy Adjustments 0005 -359.70 $80.00 $-28,776.00
29053(04) 0076 CLSM BACKFILL * Material Discrepancy Adjustments 0006 359.70 $80.00 $28,776.00
29053(04) 0082 STRUCTURAL STEEL * Missing Material Certification 0005 -500.00 $20.00 $-10,000.00
29053(04) 0082 STRUCTURAL STEEL * Missing Material Certification 0008 500.00 $20.00 $10,000.00
29053(04) 0097 6" PERFORATED PIPE UNDERDRAIN ROUND * Missing Material Certification 0005 -90.00 $25.00 $-2,250.00
29053(04) 0097 6" PERFORATED PIPE UNDERDRAIN ROUND * Missing Material Certification 0008 90.00 $25.00 $2,250.00
29053(04) 0098 6" NON-PERF.PIPE UNDERDRAIN RND. * Missing Material Certification 0006 -30.00 $25.00 $-750.00
29053(04) 0098 6" NON-PERF.PIPE UNDERDRAIN RND. * Missing Material Certification 0008 30.00 $25.00 $750.00
Subtotals For Line Item Adjustments $562.32
* = User applied Line Item Adjustments


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
01 Incentive/Disincentive Substantial Completion 04/23/2012 11/06/2012 200.00 DYS $4,200.00 Y
02 Incentive/Disincentive Bridge A 04/23/2012 07/13/2012 84.00 DYS $4,000.00 Y


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
No milestones adjustments exist for this contract.
Subtotals For Milestones $

Line Item Detail

Contract ID: 110526   Estimate Number: 0008     Primary JP: 27633(04)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    SBR-172A(515)SB Project:    27633(04) Category:    0100/ROADWAY - SBR-172A(515)SB
0001 CLEARING AND GRUBBING 201(A) 0102 LSUM 1.000 1.000   1.000 $10,000.00 $0.00 $10,000.00
0002 SUPERPAVE, TYPE S4(PG 76-28 OK) 411(C) 5950 TON 409.000 452.400   452.400 $115.00 $0.00 $52,026.00
0003 COLD MILLING PAVEMENT 412 5267 SY 1,015.000 1,998.470 -0.560 1,998.470 $5.00 $-2.80 $9,992.35
0004 42" F-SHAPED PARAPET 504(E) 6190 LF 542.000 510.000   510.000 $185.00 $0.00 $94,350.00
0005 CLASS C CONCRETE 509(D) 0325 CY 10.600 15.280 -1.070 15.280 $500.00 $-535.00 $7,640.00
0006 REMOVAL OF CONCRETE MEDIAN BARRIER 619(B) 4915 LF 542.000 510.000   510.000 $25.00 $0.00 $12,750.00
0007 REMOVAL OF CONCRETE DITCH LINER 619(B) 5881 LF 44.000 92.500   92.500 $10.00 $0.00 $925.00
0008 REMOVAL OF 4" CONCRETE DIVIDING STRIP 619(B) 6130 SY 53.000 139.220 0.010 139.220 $10.00 $0.10 $1,392.20
Subtotals For Category     0100/ROADWAY - SBR-172A(515)SB    $-537.70 $189,075.55
Fed/State Project Number:    SBR-172A(515)SB Project:    27633(04) Category:    0200/BRIDGE 'A' - SBR-172A(515)SB
0009 CLSM BACKFILL 501(G) 6309 CY 16.000 26.240 -3.760 26.240 $200.00 $-752.00 $5,248.00
0010 APPROACH SLAB 504(A) 1304 SY 228.200 228.200   228.200 $215.00 $0.00 $49,063.00
0011 SAW-CUT GROOVING 504(B) 1305 SY 483.400 483.400   483.400 $5.00 $0.00 $2,417.00
0012 SEALED EXPANSION JOINT 504(C) 6250 LF 50.600 50.600   50.600 $270.00 $0.00 $13,662.00
0013 42" F-SHAPED PARAPET 504(E) 6190 LF 180.000 180.000   180.000 $125.00 $0.00 $22,500.00
0014 STRUCTURAL STEEL 506(A) 1322 LB 750.000 119.070 11.070 119.070 $18.00 $199.26 $2,143.26
0015 SPECIAL CONCRETE FINISH 509 6152 SY 270.000 270.000   270.000 $40.00 $0.00 $10,800.00
0016 CLASS AA CONCRETE 509(A) 1326 CY 68.700 68.700   68.700 $1,000.00 $0.00 $68,700.00
0017 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 12,340.000 12,340.000   12,340.000 $1.50 $0.00 $18,510.00
