Contract ID: | 110526 | Estimate Number: | 0006 | Contract No: | 710885 | |||
Residency: | TULSA (08100) | Estimate Type: | Progressive | Account No: | 404800 | |||
Project Number(s): | SBR-172A(515)SB, SBR-272A(005)SB | ||||||||||||
Primary Job Piece No: | 27633(04) | ||||||||||||
Contract Description: | BRIDGE REHABILITATION SH-51: OVER PITTSBURG AVE 0.5 MI E OF HARVARD AVE, AND OVER MK&T RAILROAD 0.7 MI E OF YALE AVE IN THE CITY OF TULSA. PROJECT LENGTH = 0.051 MILES | ||||||||||||
Primary County: | TULSA | ||||||||||||
Name of Road: | SH-51 | ||||||||||||
Prime Contractor: | BECCO CONTRACTORS, INC. | ||||||||||||
P.O. BOX 9159 | |||||||||||||
TULSA , OK 74157 | |||||||||||||
Surety Company: | MID-CONTINENT CASUALTY COMPANY | ||||||||||||
Date Let: | 01/19/2012 | NTP Effective Date: | 04/23/2012 | Pay Period: | 11/01/2012 TO 11/30/2012 |
Date Awarded: | 02/06/2012 | Date Work Began: | 04/23/2012 | Original Contract Time: | 240 |
Date Contract Executed: | 02/21/2012 | Date Time Stopped: | Current Time Charged: | 198.00 | |
Date NTP Issued: | 03/22/2012 | Completion Date: | Current Time Allowed: | 240.00 | |
General Liability Expires: | 03/01/2013 | Workman's Comp Expires: | 02/01/2013 | Percent Time Used: | 82.50 % |
Specification Year: | 2009 | Date Approved: | |||
Current Contract Amount: | $2,680,788.96 | Total to Date | Prev to Date | This Estimate | |||
Bid Amount: | $2,680,788.96 | Participating: | $0.00 | $0.00 | $0.00 | ||
Percent Complete: | 87.36 % | Non Participating: | $2,358,841.55 | $2,329,961.35 | $28,880.20 | ||
Funds Available: | $338,933.09 | Total Earnings: | $2,358,841.55 | $2,329,961.35 | $28,880.20 | ||
Unearned Balance: | $338,933.09 | Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||
Gross Earnings: | $2,358,841.55 | $2,329,961.35 | $28,880.20 | ||||
Other Adjustments: | $-16,985.68 | $-81,554.68 | $64,569.00 | ||||
Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
TOTAL: | $2,341,855.87 | $2,248,406.67 | $93,449.20 |
Contract ID: | 110526 | Estimate Number: | 0006 | Primary JP: | 27633(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
No change orders have been created for this contract. |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
No material stockpiles have been created for this contract. | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | |||||||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
No liquidated damages have been assessed on this contract. | Subtotals For Liquidated Damages | $ |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
27633(04) | 0002 | SUPERPAVE, TYPE S4(PG 76-28 OK) | Asphalt Binder Adjustment | 0003 | 114.03 | $1.50 | $172.14 |
27633(04) | 0002 | SUPERPAVE, TYPE S4(PG 76-28 OK) | * Material Discrepancy Adjustments | 0004 | 20.00 | $200.00 | $4,000.00 |
27633(04) | 0002 | SUPERPAVE, TYPE S4(PG 76-28 OK) | * Material Discrepancy Adjustments | 0004 | 20.00 | $200.00 | $4,000.00 |
27633(04) | 0002 | SUPERPAVE, TYPE S4(PG 76-28 OK) | Asphalt Binder Adjustment | 0004 | 223.01 | $1.74 | $390.18 |
