Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    04/17/2013
Contract ID: 110453   Estimate Number: 0029     Contract No: 710400
Residency: COBB ENGINEERING CO., INC. (08003)   Estimate Type: Progressive     Account No: 400800

Project Number(s): IMY-244-2(500)014, IMY-244-2(499)011
Primary Job Piece No: 27146(04)
Contract Description: BRIDGE AND PAVEMENT REHABILITATION I-244: FROM 73RD STREET, EXTEND EAST TO THE I-44 INTERCHANGE IN THE CITY OF TULSA. PROJECT LENGTH = 4.333 MILES.
Primary County: TULSA              
Name of Road: I-244              
Prime Contractor: SHERWOOD CONSTRUCTION CO., INC.              
    P.O. BOX 10              
    CATOOSA , OK   74015-0010              
Surety Company: TRAVELERS INDEMNITY COMPANY              

Date Let: 09/15/2011 NTP Effective Date: 02/06/2012 Pay Period: 04/01/2013  TO  04/15/2013
Date Awarded: 10/03/2011 Date Work Began: 02/06/2012 Original Contract Time: 420
Date Contract Executed: 10/12/2011 Date Time Stopped: Current Time Charged: 403.00
Date NTP Issued: 10/20/2011 Completion Date: Current Time Allowed: 420.00
General Liability Expires: 01/01/2014 Workman's Comp Expires: 01/01/2014 Percent Time Used: 95.95 %
Specification Year: 2009     Date Approved:

Current Contract Amount: $35,915,448.48 Total to Date Prev to Date This Estimate
Bid Amount: $35,057,955.07 Participating: $33,103,514.13 $33,020,364.54 $83,149.59
Percent Complete: 93.61 % Non Participating: $52,200.00 $52,200.00 $0.00
Funds Available: $2,293,598.39 Total Earnings: $33,155,714.13 $33,072,564.54 $83,149.59
Unearned Balance: $1,436,104.98 Stockpiled Materials: $81,188.37 $81,188.37 $0.00
Gross Earnings: $33,236,902.50 $33,153,752.91 $83,149.59
Other Adjustments: $384,947.59 $384,947.59 $0.00
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $33,621,850.09 $33,538,700.50 $83,149.59

Estimate Adjustment Detail

Contract ID: 110453   Estimate Number: 0029     Primary JP: 27146(04)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 Adding seven new items & reducing the quantity on six items Approved 05/11/2012 0.0 $-177,705.20
002 adding fifteen new items to the contract & correcting one Approved 02/05/2013 0.0 $235,198.61
003 To modify the plan phase of construction. Approved 08/24/2012 0.0 $0.00
004 Compensate Contractor for B Time & C Time. Approved 04/01/2013 0.0 $800,000.00


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-7,303.45
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $34,501.59
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0009 $-27,198.14
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0009 $-29,941.61
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0012 $-8,705.32
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-7,303.45
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0011 $-98.66
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0009 $-29,941.61
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0012 $-8,705.32
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0011 $-98.66
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-7,303.45
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0012 $-8,705.32
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0009 $-29,941.61
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-7,303.45
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0011 $-98.66
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $16,633.26
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-14,413.01
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-2,220.25
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-2,220.25
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $47,269.86
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-21,360.25
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0014 $-11,552.47
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0012 $-12,136.89
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0014 $-12,626.78
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-2,220.25
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0012 $-12,136.89
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $48,344.17
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-21,360.24
26300(09) 0021 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0005 $12,926.38
26300(09) 0021 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0010 $-12,926.38
26300(09) 0021 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0010 $-34,292.22
26300(09) 0021 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0005 $34,292.22
26300(09) 0021 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0010 $-13,772.12
26300(09) 0021 9.5" PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0006 $13,772.12
