Contract ID: 110490   Estimate Number: 0006     Contract No: 710558
Residency: PERRY (04100)   Estimate Type: Progressive     Account No: 400400

Project Number(s): IMY-0035-4(244)186, SBR-152N(191)SB
Primary Job Piece No: 27909(04)
Contract Description: BRIDGE, APPROACHES, AND CABLE BARRIER I-35: OVER US-64 (FIR STREET) 1.0 MILE NORTH OF US-77 IN PERRY; AND OVER B.N.S.F. RAILROAD. PROJECT LENGTH = 0.740 MILES.
Primary County: NOBLE              
Name of Road: I-35              
Prime Contractor: MANHATTAN ROAD & BRIDGE COMPANY              
    5601 S. 122ND E. AVE.              
    TULSA , OK   74146              
Surety Company: FIDELITY & DEPOSIT INSURANCE COMPANY OF MARYLAND              

Date Let: 10/20/2011 NTP Effective Date: 02/06/2012 Pay Period: 05/01/2012  TO  05/15/2012
Date Awarded: 11/07/2011 Date Work Began: 02/06/2012 Original Contract Time: 300
Date Contract Executed: 11/17/2011 Date Time Stopped: Current Time Charged: 84.00
Date NTP Issued: 12/07/2011 Completion Date: Current Time Allowed: 330.00
General Liability Expires: 10/01/2012 Workman's Comp Expires: 10/01/2012 Percent Time Used: 25.45 %
Specification Year: 2009     Date Approved:

Current Contract Amount: $6,424,547.38 Total to Date Prev to Date This Estimate
Bid Amount: $6,254,011.33 Participating: $1,143,872.17 $635,084.20 $508,787.97
Percent Complete: 22.79 % Non Participating: $0.00 $0.00 $0.00
Funds Available: $4,960,095.80 Total Earnings: $1,143,872.17 $635,084.20 $508,787.97
Unearned Balance: $4,789,559.75 Stockpiled Materials: $320,579.41 $320,579.41 $0.00
Gross Earnings: $1,464,451.58 $955,663.61 $508,787.97
Other Adjustments: $0.00 $0.00 $0.00
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $1,464,451.58 $955,663.61 $508,787.97

Estimate Adjustment Detail

Contract ID: 110490   Estimate Number: 0006     Primary JP: 27909(04)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 SHOULDER RECONSTRUCTION, CL.C BRIDGE DECK REPAIRS, 30 DAYS Approved 05/08/2012 30.0 $164,536.05
002 CORRECTIONS TO PLAN GUARDRAIL AND DELINEATOR ITEMS Approved 05/08/2012 0.0 $6,000.00


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
27909(04) 0047 Prestr.Concrete Beams - Bridge A - stockpile Stockpiled Material Initial Payment 0004 $134,605.80
27909(04) 0058 Br.A Black Reinf.Steel Stockpiled Material Initial Payment 0002 $648.44
27909(04) 0059 Br.A Epoxy R-Steel Stockpiled Material Initial Payment 0002 $12,588.83
27909(04) 0063 Br.A Drilled Shaft R-Steel Stockpiled Material Initial Payment 0002 $13,710.12
27909(04) 0072 Prestr.Concrete Beams - Bridge B - stockpile Stockpiled Material Initial Payment 0005 $134,605.80
27909(04) 0083 Br.B Black Reinf.Steel Stockpiled Material Initial Payment 0002 $648.44
27909(04) 0084 Br.B Epoxy R-Steel Stockpiled Material Initial Payment 0002 $10,061.86
27909(04) 0088 Br.B Drilled Shaft R-Steel Stockpiled Material Initial Payment 0002 $13,710.12
Subtotals For Stockpile Payments $320,579.41


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.
Subtotals For Liquidated Damages $


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
No line item adjustments have been created on this contract.
Subtotals For Line Item Adjustments $0.00


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
01 TIME 'B' BID NOT ENTERED NOT ENTERED 240.00 DAYS $5,000.00 N


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
No milestones adjustments exist for this contract.