27633(04) | 0002 | SUPERPAVE, TYPE S4(PG 76-28 OK) | * Material Discrepancy Adjustments | 0006 | -20.00 | $200.00 | $-4,000.00 |
27633(04) | 0002 | SUPERPAVE, TYPE S4(PG 76-28 OK) | * Material Discrepancy Adjustments | 0006 | -20.00 | $200.00 | $-4,000.00 |
27633(04) | 0009 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0003 | -20.00 | $200.00 | $-4,000.00 |
27633(04) | 0009 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0006 | 20.00 | $200.00 | $4,000.00 |
27633(04) | 0012 | SEALED EXPANSION JOINT | * Missing Material Certification | 0002 | -23.00 | $270.00 | $-6,210.00 |
27633(04) | 0012 | SEALED EXPANSION JOINT | * Missing Material Certification | 0004 | -27.60 | $270.00 | $-7,452.00 |
27633(04) | 0012 | SEALED EXPANSION JOINT | * Missing Material Certification | 0006 | 23.00 | $270.00 | $6,210.00 |
27633(04) | 0012 | SEALED EXPANSION JOINT | * Missing Material Certification | 0006 | 27.60 | $270.00 | $7,452.00 |
27633(04) | 0014 | STRUCTURAL STEEL | * Missing Material Certification | 0002 | -108.00 | $18.00 | $-1,944.00 |
27633(04) | 0014 | STRUCTURAL STEEL | * Missing Material Certification | 0005 | -108.00 | $18.00 | $-1,944.00 |
27633(04) | 0014 | STRUCTURAL STEEL | * Missing Material Certification | 0006 | 108.00 | $18.00 | $1,944.00 |
27633(04) | 0025 | SEALER RESIN | * Missing Material Certification | 0004 | -2.00 | $165.00 | $-330.00 |
27633(04) | 0025 | SEALER RESIN | * Missing Material Certification | 0005 | -2.00 | $165.00 | $-330.00 |
27633(04) | 0025 | SEALER RESIN | * Missing Material Certification | 0006 | 2.00 | $165.00 | $330.00 |
27633(04) | 0030 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0003 | -20.00 | $200.00 | $-4,000.00 |
27633(04) | 0030 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0006 | 20.00 | $200.00 | $4,000.00 |
27633(04) | 0033 | SEALED EXPANSION JOINT | * Missing Material Certification | 0002 | -23.00 | $270.00 | $-6,210.00 |
27633(04) | 0033 | SEALED EXPANSION JOINT | * Missing Material Certification | 0004 | -27.60 | $270.00 | $-7,452.00 |
27633(04) | 0033 | SEALED EXPANSION JOINT | * Missing Material Certification | 0006 | 27.60 | $270.00 | $7,452.00 |
27633(04) | 0033 | SEALED EXPANSION JOINT | * Missing Material Certification | 0006 | 23.00 | $270.00 | $6,210.00 |
27633(04) | 0035 | STRUCTURAL STEEL | * Missing Material Certification | 0002 | -108.00 | $18.00 | $-1,944.00 |
27633(04) | 0035 | STRUCTURAL STEEL | * Missing Material Certification | 0005 | -108.00 | $18.00 | $-1,944.00 |
27633(04) | 0035 | STRUCTURAL STEEL | * Missing Material Certification | 0006 | 108.00 | $18.00 | $1,944.00 |
27633(04) | 0044 | PNEUMATICALLY PLACED MORTAR | * Missing Material Certification | 0004 | -7.50 | $600.00 | $-4,500.00 |
27633(04) | 0044 | PNEUMATICALLY PLACED MORTAR | * Missing Material Certification | 0006 | 7.50 | $600.00 | $4,500.00 |
27633(04) | 0046 | SEALER RESIN | * Missing Material Certification | 0004 | -2.00 | $165.00 | $-330.00 |
27633(04) | 0046 | SEALER RESIN | * Missing Material Certification | 0005 | -2.00 | $165.00 | $-330.00 |
