Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    07/19/2012
Contract ID: 110492   Estimate Number: 0013     Contract No: 710579
Residency: MUSKOGEE (01100)   Estimate Type: Progressive     Account No: 400100

Project Number(s): IMY-0040-6(370)233, IMY-0040-5(386)207, BRFY-NBIP(422)
Primary Job Piece No: 20908(05)
Contract Description: PAVEMENT REHABILITATION AND BRIDGE PAINTING I-40: FROM US-75 EXTEND EAST. PROJECT LENGTH = 6.347 MILES.
Primary County: OKMULGEE              
Name of Road: I-40              
Prime Contractor: DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV              
    P.O. BOX 3788              
    EDMOND , OK   73083              
Surety Company: LIBERTY MUTUAL INSURANCE COMPANY              

Date Let: 10/20/2011 NTP Effective Date: 01/09/2012 Pay Period: 07/01/2012  TO  07/15/2012
Date Awarded: 11/07/2011 Date Work Began: 01/09/2012 Original Contract Time: 620
Date Contract Executed: 11/17/2011 Date Time Stopped: Current Time Charged: 162.00
Date NTP Issued: 11/28/2011 Completion Date: Current Time Allowed: 620.00
General Liability Expires: 03/01/2013 Workman's Comp Expires: 03/01/2013 Percent Time Used: 26.13 %
Specification Year: 2009     Date Approved:

Current Contract Amount: $24,656,322.93 Total to Date Prev to Date This Estimate
Bid Amount: $24,494,383.94 Participating: $8,021,737.19 $6,471,501.78 $1,550,235.41
Percent Complete: 34.06 % Non Participating: $0.00 $0.00 $0.00
Funds Available: $16,257,562.22 Total Earnings: $8,021,737.19 $6,471,501.78 $1,550,235.41
Unearned Balance: $16,095,623.23 Stockpiled Materials: $388,155.37 $544,063.35 $-155,907.98
Gross Earnings: $8,409,892.56 $7,015,565.13 $1,394,327.43
Other Adjustments: $-11,131.85 $-5,376.35 $-5,755.50
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $8,398,760.71 $7,010,188.78 $1,388,571.93

Estimate Adjustment Detail

Contract ID: 110492   Estimate Number: 0013     Primary JP: 20908(05)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 Modifying typical section, and Earth Work Qtys Approved 07/02/2012 0.0 $161,938.99
002 Revise agg base and stabilization, add new deck repair item. Pending 0 0.0 $467.66


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
20908(05) 0013 MOH for SeparatorFabric Stockpiled Material Adjustment 0013 $-55,907.55
20908(05) 0013 MOH for SeparatorFabric Stockpiled Material Adjustment 0012 $-108,875.94
20908(05) 0013 MOH for SeparatorFabric Stockpiled Material Initial Payment 0012 $252,164.09
20908(05) 0014 MOH for Separator Fabric Stockpiled Material Initial Payment 0012 $85,648.37
20908(05) 0014 MOH for Separator Fabric Stockpiled Material Adjustment 0013 $-254.80
20908(05) 0021 MOH for Epoxy Dowel Stockpiled Material Adjustment 0013 $-99,745.63
20908(05) 0021 MOH for Epoxy Dowel Stockpiled Material Adjustment 0012 $-32,554.37
20908(05) 0021 MOH for Epoxy Dowel Stockpiled Material Initial Payment 0012 $132,300.00
20908(05) 0048 MOH For WWF Stockpiled Material Initial Payment 0012 $85,251.45
20908(05) 0048 MOH For WWF Stockpiled Material Initial Payment 0011 $72,151.45
21007(04) 0138 MOH for Separator Fabric Stockpiled Material Initial Payment 0012 $57,978.30
Subtotals For Stockpile Payments $388,155.37


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.
Subtotals For Liquidated Damages $


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
20908(05) 0011 AGGREGATE BASE TYPE A * Material Discrepancy Adjustments 0012 -4,698.88 $1.09 $-5,121.78
21007(04) 0133 AGGREGATE BASE TYPE B * Material Discrepancy Adjustments 0012 -3,907.92 $1.30 $-5,080.30
21007(04) 0142 SUPERPAVE, TYPE S4(PG 64-22 OK) Asphalt Binder Adjustment 0012 5,456.50 $0.88 $4,825.73
21007(04) 0142 SUPERPAVE, TYPE S4(PG 64-22 OK) * HMA Deduction as per Sec. 411 0013 -90.00 $63.95 $-5,755.50
Subtotals For Line Item Adjustments $-11,131.85
* = User applied Line Item Adjustments


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
01 TIME 'B' BID 01/09/2012 NOT ENTERED 485.00 DAYS $15,000.00 N


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
No milestones adjustments exist for this contract.