0018 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   1.000 $25,000.00 $0.00 $25,000.00
0019 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   1.000 $5,000.00 $0.00 $5,000.00
0020 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 160.000 160.000 160.000 160.000 $5.00 $800.00 $800.00
0021 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 100.000 0.000   0.000 $20.00 $0.00 $0.00
0022 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 2.000 0.000   0.000 $55.00 $0.00 $0.00
0023 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 100.000 36.080 -0.080 36.080 $600.00 $-48.00 $21,648.00
0024 SEALER CRACK PREPARATION 523(A) 6550 LF 90.000 90.000   90.000 $5.00 $0.00 $450.00
0025 SEALER RESIN 523(B) 6560 GAL 2.000 2.000 0.000 2.000 $165.00 $0.00 $330.00
0026 (PL)REPAIR BRIDGE ITEMS 540 4500 LSUM 1.000 1.000   1.000 $15,000.00 $0.00 $15,000.00
0027 (PL)REPAIR BRIDGE ITEM (TYPE A) 540 4510 LSUM 1.000 1.000   1.000 $15,000.00 $0.00 $15,000.00
0028 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   1.000 $13,000.00 $0.00 $13,000.00
0029 REMOVAL OF BRIDGE ITEM (TYPE A) 619(B) 2510 LSUM 1.000 1.000   1.000 $70,000.00 $0.00 $70,000.00
Subtotals For Category     0200/BRIDGE 'A' - SBR-172A(515)SB    $199.26 $359,271.26
Fed/State Project Number:    SBR-172A(515)SB Project:    27633(04) Category:    0201/BRIDGE 'B' - SBR-172A(515)SB
0030 CLSM BACKFILL 501(G) 6309 CY 16.000 36.660 1.660 36.660 $200.00 $332.00 $7,332.00
0031 APPROACH SLAB 504(A) 1304 SY 228.200 228.200   228.200 $215.00 $0.00 $49,063.00
0032 SAW-CUT GROOVING 504(B) 1305 SY 483.400 483.400 243.400 483.400 $5.00 $1,217.00 $2,417.00
0033 SEALED EXPANSION JOINT 504(C) 6250 LF 50.600 50.600   50.600 $270.00 $0.00 $13,662.00
0034 42" F-SHAPED PARAPET 504(E) 6190 LF 180.000 180.000   180.000 $125.00 $0.00 $22,500.00
0035 STRUCTURAL STEEL 506(A) 1322 LB 750.000 119.070 11.070 119.070 $18.00 $199.26 $2,143.26
0036 SPECIAL CONCRETE FINISH 509 6152 SY 274.000 274.000   274.000 $40.00 $0.00 $10,960.00
0037 CLASS AA CONCRETE 509(A) 1326 CY 68.700 68.700   68.700 $1,000.00 $0.00 $68,700.00
0038 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 12,360.000 12,360.000   12,360.000 $1.50 $0.00 $18,540.00
0039 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   1.000 $25,000.00 $0.00 $25,000.00
0040 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   1.000 $5,000.00 $0.00 $5,000.00
0041 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 160.000 160.000 160.000 160.000 $5.00 $800.00 $800.00
0042 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 100.000 0.000   0.000 $20.00 $0.00 $0.00
0043 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 2.000 0.000   0.000 $55.00 $0.00 $0.00
0044 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 100.000 23.120 -0.100 23.120 $600.00 $-60.00 $13,872.00
0045 SEALER CRACK PREPARATION 523(A) 6550 LF 90.000 90.000   90.000 $5.00 $0.00 $450.00
0046 SEALER RESIN 523(B) 6560 GAL 2.000 2.000 0.000 2.000 $165.00 $0.00 $330.00
0047 (PL)REPAIR BRIDGE ITEMS 540 4500 LSUM 1.000 1.000 0.330 1.000 $5,000.00 $1,650.00 $5,000.00
0048 (PL)REPAIR BRIDGE ITEM (TYPE A) 540 4510 LSUM 1.000 1.000   1.000 $15,000.00 $0.00 $15,000.00
0049 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   1.000 $13,000.00 $0.00 $13,000.00
