Contract ID: | 110455 | Estimate Number: | 0009 | Contract No: | 710148 | |||
Residency: | ENGINEERING SERVICES & TESTING (08001) | Estimate Type: | Progressive | Account No: | 400800 | |||
Project Number(s): | BRFY-172A(531)3B | ||||||||||||
Primary Job Piece No: | 28593(05) | ||||||||||||
Contract Description: | JOINT SEAL/REPAIR I-244/US-64/US-75/UNION AVE: AT VARIOUS LOCATIONS IN DIVISION VIII. | ||||||||||||
Primary County: | TULSA | ||||||||||||
Name of Road: | MULTIPLE LOCATIONS | ||||||||||||
Prime Contractor: | PBX CORPORATION | ||||||||||||
P.O. BOX 644 | |||||||||||||
SAPULPA , OK 74067 | |||||||||||||
Surety Company: | WESTFIELD INSURANCE COMPANY | ||||||||||||
Date Let: | 09/15/2011 | NTP Effective Date: | 11/28/2011 | Pay Period: | 07/01/2012 TO 09/15/2012 |
Date Awarded: | 10/03/2011 | Date Work Began: | 02/16/2012 | Original Contract Time: | 90 |
Date Contract Executed: | 10/12/2011 | Date Time Stopped: | Current Time Charged: | 87.00 | |
Date NTP Issued: | 10/20/2011 | Completion Date: | Current Time Allowed: | 122.00 | |
General Liability Expires: | 10/05/2012 | Workman's Comp Expires: | 10/05/2012 | Percent Time Used: | 71.31 % |
Specification Year: | 2009 | Date Approved: | |||
Current Contract Amount: | $804,987.85 | Total to Date | Prev to Date | This Estimate | |||
Bid Amount: | $700,136.30 | Participating: | $875,883.10 | $690,301.14 | $185,581.96 | ||
Percent Complete: | 100 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
Funds Available: | $4.75 | Total Earnings: | $875,883.10 | $690,301.14 | $185,581.96 | ||
Unearned Balance: | $-104,846.80 | Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||
Gross Earnings: | $875,883.10 | $690,301.14 | $185,581.96 | ||||
Other Adjustments: | $-70,900.00 | $0.00 | $-70,900.00 | ||||
Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
TOTAL: | $804,983.10 | $690,301.14 | $114,681.96 |
Contract ID: | 110455 | Estimate Number: | 0009 | Primary JP: | 28593(05) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | Emergency Full Depth Bridge Deck Repair B, G, H | Approved | 09/11/2012 | 32.0 | $104,851.55 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
No material stockpiles have been created for this contract. | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | |||||||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
No liquidated damages have been assessed on this contract. | Subtotals For Liquidated Damages | $ |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
Withhold to Funds Avail(Prog. Est. Only) | 0009 | $-70,900.00 | Subtotals For Contract Adjustments | $-70,900.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
No line item adjustments have been created on this contract. | Subtotals For Line Item Adjustments | $0.00 |
MILESTONE INFORMATION | |||||||||
Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
No milestones exist for this contract. |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total | ||||||
No milestones adjustments exist for this contract. | Subtotals For Milestones | $ |
Contract ID: | 110455 | Estimate Number: | 0009 | Primary JP: | 28593(05) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: BRFY-172A(531)3B | Project: 28593(05) | Category: 0200/BRIDGE 'A' | ||||||||
0001 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 145.000 | 145.000 | 282.000 | 427.000 | $30.00 | $8,460.00 | $12,810.00 |
0002 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 47.700 | 47.700 | 26.810 | 77.980 | $625.00 | $16,756.25 | $48,737.50 |
0003 | SILICONE CONSTRUCTION JOINT | 509 6386 | LF | 145.000 | 145.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0004 | CLASS B BRIDGE DECK REPAIR | 513(B) 6019 | SY | 50.000 | 50.000 | -6.570 | 8.180 | $300.00 | $-1,971.00 | $2,454.00 |
0005 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 50.000 | 38.500 | $23.00 | $0.00 | $885.50 | |