Subtotals For Milestones $

Line Item Detail

Contract ID: 110492   Estimate Number: 0013     Primary JP: 20908(05)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    IMY-0040-6(370)233 Project:    20908(05) Category:    0100/ROADWAY IMY-0040-6(370)233
0001 CLEARING AND GRUBBING 201(A) 0102 LSUM 1.000 1.000   0.050 $5,000.00 $0.00 $250.00
0002 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 18,000.000 22,500.000 0.000 22,500.000 $6.83 $0.00 $153,675.00
0003 UNCLASSIFIED BORROW 202(D) 0184 CY 17,000.000 0.000   0.000 $6.71 $0.00 $0.00
0004 TEMPORARY SILT FENCE 221(C) 2801 LF 2,500.000 2,500.000   122.000 $1.76 $0.00 $214.72
0005 TEMPORARY SILT DIKE 221(F) 0100 LF 650.000 650.000   32.000 $6.39 $0.00 $204.48
0006 DITCH LINER PROTECTION 229 4318 LF 860.000 860.000   0.000 $1.60 $0.00 $0.00
0007 SOLID SLAB SODDING 230(A) 2806 SY 183,261.000 183,261.000   0.000 $1.04 $0.00 $0.00
0008 SEEDING METHOD B 232(B) 2814 AC 40.420 40.420   0.000 $213.00 $0.00 $0.00
0009 VEGETATIVE MULCHING 233(A) 2817 AC 40.420 40.420   0.000 $372.75 $0.00 $0.00
0010 MOWING 241 2832 AC 138.000 138.000   0.000 $106.50 $0.00 $0.00
0011 AGGREGATE BASE TYPE A 303(A) 2100 CY 52,534.000 52,534.000 0.000 26,611.380 $21.85 $0.00 $581,458.65
0012 STABILIZED SUBGRADE 307(K) 4300 SY 283,187.000 283,187.000 2,143.340 145,986.830 $3.05 $6,537.19 $445,259.83
0013 CEMENT TREATED BASE 317 4270 SY 238,229.000 238,229.000 34,299.110 101,094.170 $8.00 $274,392.88 $808,753.36
0014 SEPARATOR FABRIC 325 5271 SY 258,351.000 258,351.000 392.000 126,976.270 $1.00 $392.00 $126,976.27
0015 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 38,973.000 38,973.000   0.000 $25.00 $0.00 $0.00
0016 PRIME COAT 408 5774 GAL 102,989.000 102,989.000   0.000 $1.45 $0.00 $0.00
0017 SUPERPAVE, TYPE S4(PG 64-22 OK) 411(C) 5960 TON 769.000 769.000   0.000 $76.25 $0.00 $0.00
0018 COLD MILLING PAVEMENT 412 5267 SY 14,662.000 14,662.000   7,331.000 $3.75 $0.00 $27,491.25
0019 RUMBLE STRIP-METHOD PCC-CON 413(C) 4868 LF 91,183.000 91,183.000   0.000 $0.26 $0.00 $0.00
0020 P.C.CONCRETE PAVEMENT(PLACEMENT) 414(A) 0210 SY 100,122.000 100,122.000 32,889.190 48,321.030 $5.00 $164,445.95 $241,605.15
0021 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(B) 5725 SY 131,709.000 131,709.000 30,001.100 36,460.300 $9.00 $270,009.90 $328,142.70
0022 P.C. CONCRETE FOR PAVEMENT 414(G) 5275 CY 66,095.000 66,095.000 10,614.000 18,858.930 $78.00 $827,892.00 $1,470,996.54
0023 CONCRETE PARAPET 504(E) 1381 LF 32.000 32.000   0.000 $213.00 $0.00 $0.00
0024 CLASS C CONCRETE 509(D) 0325 CY 250.000 250.000   0.000 $250.28 $0.00 $0.00
0025 INLET GPI TYPE 2 (DES. 10) 611(G) 5336 EA 1.000 1.000   0.000 $3,002.06 $0.00 $0.00
0026 INLET GPI TYPE 2 (DES. 11) 611(G) 5337 EA 1.000 1.000   0.000 $3,002.06 $0.00 $0.00
0027 28" X 18" R.C.PIPE ARCH CLASS A-III 613(A) 4496 LF 375.000 375.000   0.000 $98.07 $0.00 $0.00
0028 36" X 22" R.C.PIPE ARCH CLASS A-III 613(A) 4497 LF 235.000 235.000   0.000 $107.38 $0.00 $0.00