26300(09) 0021 9.5" PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0006 $34,249.60
26300(09) 0021 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0010 $-34,249.60
26300(09) 0093 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
26300(09) 0093 HARDWARE AND PLATES Stockpiled Material Adjustment 0023 $-2,542.48
26300(09) 0093 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
26300(09) 0093 U-BOLTS AND HARDWARE Stockpiled Material Adjustment 0023 $-849.23
26300(09) 0093 BASE/HAND HOLE PLATES Stockpiled Material Adjustment 0023 $-6,286.91
26300(09) 0093 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
26300(09) 0093 HARDWARE Stockpiled Material Adjustment 0023 $-1,381.96
26300(09) 0093 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
26300(09) 0093 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Adjustment 0023 $-1,585.78
26300(09) 0093 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
26300(09) 0093 PIPE BENDING Stockpiled Material Adjustment 0023 $-2,061.67
26300(09) 0093 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
26300(09) 0093 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
26300(09) 0093 STEEL PIPE Stockpiled Material Adjustment 0023 $-10,496.23
26300(09) 0093 ROUND HEAD MACHINE SCREWS Stockpiled Material Adjustment 0023 $-6.02
26300(09) 0093 ROUND HEAD MACHINE SCREWS Stockpiled Material Initial Payment 0013 $6.02
26300(09) 0094 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
26300(09) 0094 HARDWARE AND PLATES Stockpiled Material Adjustment 0024 $-2,542.48
26300(09) 0094 BASE/HAND HOLE PLATES Stockpiled Material Adjustment 0024 $-6,286.91
26300(09) 0094 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
26300(09) 0094 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
26300(09) 0094 U-BOLTS AND HARDWARE Stockpiled Material Adjustment 0024 $-849.23
26300(09) 0094 HARDWARE Stockpiled Material Adjustment 0024 $-1,381.96
26300(09) 0094 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
26300(09) 0094 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
26300(09) 0094 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Adjustment 0024 $-1,585.78
26300(09) 0094 PIPE BENDING Stockpiled Material Adjustment 0024 $-2,061.67
26300(09) 0094 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
26300(09) 0094 STEEL PIPE Stockpiled Material Adjustment 0024 $-10,496.23
26300(09) 0094 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
26300(09) 0094 ROUND HEAD MACHINE SCREWS Stockpiled Material Adjustment 0024 $-6.02
26300(09) 0094 ROUND HEAD MACHINE SCREWS Stockpiled Material Initial Payment 0013 $6.02
26300(09) 0095 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
26300(09) 0095 HARDWARE AND PLATES Stockpiled Material Adjustment 0023 $-2,542.48
26300(09) 0095 BASE/HAND HOLE PLATES Stockpiled Material Adjustment 0023 $-6,286.91
26300(09) 0095 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
26300(09) 0095 U-BOLTS AND HARDWARE Stockpiled Material Adjustment 0023 $-849.23
26300(09) 0095 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
26300(09) 0095 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
26300(09) 0095 HARDWARE Stockpiled Material Adjustment 0023 $-1,381.96
26300(09) 0095 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
26300(09) 0095 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Adjustment 0023 $-1,585.78
26300(09) 0095 PIPE BENDING Stockpiled Material Adjustment 0023 $-2,061.67
26300(09) 0095 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
26300(09) 0095 STEEL PIPE Stockpiled Material Adjustment 0023 $-10,496.23
26300(09) 0095 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
26300(09) 0095 ROUND HEAD MACHINE SCREWS Stockpiled Material Adjustment 0023 $-6.02
26300(09) 0095 ROUND HEAD MACHINE SCREWS Stockpiled Material Initial Payment 0013 $6.02
26300(09) 0109 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Initial Payment 0013 $77,544.00
26300(09) 0109 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0020 $-12,206.00
26300(09) 0109 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0026 $-15,796.00
26300(09) 0109 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0024 $-24,412.00
26300(09) 0109 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0018 $-25,130.00
26300(09) 0110 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0020 $-4,352.00
26300(09) 0110 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0026 $-5,632.00
26300(09) 0110 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0018 $-8,960.00
26300(09) 0110 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0024 $-8,704.00
26300(09) 0110 DESIGN B BREAKAWAY BASE Stockpiled Material Initial Payment 0013 $27,648.00
26300(09) 0111 Roadway Luminaire Stockpiled Material Initial Payment 0001 $26,076.00