Subtotals For Milestones $

Line Item Detail

Contract ID: 110490   Estimate Number: 0006     Primary JP: 27909(04)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    IMY-0035-4(244)186 Project:    27909(04) Category:    0100/ROADWAY - IMY-35-4(244)186
0001 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 7,226.000 7,226.000 1,428.540 1,584.890 $11.50 $16,428.21 $18,226.24
0002 UNCLASSIFIED BORROW 202(D) 0184 CY 1,716.000 1,716.000 1,428.540 3,144.540 $20.00 $28,570.80 $62,890.80
0003 TYPE A-SALVAGED TOPSOIL 205(A) 4229 LSUM 1.000 1.000 0.000 0.200 $16,250.00 $0.00 $3,250.00
0004 TEMPORARY SILT FENCE 221(C) 2801 LF 5,127.000 5,127.000   4,841.000 $2.25 $0.00 $10,892.25
0005 TEMPORARY SILT DIKE 221(F) 0100 LF 84.000 84.000 0.000 27.000 $8.00 $0.00 $216.00
0006 SOLID SLAB SODDING 230(A) 2806 SY 16,666.000 16,666.000   0.000 $1.70 $0.00 $0.00
0007 SEEDING METHOD A 232(A) 2813 AC 3.450 3.450   0.000 $525.00 $0.00 $0.00
0008 VEGETATIVE MULCHING 233(A) 2817 AC 3.450 3.450   0.000 $525.00 $0.00 $0.00
0009 MOWING 241 2832 AC 7.000 7.000   0.000 $77.50 $0.00 $0.00
0010 AGGREGATE BASE TYPE A 303(A) 2100 CY 2,894.000 2,894.000   0.000 $60.00 $0.00 $0.00
0011 SUBGRADE, METHOD B 310(B) 0149 SY 19,019.000 19,019.000 426.660 7,888.880 $2.50 $1,066.65 $19,722.20
0012 SEPARATOR FABRIC 325 5271 SY 8,021.000 8,021.000   0.000 $1.50 $0.00 $0.00
0013 GEOGRID REINFORCEMENT 326(B) 0100 SY 9,148.000 9,148.000   0.000 $2.50 $0.00 $0.00
0014 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 2,621.000 2,621.000   0.000 $30.00 $0.00 $0.00
0015 SUPERPAVE, TYPE S3(PG 76-28 OK) 411(B) 5935 TON 810.000 810.000   0.000 $81.50 $0.00 $0.00
0016 SUPERPAVE, TYPE S3(PG 64-22 OK) 411(B) 5945 TON 8,377.000 6,809.000 0.000 771.580 $78.50 $0.00 $60,569.03
0017 SUPERPAVE, TYPE S4(PG 76-28 OK) 411(C) 5950 TON 2,667.000 2,667.000   0.000 $103.00 $0.00 $0.00
0018 SUPERPAVE, TYPE S4(PG 64-22 OK) 411(C) 5960 TON 1,804.000 1,356.000   116.910 $82.75 $0.00 $9,674.30
0019 COLD MILLING PAVEMENT 412 5267 SY 20,098.000 20,098.000   4,167.180 $1.85 $0.00 $7,709.29
0020 RUMBLE STRIP-METHOD HMA-CON 413(A) 4861 LF 3,760.000 3,760.000   0.000 $1.75 $0.00 $0.00
0021 GRANULAR BACKFILL 501(F) 6352 CY 266.000 266.000   0.000 $62.50 $0.00 $0.00
0022 CLASS C CONCRETE 509(D) 0325 CY 34.620 34.620   0.000 $425.00 $0.00 $0.00
0023 1'-8" COMB. CURB & GUTTER (6" BARRIER) 609(B) 1513 LF 396.000 396.000   0.000 $26.25 $0.00 $0.00
0024 6" CONCRETE DIVIDING STRIP 610(C) 0609 SY 797.000 797.000   0.000 $40.50 $0.00 $0.00
0025 INLET (SMD-TYPE 1) 611(G) 6000 EA 2.000 2.000   0.000 $1,500.00 $0.00 $0.00
0026 18" R.C.PIPE CLASS III 613(A) 0491 LF 759.000 759.000 8.000 616.000 $50.00 $400.00 $30,800.00
0027 34" X 53" R.C.PIPE ELLIPTICAL CLASS HE-III 613(A) 4507 LF 233.000 233.000   0.000 $225.00 $0.00 $0.00