0029 43" X 26" R.C.PIPE ARCH CLASS A-III 613(A) 4498 LF 200.000 200.000   0.000 $129.02 $0.00 $0.00
0030 58" X 36" R.C.PIPE ARCH CLASS A-III 613(A) 4500 LF 141.000 141.000   0.000 $171.18 $0.00 $0.00
0031 18" CORR. GALV. STEEL PIPE 613(B) 0689 LF 2,780.000 2,780.000   2,720.000 $20.88 $0.00 $56,793.60
0032 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 6204 LF 2,400.000 2,400.000   0.000 $7.71 $0.00 $0.00
0033 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 1096 LF 1,600.000 1,600.000   0.000 $7.71 $0.00 $0.00
0034 TYPE A4 CULVERT END TREATMENT 613(M) 7186 EA 10.000 10.000   0.000 $969.18 $0.00 $0.00
0035 TYPE B4 CULVERT END TREATMENT 613(M) 7187 EA 2.000 2.000   0.000 $1,211.41 $0.00 $0.00
0036 TYPE C4 CULVERT END TREATMENT 613(M) 7188 EA 2.000 2.000   0.000 $1,423.09 $0.00 $0.00
0037 TYPE D4 CULVERT END TREATMENT 613(M) 7189 EA 2.000 2.000   0.000 $1,733.09 $0.00 $0.00
0038 OUTLET LATERAL HEADWALL 613(Q) 5946 EA 8.000 8.000   0.000 $213.16 $0.00 $0.00
0039 REMOVAL OF STRUCTURES & OBSTRUCTIONS 619(A) 0920 LSUM 1.000 1.000   0.000 $2,500.00 $0.00 $0.00
0040 REMOVAL OF CONCRETE PAVEMENT 619(B) 4727 SY 143,532.000 143,532.000   60,837.330 $2.10 $0.00 $127,758.39
0041 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 70,920.000 70,920.000   0.000 $1.50 $0.00 $0.00
0042 REMOVAL OF GUARDRAIL 619(B) 4780 LF 5,640.000 5,640.000   2,718.750 $1.07 $0.00 $2,909.06
0043 SAWING PAVEMENT 619(C) 0924 LF 5,352.000 5,352.000   0.000 $2.67 $0.00 $0.00
0044 BEAM GUARDRAIL W-BEAM SINGLE 623(A) 0932 LF 4,500.000 4,500.000   0.000 $17.09 $0.00 $0.00
0045 GUARDRAIL ANCHOR UNIT (TYPE B) 623(F) 4447 EA 6.000 6.000   0.000 $431.33 $0.00 $0.00
0046 GUARDRAIL END TREATMENT (GET) 623(G) 8571 EA 14.000 14.000   0.000 $2,662.50 $0.00 $0.00
0047 GUARDRAIL BRIDGE CONNECTION-TYPE A 623(I) 8675 EA 8.000 8.000   0.000 $1,810.50 $0.00 $0.00
0048 FENCE-STYLE WWF 624(A) 4281 LF 46,540.000 46,540.000   0.000 $5.86 $0.00 $0.00
8000 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 0.000 25,430.510 0.000 1,465.260 $6.71 $0.00 $9,831.89
8003 LIME PRETREATMENT 307(G) 4260 SY 0.000 28,319.000   0.000 $0.84 $0.00 $0.00
8004 LIME 307(D) 4230 TON 0.000 408.000   0.000 $140.00 $0.00 $0.00
Subtotals For Category     0100/ROADWAY IMY-0040-6(370)233    $1,543,669.92 $4,382,320.89
Fed/State Project Number:    IMY-0040-6(370)233 Project:    20908(05) Category:    0200/BRIDGE 'A' IMY-0040-6(370)233
0049 SUBSTRUCTURE EXCAVATION COMMON 501(B) 1307 CY 45.000 45.000   0.000 $39.41 $0.00 $0.00
0050 CLSM BACKFILL 501(G) 6309 CY 32.200 32.200   0.000 $165.08 $0.00 $0.00
0051 APPROACH SLAB 504(A) 1304 SY 192.000 192.000   0.000 $308.85 $0.00 $0.00
0052 SAW-CUT GROOVING 504(B) 1305 SY 597.500 597.500   0.000 $4.79 $0.00 $0.00
0053 CONCRETE PARAPET 504(E) 1381 LF 78.000 78.000   0.000 $213.00 $0.00 $0.00
0054 BRIDGE DECK CONCRETE OVERLAY 505(A) 6065 SY 429.000 429.000   0.000 $127.80 $0.00 $0.00
0055 HYDRODEMOLITION 505(E) 1000 SY 429.000 429.000   0.000 $106.50 $0.00 $0.00
0056 CLASS C CONCRETE 509(D) 1331 CY 1.000 1.000   0.000 $1,171.50 $0.00 $0.00
