Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    10/17/2012
Contract ID: 110453   Estimate Number: 0017     Contract No: 710400
Residency: COBB ENGINEERING CO., INC. (08003)   Estimate Type: Progressive     Account No: 400800

Project Number(s): IMY-244-2(500)014, IMY-244-2(499)011
Primary Job Piece No: 27146(04)
Contract Description: BRIDGE AND PAVEMENT REHABILITATION I-244: FROM 73RD STREET, EXTEND EAST TO THE I-44 INTERCHANGE IN THE CITY OF TULSA. PROJECT LENGTH = 4.333 MILES.
Primary County: TULSA              
Name of Road: I-244              
Prime Contractor: SHERWOOD CONSTRUCTION CO., INC.              
    P.O. BOX 10              
    CATOOSA , OK   74015-0010              
Surety Company: TRAVELERS INDEMNITY COMPANY              

Date Let: 09/15/2011 NTP Effective Date: 02/06/2012 Pay Period: 10/01/2012  TO  10/15/2012
Date Awarded: 10/03/2011 Date Work Began: 02/06/2012 Original Contract Time: 420
Date Contract Executed: 10/12/2011 Date Time Stopped: Current Time Charged: 236.00
Date NTP Issued: 10/20/2011 Completion Date: Current Time Allowed: 420.00
General Liability Expires: 01/01/2013 Workman's Comp Expires: 01/01/2013 Percent Time Used: 56.19 %
Specification Year: 2009     Date Approved:

Current Contract Amount: $34,880,249.87 Total to Date Prev to Date This Estimate
Bid Amount: $35,057,955.07 Participating: $20,378,942.33 $19,432,886.26 $946,056.07
Percent Complete: 60.50 % Non Participating: $52,200.00 $52,200.00 $0.00
Funds Available: $13,777,671.90 Total Earnings: $20,431,142.33 $19,485,086.26 $946,056.07
Unearned Balance: $13,955,377.10 Stockpiled Materials: $671,108.31 $672,162.39 $-1,054.08
Gross Earnings: $21,102,250.64 $20,157,248.65 $945,001.99
Other Adjustments: $327.33 $327.33 $0.00
Liq Dam/Disincentive: $0.00 $0.00 $0.00
TOTAL: $21,102,577.97 $20,157,575.98 $945,001.99

Estimate Adjustment Detail

Contract ID: 110453   Estimate Number: 0017     Primary JP: 27146(04)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 Adding seven new items & reducing the quantity on six items Approved 05/11/2012 0.0 $-177,705.20
003 To modify the plan phase of construction. Approved 08/24/2012 0.0 $0.00