0006 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.500 | 0.500 | $70.00 | $0.00 | $35.00 | |
0007 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 20.000 | 20.000 | 22.860 | $525.00 | $0.00 | $12,001.50 | |
0008 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 814.000 | 814.000 | 0.090 | 814.090 | $18.00 | $1.62 | $14,653.62 |
0009 | (PL)REPLACE BRIDGE ITEM (TYPE A) | 545 4815 | EA | 1.000 | 1.000 | 1.000 | $2,000.00 | $0.00 | $2,000.00 | |
Subtotals For Category 0200/BRIDGE 'A' | $23,246.87 | $93,577.12 | ||||||||
Fed/State Project Number: BRFY-172A(531)3B | Project: 28593(05) | Category: 0201/BRIDGE 'B' | ||||||||
0010 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 145.000 | 145.000 | -1.590 | 427.000 | $30.00 | $-47.70 | $12,810.00 |
0011 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 47.700 | 47.700 | 6.480 | 77.980 | $625.00 | $4,050.00 | $48,737.51 |
0012 | SILICONE CONSTRUCTION JOINT | 509 6386 | LF | 145.000 | 145.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0013 | CLASS B BRIDGE DECK REPAIR | 513(B) 6019 | SY | 50.000 | 50.000 | 7.010 | 15.370 | $300.00 | $2,103.00 | $4,611.00 |
0014 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 50.000 | 68.000 | $23.00 | $0.00 | $1,564.00 | |
0015 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.500 | 0.500 | $70.00 | $0.00 | $35.00 | |
0016 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 10.000 | 10.000 | 11.420 | $525.00 | $0.00 | $5,995.50 | |
0017 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 814.000 | 814.000 | 0.670 | 814.670 | $18.00 | $12.06 | $14,664.06 |
8010 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 0.000 | 1.000 | 1.000 | 1.000 | $40,020.85 | $40,020.85 | $40,020.85 |
Subtotals For Category 0201/BRIDGE 'B' | $46,138.21 | $128,437.92 | ||||||||
Fed/State Project Number: BRFY-172A(531)3B | Project: 28593(05) | Category: 0202/BRIDGE 'C' | ||||||||
0018 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 5.000 | 16.500 | $500.00 | $0.00 | $8,250.00 | |
0019 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 77.400 | 77.400 | 247.500 | 324.900 | $30.00 | $7,425.00 | $9,747.00 |
0020 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 16.000 | 16.000 | 3.373 | 19.373 | $700.00 | $2,361.10 | $13,561.10 |
0021 | SILICONE CONSTRUCTION JOINT | 509 6386 | LF | 154.400 | 154.400 | 0.000 | $7.00 | $0.00 | $0.00 | |
0022 | CLASS B BRIDGE DECK REPAIR | 513(B) 6019 | SY | 10.000 | 10.000 | 10.750 | 36.180 | $300.00 | $3,225.00 | $10,854.00 |
0023 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 50.000 | 0.000 | $23.00 | $0.00 | $0.00 | |
0024 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.500 | 0.000 | $70.00 | $0.00 | $0.00 | |
0025 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 10.000 | 10.000 | 0.000 | 31.530 | $525.00 | $0.00 | $16,553.25 |
0026 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 898.000 | 898.000 | 2.860 | 900.860 | $18.00 | $51.48 | $16,215.48 |
0027 | MASTIC ASPHALT JOINT MATERIAL | 535 6410 | CF | 26.000 | 26.000 | 26.000 | $400.00 | $0.00 | $10,400.00 | |
0028 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4515 | EA | 1.000 | 1.000 | -1.000 | 1.000 | $3,500.00 | $-3,500.00 | $3,500.00 |
0029 | (PL)REPLACE BRIDGE ITEM (TYPE A) | 545 4815 | EA | 3.000 | 3.000 | 0.000 | $1,500.00 | $0.00 | $0.00 | |
Subtotals For Category 0202/BRIDGE 'C' | $9,562.58 | $89,080.83 | ||||||||
Fed/State Project Number: BRFY-172A(531)3B | Project: 28593(05) | Category: 0203/BRIDGE 'D' | ||||||||
0030 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 5.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0031 | (PL)FALSEWORK JACKING | 502 6116 | LSUM | 1.000 | 1.000 | 0.250 | 1.000 | $3,000.00 | $750.00 | $3,000.00 |
0032 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 83.000 | 83.000 | 243.000 | 326.000 | $30.00 | $7,290.00 | $9,780.00 |