26300(09) 0111 Roadway Luminaire Stockpiled Material Adjustment 0018 $-17,220.00
26300(09) 0111 Roadway Luminaire Stockpiled Material Adjustment 0020 $-8,364.00
26300(09) 0111 Roadway Luminaire Stockpiled Material Adjustment 0024 $-492.00
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Closure 0005 $-20,615.76
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Initial Payment 0002 $20,615.76
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Initial Payment 0002 $1,650.00
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Closure 0005 $-1,650.00
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0018 $-17,220.00
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Initial Payment 0005 $27,060.00
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0024 $-1,476.00
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0020 $-8,364.00
26300(09) 0111 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0018 $-3,452.40
26300(09) 0111 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Initial Payment 0005 $10,653.12
26300(09) 0111 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0024 $-3,353.76
26300(09) 0111 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0026 $-2,170.08
26300(09) 0111 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0020 $-1,676.88
26300(09) 0113 XHHW-4-BLACK-STRANDED Stockpiled Material Initial Payment 0013 $22,405.36
26300(09) 0113 XHHW 4 WHITE Stockpiled Material Initial Payment 0013 $15,823.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-4,825.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $49,418.49
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-8,194.48
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.01
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-4,825.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-4,825.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-4,825.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-4,825.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-11,547.45
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $11,547.45
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0006 $-17,831.24
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $47,269.86
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-10,319.88
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-12,672.86
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0009 $-6,445.89
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $47,627.96
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-10,319.88
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-12,672.85
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0009 $-6,803.99
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0006 $-17,831.23
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0006 $-17,831.24
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-10,319.88
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $47,269.86
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-12,672.86
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0009 $-6,445.89
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0006 $-17,831.23
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $31,710.91
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-1,206.82
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-12,672.85
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0005 $31,842.78
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-20,848.11
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,994.67
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,994.66
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-23,297.56
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0005 $34,292.22
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,994.66
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0005 $21,365.83
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-10,371.17
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,981.00
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0006 $34,249.60
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-23,268.60
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0006 $34,249.60
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,981.00
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-23,268.60
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-9,496.48
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0006 $20,477.48
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,981.00
27146(04) 0166 BEAM GUARDRAIL W-BEAM SINGLE Stockpiled Material Initial Payment 0011 $22,509.00
27146(04) 0166 BEAM GUARDRAIL W-BEAM SINGLE Stockpiled Material Adjustment 0011 $-5,105.70