0028 43" X 68" R.C.PIPE ELLIPTICAL CLASS HE-III 613(A) 4509 LF 226.000 226.000   0.000 $325.00 $0.00 $0.00
0029 18" CORR. GALV. STEEL PIPE 613(B) 0689 LF 84.000 84.000   0.000 $60.00 $0.00 $0.00
0030 TYPE B6 CULVERT END TREATMENT 613(M) 7197 EA 2.000 2.000 2.000 2.000 $800.00 $1,600.00 $1,600.00
0031 SPECIAL END SECTION OF 18" RCP ROUND 613(O) 4373 EA 1.000 1.000   0.000 $750.00 $0.00 $0.00
0032 SPECIAL END SECTION OF 43" X 68" RCP ELLIPTICAL 613(O) 5101 EA 2.000 2.000   0.000 $2,600.00 $0.00 $0.00
0033 SPECIAL END SECTION OF 34" X 53" RCP ELLIPTICAL 613(O) 5155 EA 2.000 2.000   0.000 $2,200.00 $0.00 $0.00
0034 18" GALV. STEEL CULVERT END SECTION ROUND 613(P) 0760 EA 1.000 1.000   0.000 $500.00 $0.00 $0.00
0035 REMOVAL OF STRUCTURES & OBSTRUCTIONS 619(A) 0920 LSUM 1.000 1.000   0.000 $25,000.00 $0.00 $0.00
0036 REMOVAL OF CURB AND GUTTER 619(B) 4726 LF 396.000 396.000 420.000 852.000 $8.00 $3,360.00 $6,816.00
0037 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 8,876.000 8,876.000 133.890 1,924.420 $3.75 $502.09 $7,216.58
0038 REMOVAL OF GUARDRAIL 619(B) 4780 LF 1,708.000 1,708.000   657.000 $3.00 $0.00 $1,971.00
0039 SAWING PAVEMENT 619(C) 0924 LF 152.000 152.000 0.000 5,335.940 $3.50 $0.00 $18,675.79
0040 BEAM GUARDRAIL W-BEAM SINGLE 623(A) 0932 LF 1,050.000 1,050.000   0.000 $20.00 $0.00 $0.00
0041 GUARDRAIL END TREATMENT (GET) 623(G) 8571 EA 4.000 4.000   0.000 $2,550.00 $0.00 $0.00
0042 GUARDRAIL BRIDGE CONNECTION-TYPE B 623(I) 8680 EA 4.000 0.000   0.000 $600.00 $0.00 $0.00
0043 (PL)REMOVAL OF EXISTING SIGNS 805(A) 8724 EA 5.000 5.000   0.000 $105.09 $0.00 $0.00
8000 FULL DEPTH P.C.C. PATCH(PLACEMENT ONLY) 414(E) 0225 SY 0.000 2,815.000 3,330.080 3,330.080 $13.51 $44,989.38 $44,989.38
8001 P.C. CONCRETE FOR PAVEMENT 414(G) 5275 CY 0.000 545.000 824.000 824.000 $109.87 $90,532.88 $90,532.88
8006 GUARDRAIL BRIDGE CONNECTION-TYPE A 623(I) 8675 EA 0.000 4.000   0.000 $2,100.00 $0.00 $0.00
8007 GUARDRAIL DELINEATORS(TYPE 1, CODE 1) 853 9066 EA 0.000 21.000   0.000 $14.71 $0.00 $0.00
Subtotals For Category     0100/ROADWAY - IMY-35-4(244)186    $187,450.01 $395,751.74
Fed/State Project Number:    IMY-0035-4(244)186 Project:    27909(04) Category:    0200/BRIDGE "A" - IMY-35-4(244)186
0044 SUBSTRUCTURE EXCAVATION COMMON 501(B) 1307 CY 100.000 100.000   0.000 $50.00 $0.00 $0.00
0045 GRANULAR BACKFILL 501(F) 6352 CY 66.000 66.000   0.000 $75.00 $0.00 $0.00
0046 CLSM BACKFILL 501(G) 6309 CY 80.000 80.000   0.000 $125.00 $0.00 $0.00
0047 PRESTRESSED CONCRETE BEAMS (TYPE II) 503(A) 1311 LF 1,068.300 1,068.300   0.000 $185.00 $0.00 $0.00
0048 APPROACH SLAB 504(A) 1304 SY 364.400 364.400   0.000 $200.00 $0.00 $0.00
0049 SAW-CUT GROOVING 504(B) 1305 SY 1,247.700 1,247.700   0.000 $5.00 $0.00 $0.00
0050 42" F-SHAPED PARAPET 504(E) 6190 LF 591.000 591.000   0.000 $70.00 $0.00 $0.00