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0009 $-27,198.14
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-7,303.45
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $34,501.59
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0011 $-98.66
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0012 $-8,705.32
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0009 $-29,941.61
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-7,303.45
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-7,303.45
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0011 $-98.66
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0012 $-8,705.32
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0009 $-29,941.61
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-7,303.45
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0011 $-98.66
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0009 $-29,941.61
26300(09) 0011 FABRIC-CTB SEP Stockpiled Material Adjustment 0012 $-8,705.32
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-2,220.25
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-14,413.01
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $16,633.26
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-21,360.25
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0014 $-11,552.47
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $47,269.86
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0012 $-12,136.89
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-2,220.25
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0014 $-12,626.78
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0012 $-12,136.89
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $48,344.17
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-2,220.25
26300(09) 0012 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-21,360.24
26300(09) 0021 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0010 $-12,926.38
26300(09) 0021 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0005 $12,926.38
26300(09) 0021 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0005 $34,292.22
26300(09) 0021 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0010 $-34,292.22
26300(09) 0021 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0010 $-13,772.12
26300(09) 0021 9.5" PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0006 $13,772.12
26300(09) 0021 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0010 $-34,249.60
26300(09) 0021 9.5" PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0006 $34,249.60
26300(09) 0093 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
26300(09) 0093 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
26300(09) 0093 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
26300(09) 0093 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
26300(09) 0093 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
26300(09) 0093 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
26300(09) 0093 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
26300(09) 0093 ROUND HEAD MACHINE SCREWS Stockpiled Material Initial Payment 0013 $6.02
26300(09) 0094 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
26300(09) 0094 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
26300(09) 0094 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
26300(09) 0094 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
26300(09) 0094 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
26300(09) 0094 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
26300(09) 0094 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
26300(09) 0094 ROUND HEAD MACHINE SCREWS Stockpiled Material Initial Payment 0013 $6.02
26300(09) 0095 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
26300(09) 0095 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
26300(09) 0095 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
26300(09) 0095 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
26300(09) 0095 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
26300(09) 0095 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
26300(09) 0095 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
26300(09) 0095 ROUND HEAD MACHINE SCREWS Stockpiled Material Initial Payment 0013 $6.02
26300(09) 0109 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Initial Payment 0013 $77,544.00
26300(09) 0110 DESIGN B BREAKAWAY BASE Stockpiled Material Initial Payment 0013 $27,648.00
26300(09) 0111 Roadway Luminaire Stockpiled Material Initial Payment 0001 $26,076.00
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Closure 0005 $-20,615.76
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Initial Payment 0002 $20,615.76
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Closure 0005 $-1,650.00
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Initial Payment 0002 $1,650.00
26300(09) 0111 ROADWAY LUMINAIRE Stockpiled Material Initial Payment 0005 $27,060.00
26300(09) 0111 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Initial Payment 0005 $10,653.12
26300(09) 0113 XHHW-4-BLACK-STRANDED Stockpiled Material Initial Payment 0013 $22,405.36
26300(09) 0113 XHHW 4 WHITE Stockpiled Material Initial Payment 0013 $15,823.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-4,825.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.01
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-8,194.48
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $49,418.49
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-4,825.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-4,825.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-4,825.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $46,049.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-41,224.00
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0008 $-4,825.04
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Adjustment 0007 $-11,547.45
27146(04) 0130 FABRIC-CTB SEP Stockpiled Material Initial Payment 0005 $11,547.45
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $47,269.86
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0006 $-17,831.24
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-10,319.88
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-12,672.86
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0009 $-6,445.89
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-10,319.88
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0009 $-6,803.99
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $47,627.96
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0006 $-17,831.23
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-12,672.85
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0009 $-6,445.89
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $47,269.86
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-12,672.86
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0006 $-17,831.24
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-10,319.88
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0006 $-17,831.23
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Initial Payment 0005 $31,710.91
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0007 $-12,672.85
27146(04) 0131 FABRIC-BASE SEP Stockpiled Material Adjustment 0008 $-1,206.82
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0005 $31,842.78
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,994.67