27146(04) 0166 BEAM GUARDRAIL W-BEAM SINGLE Stockpiled Material Closure 0020 $-10,859.22
27146(04) 0166 BEAM GUARDRAIL W-BEAM SINGLE Stockpiled Material Adjustment 0012 $-4,611.60
27146(04) 0166 BEAM GUARDRAIL W-BEAM SINGLE Stockpiled Material Adjustment 0017 $-1,054.08
27146(04) 0166 BEAM GUARDRAIL W-BEAM SINGLE Stockpiled Material Adjustment 0018 $-878.40
27146(04) 0317 QGELITE 2FT0IN WIDE 8 BAY IMPACT ATTEN. Stockpiled Material Initial Payment 0014 $33,780.88
27146(04) 0317 QGELITE 2FT0IN WIDE 8 BAY IMPACT ATTEN. Stockpiled Material Adjustment 0014 $-33,780.88
27146(04) 0354 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
27146(04) 0354 HARDWARE AND PLATES Stockpiled Material Adjustment 0023 $-2,542.48
27146(04) 0354 BASE/HAND HOLE PLATES Stockpiled Material Adjustment 0023 $-6,286.91
27146(04) 0354 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
27146(04) 0354 U-BOLTS AND HARDWARE Stockpiled Material Adjustment 0023 $-849.23
27146(04) 0354 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
27146(04) 0354 HARDWARE Stockpiled Material Adjustment 0023 $-1,381.96
27146(04) 0354 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
27146(04) 0354 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
27146(04) 0354 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Adjustment 0023 $-1,585.78
27146(04) 0354 PIPE BENDING Stockpiled Material Adjustment 0023 $-2,061.67
27146(04) 0354 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
27146(04) 0354 STEEL PIPE Stockpiled Material Adjustment 0023 $-10,496.23
27146(04) 0354 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
27146(04) 0354 ROUND MACHINE HEAD SCREWS Stockpiled Material Adjustment 0023 $-6.02
27146(04) 0354 ROUND MACHINE HEAD SCREWS Stockpiled Material Initial Payment 0013 $6.02
27146(04) 0355 HARDWARE AND PLATES Stockpiled Material Adjustment 0024 $-2,542.48
27146(04) 0355 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
27146(04) 0355 BASE/HAND HOLE PLATES Stockpiled Material Adjustment 0024 $-6,286.91
27146(04) 0355 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
27146(04) 0355 U-BOLTS AND HARDWARE Stockpiled Material Adjustment 0024 $-849.23
27146(04) 0355 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
27146(04) 0355 HARDWARE Stockpiled Material Adjustment 0024 $-1,381.96
27146(04) 0355 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
27146(04) 0355 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Adjustment 0024 $-1,585.78
27146(04) 0355 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
27146(04) 0355 PIPE BENDING Stockpiled Material Adjustment 0024 $-2,061.67
27146(04) 0355 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
27146(04) 0355 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
27146(04) 0355 STEEL PIPE Stockpiled Material Adjustment 0024 $-10,496.23
27146(04) 0355 ROUND MACHINE HEAD SCREWS Stockpiled Material Initial Payment 0013 $6.02
27146(04) 0355 ROUND MACHINE HEAD SCREWS Stockpiled Material Adjustment 0024 $-6.02
27146(04) 0356 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $5,084.96
27146(04) 0356 HARDWARE AND PLATES Stockpiled Material Adjustment 0022 $-5,084.96
27146(04) 0356 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $12,573.82
27146(04) 0356 BASE/HAND HOLE PLATES Stockpiled Material Adjustment 0022 $-12,573.82
27146(04) 0356 U-BOLTS AND HARDWARE Stockpiled Material Adjustment 0022 $-1,698.46
27146(04) 0356 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $1,698.46
27146(04) 0356 HARDWARE Stockpiled Material Initial Payment 0013 $2,763.92
27146(04) 0356 HARDWARE Stockpiled Material Adjustment 0022 $-2,763.92
27146(04) 0356 STEEL PLATE, BEAM AND FLAT BAR Stockpiled Material Initial Payment 0013 $3,171.56
27146(04) 0356 STEEL PLATE, BEAM AND FLAT BAR Stockpiled Material Adjustment 0022 $-3,171.56
27146(04) 0356 PIPE BENDING Stockpiled Material Adjustment 0022 $-4,123.34
27146(04) 0356 PIPE BENDING Stockpiled Material Initial Payment 0013 $4,123.34
27146(04) 0356 STEEL PIPE Stockpiled Material Adjustment 0022 $-20,992.46
27146(04) 0356 STEEL PIPE Stockpiled Material Initial Payment 0013 $20,992.46
27146(04) 0356 ROUND MACHINE HEAD SCREWS Stockpiled Material Initial Payment 0013 $12.04
27146(04) 0356 ROUND MACHINE HEAD SCREWS Stockpiled Material Adjustment 0022 $-12.04
27146(04) 0357 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
27146(04) 0357 HARDWARE AND PLATES Stockpiled Material Adjustment 0022 $-2,542.48
27146(04) 0357 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
27146(04) 0357 BASE/HAND HOLE PLATES Stockpiled Material Adjustment 0022 $-6,286.91
27146(04) 0357 U-BOLTS AND HARDWARE Stockpiled Material Adjustment 0022 $-849.23
27146(04) 0357 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