0051 STRUCTURAL STEEL 506(A) 1322 LB 1,500.000 1,500.000   0.000 $3.50 $0.00 $0.00
0052 WEATHERING STEEL FIXED BEARING ASSEMBLY 507(A) 6172 EA 10.000 10.000   0.000 $500.00 $0.00 $0.00
0053 STAINLESS STEEL EXPANSION BEARING ASSEMBLY 507(B) 6174 EA 30.000 30.000   0.000 $2,500.00 $0.00 $0.00
0054 ELASTOMERIC BEARING PADS 507(C) 6282 EA 30.000 30.000   0.000 $350.00 $0.00 $0.00
0055 CLASS AA CONCRETE 509(A) 1326 CY 311.800 311.800   0.000 $550.00 $0.00 $0.00
0056 CLASS A CONCRETE 509(B) 1328 CY 162.900 162.900   0.000 $550.00 $0.00 $0.00
0057 SLOPE WALL (5") 510(C) 6138 SY 2,220.000 2,220.000   0.000 $72.00 $0.00 $0.00
0058 REINFORCING STEEL 511(A) 1332 LB 1,260.000 1,260.000   0.000 $1.25 $0.00 $0.00
0059 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 87,560.000 87,560.000   0.000 $1.00 $0.00 $0.00
0060 PILES, FURNISHED (HP 10X42) 514(A) 6010 LF 396.000 396.000   0.000 $35.00 $0.00 $0.00
0061 PILES, DRIVEN (HP 10X42) 514(B) 6292 LF 396.000 396.000   0.000 $15.00 $0.00 $0.00
0062 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 1,091.000 1,091.000   0.000 $4.00 $0.00 $0.00
0063 DRILLED SHAFTS 54" DIAMETER 516(A) 6095 LF 258.000 258.000   0.000 $550.00 $0.00 $0.00
0064 SEALER CRACK PREPARATION 523(A) 6550 LF 246.000 246.000   0.000 $5.00 $0.00 $0.00
0065 SEALER RESIN 523(B) 6560 GAL 5.000 5.000   0.000 $250.00 $0.00 $0.00
0066 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 6204 LF 631.000 631.000   0.000 $17.50 $0.00 $0.00
0067 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 6207 LF 72.000 72.000   0.000 $17.50 $0.00 $0.00
0068 REMOVAL OF EXISTING BRIDGE STRUCTURE 619(D) 1397 LSUM 1.000 1.000   0.000 $107,500.00 $0.00 $0.00
Subtotals For Category     0200/BRIDGE "A" - IMY-35-4(244)186    $0.00 $0.00
Fed/State Project Number:    IMY-0035-4(244)186 Project:    27909(04) Category:    0210/BRIDGE "B" - IMY-35-4(244)186
0069 SUBSTRUCTURE EXCAVATION COMMON 501(B) 1307 CY 100.000 100.000   0.000 $50.00 $0.00 $0.00
0070 GRANULAR BACKFILL 501(F) 6352 CY 66.000 66.000   0.000 $75.00 $0.00 $0.00
0071 CLSM BACKFILL 501(G) 6309 CY 80.000 80.000   0.000 $125.00 $0.00 $0.00
0072 PRESTRESSED CONCRETE BEAMS (TYPE II) 503(A) 1311 LF 1,068.300 1,068.300   0.000 $185.00 $0.00 $0.00
0073 APPROACH SLAB 504(A) 1304 SY 364.400 364.400   0.000 $200.00 $0.00 $0.00
0074 SAW-CUT GROOVING 504(B) 1305 SY 1,247.700 1,247.700   0.000 $5.00 $0.00 $0.00
0075 42" F-SHAPED PARAPET 504(E) 6190 LF 591.000 591.000   0.000 $70.00 $0.00 $0.00
0076 STRUCTURAL STEEL 506(A) 1322 LB 1,500.000 1,500.000   0.000 $3.50 $0.00 $0.00
0077 WEATHERING STEEL FIXED BEARING ASSEMBLY 507(A) 6172 EA 10.000 10.000   0.000 $500.00 $0.00 $0.00
0078 STAINLESS STEEL EXPANSION BEARING ASSEMBLY 507(B) 6174 EA 30.000 30.000   0.000 $2,500.00 $0.00 $0.00