0057 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 32.000 32.000   0.000 $4.26 $0.00 $0.00
0058 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 6204 LF 80.000 80.000 0.000 85.000 $18.11 $0.00 $1,539.35
0059 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 6207 LF 20.000 20.000 0.000 55.000 $18.11 $0.00 $996.05
Subtotals For Category     0200/BRIDGE 'A' IMY-0040-6(370)233    $0.00 $2,535.40
Fed/State Project Number:    IMY-0040-6(370)233 Project:    20908(05) Category:    0201/BRIDGE 'B' IMY-0040-6(370)233
0060 SUBSTRUCTURE EXCAVATION COMMON 501(B) 1307 CY 45.000 45.000   45.000 $39.41 $0.00 $1,773.45
0061 CLSM BACKFILL 501(G) 6309 CY 32.200 32.200 0.000 32.200 $165.08 $0.00 $5,315.58
0062 APPROACH SLAB 504(A) 1304 SY 192.000 192.000 0.000 192.000 $308.85 $0.00 $59,299.20
0063 SAW-CUT GROOVING 504(B) 1305 SY 597.500 597.500   0.000 $4.79 $0.00 $0.00
0064 CONCRETE PARAPET 504(E) 1381 LF 78.000 78.000 0.000 78.000 $213.00 $0.00 $16,614.00
0065 BRIDGE DECK CONCRETE OVERLAY 505(A) 6065 SY 429.000 429.000 0.000 429.000 $127.80 $0.00 $54,826.20
0066 HYDRODEMOLITION 505(E) 1000 SY 429.000 429.000   429.000 $106.50 $0.00 $45,688.50
0067 CLASS C CONCRETE 509(D) 1331 CY 1.000 1.000 0.000 0.790 $1,171.50 $0.00 $925.49
0068 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 32.000 32.000   0.000 $4.26 $0.00 $0.00
0069 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 6204 LF 80.000 80.000   0.000 $18.11 $0.00 $0.00
0070 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 6207 LF 20.000 20.000   0.000 $18.11 $0.00 $0.00
Subtotals For Category     0201/BRIDGE 'B' IMY-0040-6(370)233    $0.00 $184,442.42
Fed/State Project Number:    IMY-0040-6(370)233 Project:    20908(05) Category:    0202/BRIDGE 'C' IMY-0040-6(370)233
0071 CONCRETE PARAPET 504(E) 1381 LF 20.000 20.000   0.000 $271.58 $0.00 $0.00
0072 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 9.000 9.000   0.000 $4.26 $0.00 $0.00
0073 REMOVAL OF EXISTING PARAPET 619(B) 6252 LF 271.000 271.000   0.000 $79.88 $0.00 $0.00
Subtotals For Category     0202/BRIDGE 'C' IMY-0040-6(370)233    $0.00 $0.00
Fed/State Project Number:    IMY-0040-6(370)233 Project:    20908(05) Category:    0203/BRIDGE 'D' IMY-0040-6(370)233
0074 CONCRETE PARAPET 504(E) 1381 LF 20.000 20.000 0.000 20.000 $271.58 $0.00 $5,431.60
0075 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 9.000 9.000   0.000 $4.26 $0.00 $0.00
0076 REMOVAL OF EXISTING PARAPET 619(B) 6252 LF 271.000 271.000   274.000 $79.88 $0.00 $21,887.12
Subtotals For Category     0203/BRIDGE 'D' IMY-0040-6(370)233    $0.00 $27,318.72
Fed/State Project Number:    IMY-0040-6(370)233 Project:    20908(05) Category:    0300/TRAFFIC CONTROL IMY-0040-6(370)233
0077 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 857(A) 8839 LF 327,500.000 327,500.000   36,065.000 $0.02 $0.00 $721.30
0078 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 857(E) 8887 EA 14,560.000 14,560.000 589.000 829.000 $0.43 $253.27 $356.47