27633(04) | 0046 | SEALER RESIN | * Missing Material Certification | 0006 | 2.00 | $165.00 | $330.00 |
27633(04) | 0054 | SAND FILLED IMPACT ATTENUATION MODULE | * Material Discrepancy Adjustments | 0003 | -570.00 | $0.30 | $-171.00 |
27633(04) | 0054 | SAND FILLED IMPACT ATTENUATION MODULE | * Material Discrepancy Adjustments | 0006 | 570.00 | $0.30 | $171.00 |
29053(04) | 0076 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0005 | -359.70 | $80.00 | $-28,776.00 |
29053(04) | 0076 | CLSM BACKFILL | * Material Discrepancy Adjustments | 0006 | 359.70 | $80.00 | $28,776.00 |
29053(04) | 0082 | STRUCTURAL STEEL | * Missing Material Certification | 0005 | -500.00 | $20.00 | $-10,000.00 |
29053(04) | 0097 | 6" PERFORATED PIPE UNDERDRAIN ROUND | * Missing Material Certification | 0005 | -90.00 | $25.00 | $-2,250.00 |
29053(04) | 0098 | 6" NON-PERF.PIPE UNDERDRAIN RND. | * Missing Material Certification | 0006 | -30.00 | $25.00 | $-750.00 | Subtotals For Line Item Adjustments | $-16,985.68 | * = User applied Line Item Adjustments |
MILESTONE INFORMATION | |||||||||
Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
01 | Incentive/Disincentive Substantial Completion | NOT ENTERED | NOT ENTERED | 200.00 DYS | $4,200.00 | N | |||
02 | Incentive/Disincentive Bridge A | NOT ENTERED | NOT ENTERED | 80.00 DYS | $4,000.00 | N |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total | ||||||
No milestones adjustments exist for this contract. | Subtotals For Milestones | $ |
Contract ID: | 110526 | Estimate Number: | 0006 | Primary JP: | 27633(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: SBR-172A(515)SB | Project: 27633(04) | Category: 0100/ROADWAY - SBR-172A(515)SB | ||||||||
0001 | CLEARING AND GRUBBING | 201(A) 0102 | LSUM | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
0002 | SUPERPAVE, TYPE S4(PG 76-28 OK) | 411(C) 5950 | TON | 409.000 | 409.000 | 0.000 | 452.400 | $115.00 | $0.00 | $52,026.00 |
0003 | COLD MILLING PAVEMENT | 412 5267 | SY | 1,015.000 | 1,015.000 | 1,999.030 | $5.00 | $0.00 | $9,995.15 | |
0004 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 542.000 | 542.000 | 0.000 | 510.000 | $185.00 | $0.00 | $94,350.00 |
0005 | CLASS C CONCRETE | 509(D) 0325 | CY | 10.600 | 10.600 | 16.350 | $500.00 | $0.00 | $8,175.00 | |
0006 | REMOVAL OF CONCRETE MEDIAN BARRIER | 619(B) 4915 | LF | 542.000 | 542.000 | 510.000 | $25.00 | $0.00 | $12,750.00 | |
0007 | REMOVAL OF CONCRETE DITCH LINER | 619(B) 5881 | LF | 44.000 | 44.000 | 92.500 | $10.00 | $0.00 | $925.00 | |
0008 | REMOVAL OF 4" CONCRETE DIVIDING STRIP | 619(B) 6130 | SY | 53.000 | 53.000 | 139.210 | $10.00 | $0.00 | $1,392.10 | |
Subtotals For Category 0100/ROADWAY - SBR-172A(515)SB | $0.00 | $189,613.25 | ||||||||
Fed/State Project Number: SBR-172A(515)SB | Project: 27633(04) | Category: 0200/BRIDGE 'A' - SBR-172A(515)SB | ||||||||
0009 | CLSM BACKFILL | 501(G) 6309 | CY | 16.000 | 16.000 | 0.000 | 30.000 | $200.00 | $0.00 | $6,000.00 |
0010 | APPROACH SLAB | 504(A) 1304 | SY | 228.200 | 228.200 | 228.200 | $215.00 | $0.00 | $49,063.00 | |
