| Fed/State Project Number: IMY-0040-4(430)102 |
Project: 26488(04) |
Category: 0100/ROADWAY |
| 0001 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
5,000.000 |
5,000.000 |
|
440.000 |
$7.50 |
$0.00 |
$3,300.00 |
| 0002 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$40,000.00 |
$0.00 |
$0.00 |
| 0003 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
1,450.000 |
1,450.000 |
|
0.000 |
$1.30 |
$0.00 |
$0.00 |
| 0004 |
TEMPORARY SEDIMENT FILTER |
221(D) 2803 |
EA |
7.000 |
7.000 |
|
7.000 |
$275.00 |
$0.00 |
$1,925.00 |
| 0005 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
546.000 |
546.000 |
|
0.000 |
$6.50 |
$0.00 |
$0.00 |
| 0006 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
75,481.000 |
75,481.000 |
|
0.000 |
$1.10 |
$0.00 |
$0.00 |
| 0007 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
19.430 |
19.430 |
|
0.000 |
$200.00 |
$0.00 |
$0.00 |
| 0008 |
MOWING |
241 2832 |
AC |
38.860 |
38.860 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
| 0009 |
FLY ASH |
307(A) 4200 |
TON |
216.000 |
216.000 |
|
0.000 |
$55.00 |
$0.00 |
$0.00 |
| 0010 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
3,986.000 |
3,986.000 |
|
0.000 |
$4.75 |
$0.00 |
$0.00 |
| 0011 |
OPEN GRADED FRICTION SURFACE COURSE |
406 4257 |
TON |
2,218.000 |
2,218.000 |
|
0.000 |
$105.00 |
$0.00 |
$0.00 |
| 0012 |
TACK COAT |
407(B) 0250 |
GAL |
32,859.000 |
32,859.000 |
3,500.000 |
4,725.000 |
$2.00 |
$7,000.00 |
$9,450.00 |
| 0013 |
PRIME COAT |
408 5774 |
GAL |
1,641.000 |
1,641.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
| 0014 |
SUPERPAVE, TYPE S3(PG 76-28 OK) |
411(B) 5935 |
TON |
719.000 |
719.000 |
158.590 |
645.120 |
$68.50 |
$10,863.42 |
$44,190.73 |
| 0015 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
9,846.000 |
9,846.000 |
1,946.090 |
3,911.960 |
$57.00 |
$110,927.13 |
$222,981.72 |
| 0016 |
(SP) SUPERPAVE, TYPE S3(PG 76-28 E) |
411(B) 5950 |
TON |
17,765.000 |
17,765.000 |
6,418.950 |
6,615.500 |
$78.00 |
$500,678.10 |
$516,009.00 |
| 0017 |
SUPERPAVE, TYPE S4(PG 76-28 OK) |
411(C) 5950 |
TON |
1,997.000 |
1,997.000 |
0.000 |
599.600 |
$74.50 |
$0.00 |
$44,670.20 |
| 0018 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
3,354.000 |
3,354.000 |
0.000 |
1,165.020 |
$63.50 |
$0.00 |
$73,978.77 |
| 0019 |
(SP) SUPERPAVE, TYPE S5(PG 76-28 E) |
411(D) 5980 |
TON |
5,730.000 |
5,730.000 |
0.000 |
109.680 |
$90.00 |
$0.00 |
$9,871.20 |
| 0020 |
(SP) RICH INTERMEDIATE LAYER |
411(J) 6410 |
TON |
4,869.000 |
4,869.000 |
2,324.460 |
2,434.970 |
$95.00 |
$220,823.70 |
$231,322.15 |
| 0021 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
91,764.000 |
91,764.000 |
39,150.440 |
50,999.107 |
$2.00 |
$78,300.88 |
$101,998.21 |
| 0022 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
20.000 |
20.000 |
|
0.000 |
$300.00 |
$0.00 |
$0.00 |
| 0023 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
650.000 |
650.000 |
|
640.000 |
$25.25 |
$0.00 |
$16,160.00 |
| 0024 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
2,134.000 |
2,134.000 |
1,785.000 |
1,785.000 |
$6.00 |
$10,710.00 |
$10,710.00 |
| 0025 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
4,970.000 |
4,970.000 |
2,709.000 |
2,709.000 |
$1.40 |
$3,792.60 |
$3,792.60 |
| 0026 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
1,352.000 |
1,352.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