0079 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 857(F) 8006 LF 164,500.000 164,500.000 721.000 41,547.000 $0.05 $36.05 $2,077.35
0080 (SP)CONST.ZONE IMPACT ATTEN. 871(B) 8705 SD 1,680.000 1,680.000   0.000 $2.13 $0.00 $0.00
0081 (PL)TRUCK MOUNTED ATTENUATOR 876(A) 8482 SD 1,120.000 1,120.000   0.000 $5.33 $0.00 $0.00
0082 DELIVER PORTABLE LONGITUDINAL BARRIER 877(B) 8484 LF 36,400.000 36,400.000   29,216.000 $26.00 $0.00 $759,616.00
0083 RELOCATION OF PORTABLE LONGITUDINAL BARRIER 877(C) 8486 LF 36,400.000 36,400.000   0.000 $3.25 $0.00 $0.00
0084 MODULAR GLARE SCREEN (TEMPORARY) 878(B) 8487 SD 45,500.000 45,500.000 4,290.000 35,171.000 $0.11 $471.90 $3,868.81
0085 ARROW DISPLAY(TYPE C) 880(A) 8812 SD 1,120.000 1,120.000 30.000 378.000 $10.65 $319.50 $4,025.70
0086 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 66,080.000 66,080.000 3,525.000 30,467.000 $0.02 $70.50 $609.34
0087 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 35,840.000 35,840.000 910.000 11,299.000 $0.27 $245.70 $3,050.73
0088 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 28,560.000 28,560.000 1,720.000 18,482.000 $2.40 $4,128.00 $44,356.80
0089 CONSTRUCTION BARRICADES(TYPE III) 880(C) 8842 SD 23,520.000 23,520.000 535.000 6,600.000 $1.07 $572.45 $7,062.00
0090 WING BARRICADES 880(C) 8848 SD 2,240.000 2,240.000 60.000 756.000 $2.13 $127.80 $1,610.28
0091 VERTICAL PANELS 880(D) 8854 SD 182,000.000 182,000.000 4,367.000 37,302.000 $0.01 $43.67 $373.02
0092 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 57,120.000 57,120.000 1,620.000 19,926.000 $0.02 $32.40 $398.52
0093 DRUMS 880(F) 8878 SD 145,600.000 145,600.000 4,745.000 40,993.000 $0.05 $237.25 $2,049.65
0094 CHANNELIZER CONES 880(G) 8890 SD 190,400.000 190,400.000 540.000 44,193.000 $0.05 $27.00 $2,209.65
0095 FLAGGER 880(I) 8902 SD 30.000 30.000   0.000 $372.75 $0.00 $0.00
0096 TRAFFIC SURVEILLANCE, POLICE 880(L) 8911 HOUR 1,300.000 1,300.000   124.000 $52.42 $0.00 $6,500.08
0097 PORTABLE CHANGEABLE MESSAGE SIGN 882(A) 8303 EA 4.000 4.000   4.000 $15,975.00 $0.00 $63,900.00
Subtotals For Category     0300/TRAFFIC CONTROL IMY-0040-6(370)233    $6,565.49 $902,785.70
Fed/State Project Number:    IMY-0040-6(370)233 Project:    20908(05) Category:    0301/STRIPING & SIGNING IMY-0040-6(370)233
0098 STRUCTURAL CONCRETE 804(A) 2915 CY 4.000 4.000   0.000 $372.75 $0.00 $0.00
0099 REINFORCING STEEL 804(B) 2916 LB 676.000 676.000   0.000 $2.13 $0.00 $0.00
0100 (PL)REMOVE & RESET EXISTING SIGNS 805(D) 8756 EA 2.000 2.000   0.000 $1,065.00 $0.00 $0.00
0101 SHEET ALUMINUM SIGNS 850(A) 8110 SF 182.360 182.360   0.000 $12.78 $0.00 $0.00
0102 EXTRUDED ALUMINUM PANEL SIGNS 850(B) 8112 SF 528.000 528.000   0.000 $19.17 $0.00 $0.00
0103 4"@13 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3206 LF 179.500 179.500   0.000 $26.63 $0.00 $0.00
0104 6"@15 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3207 LF 42.000 42.000   0.000 $28.76 $0.00 $0.00