0079 ELASTOMERIC BEARING PADS 507(C) 6282 EA 30.000 30.000   0.000 $350.00 $0.00 $0.00
0080 CLASS AA CONCRETE 509(A) 1326 CY 311.800 311.800   0.000 $550.00 $0.00 $0.00
0081 CLASS A CONCRETE 509(B) 1328 CY 162.900 162.900   0.000 $550.00 $0.00 $0.00
0082 SLOPE WALL (5") 510(C) 6138 SY 2,714.000 2,714.000   0.000 $72.00 $0.00 $0.00
0083 REINFORCING STEEL 511(A) 1332 LB 1,260.000 1,260.000   0.000 $1.50 $0.00 $0.00
0084 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 87,450.000 87,450.000   0.000 $1.00 $0.00 $0.00
0085 PILES, FURNISHED (HP 10X42) 514(A) 6010 LF 438.000 438.000   0.000 $35.00 $0.00 $0.00
0086 PILES, DRIVEN (HP 10X42) 514(B) 6292 LF 438.000 438.000   0.000 $15.00 $0.00 $0.00
0087 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 1,091.000 1,091.000   0.000 $4.00 $0.00 $0.00
0088 DRILLED SHAFTS 54" DIAMETER 516(A) 6095 LF 258.000 258.000   0.000 $550.00 $0.00 $0.00
0089 SEALER CRACK PREPARATION 523(A) 6550 LF 246.000 246.000   0.000 $5.00 $0.00 $0.00
0090 SEALER RESIN 523(B) 6560 GAL 5.000 5.000   0.000 $250.00 $0.00 $0.00
0091 6" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 6204 LF 666.000 666.000   0.000 $17.50 $0.00 $0.00
0092 6" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 6207 LF 72.000 72.000   0.000 $17.50 $0.00 $0.00
0093 REMOVAL OF EXISTING BRIDGE STRUCTURE 619(D) 1397 LSUM 1.000 1.000   0.000 $107,500.00 $0.00 $0.00
8002 CLASS C BRIDGE DECK REPAIR 513(C) 6020 SY 0.000 190.000 225.580 225.580 $624.75 $140,931.11 $140,931.11
Subtotals For Category     0210/BRIDGE "B" - IMY-35-4(244)186    $140,931.11 $140,931.11
Fed/State Project Number:    IMY-0035-4(244)186 Project:    27909(04) Category:    0300/TRAFFIC CONTROL - IMY-35-4(244)186
0094 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 857(A) 8839 LF 41,211.000 41,211.000   8,065.000 $0.08 $0.00 $645.20
0095 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 857(E) 8887 EA 5,115.000 5,115.000   0.000 $0.53 $0.00 $0.00
0096 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 857(F) 8006 LF 15,000.000 15,000.000   1,307.500 $0.11 $0.00 $143.83
0097 (PL)TRUCK MOUNTED ATTENUATOR 876(A) 8482 SD 420.000 420.000 15.000 115.000 $2.63 $39.45 $302.45
0098 DELIVER PORTABLE LONGITUDINAL BARRIER 877(B) 8484 LF 4,400.000 4,400.000   1,992.800 $30.00 $0.00 $59,784.00
0099 RELOCATION OF PORTABLE LONGITUDINAL BARRIER 877(C) 8486 LF 5,275.000 5,275.000   300.000 $2.75 $0.00 $825.00
0100 MODULAR GLARE SCREEN (TEMPORARY) 878(B) 8487 SD 56,700.000 56,700.000   0.000 $0.05 $0.00 $0.00
0101 ARROW DISPLAY(TYPE C) 880(A) 8812 SD 780.000 780.000 30.000 200.000 $5.25 $157.50 $1,050.00
0102 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 8,100.000 8,100.000 712.000 5,069.000 $0.16 $113.92 $811.04
0103 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 13,740.000 13,740.000 302.000 2,440.000 $0.26 $78.52 $634.40
