Fed/State Project Number: BRFY-102C(093) |
Project: 23272(04) |
Category: 0100/ROADWAY |
0001 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
8,618.000 |
8,618.000 |
-1,129.940 |
5,231.780 |
$3.30 |
$-3,728.80 |
$17,264.87 |
0002 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
57,497.000 |
57,497.000 |
12,590.290 |
70,087.290 |
$6.00 |
$75,541.74 |
$420,523.74 |
0003 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.100 |
1.000 |
$22,000.00 |
$2,200.00 |
$22,000.00 |
0004 |
OBLITERATING ABANDONED ROAD |
210 0121 |
LF |
1,830.000 |
1,830.000 |
|
1,730.000 |
$11.00 |
$0.00 |
$19,030.00 |
0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
1,011.000 |
1,011.000 |
|
1,523.000 |
$1.40 |
$0.00 |
$2,132.20 |
0006 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
273.000 |
273.000 |
|
84.000 |
$7.70 |
$0.00 |
$646.80 |
0007 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
85,373.000 |
85,373.000 |
|
0.000 |
$1.24 |
$0.00 |
$0.00 |
0008 |
SEEDING METHOD A |
232(A) 2813 |
AC |
15.570 |
15.570 |
|
0.000 |
$756.00 |
$0.00 |
$0.00 |
0009 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
15.570 |
15.570 |
|
0.000 |
$550.00 |
$0.00 |
$0.00 |
0010 |
MOWING |
241 2832 |
AC |
31.140 |
31.140 |
|
0.000 |
$65.00 |
$0.00 |
$0.00 |
0011 |
FLY ASH |
307(A) 4200 |
TON |
764.000 |
764.000 |
|
788.880 |
$65.00 |
$0.00 |
$51,277.20 |
0012 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
15,159.000 |
15,159.000 |
0.000 |
16,116.410 |
$2.00 |
$0.00 |
$32,232.82 |
0013 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
269.000 |
269.000 |
|
275.670 |
$38.00 |
$0.00 |
$10,475.46 |
0014 |
TACK COAT |
407(B) 0250 |
GAL |
3,887.000 |
3,887.000 |
|
2,025.000 |
$4.00 |
$0.00 |
$8,100.00 |
0015 |
PRIME COAT |
408 5774 |
GAL |
2,890.000 |
2,890.000 |
|
3,019.220 |
$6.50 |
$0.00 |
$19,624.93 |
0016 |
FABRIC REINFORCEMENT |
409(A) 4242 |
SY |
1,512.000 |
1,512.000 |
|
686.420 |
$3.05 |
$0.00 |
$2,093.58 |
0017 |
BITUMINOUS BINDER |
409(B) 4268 |
GAL |
378.000 |
378.000 |
|
0.000 |
$12.00 |
$0.00 |
$0.00 |
0018 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
7,822.000 |
7,822.000 |
0.000 |
7,637.550 |
$95.00 |
$0.00 |
$725,567.25 |
0019 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
2,572.000 |
2,572.000 |
0.000 |
2,463.540 |
$108.00 |
$0.00 |
$266,062.32 |
0020 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
1,238.000 |
1,238.000 |
|
1,333.330 |
$6.00 |
$0.00 |
$7,999.98 |
0021 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
62.000 |
62.000 |
|
61.710 |
$8.00 |
$0.00 |
$493.68 |
0022 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
184.000 |
184.000 |
|
199.360 |
$350.00 |
$0.00 |
$69,776.00 |
0023 |
REINFORCING STEEL |
511(A) 0332 |
LB |
26,210.000 |
26,210.000 |
|
26,429.000 |
$0.90 |
$0.00 |
$23,786.10 |
0024 |
TYPE I PLAIN RIPRAP |
601(A) 0297 |
TON |
15.000 |
15.000 |
|
0.000 |
$55.00 |
$0.00 |
$0.00 |
0025 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
629.000 |
629.000 |
-109.000 |
479.000 |
$20.00 |
$-2,180.00 |
$9,580.00 |
0026 |
8" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 0500 |
LF |
320.000 |
320.000 |
|
0.000 |
$10.00 |
$0.00 |
$0.00 |
0027 |
8" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1097 |
LF |
106.000 |
106.000 |
|
0.000 |
$10.00 |
$0.00 |