0105 6"@20 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3208 LF 45.500 45.500   0.000 $31.95 $0.00 $0.00
0106 6"@25 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3209 LF 99.000 99.000   0.000 $38.34 $0.00 $0.00
0107 2 1/2"@5.79 GALV.STEEL PIPE POST 851(B) 3217 LF 42.000 42.000   0.000 $10.13 $0.00 $0.00
0108 3"@7.58 GALV.STEEL PIPE POST 851(B) 3218 LF 32.000 32.000   0.000 $19.17 $0.00 $0.00
0109 2" SQUARE TUBE POST 851(C) 8324 LF 601.000 601.000   0.000 $4.26 $0.00 $0.00
0110 2 1/2" SQUARE TUBE POST 851(C) 8330 LF 30.000 30.000   0.000 $10.65 $0.00 $0.00
0111 DELINEATORS(TYPE 1, CODE 1) 853 9024 EA 86.000 86.000   0.000 $17.04 $0.00 $0.00
0112 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 856(A) 8530 LF 76,540.000 76,540.000   0.000 $0.43 $0.00 $0.00
0113 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) 856(A) 8535 LF 23,712.000 23,712.000   0.000 $0.53 $0.00 $0.00
0114 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) 856(A) 8540 LF 1,000.000 1,000.000   0.000 $1.07 $0.00 $0.00
Subtotals For Category     0301/STRIPING & SIGNING IMY-0040-6(370)233    $0.00 $0.00
Fed/State Project Number:    IMY-0040-6(370)233 Project:    20908(05) Category:    0304/CABLE BARRIER IMY-0040-6(370)233
0115 CLASS AA CONCRETE 509(A) 0319 CY 142.000 142.000   0.000 $266.25 $0.00 $0.00
0116 HIGH-TENSION CABLE BARRIER(TL-4) 628(B) 5125 LF 14,861.000 14,861.000   0.000 $10.65 $0.00 $0.00
0117 END ANCHORS 628(C) 5110 EA 2.000 2.000   0.000 $1,171.50 $0.00 $0.00
0118 CABLE BARRIER TENSION METER 628(E) 5175 EA 1.000 1.000   0.000 $2,130.00 $0.00 $0.00
0119 GUARDRAIL DELINEATORS(TYPE 1, CODE 1) 853 9066 EA 90.000 90.000   0.000 $8.52 $0.00 $0.00
Subtotals For Category     0304/CABLE BARRIER IMY-0040-6(370)233    $0.00 $0.00
Fed/State Project Number:    IMY-0040-6(370)233 Project:    20908(05) Category:    0600/STAKING IMY-0040-6(370)233
0120 CONSTRUCTION STAKING LEVEL II 642(B) 0096 LSUM 1.000 1.000   0.500 $99,225.75 $0.00 $49,612.88
Subtotals For Category     0600/STAKING IMY-0040-6(370)233    $0.00 $49,612.88
Fed/State Project Number:    IMY-0040-6(370)233 Project:    20908(05) Category:    0640/CONSTRUCTION IMY-0040-6(370)233
0121 SWPPP DOCUMENTATION AND MANAGEMENT 220 2800 LSUM 1.000 1.000   0.100 $3,500.00 $0.00 $350.00
0122 FIELD OFFICE 640(A) 1426 EA 1.000 1.000   1.000 $23,393.91 $0.00 $23,393.91
0123 MOBILIZATION 641 1552 LSUM 1.000 1.000   1.000 $675,846.00 $0.00 $675,846.00
0124 (SP)CONTRACTORS QUALITY CONTROL 643 0087 LSUM 1.000 1.000   0.250 $116,000.00 $0.00 $29,000.00
Subtotals For Category     0640/CONSTRUCTION IMY-0040-6(370)233    $0.00 $728,589.91
Subtotals For Project IMY-0040-6(370)233 /20908(05) $1,550,235.41 $6,277,605.92


Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    IMY-0040-5(386)207 Project:    21007(04) Category:    0100/ROADWAY IMY-0040-5(386)207
0125 CLEARING AND GRUBBING 201(A) 0102 LSUM 1.000 1.000   0.000 $5,000.00 $0.00 $0.00
0126 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 28,585.000 35,731.250 0.000 19,249.400 $7.83 $0.00 $150,722.80