0033 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 27.100 | 27.100 | 9.580 | 33.280 | $625.00 | $5,987.50 | $20,800.00 |
0034 | SILICONE CONSTRUCTION JOINT | 509 6386 | LF | 239.000 | 239.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0035 | CLASS B BRIDGE DECK REPAIR | 513(B) 6019 | SY | 10.000 | 10.000 | 5.280 | 7.400 | $300.00 | $1,584.00 | $2,220.00 |
0036 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 50.000 | 0.000 | $23.00 | $0.00 | $0.00 | |
0037 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.500 | 0.000 | $70.00 | $0.00 | $0.00 | |
0038 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 10.000 | 10.000 | 0.000 | $525.00 | $0.00 | $0.00 | |
0039 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 772.000 | 772.000 | 0.220 | 772.220 | $18.00 | $3.96 | $13,899.96 |
0040 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4515 | EA | 1.000 | 1.000 | 1.000 | $1,500.00 | $0.00 | $1,500.00 | |
0041 | (PL)REPLACE BRIDGE ITEM (TYPE A) | 545 4815 | EA | 1.000 | 1.000 | 1.000 | $2,000.00 | $0.00 | $2,000.00 | |
0042 | (PL)REPLACE BRIDGE ITEM (TYPE B) | 545 4825 | EA | 1.000 | 1.000 | 0.250 | 1.000 | $3,000.00 | $750.00 | $3,000.00 |
Subtotals For Category 0203/BRIDGE 'D' | $16,365.46 | $56,199.96 | ||||||||
Fed/State Project Number: BRFY-172A(531)3B | Project: 28593(05) | Category: 0204/BRIDGE 'E' | ||||||||
0043 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 5.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0044 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 83.000 | 83.000 | 243.800 | 326.800 | $30.00 | $7,314.00 | $9,804.00 |
0045 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 27.100 | 27.100 | 7.920 | 31.620 | $625.00 | $4,950.00 | $19,762.50 |
0046 | SILICONE CONSTRUCTION JOINT | 509 6386 | LF | 239.000 | 239.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0047 | CLASS B BRIDGE DECK REPAIR | 513(B) 6019 | SY | 10.000 | 10.000 | 2.320 | 4.320 | $300.00 | $696.00 | $1,296.00 |
0048 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 50.000 | 0.000 | $23.00 | $0.00 | $0.00 | |
0049 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.500 | 0.000 | $70.00 | $0.00 | $0.00 | |
0050 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 10.000 | 10.000 | 0.000 | $525.00 | $0.00 | $0.00 | |
0051 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 772.000 | 772.000 | 1.330 | 1.330 | $18.00 | $23.94 | $23.94 |
Subtotals For Category 0204/BRIDGE 'E' | $12,983.94 | $30,886.44 | ||||||||
Fed/State Project Number: BRFY-172A(531)3B | Project: 28593(05) | Category: 0205/BRIDGE 'F' | ||||||||
0052 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 98.000 | 98.000 | 73.750 | 171.750 | $30.00 | $2,212.50 | $5,152.50 |
0053 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 23.400 | 23.400 | -3.930 | 19.470 | $625.00 | $-2,456.25 | $12,168.75 |
0054 | SILICONE CONSTRUCTION JOINT | 509 6386 | LF | 49.000 | 49.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0055 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 50.000 | 70.000 | $23.00 | $0.00 | $1,610.00 | |
0056 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.500 | 0.500 | $70.00 | $0.00 | $35.00 | |
0057 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 50.000 | 50.000 | 32.850 | $525.00 | $0.00 | $17,246.25 | |
0058 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 105.000 | 105.000 | 0.000 | $2.00 | $0.00 | $0.00 | |
0059 | SEALER RESIN | 523(B) 6560 | GAL | 1.100 | 1.100 | 1.100 | $50.00 | $0.00 | $55.00 | |
0060 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 588.000 | 588.000 | 0.440 | 588.440 | $18.00 | $7.92 | $10,591.92 |
0061 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4515 | EA | 2.000 | 2.000 | 2.000 | $25,000.00 | $0.00 | $50,000.00 | |
Subtotals For Category 0205/BRIDGE 'F' | $-235.83 | $96,859.42 | ||||||||
Fed/State Project Number: BRFY-172A(531)3B | Project: 28593(05) | Category: 0206/BRIDGE 'G' | ||||||||