| 0027 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
4,650.000 |
4,650.000 |
|
0.000 |
$15.00 |
$0.00 |
$0.00 |
| 0028 |
GUARDRAIL ANCHOR UNIT (TYPE B) |
623(F) 4447 |
EA |
10.000 |
10.000 |
|
0.000 |
$800.00 |
$0.00 |
$0.00 |
| 0029 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
10.000 |
10.000 |
|
0.000 |
$2,200.00 |
$0.00 |
$0.00 |
| 0030 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) |
853 9066 |
EA |
112.000 |
112.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
| Subtotals For Category 0100/ROADWAY |
$943,095.83 |
$1,290,359.58 |
|
| Fed/State Project Number: IMY-0040-4(430)102 |
Project: 26488(04) |
Category: 0300/TRAFFIC CONTROL |
| 0031 |
RUMBLE STRIP-METHOD HMA-CON |
413(A) 4861 |
LF |
49,000.000 |
49,000.000 |
|
0.000 |
$0.18 |
$0.00 |
$0.00 |
| 0032 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
103,000.000 |
103,000.000 |
|
50,877.000 |
$0.08 |
$0.00 |
$4,070.16 |
| 0033 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
20,600.000 |
20,600.000 |
|
0.000 |
$0.35 |
$0.00 |
$0.00 |
| 0034 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
20,000.000 |
20,000.000 |
|
14,529.000 |
$0.04 |
$0.00 |
$581.16 |
| 0035 |
(PL)TRUCK MOUNTED ATTENUATOR |
876(A) 8482 |
SD |
240.000 |
240.000 |
|
0.000 |
$4.20 |
$0.00 |
$0.00 |
| 0036 |
DELIVER PORTABLE LONGITUDINAL BARRIER |
877(B) 8484 |
LF |
12,500.000 |
12,500.000 |
|
12,464.000 |
$10.00 |
$0.00 |
$124,640.00 |
| 0037 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER |
877(C) 8486 |
LF |
12,500.000 |
12,500.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
| 0038 |
MODULAR GLARE SCREEN (TEMPORARY) |
878(B) 8487 |
SD |
11,520.000 |
11,520.000 |
1,800.000 |
2,040.000 |
$0.13 |
$234.00 |
$265.20 |
| 0039 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
240.000 |
240.000 |
30.000 |
78.000 |
$3.15 |
$94.50 |
$245.70 |
| 0040 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
5,040.000 |
5,040.000 |
780.000 |
2,090.000 |
$1.00 |
$780.00 |
$2,090.00 |
| 0041 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
5,760.000 |
5,760.000 |
690.000 |
1,482.000 |
$1.00 |
$690.00 |
$1,482.00 |
| 0042 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
2,560.000 |
2,560.000 |
480.000 |
1,296.000 |
$1.05 |
$504.00 |
$1,360.80 |
| 0043 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
1,680.000 |
1,680.000 |
330.000 |
714.000 |
$1.05 |
$346.50 |
$749.70 |
| 0044 |
WING BARRICADES |
880(C) 8848 |
SD |
480.000 |
480.000 |
60.000 |
156.000 |
$0.11 |
$6.60 |
$17.16 |
| 0045 |
VERTICAL PANELS |
880(D) 8854 |
SD |
26,160.000 |
26,160.000 |
3,495.000 |
3,956.000 |
$0.11 |
$384.45 |
$435.16 |
| 0046 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
5,280.000 |
5,280.000 |
930.000 |
2,130.000 |
$0.52 |
$483.60 |
$1,107.60 |
| 0047 |
DRUMS |
880(F) 8878 |
SD |
7,200.000 |
7,200.000 |
2,850.000 |
4,830.000 |
$0.42 |
$1,197.00 |
$2,028.60 |
| 0048 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
8,700.000 |
8,700.000 |
45.000 |
7,789.000 |
$0.11 |
$4.95 |
$856.79 |
| 0049 |
TRAFFIC SURVEILLANCE, POLICE |
880(L) 8911 |
HOUR |
350.000 |
350.000 |
|
0.000 |
$65.00 |
$0.00 |
$0.00 |
| 0050 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
480.000 |
480.000 |
30.000 |
78.000 |
$4.20 |
$126.00 |
$327.60 |
| Subtotals For Category 0300/TRAFFIC CONTROL |
$4,851.60 |
$140,257.63 |
|