$0.00 |
0028 |
TYPE A6 CULVERT END TREATMENT |
613(M) 7196 |
EA |
14.000 |
14.000 |
0.000 |
4.000 |
$1,100.00 |
$0.00 |
$4,400.00 |
0029 |
OUTLET LATERAL HEADWALL |
613(Q) 5946 |
EA |
2.000 |
2.000 |
|
0.000 |
$400.00 |
$0.00 |
$0.00 |
0030 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$5,000.00 |
$0.00 |
$5,000.00 |
0031 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
14,632.000 |
14,632.000 |
|
7,263.210 |
$4.00 |
$0.00 |
$29,052.84 |
0032 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
1,897.000 |
1,897.000 |
|
1,898.000 |
$1.00 |
$0.00 |
$1,898.00 |
0033 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
3,300.000 |
3,300.000 |
|
3,278.000 |
$4.00 |
$0.00 |
$13,112.00 |
0034 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
1,275.000 |
1,275.000 |
|
1,087.500 |
$16.00 |
$0.00 |
$17,400.00 |
0035 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
4.000 |
4.000 |
|
4.000 |
$2,100.00 |
$0.00 |
$8,400.00 |
0036 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
4.000 |
4.000 |
|
4.000 |
$1,450.00 |
$0.00 |
$5,800.00 |
0037 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
1,304.000 |
1,304.000 |
|
1,308.000 |
$4.00 |
$0.00 |
$5,232.00 |
0038 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
1.000 |
1.000 |
|
1.000 |
$100.00 |
$0.00 |
$100.00 |
0039 |
MAILBOX |
629(C) 4960 |
EA |
1.000 |
1.000 |
|
1.000 |
$40.00 |
$0.00 |
$40.00 |
0040 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
1.000 |
1.000 |
|
1.000 |
$25.00 |
$0.00 |
$25.00 |
8001 |
WING BARRICADES |
880(C) 8848 |
SD |
0.000 |
1,200.000 |
|
72.000 |
$2.20 |
$0.00 |
$158.40 |
Subtotals For Category 0100/ROADWAY |
$71,832.94 |
$1,799,285.17 |
|
Fed/State Project Number: BRFY-102C(093) |
Project: 23272(04) |
Category: 0200/BRIDGE 'A' |
0041 |
UNCLASSIFIED EXCAVATION |
202(A) 1301 |
CY |
5,630.000 |
5,630.000 |
|
5,630.000 |
$3.30 |
$0.00 |
$18,579.00 |
0042 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
180.000 |
180.000 |
|
180.000 |
$7.00 |
$0.00 |
$1,260.00 |
0043 |
CLSM BACKFILL |
501(G) 6309 |
CY |
206.000 |
206.000 |
|
206.000 |
$150.00 |
$0.00 |
$30,900.00 |
0044 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) |
503(A) 1313 |
LF |
1,995.000 |
1,995.000 |
|
1,995.000 |
$190.00 |
$0.00 |
$379,050.00 |
0045 |
APPROACH SLAB |
504(A) 1304 |
SY |
281.200 |
281.200 |
0.000 |
281.200 |
$155.00 |
$0.00 |
$43,586.00 |
0046 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
2,496.000 |
2,496.000 |
|
2,496.000 |
$4.00 |
$0.00 |
$9,984.00 |
0047 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
86.400 |
86.400 |
|
86.400 |
$275.00 |
$0.00 |
$23,760.00 |
0048 |
CONCRETE RAIL (TR4) |
504(D) 6245 |
LF |
1,123.400 |
1,123.400 |
|
1,123.400 |
$60.00 |
$0.00 |
$67,404.00 |
0049 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
2,250.000 |
2,250.000 |
|
2,250.000 |
$3.00 |
$0.00 |
$6,750.00 |
0050 |
STAINLESS STEEL FIXED BEARING ASSEMBLY |
507(A) 6170 |
EA |
16.000 |
16.000 |
|
16.000 |
$2,300.00 |
$0.00 |
$36,800.00 |
0051 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY |
507(B) 6174 |
EA |
24.000 |
24.000 |
|
24.000 |
$2,350.00 |
$0.00 |
$56,400.00 |
0052 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
580.600 |
580.600 |
0.000 |
580.600 |
$425.00 |
$0.00 |
$246,755.00 |