0127 UNCLASSIFIED BORROW 202(D) 0184 CY 14,000.000 0.000   0.000 $5.54 $0.00 $0.00
0128 TEMPORARY SILT FENCE 221(C) 2801 LF 3,000.000 3,000.000   2,396.000 $1.76 $0.00 $4,216.96
0129 TEMPORARY SEDIMENT FILTER 221(D) 2803 EA 5.000 5.000   0.000 $106.50 $0.00 $0.00
0130 TEMPORARY SILT DIKE 221(F) 0100 LF 182.000 182.000   16.000 $6.39 $0.00 $102.24
0131 SOLID SLAB SODDING 230(A) 2806 SY 72,286.000 72,286.000   0.000 $1.04 $0.00 $0.00
0132 MOWING 241 2832 AC 14.940 14.940   0.000 $106.50 $0.00 $0.00
0133 AGGREGATE BASE TYPE B 303(B) 2110 CY 25,724.000 25,724.000 0.000 11,783.650 $25.94 $0.00 $305,667.88
0134 FLY ASH 307(A) 4200 TON 7,616.000 7,616.000   0.000 $34.00 $0.00 $0.00
0135 LIME 307(D) 4230 TON 1,068.000 1,068.000   294.950 $140.00 $0.00 $41,293.00
0136 CEMENTITIOUS STABILIZED SUBGRADE 307(E) 4240 SY 138,674.000 138,674.000 0.000 76,329.940 $0.84 $0.00 $64,117.15
0137 LIME PRETREATMENT 307(G) 4260 SY 74,138.000 74,138.000   15,292.440 $0.84 $0.00 $12,845.65
0138 SEPARATOR FABRIC 325 5271 SY 123,563.000 123,563.000   34,365.610 $1.00 $0.00 $34,365.61
0139 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 13,632.000 13,632.000   0.000 $25.00 $0.00 $0.00
0140 PRIME COAT 408 5774 GAL 46,590.000 46,590.000   0.000 $1.45 $0.00 $0.00
0141 SUPERPAVE, TYPE S3(PG 64-22 OK) 411(B) 5945 TON 2,917.000 2,917.000   0.000 $65.60 $0.00 $0.00
0142 SUPERPAVE, TYPE S4(PG 64-22 OK) 411(C) 5960 TON 11,645.000 11,645.000 0.000 5,456.500 $63.95 $0.00 $348,943.18
0143 COLD MILLING PAVEMENT 412 5267 SY 9,415.000 9,415.000   4,708.000 $3.75 $0.00 $17,655.00
0144 RUMBLE STRIP-METHOD PCC-CON 413(C) 4868 LF 41,365.000 41,365.000   0.000 $0.26 $0.00 $0.00
0145 P.C.CONCRETE PAVEMENT(PLACEMENT) 414(A) 0210 SY 52,769.000 52,769.000   21,240.470 $5.00 $0.00 $106,202.35
0146 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(B) 5725 SY 61,193.000 61,193.000   0.000 $9.00 $0.00 $0.00
0147 P.C. CONCRETE FOR PAVEMENT 414(G) 5275 CY 36,374.000 36,374.000 0.000 6,423.000 $78.00 $0.00 $500,994.00
0148 APPROACH SLAB 504(A) 1304 SY 182.000 182.000 0.000 91.110 $308.85 $0.00 $28,139.32
0149 CONCRETE PARAPET 504(E) 1381 LF 77.700 77.700 0.000 38.890 $271.58 $0.00 $10,560.39
0150 24" R.C.PIPE CLASS III 613(A) 0492 LF 40.000 40.000   0.000 $98.36 $0.00 $0.00
0151 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 0450 LF 750.000 750.000   0.000 $3.20 $0.00 $0.00
0152 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 1096 LF 250.000 250.000   0.000 $3.20 $0.00 $0.00
0153 TYPE B6 CULVERT END TREATMENT 613(M) 7197 EA 2.000 2.000   0.000 $1,427.08 $0.00 $0.00
0154 OUTLET LATERAL HEADWALL 613(Q) 5946 EA 2.000 2.000   0.000 $213.16 $0.00 $0.00
0155 PIPE UNDERDRAIN COVER MAT'L. 613(U) 1100 CY 225.000 225.000   0.000 $30.54 $0.00 $0.00
0156 TRENCH EXCAVATION 613(V) 1180 CY 300.000 300.000   0.000 $4.88 $0.00 $0.00
0157 REMOVAL OF BRIDGE ITEMS 619(B) 2505 EA 2.000 2.000   1.000 $8,520.00 $0.00 $8,520.00
0158 REMOVAL OF CONCRETE PAVEMENT 619(B) 4727 SY 15,112.000 15,112.000   0.000 $2.10 $0.00 $0.00