0011 | SAW-CUT GROOVING | 504(B) 1305 | SY | 483.400 | 483.400 | 483.400 | $5.00 | $0.00 | $2,417.00 | |
0012 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 50.600 | 50.600 | 0.000 | 50.600 | $270.00 | $0.00 | $13,662.00 |
0013 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 180.000 | 180.000 | 180.000 | $125.00 | $0.00 | $22,500.00 | |
0014 | STRUCTURAL STEEL | 506(A) 1322 | LB | 750.000 | 750.000 | 0.000 | 108.000 | $18.00 | $0.00 | $1,944.00 |
0015 | SPECIAL CONCRETE FINISH | 509 6152 | SY | 270.000 | 270.000 | 270.000 | $40.00 | $0.00 | $10,800.00 | |
0016 | CLASS AA CONCRETE | 509(A) 1326 | CY | 68.700 | 68.700 | 68.700 | $1,000.00 | $0.00 | $68,700.00 | |
0017 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 12,340.000 | 12,340.000 | 12,340.000 | $1.50 | $0.00 | $18,510.00 | |
0018 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0019 | COLLECTION AND HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
0020 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 160.000 | 160.000 | 0.000 | $5.00 | $0.00 | $0.00 | |
0021 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 100.000 | 100.000 | 0.000 | $20.00 | $0.00 | $0.00 | |
0022 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 2.000 | 2.000 | 0.000 | $55.00 | $0.00 | $0.00 | |
0023 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 100.000 | 100.000 | 36.160 | $600.00 | $0.00 | $21,696.00 | |
0024 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 90.000 | 90.000 | 90.000 | $5.00 | $0.00 | $450.00 | |
0025 | SEALER RESIN | 523(B) 6560 | GAL | 2.000 | 2.000 | 0.000 | 2.000 | $165.00 | $0.00 | $330.00 |
0026 | (PL)REPAIR BRIDGE ITEMS | 540 4500 | LSUM | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
0027 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
0028 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $13,000.00 | $0.00 | $13,000.00 | |
0029 | REMOVAL OF BRIDGE ITEM (TYPE A) | 619(B) 2510 | LSUM | 1.000 | 1.000 | 1.000 | $70,000.00 | $0.00 | $70,000.00 | |
Subtotals For Category 0200/BRIDGE 'A' - SBR-172A(515)SB | $0.00 | $359,072.00 | ||||||||
Fed/State Project Number: SBR-172A(515)SB | Project: 27633(04) | Category: 0201/BRIDGE 'B' - SBR-172A(515)SB | ||||||||
0030 | CLSM BACKFILL | 501(G) 6309 | CY | 16.000 | 16.000 | 0.000 | 35.000 | $200.00 | $0.00 | $7,000.00 |
0031 | APPROACH SLAB | 504(A) 1304 | SY | 228.200 | 228.200 | 228.200 | $215.00 | $0.00 | $49,063.00 | |
0032 | SAW-CUT GROOVING | 504(B) 1305 | SY | 483.400 | 483.400 | 240.000 | $5.00 | $0.00 | $1,200.00 | |
0033 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 50.600 | 50.600 | 0.000 | 50.600 | $270.00 | $0.00 | $13,662.00 |
0034 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 180.000 | 180.000 | 180.000 | $125.00 | $0.00 | $22,500.00 | |
0035 | STRUCTURAL STEEL | 506(A) 1322 | LB | 750.000 | 750.000 | 0.000 | 108.000 | $18.00 | $0.00 | $1,944.00 |
0036 | SPECIAL CONCRETE FINISH | 509 6152 | SY | 274.000 | 274.000 | 274.000 | 274.000 | $40.00 | $10,960.00 | $10,960.00 |
0037 | CLASS AA CONCRETE | 509(A) 1326 | CY | 68.700 | 68.700 | 68.700 | $1,000.00 | $0.00 | $68,700.00 | |