27146(04) 0357 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
27146(04) 0357 HARDWARE Stockpiled Material Adjustment 0022 $-1,381.96
27146(04) 0357 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
27146(04) 0357 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Adjustment 0022 $-1,585.78
27146(04) 0357 PIPE BENDING Stockpiled Material Adjustment 0022 $-2,061.67
27146(04) 0357 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
27146(04) 0357 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
27146(04) 0357 STEEL PIPE Stockpiled Material Adjustment 0022 $-10,496.23
27146(04) 0357 ROUND HEAD MACHINE SCREWS Stockpiled Material Initial Payment 0013 $6.02
27146(04) 0357 ROUND HEAD MACHINE SCREWS Stockpiled Material Adjustment 0022 $-6.02
27146(04) 0358 HARDWARE AND PLATES Stockpiled Material Adjustment 0022 $-10,169.92
27146(04) 0358 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $10,169.92
27146(04) 0358 BASE/HAND HOLE PLATES Stockpiled Material Adjustment 0022 $-25,147.64
27146(04) 0358 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $25,147.64
27146(04) 0358 U-BOLTS AND HARDWARE Stockpiled Material Adjustment 0022 $-3,396.92
27146(04) 0358 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $3,396.92
27146(04) 0358 HARDWARE Stockpiled Material Adjustment 0022 $-5,527.84
27146(04) 0358 HARDWARE Stockpiled Material Initial Payment 0013 $5,527.84
27146(04) 0358 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Adjustment 0022 $-6,343.12
27146(04) 0358 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $6,343.12
27146(04) 0358 PIPE BENDING Stockpiled Material Adjustment 0022 $-8,246.68
27146(04) 0358 PIPE BENDING Stockpiled Material Initial Payment 0013 $8,246.68
27146(04) 0358 STEEL PIPE Stockpiled Material Adjustment 0022 $-41,984.92
27146(04) 0358 STEEL PIPE Stockpiled Material Initial Payment 0013 $41,984.92
27146(04) 0358 ROUND HEAD MACHINE SCREWS Stockpiled Material Initial Payment 0013 $24.08
27146(04) 0358 ROUND HEAD MACHINE SCREWS Stockpiled Material Adjustment 0022 $-24.08
27146(04) 0373 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0026 $-12,924.00
27146(04) 0373 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0020 $-12,924.00
27146(04) 0373 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0016 $-4,308.00
27146(04) 0373 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0014 $-7,898.00
27146(04) 0373 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0024 $-15,078.00
27146(04) 0373 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0022 $-8,616.00
27146(04) 0373 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Initial Payment 0013 $83,288.00
27146(04) 0374 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0024 $-5,376.00
27146(04) 0374 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0022 $-3,072.00
27146(04) 0374 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0020 $-4,608.00
27146(04) 0374 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0016 $-1,536.00
27146(04) 0374 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0014 $2,560.00
27146(04) 0374 DESIGN B BREAKAWAY BASE Stockpiled Material Initial Payment 0013 $29,696.00
27146(04) 0374 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0026 $-4,608.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0024 $-10,332.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0020 $-8,856.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0026 $-8,856.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0012 $-13,776.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0016 $-2,952.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Initial Payment 0005 $64,452.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0022 $-5,904.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0014 $-5,412.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Closure 0005 $0.00
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0026 $-493.20
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0016 $-591.84
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Initial Payment 0005 $9,962.64
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0020 $-1,775.52
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0012 $-2,761.92
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0022 $-1,183.68
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0024 $-2,071.44
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0014 $-1,085.04
27146(04) 0375 ROADWAY LUMINAIRE (Double Mast Arm) Stockpiled Material Adjustment 0012 $-1,650.00
27146(04) 0375 ROADWAY LUMINAIRE (Double Mast Arm) Stockpiled Material Initial Payment 0005 $1,650.00
Subtotals For Stockpile Payments $81,188.37


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.