0104 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 14,805.000 14,805.000 554.000 3,773.000 $2.63 $1,457.02 $9,922.99
0105 CONSTRUCTION BARRICADES(TYPE III) 880(C) 8842 SD 8,805.000 8,805.000 120.000 1,062.000 $0.05 $6.00 $53.10
0106 WING BARRICADES 880(C) 8848 SD 1,380.000 1,380.000 120.000 800.000 $1.05 $126.00 $840.00
0107 VERTICAL PANELS 880(D) 8854 SD 735.000 735.000   0.000 $1.05 $0.00 $0.00
0108 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 17,520.000 17,520.000 734.000 5,390.000 $0.05 $36.70 $269.50
0109 DRUMS 880(F) 8878 SD 103,635.000 103,635.000 3,397.000 27,330.000 $0.03 $101.91 $819.90
0110 TRAFFIC SURVEILLANCE, POLICE 880(L) 8911 HOUR 1,500.000 1,500.000   553.750 $55.50 $0.00 $30,733.13
0111 PORT.CHANGEABLE MESSAGE SIGN 882(A) 8306 SD 1,140.000 1,140.000 30.000 200.000 $10.51 $315.30 $2,102.00
Subtotals For Category     0300/TRAFFIC CONTROL - IMY-35-4(244)186    $2,432.32 $108,936.54
Fed/State Project Number:    IMY-0035-4(244)186 Project:    27909(04) Category:    0304/CABLE BARRIER - IMY-35-4(244)186
0112 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 125.000 125.000   0.000 $67.25 $0.00 $0.00
0113 CLASS AA CONCRETE 509(A) 0319 CY 24.540 24.540   2.830 $275.00 $0.00 $778.25
0114 REMOVAL OF CABLE BARRIER 619(B) 5190 LF 2,135.000 2,135.000   2,125.000 $6.00 $0.00 $12,750.00
0115 HIGH-TENSION CABLE BARRIER(TL-4) 628(B) 5125 LF 3,002.000 3,002.000   0.000 $11.00 $0.00 $0.00
0116 END ANCHORS 628(C) 5110 EA 9.000 9.000   1.000 $1,250.00 $0.00 $1,250.00
Subtotals For Category     0304/CABLE BARRIER - IMY-35-4(244)186    $0.00 $14,778.25
Fed/State Project Number:    IMY-0035-4(244)186 Project:    27909(04) Category:    0310/SIGNING AND STRIPING - IMY-35-4(244)186
0117 SHEET ALUMINUM SIGNS 850(A) 8110 SF 52.000 52.000   0.000 $14.71 $0.00 $0.00
0118 2" SQUARE TUBE POST 851(C) 8324 LF 94.000 94.000   0.000 $10.51 $0.00 $0.00
0119 DELINEATORS(TYPE 1, CODE 1) 853 9024 EA 21.000 0.000   0.000 $14.71 $0.00 $0.00
0120 TRAFFIC STRIPE(PLASTIC)(4" WIDE) 855(A) 8812 LF 21,040.000 21,040.000   0.000 $0.47 $0.00 $0.00
0121 TRAFFIC STRIPE(PLASTIC)(6" WIDE) 855(A) 8813 LF 2,931.000 2,931.000   0.000 $0.58 $0.00 $0.00
0122 TRAFFIC STRIPE(PLASTIC)(8" WIDE) 855(A) 8814 LF 1,754.000 1,754.000   0.000 $1.05 $0.00 $0.00
0123 TRAFFIC STRIPE(PLASTIC)(12" WIDE) 855(A) 8818 LF 917.000 917.000   0.000 $3.15 $0.00 $0.00
0124 TUBE CHANNELIZERS 880(G) 8900 EA 50.000 50.000   0.000 $26.27 $0.00 $0.00
Subtotals For Category     0310/SIGNING AND STRIPING - IMY-35-4(244)186    $0.00 $0.00
Fed/State Project Number:    IMY-0035-4(244)186 Project:    27909(04) Category:    0600/STAKING - IMY-35-4(244)186
0125 CONSTRUCTION STAKING LEVEL II 642(B) 0096 LSUM 1.000 1.000   0.250 $20,000.00 $0.00 $5,000.00
Subtotals For Category     0600/STAKING - IMY-35-4(244)186    $0.00 $5,000.00