0062 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 5.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0063 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 108.500 | 108.500 | 153.500 | 262.000 | $30.00 | $4,605.00 | $7,860.00 |
0064 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 40.700 | 40.700 | -9.890 | 43.860 | $625.00 | $-6,181.25 | $27,412.50 |
0065 | SILICONE CONSTRUCTION JOINT | 509 6386 | LF | 108.500 | 108.500 | 0.000 | $7.00 | $0.00 | $0.00 | |
0066 | CLASS B BRIDGE DECK REPAIR | 513(B) 6019 | SY | 10.000 | 10.000 | 0.090 | 28.400 | $300.00 | $27.00 | $8,520.00 |
0067 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 50.000 | 16.830 | $23.00 | $0.00 | $387.09 | |
0068 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.500 | 0.500 | $70.00 | $0.00 | $35.00 | |
0069 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 10.000 | 10.000 | 1.260 | $525.00 | $0.00 | $661.50 | |
0070 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 942.000 | 942.000 | -0.220 | 941.780 | $18.00 | $-3.96 | $16,952.04 |
8011 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 0.000 | 1.000 | 1.000 | 1.000 | $32,415.35 | $32,415.35 | $32,415.35 |
Subtotals For Category 0206/BRIDGE 'G' | $30,862.14 | $94,243.48 | ||||||||
Fed/State Project Number: BRFY-172A(531)3B | Project: 28593(05) | Category: 0207/BRIDGE 'H' | ||||||||
0071 | CLSM BACKFILL | 501(G) 6309 | CY | 5.000 | 5.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0072 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 108.500 | 108.500 | 96.200 | 262.000 | $30.00 | $2,886.00 | $7,860.00 |
0073 | ELASTOMERIC MORTAR | 504(H) 6389 | CF | 36.200 | 36.200 | 13.460 | 43.860 | $625.00 | $8,412.50 | $27,412.50 |
0074 | SILICONE CONSTRUCTION JOINT | 509 6386 | LF | 108.500 | 108.500 | 0.000 | $7.00 | $0.00 | $0.00 | |
0075 | CLASS B BRIDGE DECK REPAIR | 513(B) 6019 | SY | 10.000 | 10.000 | -0.120 | 12.250 | $300.00 | $-36.00 | $3,675.00 |
0076 | CLASS C BRIDGE DECK REPAIR | 513(C) 6020 | SY | 3.000 | 3.000 | -0.780 | 2.220 | $450.00 | $-351.00 | $999.00 |
0077 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 50.000 | 11.830 | $23.00 | $0.00 | $272.09 | |
0078 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 0.500 | 0.500 | 0.500 | $70.00 | $0.00 | $35.00 | |
0079 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 10.000 | 10.000 | 9.570 | $525.00 | $0.00 | $5,024.25 | |
0080 | DECK AREA SEALED (FLOODCOATS) | 523(C) 6570 | SY | 942.000 | 942.000 | 0.930 | 942.930 | $18.00 | $16.74 | $16,972.74 |
0081 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4515 | EA | 1.000 | 1.000 | 1.000 | $3,000.00 | $0.00 | $3,000.00 | |
0082 | (PL)REPAIR BRIDGE ITEM (TYPE B) | 540 4525 | EA | 1.000 | 1.000 | 1.000 | $700.00 | $0.00 | $700.00 | |
8012 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4510 | LSUM | 0.000 | 1.000 | 1.000 | 1.000 | $32,415.35 | $32,415.35 | $32,415.35 |
Subtotals For Category 0207/BRIDGE 'H' | $43,343.59 | $98,365.93 | ||||||||
Fed/State Project Number: BRFY-172A(531)3B | Project: 28593(05) | Category: 0300/TRAFFIC CONTROL | ||||||||
0083 | (PL)TRUCK MOUNTED ATTENUATOR | 876(A) 8482 | SD | 120.000 | 120.000 | 26.000 | 379.000 | $85.00 | $2,210.00 | $32,215.00 |
0084 | CONSTRUCTION TRAFFIC CONTROL | 880(J) 8905 | LSUM | 1.000 | 1.000 | 1.000 | $80,000.00 | $0.00 | $80,000.00 | |
0085 | PORT.CHANGEABLE MESSAGE SIGN | 882(A) 8306 | SD | 240.000 | 240.000 | 13.000 | 304.000 | $85.00 | $1,105.00 | $25,840.00 |
Subtotals For Category 0300/TRAFFIC CONTROL | $3,315.00 | $138,055.00 | ||||||||
Fed/State Project Number: BRFY-172A(531)3B | Project: 28593(05) | Category: 0640/CONSTRUCTION | ||||||||
0086 | MOBILIZATION | 641 1399 | LSUM | 1.000 | 1.000 | 1.000 | $50,177.00 | $0.00 | $50,177.00 | |
Subtotals For Category 0640/CONSTRUCTION | $0.00 | $50,177.00 | ||||||||
Subtotals For Project BRFY-172A(531)3B /28593(05) | $185,581.96 | $875,883.10 |