0038 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 12,360.000 | 12,360.000 | 12,360.000 | $1.50 | $0.00 | $18,540.00 | |
0039 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0040 | COLLECTION AND HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
0041 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 160.000 | 160.000 | 0.000 | $5.00 | $0.00 | $0.00 | |
0042 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 100.000 | 100.000 | 0.000 | $20.00 | $0.00 | $0.00 | |
0043 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 2.000 | 2.000 | 0.000 | $55.00 | $0.00 | $0.00 | |
0044 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 100.000 | 100.000 | 0.000 | 23.220 | $600.00 | $0.00 | $13,932.00 |
0045 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 90.000 | 90.000 | 90.000 | $5.00 | $0.00 | $450.00 | |
0046 | SEALER RESIN | 523(B) 6560 | GAL | 2.000 | 2.000 | 0.000 | 2.000 | $165.00 | $0.00 | $330.00 |
0047 | (PL)REPAIR BRIDGE ITEMS | 540 4500 | LSUM | 1.000 | 1.000 | 0.670 | $5,000.00 | $0.00 | $3,350.00 | |
0048 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
0049 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $13,000.00 | $0.00 | $13,000.00 | |
0050 | REMOVAL OF BRIDGE ITEM (TYPE A) | 619(B) 2510 | LSUM | 1.000 | 1.000 | 1.000 | $70,000.00 | $0.00 | $70,000.00 | |
Subtotals For Category 0201/BRIDGE 'B' - SBR-172A(515)SB | $10,960.00 | $339,631.00 | ||||||||
Fed/State Project Number: SBR-172A(515)SB | Project: 27633(04) | Category: 0300/TRAFFIC OPERATIONS - SBR-172A(515)SB | ||||||||
0051 | CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 857(A) 8839 | LF | 11,099.000 | 11,099.000 | 32,975.000 | $0.15 | $0.00 | $4,946.25 | |
0052 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 857(E) 8887 | EA | 1,150.000 | 1,150.000 | 0.000 | $1.10 | $0.00 | $0.00 | |
0053 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 857(F) 8006 | LF | 12,961.000 | 12,961.000 | 6,184.000 | $0.11 | $0.00 | $680.24 | |
0054 | SAND FILLED IMPACT ATTENUATION MODULE | 870(A) 8485 | SD | 7,200.000 | 7,200.000 | 0.000 | 3,515.000 | $0.30 | $0.00 | $1,054.50 |
0055 | DELIVER PORTABLE LONGITUDINAL BARRIER | 877(B) 8484 | LF | 1,488.000 | 1,488.000 | 1,107.000 | $20.00 | $0.00 | $22,140.00 | |
0056 | RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 877(C) 8486 | LF | 1,385.000 | 1,385.000 | 1,384.000 | $3.00 | $0.00 | $4,152.00 | |
0057 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 480.000 | 480.000 | 271.000 | $5.50 | $0.00 | $1,490.50 | |
0058 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 5,760.000 | 5,760.000 | 42.000 | 6,901.000 | $0.30 | $12.60 | $2,070.30 |
0059 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 7,080.000 | 7,080.000 | 147.000 | 7,433.000 | $1.40 | $205.80 | $10,406.20 |
0060 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 11,880.000 | 11,880.000 | 210.000 | 5,709.000 | $0.55 | $115.50 | $3,139.95 |
0061 | CONSTRUCTION BARRICADES(TYPE III) | 880(C) 8842 | SD | 5,880.000 | 5,880.000 | 3,382.000 | $0.55 | $0.00 | $1,860.10 | |