Fed/State Project Number:    IMY-0035-4(244)186 Project:    27909(04) Category:    0640/CONSTRUCTION - IMY-35-4(244)186
0126 SWPPP DOCUMENTATION AND MANAGEMENT 220 2800 LSUM 1.000 1.000   0.100 $5,000.00 $0.00 $500.00
0127 MOBILIZATION 641 1552 LSUM 1.000 1.000   1.000 $300,000.00 $0.00 $300,000.00
8005 MOBILIZATION 641 1552 LSUM 0.000 1.000 1.000 1.000 $5,000.00 $5,000.00 $5,000.00
Subtotals For Category     0640/CONSTRUCTION - IMY-35-4(244)186    $5,000.00 $305,500.00
Subtotals For Project IMY-0035-4(244)186 /27909(04) $335,813.44 $970,897.64


Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    SBR-152N(191)SB Project:    28310(04) Category:    0100/ROADWAY - SBR-152N(191)SB
0128 TEMPORARY SILT FENCE 221(C) 2801 LF 1,000.000 1,000.000   0.000 $2.50 $0.00 $0.00
0129 FOG SEAL 407(A) 4659 GAL 26.000 26.000   0.000 $40.00 $0.00 $0.00
0130 TACK COAT 407(B) 0250 GAL 95.000 95.000   0.000 $12.00 $0.00 $0.00
0131 SUPERPAVE, TYPE S4(PG 70-28 OK) 411(C) 5955 TON 213.000 0.000   0.000 $150.00 $0.00 $0.00
0132 COLD MILLING PAVEMENT 412 5267 SY 1,267.000 1,267.000   0.000 $7.50 $0.00 $0.00
0133 CLASS C CONCRETE 509(D) 0325 CY 14.100 14.100   0.000 $500.00 $0.00 $0.00
0134 REMOVAL OF GUARDRAIL 619(B) 4780 LF 900.000 900.000   0.000 $3.00 $0.00 $0.00
0135 (PL)GUARDRAIL CURBING 623 0100 EA 4.000 4.000   0.000 $1,200.00 $0.00 $0.00
0136 BEAM GUARDRAIL W-BEAM SINGLE 623(A) 0932 LF 325.000 325.000   0.000 $20.00 $0.00 $0.00
0137 GUARDRAIL ANCHOR UNIT (TYPE B) 623(F) 4447 EA 3.000 3.000   0.000 $600.00 $0.00 $0.00
0138 GUARDRAIL BRIDGE CONNECTION-TYPE A 623(I) 8675 EA 8.000 8.000   0.000 $2,100.00 $0.00 $0.00
0139 FENCE-STYLE CLF (8'HIGH, CLASS A) 624(E) 4294 LF 538.000 538.000   0.000 $60.00 $0.00 $0.00
8004 SUPERPAVE, TYPE S4(PG 76-28 OK) 411(C) 5950 TON 0.000 213.000   0.000 $150.00 $0.00 $0.00
Subtotals For Category     0100/ROADWAY - SBR-152N(191)SB    $0.00 $0.00
Fed/State Project Number:    SBR-152N(191)SB Project:    28310(04) Category:    0200/BRIDGE 'A' - SBR-152N(191)SB
0140 APPROACH SLAB 504(A) 1304 SY 219.000 219.000   0.000 $170.00 $0.00 $0.00
0141 SAW-CUT GROOVING 504(B) 1305 SY 764.300 764.300   0.000 $5.00 $0.00 $0.00
0142 SEALED EXPANSION JOINT 504(C) 6250 LF 84.000 84.000   0.000 $255.00 $0.00 $0.00
0143 42" F-SHAPED PARAPET 504(E) 6190 LF 362.200 362.200   0.000 $70.00 $0.00 $0.00
0144 STRUCTURAL STEEL 506(A) 1322 LB 500.000 500.000   0.000 $10.00 $0.00 $0.00
0145 CLASS AA CONCRETE 509(A) 1326 CY 137.400 137.400   0.000 $600.00 $0.00 $0.00
0146 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 41,777.000 41,777.000   0.000 $1.00 $0.00 $0.00
0147 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   0.000 $10,000.00 $0.00 $0.00
0148 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   0.000 $500.00 $0.00 $0.00