0050 REMOVAL OF BRIDGE ITEM (TYPE A) 619(B) 2510 LSUM 1.000 1.000   1.000 $70,000.00 $0.00 $70,000.00
Subtotals For Category     0201/BRIDGE 'B' - SBR-172A(515)SB    $4,138.26 $343,769.26
Fed/State Project Number:    SBR-172A(515)SB Project:    27633(04) Category:    0300/TRAFFIC OPERATIONS - SBR-172A(515)SB
0051 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 857(A) 8839 LF 11,099.000 0.000 -32,975.000 0.000 $0.15 $-4,946.25 $0.00
0052 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 857(E) 8887 EA 1,150.000 0.000   0.000 $1.10 $0.00 $0.00
0053 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 857(F) 8006 LF 12,961.000 6,184.000   6,184.000 $0.11 $0.00 $680.24
0054 SAND FILLED IMPACT ATTENUATION MODULE 870(A) 8485 SD 7,200.000 3,515.000   3,515.000 $0.30 $0.00 $1,054.50
0055 DELIVER PORTABLE LONGITUDINAL BARRIER 877(B) 8484 LF 1,488.000 1,384.000 277.000 1,384.000 $20.00 $5,540.00 $27,680.00
0056 RELOCATION OF PORTABLE LONGITUDINAL BARRIER 877(C) 8486 LF 1,385.000 1,384.000   1,384.000 $3.00 $0.00 $4,152.00
0057 ARROW DISPLAY(TYPE C) 880(A) 8812 SD 480.000 274.000 3.000 274.000 $5.50 $16.50 $1,507.00
0058 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 5,760.000 6,919.000 -180.000 6,919.000 $0.30 $-54.00 $2,075.70
0059 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 7,080.000 7,496.000 -630.000 7,496.000 $1.40 $-882.00 $10,494.40
0060 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 11,880.000 5,799.000 -900.000 5,799.000 $0.55 $-495.00 $3,189.45
0061 CONSTRUCTION BARRICADES(TYPE III) 880(C) 8842 SD 5,880.000 3,382.000   3,382.000 $0.55 $0.00 $1,860.10
0062 WING BARRICADES 880(C) 8848 SD 960.000 650.000 -180.000 650.000 $1.10 $-198.00 $715.00
0063 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 23,640.000 12,645.000 -900.000 12,645.000 $0.06 $-54.00 $758.70
0064 DRUMS 880(F) 8878 SD 15,600.000 22,368.000 2,510.000 22,368.000 $0.28 $702.80 $6,263.04
0065 PORT.CHANGEABLE MESSAGE SIGN 882(A) 8306 SD 480.000 197.000   197.000 $16.00 $0.00 $3,152.00
8000 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) 857(C) 8851 LF 0.000 32,975.000 32,975.000 32,975.000 $1.30 $42,867.50 $42,867.50
Subtotals For Category     0300/TRAFFIC OPERATIONS - SBR-172A(515)SB    $42,497.55 $106,449.63
Fed/State Project Number:    SBR-172A(515)SB Project:    27633(04) Category:    0301/TRAFFIC SIGNING AND STRIPING - SBR-172A(515)SB
0066 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 4,751.000 6,808.000   6,808.000 $1.10 $0.00 $7,488.80
Subtotals For Category     0301/TRAFFIC SIGNING AND STRIPING - SBR-172A(515)SB    $0.00 $7,488.80
Fed/State Project Number:    SBR-172A(515)SB Project:    27633(04) Category:    0600/STAKING - SBR-172A(515)SB
0067 CONSTRUCTION STAKING LEVEL II 642(B) 0096 LSUM 1.000 1.000 0.100 1.000 $4,000.00 $400.00 $4,000.00
Subtotals For Category     0600/STAKING - SBR-172A(515)SB    $400.00 $4,000.00
Fed/State Project Number:    SBR-172A(515)SB Project:    27633(04) Category:    0640/CONSTRUCTION - SBR-172A(515)SB
0068 MOBILIZATION 641 1552 LSUM 1.000 1.000 0.010 1.000 $160,000.00 $1,600.00 $160,000.00
8010 MILESTONE INCENTIVE COMPENSATION 644 7215 LSUM 0.000 1.000 1.000 1.000 $8,000.00 $8,000.00 $8,000.00
8020 MILESTONE INCENTIVE COMPENSATION 644 7215 LSUM 0.000 1.000 1.000 1.000 $8,400.00 $8,400.00 $8,400.00