0159 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY 619(B) 4763 SY 89,436.000 89,436.000   28,242.670 $1.62 $0.00 $45,753.13
0160 SAWING PAVEMENT 619(C) 0924 LF 6,000.000 6,000.000   0.000 $2.67 $0.00 $0.00
0161 GUARDRAIL BRIDGE CONNECTION-TYPE A 623(I) 8675 EA 6.000 6.000   0.000 $1,810.50 $0.00 $0.00
0162 REMOVE AND RECONSTRUCT GUARDRAIL 625(D) 1254 LF 2,931.000 2,931.000   0.000 $14.91 $0.00 $0.00
0163 (PL)REMOVE & RESET G.E.T. GUARD RAIL END SECTION 805(D) 8762 EA 9.000 9.000   0.000 $798.75 $0.00 $0.00
0164 DELINEATORS(TYPE 1, CODE 1) 853 9024 EA 73.000 73.000   0.000 $17.04 $0.00 $0.00
8001 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 0.000 2,767.540   0.000 $5.54 $0.00 $0.00
Subtotals For Category     0100/ROADWAY IMY-0040-5(386)207    $0.00 $1,680,098.66
Fed/State Project Number:    IMY-0040-5(386)207 Project:    21007(04) Category:    0301/TRAFFIC SIGNING AND STRIPING IMY-0040-5(386)207
0165 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 856(A) 8530 LF 42,366.000 42,366.000   0.000 $0.43 $0.00 $0.00
0166 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) 856(A) 8535 LF 13,152.000 13,152.000   0.000 $0.53 $0.00 $0.00
0167 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) 856(A) 8540 LF 1,600.000 1,600.000   0.000 $1.07 $0.00 $0.00
0168 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) 856(A) 8548 LF 600.000 600.000   0.000 $3.20 $0.00 $0.00
Subtotals For Category     0301/TRAFFIC SIGNING AND STRIPING IMY-0040-5(386)207    $0.00 $0.00
Fed/State Project Number:    IMY-0040-5(386)207 Project:    21007(04) Category:    0304/CABLE BARRIER IMY-0040-5(386)207
0169 CLASS AA CONCRETE 509(A) 0319 CY 103.000 103.000   0.000 $266.25 $0.00 $0.00
0170 HIGH-TENSION CABLE BARRIER(TL-4) 628(B) 5125 LF 10,545.000 10,545.000   0.000 $10.65 $0.00 $0.00
0171 END ANCHORS 628(C) 5110 EA 2.000 2.000   0.000 $1,171.50 $0.00 $0.00
0172 CABLE BARRIER TENSION METER 628(E) 5175 EA 1.000 1.000   0.000 $2,130.00 $0.00 $0.00
Subtotals For Category     0304/CABLE BARRIER IMY-0040-5(386)207    $0.00 $0.00
Subtotals For Project IMY-0040-5(386)207 /21007(04) $0.00 $1,680,098.66


Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    BRFY-NBIP(422) Project:    27034(04) Category:    0200/BRIDGE 'A' BRFY-NBIP(422)
0173 ELASTOMERIC BEARING PADS 507(C) 6282 EA 28.000 28.000   0.000 $1,597.50 $0.00 $0.00
0174 CLEANING AND PAINTING BRIDGE METAL RAIL 512 6280 LF 439.167 439.167   33.950 $67.90 $0.00 $2,305.21
0175 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   0.495 $31,950.00 $0.00 $15,815.25
0176 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   0.479 $95,850.00 $0.00 $45,912.15
0177 (PL)REPAIR BRIDGE ITEM (TYPE A) 540 4515 EA 1.000 1.000   0.000 $15,975.00 $0.00 $0.00
0178 (PL)REPAIR BRIDGE ITEM (TYPE B) 540 4525 EA 1.000 1.000   0.000 $15,975.00 $0.00 $0.00
Subtotals For Category     0200/BRIDGE 'A' BRFY-NBIP(422)    $0.00 $64,032.61
Subtotals For Project BRFY-NBIP(422) /27034(04) $0.00 $64,032.61