0149 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 276.000 276.000   0.000 $4.00 $0.00 $0.00
0150 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 55.000 55.000   0.000 $75.00 $0.00 $0.00
0151 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 2.100 2.100   0.000 $500.00 $0.00 $0.00
0152 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 1.000 1.000   0.000 $2,500.00 $0.00 $0.00
0153 SEALER CRACK PREPARATION 523(A) 6550 LF 84.000 84.000   0.000 $5.00 $0.00 $0.00
0154 SEALER RESIN 523(B) 6560 GAL 1.000 1.000   0.000 $250.00 $0.00 $0.00
0155 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   0.000 $175,000.00 $0.00 $0.00
Subtotals For Category     0200/BRIDGE 'A' - SBR-152N(191)SB    $0.00 $0.00
Fed/State Project Number:    SBR-152N(191)SB Project:    28310(04) Category:    0201/BRIDGE 'B' -SBR-152N(191)SB
0156 APPROACH SLAB 504(A) 1304 SY 219.000 219.000   0.000 $170.00 $0.00 $0.00
0157 SAW-CUT GROOVING 504(B) 1305 SY 764.300 764.300   0.000 $5.00 $0.00 $0.00
0158 SEALED EXPANSION JOINT 504(C) 6250 LF 84.000 84.000   0.000 $255.00 $0.00 $0.00
0159 42" F-SHAPED PARAPET 504(E) 6190 LF 362.200 362.200   0.000 $72.00 $0.00 $0.00
0160 STRUCTURAL STEEL 506(A) 1322 LB 500.000 500.000   0.000 $10.00 $0.00 $0.00
0161 CLASS AA CONCRETE 509(A) 1326 CY 137.400 137.400   0.000 $600.00 $0.00 $0.00
0162 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 41,777.000 41,777.000   0.000 $1.00 $0.00 $0.00
0163 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   0.000 $10,000.00 $0.00 $0.00
0164 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   0.000 $500.00 $0.00 $0.00
0165 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 276.000 276.000   0.000 $4.00 $0.00 $0.00
0166 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 95.000 95.000   0.000 $55.00 $0.00 $0.00
0167 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 3.700 3.700   0.000 $250.00 $0.00 $0.00
0168 SEALER CRACK PREPARATION 523(A) 6550 LF 84.000 84.000   0.000 $5.00 $0.00 $0.00
0169 SEALER RESIN 523(B) 6560 GAL 1.000 1.000   0.000 $250.00 $0.00 $0.00
0170 (PL)REPAIR BRIDGE ITEM (TYPE A) 540 4515 EA 1.000 1.000   0.000 $6,000.00 $0.00 $0.00
0171 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   0.000 $175,000.00 $0.00 $0.00
8003 CLASS C BRIDGE DECK REPAIR 513(C) 6020 SY 0.000 165.000 276.870 276.870 $624.75 $172,974.53 $172,974.53
Subtotals For Category     0201/BRIDGE 'B' -SBR-152N(191)SB    $172,974.53 $172,974.53
Fed/State Project Number:    SBR-152N(191)SB Project:    28310(04) Category:    0600/STAKING - SBR-152N(191)SB
0172 CONSTRUCTION STAKING LEVEL I 642(A) 0095 LSUM 1.000 1.000   0.000 $15,000.00 $0.00 $0.00
Subtotals For Category     0600/STAKING - SBR-152N(191)SB    $0.00 $0.00
Subtotals For Project SBR-152N(191)SB /28310(04) $172,974.53 $172,974.53