Subtotals For Liquidated Damages $


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
Milestone Adjust. (Prog. Est. Only) 0022 $250,000.00
Milestone Adjust. (Prog. Est. Only) 0027 $150,000.00
Subtotals For Contract Adjustments $400,000.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
26300(09) 0001 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0006 7,732.00 $0.05 $414.05
26300(09) 0001 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0007 1,848.00 $0.02 $43.52
26300(09) 0001 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0011 1,700.70 $-0.06 $-111.48
26300(09) 0001 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0012 15,315.58 $-0.06 $-1,003.94
26300(09) 0016 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0012 103.36 $0.63 $65.86
26300(09) 0018 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0002 1,237.65 $-0.17 $-214.83
26300(09) 0018 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0008 -33.00 $0.43 $-14.47
26300(09) 0022 P.C. CONCRETE FOR PAVEMENT * QAQC 0026 0.00 $0.00 $-139.01
26300(09) 0024 42" F-SHAPED PARAPET * QAQC 0024 0.00 $0.00 $-1,043.19
26300(09) 0024 42" F-SHAPED PARAPET * QAQC 0026 0.00 $0.00 $-4,438.81
26300(09) 0052 CLSM BACKFILL * COMPRESSIVE STRENGTH 0024 0.00 $0.00 $-4,937.51
26300(09) 0076 DRILLED SHAFTS 60" DIAMETER * COMPRESSIVE STRENGTH 0026 0.00 $0.00 $-1,298.77
26300(09) 0115 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0011 1,376.04 $0.55 $767.21
26300(09) 0115 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0012 242.37 $0.55 $135.13
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0003 6,390.00 $0.01 $112.15
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0004 488.00 $0.01 $8.56
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0005 7,740.00 $0.05 $414.48
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0006 4,360.00 $0.05 $233.48
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0007 752.00 $0.02 $17.71
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0008 788.00 $0.02 $18.56
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0009 2,184.00 $-0.01 $-25.23
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0010 340.50 $-0.01 $-3.93
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0011 879.50 $-0.06 $-57.65
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0012 5,912.00 $-0.06 $-387.53
27146(04) 0135 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0010 16.06 $0.63 $10.23
27146(04) 0135 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0011 38.20 $0.63 $24.34
27146(04) 0135 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0012 90.69 $0.63 $57.79
27146(04) 0136 SUPERPAVE, TYPE S4(PG 64-22 OK) Asphalt Binder Adjustment 0010 30.73 $0.63 $19.58
27146(04) 0136 SUPERPAVE, TYPE S4(PG 64-22 OK) Asphalt Binder Adjustment 0011 94.52 $0.63 $60.23
27146(04) 0136 SUPERPAVE, TYPE S4(PG 64-22 OK) Asphalt Binder Adjustment 0012 54.34 $0.63 $34.63
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0001 886.84 $-0.17 $-153.94
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0002 739.16 $-0.17 $-128.30
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0003 236.56 $-0.17 $-41.06
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0004 276.64 $-0.17 $-48.02
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0009 62.55 $0.70 $44.01
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0012 51.43 $0.70 $36.19
27146(04) 0142 42" F-SHAPED PARAPET * QAQC 0024 0.00 $0.00 $-923.90
27146(04) 0144 CLASS C CONCRETE * QAQC 0026 0.00 $0.00 $-165.55
27146(04) 0210 42" F-SHAPED PARAPET * QAQC 0026 0.00 $0.00 $-1,389.94
27146(04) 8016 APPROACH SLAB * QAQC 0026 0.00 $0.00 $-1,043.06
Subtotals For Line Item Adjustments $-15,052.41
* = User applied Line Item Adjustments


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
01 TIME 'B' BID 02/06/2012 02/19/2013 400.00 DYS $15,000.00 Y
02 TIME 'C' BID 10/08/2012 12/22/2012 130.00 DYS $10,000.00 Y


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
No milestones adjustments exist for this contract.