0062 | WING BARRICADES | 880(C) 8848 | SD | 960.000 | 960.000 | 42.000 | 632.000 | $1.10 | $46.20 | $695.20 |
0063 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 23,640.000 | 23,640.000 | 210.000 | 12,555.000 | $0.06 | $12.60 | $753.30 |
0064 | DRUMS | 880(F) 8878 | SD | 15,600.000 | 15,600.000 | 19,858.000 | $0.28 | $0.00 | $5,560.24 | |
0065 | PORT.CHANGEABLE MESSAGE SIGN | 882(A) 8306 | SD | 480.000 | 480.000 | 197.000 | $16.00 | $0.00 | $3,152.00 | |
Subtotals For Category 0300/TRAFFIC OPERATIONS - SBR-172A(515)SB | $392.70 | $62,100.78 | ||||||||
Fed/State Project Number: SBR-172A(515)SB | Project: 27633(04) | Category: 0301/TRAFFIC SIGNING AND STRIPING - SBR-172A(515)SB | ||||||||
0066 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 4,751.000 | 4,751.000 | 6,808.000 | $1.10 | $0.00 | $7,488.80 | |
Subtotals For Category 0301/TRAFFIC SIGNING AND STRIPING - SBR-172A(515)SB | $0.00 | $7,488.80 | ||||||||
Fed/State Project Number: SBR-172A(515)SB | Project: 27633(04) | Category: 0600/STAKING - SBR-172A(515)SB | ||||||||
0067 | CONSTRUCTION STAKING LEVEL II | 642(B) 0096 | LSUM | 1.000 | 1.000 | 0.900 | $4,000.00 | $0.00 | $3,600.00 | |
Subtotals For Category 0600/STAKING - SBR-172A(515)SB | $0.00 | $3,600.00 | ||||||||
Fed/State Project Number: SBR-172A(515)SB | Project: 27633(04) | Category: 0640/CONSTRUCTION - SBR-172A(515)SB | ||||||||
0068 | MOBILIZATION | 641 1552 | LSUM | 1.000 | 1.000 | 0.990 | $160,000.00 | $0.00 | $158,400.00 | |
Subtotals For Category 0640/CONSTRUCTION - SBR-172A(515)SB | $0.00 | $158,400.00 | ||||||||
Subtotals For Project SBR-172A(515)SB /27633(04) | $11,352.70 | $1,119,905.83 |
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: SBR-272A(005)SB | Project: 29053(04) | Category: 0100/ROADWAY - SBR-272A(005)SB | ||||||||
0069 | CLEARING AND GRUBBING | 201(A) 0102 | LSUM | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
0070 | SUPERPAVE, TYPE S4(PG 76-28 OK) | 411(C) 5950 | TON | 126.000 | 126.000 | 153.660 | $145.00 | $0.00 | $22,280.70 | |
0071 | COLD MILLING PAVEMENT | 412 5267 | SY | 1,112.000 | 1,112.000 | 1,122.210 | $6.00 | $0.00 | $6,733.26 | |
0072 | REMOVAL OF GUARDRAIL | 619(B) 4780 | LF | 100.000 | 100.000 | 101.000 | $5.00 | $0.00 | $505.00 | |
0073 | BEAM GUARDRAIL W-BEAM SINGLE | 623(A) 0932 | LF | 81.250 | 81.250 | 64.000 | $24.00 | $0.00 | $1,536.00 | |
0074 | GUARDRAIL BRIDGE CONNECTION-TYPE A | 623(I) 8675 | EA | 1.000 | 1.000 | 1.000 | $3,300.00 | $0.00 | $3,300.00 | |
Subtotals For Category 0100/ROADWAY - SBR-272A(005)SB | $0.00 | $44,354.96 | ||||||||
Fed/State Project Number: SBR-272A(005)SB | Project: 29053(04) | Category: 0200/BRIDGE 'A' - SBR-272A(005)SB | ||||||||
0075 | SUBSTRUCTURE EXCAVATION COMMON | 501(B) 1307 | CY | 697.000 | 697.000 | 744.220 | $20.00 | $0.00 | $14,884.40 | |
0076 | CLSM BACKFILL | 501(G) 6309 | CY | 539.900 | 539.900 | 0.000 | 539.900 | $80.00 | $0.00 | $43,192.00 |
0077 | (PL)FALSEWORK JACKING | 502(C) 6116 | LSUM | 1.000 | 1.000 | 1.000 | $6,500.00 | $0.00 | $6,500.00 | |