Subtotals For Category     0640/CONSTRUCTION - SBR-172A(515)SB    $18,000.00 $176,400.00
Subtotals For Project SBR-172A(515)SB /27633(04) $64,697.37 $1,186,454.50


Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    SBR-272A(005)SB Project:    29053(04) Category:    0100/ROADWAY - SBR-272A(005)SB
0069 CLEARING AND GRUBBING 201(A) 0102 LSUM 1.000 1.000   1.000 $10,000.00 $0.00 $10,000.00
0070 SUPERPAVE, TYPE S4(PG 76-28 OK) 411(C) 5950 TON 126.000 153.660   153.660 $145.00 $0.00 $22,280.70
0071 COLD MILLING PAVEMENT 412 5267 SY 1,112.000 1,122.210   1,122.210 $6.00 $0.00 $6,733.26
0072 REMOVAL OF GUARDRAIL 619(B) 4780 LF 100.000 101.000   101.000 $5.00 $0.00 $505.00
0073 BEAM GUARDRAIL W-BEAM SINGLE 623(A) 0932 LF 81.250 70.000 6.000 70.000 $24.00 $144.00 $1,680.00
0074 GUARDRAIL BRIDGE CONNECTION-TYPE A 623(I) 8675 EA 1.000 1.000   1.000 $3,300.00 $0.00 $3,300.00
Subtotals For Category     0100/ROADWAY - SBR-272A(005)SB    $144.00 $44,498.96
Fed/State Project Number:    SBR-272A(005)SB Project:    29053(04) Category:    0200/BRIDGE 'A' - SBR-272A(005)SB
0075 SUBSTRUCTURE EXCAVATION COMMON 501(B) 1307 CY 697.000 733.120 -11.100 733.120 $20.00 $-222.00 $14,662.40
0076 CLSM BACKFILL 501(G) 6309 CY 539.900 539.900   539.900 $80.00 $0.00 $43,192.00
0077 (PL)FALSEWORK JACKING 502(C) 6116 LSUM 1.000 1.000   1.000 $6,500.00 $0.00 $6,500.00
0078 APPROACH SLAB 504(A) 1304 SY 587.000 587.000   587.000 $215.00 $0.00 $126,205.00
0079 SAW-CUT GROOVING 504(B) 1305 SY 1,456.900 1,456.900   1,456.900 $5.00 $0.00 $7,284.50
0080 SEALED EXPANSION JOINT 504(C) 6250 LF 134.400 134.400 -255.600 134.400 $270.00 $-69,012.00 $36,288.00
0081 42" F-SHAPED PARAPET 504(E) 6190 LF 612.600 612.600   612.600 $125.00 $0.00 $76,575.00
0082 STRUCTURAL STEEL 506(A) 1322 LB 500.000 0.000 -500.000 0.000 $20.00 $-10,000.00 $0.00
0083 STAINLESS STEEL FIXED BEARING ASSEMBLY 507(A) 6170 EA 14.000 14.000   14.000 $2,000.00 $0.00 $28,000.00
0084 CLASS AA CONCRETE 509(A) 1326 CY 226.100 226.100   226.100 $1,150.00 $0.00 $260,015.00
0085 CLASS C CONCRETE 509(D) 1331 CY 100.700 110.420 4.980 110.420 $290.00 $1,444.20 $32,021.80
0086 MECHANICAL SPLICES 511 6306 EA 790.000 790.000   790.000 $12.00 $0.00 $9,480.00
0087 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 76,568.000 80,778.000   80,778.000 $1.55 $0.00 $125,205.90
0088 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   1.000 $220,000.00 $0.00 $220,000.00
0089 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   1.000 $35,000.00 $0.00 $35,000.00
0090 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 1,118.000 877.450 -19.540 877.450 $5.00 $-97.70 $4,387.25
0091 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 192.000 0.000   0.000 $12.00 $0.00 $0.00
0092 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 6.400 0.000   0.000 $200.00 $0.00 $0.00
0093 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 61.200 34.340 34.340 34.340 $680.00 $23,351.20 $23,351.20
0094 (PL)REPAIR BRIDGE ITEM (TYPE A) 540 4510 LSUM 1.000 1.000   1.000 $2,000.00 $0.00 $2,000.00
0095 (PL)REPAIR BRIDGE ITEM (TYPE B) 540 4525 EA 7.000 16.000   16.000 $1,500.00 $0.00 $24,000.00
0096 (PL)REPAIR BRIDGE ITEM (TYPE C) 540 4530 LSUM 1.000 1.000   1.000 $25,000.00 $0.00 $25,000.00
0097 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 6204 LF 143.000 143.000 0.000 143.000 $25.00 $0.00 $3,575.00