Subtotals For Milestones $

Line Item Detail

Contract ID: 110453   Estimate Number: 0029     Primary JP: 27146(04)



<
Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    IMY-244-2(500)014 Project:    26300(09) Category:    0100/ROADWAY - IMY-244-2(500)014
0001 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 28,000.000 28,000.000   28,472.280 $9.05 $0.00 $257,674.14
0002 UNCLASSIFIED BORROW 202(D) 0184 CY 2,000.000 2,000.000   0.000 $2.00 $0.00 $0.00
0003 TEMPORARY SILT FENCE 221(C) 2801 LF 41,900.000 41,900.000   23,897.000 $2.56 $0.00 $61,176.32
0004 TEMPORARY SILT DIKE 221(F) 0100 LF 30.000 30.000   252.000 $7.11 $0.00 $1,791.72
0005 SOLID SLAB SODDING 230(A) 2806 SY 28,000.000 28,000.000   37,108.000 $1.44 $0.00 $53,435.52
0006 VEGETATIVE MULCHING 233(A) 2817 AC 3.000 3.000   0.000 $207.34 $0.00 $0.00
0007 MOWING 241 2832 AC 225.000 225.000   0.000 $49.00 $0.00 $0.00
0008 AGGREGATE BASE TYPE A 303(A) 2100 CY 19,017.000 19,017.000   16,837.060 $26.93 $0.00 $453,422.04
0009 LIME 307(D) 4230 TON 2,261.000 100.000   0.000 $156.37 $0.00 $0.00
0010 LIME STABILIZED SUBGRADE 307(H) 4270 SY 104,690.000 4,630.000   0.000 $1.96 $0.00 $0.00
0011 CEMENT TREATED BASE 317 4270 SY 104,690.000 104,690.000   98,519.720 $10.91 $0.00 $1,074,850.14
0012 SEPARATOR FABRIC 325 5271 SY 135,270.000 135,270.000   131,804.000 $1.10 $0.00 $144,984.40
0013 GEOGRID REINFORCEMENT 326(B) 0100 SY 5,000.000 5,000.000   0.000 $2.60 $0.00 $0.00
0014 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 3,176.000 3,176.000   2,769.690 $11.54 $0.00 $31,962.22
0015 PRIME COAT 408 5774 GAL 39,665.000 39,665.000   0.000 $3.94 $0.00 $0.00
0016 SUPERPAVE, TYPE S4(PG 76-28 OK) 411(C) 5950 TON 500.000 500.000   380.460 $90.00 $0.00 $34,241.40
0017 SUPERPAVE, TYPE S4(PG 64-22 OK) 411(C) 5960 TON 37.000 37.000   140.830 $80.00 $0.00 $11,266.40
0018 SUPERPAVE, TYPE S5(PG 64-22 OK) 411(D) 5975 TON 1,515.000 1,515.000   1,220.660 $90.00 $0.00 $109,859.40
0019 COLD MILLING PAVEMENT 412 5267 SY 15,200.000 15,200.000   0.000 $1.11 $0.00 $0.00
0020 P.C.CONCRETE PAVEMENT(PLACEMENT) 414(A) 0210 SY 28,031.000 28,031.000   26,422.710 $11.58 $0.00 $305,974.98
0021 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(B) 5725 SY 67,251.000 67,251.000   63,934.250 $12.67 $0.00 $810,046.94
0022 P.C. CONCRETE FOR PAVEMENT 414(G) 5275 CY 25,144.000 25,144.000   23,854.240 $89.79 $0.00 $2,141,872.22
0023 CONCRETE PARAPET 504(E) 1381 LF 842.000 842.000   854.000 $61.35 $0.00 $52,392.90
0024 42" F-SHAPED PARAPET 504(E) 6190 LF 5,271.000 5,271.000   4,906.100 $52.16 $0.00 $255,902.18
0025 CLASS A CONCRETE 509(B) 0321 CY 50.000 50.000   3.190 $300.00 $0.00 $957.00
0026 CLASS C CONCRETE 509(D) 0325 CY 251.000 251.000   178.700 $212.25 $0.00 $37,929.11