0078 | APPROACH SLAB | 504(A) 1304 | SY | 587.000 | 587.000 | 587.000 | $215.00 | $0.00 | $126,205.00 | |
0079 | SAW-CUT GROOVING | 504(B) 1305 | SY | 1,456.900 | 1,456.900 | 1,456.900 | $5.00 | $0.00 | $7,284.50 | |
0080 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 134.400 | 134.400 | 390.000 | $270.00 | $0.00 | $105,300.00 | |
0081 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 612.600 | 612.600 | 612.600 | $125.00 | $0.00 | $76,575.00 | |
0082 | STRUCTURAL STEEL | 506(A) 1322 | LB | 500.000 | 500.000 | 0.000 | 500.000 | $20.00 | $0.00 | $10,000.00 |
0083 | STAINLESS STEEL FIXED BEARING ASSEMBLY | 507(A) 6170 | EA | 14.000 | 14.000 | 14.000 | $2,000.00 | $0.00 | $28,000.00 | |
0084 | CLASS AA CONCRETE | 509(A) 1326 | CY | 226.100 | 226.100 | 226.100 | $1,150.00 | $0.00 | $260,015.00 | |
0085 | CLASS C CONCRETE | 509(D) 1331 | CY | 100.700 | 100.700 | 18.090 | 105.440 | $290.00 | $5,246.10 | $30,577.60 |
0086 | MECHANICAL SPLICES | 511 6306 | EA | 790.000 | 790.000 | 790.000 | $12.00 | $0.00 | $9,480.00 | |
0087 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 76,568.000 | 76,568.000 | 80,778.000 | $1.55 | $0.00 | $125,205.90 | |
0088 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 0.100 | $220,000.00 | $0.00 | $22,000.00 | |
0089 | COLLECTION AND HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 0.000 | $35,000.00 | $0.00 | $0.00 | |
0090 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 1,118.000 | 1,118.000 | 0.000 | $5.00 | $0.00 | $0.00 | |
0091 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 192.000 | 192.000 | 0.000 | $12.00 | $0.00 | $0.00 | |
0092 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 6.400 | 6.400 | 0.000 | $200.00 | $0.00 | $0.00 | |
0093 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 61.200 | 61.200 | 0.000 | $680.00 | $0.00 | $0.00 | |
0094 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 1.000 | 1.000 | 1.000 | $2,000.00 | $0.00 | $2,000.00 | |
0095 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4525 | EA | 7.000 | 7.000 | 16.000 | $1,500.00 | $0.00 | $24,000.00 | |
0096 | (PL)REPAIR BRIDGE ITEM (TYPE C) | 540 4530 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0097 | 6" PERFORATED PIPE UNDERDRAIN ROUND | 613(H) 6204 | LF | 143.000 | 143.000 | 0.000 | 143.000 | $25.00 | $0.00 | $3,575.00 |
0098 | 6" NON-PERF.PIPE UNDERDRAIN RND. | 613(I) 6207 | LF | 40.000 | 40.000 | 10.000 | 30.000 | $25.00 | $250.00 | $750.00 |
0099 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $190,000.00 | $0.00 | $190,000.00 | |
Subtotals For Category 0200/BRIDGE 'A' - SBR-272A(005)SB | $5,496.10 | $1,110,544.40 | ||||||||
Fed/State Project Number: SBR-272A(005)SB | Project: 29053(04) | Category: 0300/TRAFFIC CONTROL - SBR-272A(005)SB | ||||||||
0100 | REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 857(C) 8851 | LF | 9,929.000 | 9,929.000 | 15,697.000 | $1.30 | $0.00 | $20,406.10 | |
0101 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 857(F) 8006 | LF | 13,645.000 | 13,645.000 | 2,211.000 | $0.11 | $0.00 | $243.21 | |