0098 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 6207 LF 40.000 30.000 0.000 30.000 $25.00 $0.00 $750.00
0099 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   1.000 $190,000.00 $0.00 $190,000.00
Subtotals For Category     0200/BRIDGE 'A' - SBR-272A(005)SB    $-54,536.30 $1,293,493.05
Fed/State Project Number:    SBR-272A(005)SB Project:    29053(04) Category:    0300/TRAFFIC CONTROL - SBR-272A(005)SB
0100 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) 857(C) 8851 LF 9,929.000 9,341.000 -6,356.000 9,341.000 $1.30 $-8,262.80 $12,143.30
0101 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 857(F) 8006 LF 13,645.000 2,211.000   2,211.000 $0.11 $0.00 $243.21
0102 (SP)CONST.ZONE IMPACT ATTEN. 871(B) 8705 SD 240.000 140.000   140.000 $3.30 $0.00 $462.00
0103 DELIVER PORTABLE LONGITUDINAL BARRIER 877(B) 8484 LF 1,275.000 1,268.000   1,268.000 $20.00 $0.00 $25,360.00
0104 RELOCATION OF PORTABLE LONGITUDINAL BARRIER 877(C) 8486 LF 1,000.000 1,268.000   1,268.000 $3.00 $0.00 $3,804.00
0105 ARROW DISPLAY(TYPE C) 880(A) 8812 SD 360.000 151.000   151.000 $5.50 $0.00 $830.50
0106 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 2,160.000 6,368.000 -180.000 6,368.000 $0.55 $-99.00 $3,502.40
0107 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 6,720.000 3,988.000 -630.000 3,988.000 $0.55 $-346.50 $2,193.40
0108 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 8,640.000 1,348.000 -9,000.000 1,348.000 $0.55 $-4,950.00 $741.40
0109 CONSTRUCTION BARRICADES(TYPE III) 880(C) 8842 SD 1,080.000 1,125.000   1,125.000 $1.65 $0.00 $1,856.25
0110 WING BARRICADES 880(C) 8848 SD 480.000 238.000 -180.000 238.000 $1.10 $-198.00 $261.80
0111 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 3,000.000 4,102.000 -900.000 4,102.000 $0.40 $-360.00 $1,640.80
0112 DRUMS 880(F) 8878 SD 16,440.000 12,693.000   12,693.000 $0.30 $0.00 $3,807.90
0113 TRAFFIC SURVEILLANCE, POLICE 880(L) 8911 HOUR 240.000 143.000   143.000 $65.00 $0.00 $9,295.00
0114 PORT.CHANGEABLE MESSAGE SIGN 882(A) 8306 SD 240.000 0.000   0.000 $16.00 $0.00 $0.00
Subtotals For Category     0300/TRAFFIC CONTROL - SBR-272A(005)SB    $-14,216.30 $66,141.96
Fed/State Project Number:    SBR-272A(005)SB Project:    29053(04) Category:    0301/TRAFFIC SIGNING AND STRIPING - SBR-272A(005)SB
0115 GUARDRAIL DELINEATORS(TYPE 2, CODE 1) 853 9069 EA 3.000 0.000   0.000 $55.00 $0.00 $0.00
0116 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 9,841.000 6,356.000 6,356.000 6,356.000 $0.55 $3,495.80 $3,495.80
0117 TRAFFIC STRIPE(PLASTIC)(6" WIDE) 855(A) 8813 LF 2,569.000 0.000   0.000 $1.10 $0.00 $0.00
0118 TRAFFIC STRIPE(PLASTIC)(8" WIDE) 855(A) 8814 LF 520.000 360.000 360.000 360.000 $2.20 $792.00 $792.00
0119 TRAFFIC STRIPE(PLASTIC)(12" WIDE) 855(A) 8818 LF 224.000 200.000 200.000 200.000 $3.30 $660.00 $660.00
0120 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 856(A) 8530 LF 1,176.000 1,991.000   1,991.000 $2.20 $0.00 $4,380.20
0121 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) 856(A) 8535 LF 635.000 1,408.000   1,408.000 $3.30 $0.00 $4,646.40
Subtotals For Category     0301/TRAFFIC SIGNING AND STRIPING - SBR-272A(005)SB    $4,947.80 $13,974.40
Subtotals For Project SBR-272A(005)SB /29053(04) $-63,660.80 $1,418,108.37