0053 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
251.200 |
251.200 |
|
251.200 |
$440.00 |
$0.00 |
$110,528.00 |
0054 |
CLASS C CONCRETE |
509(D) 1331 |
CY |
7.000 |
7.000 |
|
0.000 |
$450.00 |
$0.00 |
$0.00 |
0055 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
158,180.000 |
158,180.000 |
|
158,180.000 |
$0.99 |
$0.00 |
$156,598.20 |
0056 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
224.000 |
224.000 |
|
236.100 |
$22.00 |
$0.00 |
$5,194.20 |
0057 |
PILES, FURNISHED (HP 12X53) |
514(A) 6011 |
LF |
736.000 |
736.000 |
|
789.900 |
$32.00 |
$0.00 |
$25,276.80 |
0058 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
224.000 |
224.000 |
|
236.100 |
$10.00 |
$0.00 |
$2,361.00 |
0059 |
PILES, DRIVEN (HP 12X53) |
514(B) 6294 |
LF |
736.000 |
736.000 |
|
789.900 |
$13.00 |
$0.00 |
$10,268.70 |
0060 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
2,223.000 |
2,223.000 |
0.000 |
2,000.000 |
$3.00 |
$0.00 |
$6,000.00 |
0061 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
468.000 |
468.000 |
|
468.000 |
$521.00 |
$0.00 |
$243,828.00 |
0062 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
81.600 |
81.600 |
|
81.600 |
$5.25 |
$0.00 |
$428.40 |
0063 |
SEALER RESIN |
523(B) 6560 |
GAL |
1.000 |
1.000 |
0.000 |
1.000 |
$165.00 |
$0.00 |
$165.00 |
0064 |
TYPE I-A PLAIN RIPRAP |
601(B) 1353 |
TON |
1,520.000 |
1,520.000 |
|
1,479.150 |
$45.00 |
$0.00 |
$66,561.75 |
0065 |
TYPE I-A FILTER BLANKET |
601(C) 1355 |
TON |
310.000 |
310.000 |
|
244.170 |
$40.00 |
$0.00 |
$9,766.80 |
0066 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
84.000 |
84.000 |
|
84.000 |
$24.00 |
$0.00 |
$2,016.00 |
0067 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 6207 |
LF |
64.000 |
64.000 |
|
64.000 |
$24.00 |
$0.00 |
$1,536.00 |
0068 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$15,000.00 |
$0.00 |
$15,000.00 |
Subtotals For Category 0200/BRIDGE 'A' |
$0.00 |
$1,576,756.85 |
|
Fed/State Project Number: BRFY-102C(093) |
Project: 23272(04) |
Category: 0300/TRAFFIC CONTROL |
0072 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
4,000.000 |
4,000.000 |
|
14,034.000 |
$0.22 |
$0.00 |
$3,087.48 |
0073 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
500.000 |
500.000 |
|
1,293.000 |
$0.50 |
$0.00 |
$646.50 |
0074 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
4,000.000 |
4,000.000 |
|
1,284.000 |
$0.20 |
$0.00 |
$256.80 |
0075 |
(PL)TRUCK MOUNTED ATTENUATOR |
876(A) 8482 |
SD |
410.000 |
410.000 |
|
0.000 |
$1.10 |
$0.00 |
$0.00 |
0076 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
820.000 |
820.000 |
|
1,599.000 |
$0.30 |
$0.00 |
$479.70 |
0077 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
2,460.000 |
2,460.000 |
|
2,146.000 |
$0.55 |
$0.00 |
$1,180.30 |
0078 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
4,100.000 |
4,100.000 |
|
4,190.000 |
$0.90 |
$0.00 |
$3,771.00 |
0079 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
1,230.000 |
1,230.000 |
|
8.000 |
$2.20 |
$0.00 |
$17.60 |
0080 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
4,100.000 |
4,100.000 |
|
3,452.000 |
$0.20 |
$0.00 |
$690.40 |
0081 |
DRUMS |
880(F) 8878 |
SD |
7,175.000 |
7,175.000 |
|
972.000 |
$0.50 |
$0.00 |
$486.00 |
Subtotals For Category 0300/TRAFFIC CONTROL |
$0.00 |
$10,615.78 |
|