0102 | (SP)CONST.ZONE IMPACT ATTEN. | 871(B) 8705 | SD | 240.000 | 240.000 | 6.000 | 140.000 | $3.30 | $19.80 | $462.00 |
0103 | DELIVER PORTABLE LONGITUDINAL BARRIER | 877(B) 8484 | LF | 1,275.000 | 1,275.000 | 1,268.000 | $20.00 | $0.00 | $25,360.00 | |
0104 | RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 877(C) 8486 | LF | 1,000.000 | 1,000.000 | 1,268.000 | $3.00 | $0.00 | $3,804.00 | |
0105 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 360.000 | 360.000 | 6.000 | 151.000 | $5.50 | $33.00 | $830.50 |
0106 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 2,160.000 | 2,160.000 | 342.000 | 6,368.000 | $0.55 | $188.10 | $3,502.40 |
0107 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 6,720.000 | 6,720.000 | 1,478.000 | 5,088.000 | $0.55 | $812.90 | $2,798.40 |
0108 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 8,640.000 | 8,640.000 | 306.000 | 1,348.000 | $0.55 | $168.30 | $741.40 |
0109 | CONSTRUCTION BARRICADES(TYPE III) | 880(C) 8842 | SD | 1,080.000 | 1,080.000 | 54.000 | 1,125.000 | $1.65 | $89.10 | $1,856.25 |
0110 | WING BARRICADES | 880(C) 8848 | SD | 480.000 | 480.000 | 60.000 | 238.000 | $1.10 | $66.00 | $261.80 |
0111 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 3,000.000 | 3,000.000 | 450.000 | 4,102.000 | $0.40 | $180.00 | $1,640.80 |
0112 | DRUMS | 880(F) 8878 | SD | 16,440.000 | 16,440.000 | 492.000 | 12,693.000 | $0.30 | $147.60 | $3,807.90 |
0113 | TRAFFIC SURVEILLANCE, POLICE | 880(L) 8911 | HOUR | 240.000 | 240.000 | 20.000 | 143.000 | $65.00 | $1,300.00 | $9,295.00 |
0114 | PORT.CHANGEABLE MESSAGE SIGN | 882(A) 8306 | SD | 240.000 | 240.000 | 0.000 | $16.00 | $0.00 | $0.00 | |
Subtotals For Category 0300/TRAFFIC CONTROL - SBR-272A(005)SB | $3,004.80 | $75,009.76 | ||||||||
Fed/State Project Number: SBR-272A(005)SB | Project: 29053(04) | Category: 0301/TRAFFIC SIGNING AND STRIPING - SBR-272A(005)SB | ||||||||
0115 | GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 853 9069 | EA | 3.000 | 3.000 | 0.000 | $55.00 | $0.00 | $0.00 | |
0116 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 9,841.000 | 9,841.000 | 0.000 | $0.55 | $0.00 | $0.00 | |
0117 | TRAFFIC STRIPE(PLASTIC)(6" WIDE) | 855(A) 8813 | LF | 2,569.000 | 2,569.000 | 0.000 | $1.10 | $0.00 | $0.00 | |
0118 | TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 855(A) 8814 | LF | 520.000 | 520.000 | 0.000 | $2.20 | $0.00 | $0.00 | |
0119 | TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 855(A) 8818 | LF | 224.000 | 224.000 | 0.000 | $3.30 | $0.00 | $0.00 | |
0120 | TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 856(A) 8530 | LF | 1,176.000 | 1,176.000 | 1,991.000 | 1,991.000 | $2.20 | $4,380.20 | $4,380.20 |
0121 | TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 856(A) 8535 | LF | 635.000 | 635.000 | 1,408.000 | 1,408.000 | $3.30 | $4,646.40 | $4,646.40 |
Subtotals For Category 0301/TRAFFIC SIGNING AND STRIPING - SBR-272A(005)SB | $9,026.60 | $9,026.60 | ||||||||
Subtotals For Project SBR-272A(005)SB /29053(04) | $17,527.50 | $1,238,935.72 |