0027 REINFORCING STEEL 511(A) 0332 LB 154,713.000 154,713.000   154,713.000 $0.75 $0.00 $116,034.75
0028 CONCRETE CURB (6" BARRIER-INTEGRAL) 609(A) 0300 LF 1,500.000 1,500.000   1,636.900 $1.37 $0.00 $2,242.55
0029 6" CONCRETE DIVIDING STRIP 610(C) 0609 SY 4,000.000 4,000.000   247.220 $34.15 $0.00 $8,442.57
0030 18" R.C.PIPE CLASS III 613(A) 0491 LF 500.000 500.000   0.000 $57.41 $0.00 $0.00
0031 24" R.C.PIPE CLASS III 613(A) 0492 LF 500.000 500.000   0.000 $69.37 $0.00 $0.00
0032 30" R.C.PIPE CLASS III 613(A) 0493 LF 500.000 500.000   0.000 $99.60 $0.00 $0.00
0033 36" R.C.PIPE CLASS III 613(A) 0494 LF 500.000 500.000   0.000 $119.73 $0.00 $0.00
0034 8" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 0500 LF 8,500.000 8,500.000   0.000 $14.66 $0.00 $0.00
0035 8" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 1097 LF 500.000 500.000 0.000 7,959.820 $9.77 $0.00 $77,767.44
0036 EDGE DRAIN CONDUIT-PERFORATED 613(J) 5915 LF 42,342.000 42,342.000   39,051.000 $4.65 $0.00 $181,587.15
0037 EDGE DRAIN OUTLET LATERAL-NONPERFORATED 613(K) 5916 LF 4,235.000 4,235.000   4,114.000 $11.21 $0.00 $46,117.95
0038 OUTLET LATERAL HEADWALL 613(Q) 5946 EA 212.000 212.000   98.000 $190.36 $0.00 $18,655.28
0039 (PL)VIDEO INSPECTION OF CONDUIT 613(Y) 0100 LF 5,000.000 5,000.000   2,161.100 $2.00 $0.00 $4,322.20
0040 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 36,421.000 36,421.000   35,843.410 $2.50 $0.00 $89,608.54
0041 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY 619(B) 4763 SY 57,841.000 57,841.000   62,860.630 $3.50 $0.00 $220,012.21
0042 REMOVAL OF GUARDRAIL 619(B) 4780 LF 4,632.000 4,632.000   4,814.000 $3.01 $0.00 $14,490.14
0043 REMOVAL OF CONCRETE MEDIAN BARRIER 619(B) 4915 LF 210.000 210.000   339.200 $23.27 $0.00 $7,893.19
0044 SAWING PAVEMENT 619(C) 0924 LF 21,000.000 21,000.000   15,339.000 $1.61 $0.00 $24,695.79
0045 CLEAN STORM DRAIN, 12" TO 30" DIAMETER 619(H) 0200 LF 1,025.000 1,025.000   418.000 $4.75 $0.00 $1,985.50
0046 CLEAN STORM DRAIN, 36" TO 60" DIAMETER 619(H) 0210 LF 715.000 715.000   185.800 $7.25 $0.00 $1,347.05
0047 BEAM GUARDRAIL W-BEAM SINGLE 623(A) 1418 LF 400.000 400.000   820.000 $15.64 $0.00 $12,824.80
0048 GUARDRAIL ANCHOR UNIT (TYPE D-BF) 623(F) 5686 EA 2.000 2.000   0.000 $2,548.29 $0.00 $0.00
0049 GUARDRAIL END TREATMENT (GET) 623(G) 8571 EA 1.000 1.000   3.000 $2,200.79 $0.00 $6,602.37
0050 GUARDRAIL BRIDGE CONNECTION-TYPE A 623(I) 8675 EA 1.000 1.000   0.000 $1,476.85 $0.00 $0.00
0051 (SP)IMPACT ATTENUATOR 871(A) 8325 EA 12.000 12.000   12.000 $10,869.11 $0.00 $130,429.32
8003 FLY ASH 307(A) 4200 TON 0.000 2,652.000   5,101.020 $71.01 $0.00 $362,223.43
8004 CEMENTITIOUS STABILIZED SUBGRADE 307(E) 4240 SY 0.000 104,690.000   106,932.500 $1.67 $0.00