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-20,848.11
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0005 $34,292.22
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-23,297.56
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,994.66
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-10,371.17
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0005 $21,365.83
27146(04) 0140 9.5 INCH PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,994.66
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,981.00
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0006 $34,249.60
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-23,268.60
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-23,268.60
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,981.00
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0006 $34,249.60
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Initial Payment 0006 $20,477.48
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0008 $-10,981.00
27146(04) 0140 9.5" PAVING DOWEL BASKETS Stockpiled Material Adjustment 0009 $-9,496.48
27146(04) 0166 BEAM GUARDRAIL W-BEAM SINGLE Stockpiled Material Adjustment 0011 $-5,105.70
27146(04) 0166 BEAM GUARDRAIL W-BEAM SINGLE Stockpiled Material Initial Payment 0011 $22,509.00
27146(04) 0166 BEAM GUARDRAIL W-BEAM SINGLE Stockpiled Material Adjustment 0017 $-1,054.08
27146(04) 0166 BEAM GUARDRAIL W-BEAM SINGLE Stockpiled Material Adjustment 0012 $-4,611.60
27146(04) 0317 QGELITE 2FT0IN WIDE 8 BAY IMPACT ATTEN. Stockpiled Material Adjustment 0014 $-33,780.88
27146(04) 0317 QGELITE 2FT0IN WIDE 8 BAY IMPACT ATTEN. Stockpiled Material Initial Payment 0014 $33,780.88
27146(04) 0354 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
27146(04) 0354 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
27146(04) 0354 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
27146(04) 0354 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
27146(04) 0354 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
27146(04) 0354 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
27146(04) 0354 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
27146(04) 0354 ROUND MACHINE HEAD SCREWS Stockpiled Material Initial Payment 0013 $6.02
27146(04) 0355 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
27146(04) 0355 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
27146(04) 0355 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
27146(04) 0355 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
27146(04) 0355 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
27146(04) 0355 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
27146(04) 0355 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
27146(04) 0355 ROUND MACHINE HEAD SCREWS Stockpiled Material Initial Payment 0013 $6.02
27146(04) 0356 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $5,084.96
27146(04) 0356 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $12,573.82
27146(04) 0356 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $1,698.46
27146(04) 0356 HARDWARE Stockpiled Material Initial Payment 0013 $2,763.92
27146(04) 0356 STEEL PLATE, BEAM AND FLAT BAR Stockpiled Material Initial Payment 0013 $3,171.56
27146(04) 0356 PIPE BENDING Stockpiled Material Initial Payment 0013 $4,123.34
27146(04) 0356 STEEL PIPE Stockpiled Material Initial Payment 0013 $20,992.46
27146(04) 0356 ROUND MACHINE HEAD SCREWS Stockpiled Material Initial Payment 0013 $12.04
27146(04) 0357 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $2,542.48
27146(04) 0357 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $6,286.91
27146(04) 0357 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $849.23
27146(04) 0357 HARDWARE Stockpiled Material Initial Payment 0013 $1,381.96
27146(04) 0357 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $1,585.78
27146(04) 0357 PIPE BENDING Stockpiled Material Initial Payment 0013 $2,061.67
27146(04) 0357 STEEL PIPE Stockpiled Material Initial Payment 0013 $10,496.23
27146(04) 0357 ROUND HEAD MACHINE SCREWS Stockpiled Material Initial Payment 0013 $6.02
27146(04) 0358 HARDWARE AND PLATES Stockpiled Material Initial Payment 0013 $10,169.92
27146(04) 0358 BASE/HAND HOLE PLATES Stockpiled Material Initial Payment 0013 $25,147.64
27146(04) 0358 U-BOLTS AND HARDWARE Stockpiled Material Initial Payment 0013 $3,396.92
27146(04) 0358 HARDWARE Stockpiled Material Initial Payment 0013 $5,527.84
27146(04) 0358 STEEL PLATE, BEAM, AND FLAT BAR Stockpiled Material Initial Payment 0013 $6,343.12
27146(04) 0358 PIPE BENDING Stockpiled Material Initial Payment 0013 $8,246.68
27146(04) 0358 STEEL PIPE Stockpiled Material Initial Payment 0013 $41,984.92
27146(04) 0358 ROUND HEAD MACHINE SCREWS Stockpiled Material Initial Payment 0013 $24.08
27146(04) 0373 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0014 $-7,898.00
27146(04) 0373 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Adjustment 0016 $-4,308.00
27146(04) 0373 38' POLE, TENON TOP GV, AB, W/TEMP Stockpiled Material Initial Payment 0013 $83,288.00
27146(04) 0374 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0014 $2,560.00
27146(04) 0374 DESIGN B BREAKAWAY BASE Stockpiled Material Initial Payment 0013 $29,696.00
27146(04) 0374 DESIGN B BREAKAWAY BASE Stockpiled Material Adjustment 0016 $-1,536.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0012 $-13,776.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Initial Payment 0005 $64,452.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0016 $-2,952.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Adjustment 0014 $-5,412.00
27146(04) 0375 ROADWAY LUMINAIRE Stockpiled Material Closure 0005 $0.00
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Initial Payment 0005 $9,962.64
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0014 $-1,085.04
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0016 $-591.84
27146(04) 0375 ROADWAY LUMINAIRE (Mast Arm) Stockpiled Material Adjustment 0012 $-2,761.92
27146(04) 0375 ROADWAY LUMINAIRE (Double Mast Arm) Stockpiled Material Initial Payment 0005 $1,650.00
27146(04) 0375 ROADWAY LUMINAIRE (Double Mast Arm) Stockpiled Material Adjustment 0012 $-1,650.00
Subtotals For Stockpile Payments $671,108.31


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.
Subtotals For Liquidated Damages $


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
26300(09) 0001 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0006 7,732.00 $0.05 $414.05
26300(09) 0001 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0007 1,848.00 $0.02 $43.52
26300(09) 0001 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0011 1,700.70 $-0.06 $-111.48
26300(09) 0001 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0012 15,315.58 $-0.06 $-1,003.94
26300(09) 0016 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0012 103.36 $0.63 $65.86
26300(09) 0018 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0002 1,237.65 $-0.17 $-214.83
26300(09) 0018 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0008 -33.00 $0.43 $-14.47
26300(09) 0115 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0011 1,376.04 $0.55 $767.21
26300(09) 0115 SUPERPAVE, TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0012 242.37 $0.55 $135.13
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0003 6,390.00 $0.01 $112.15
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0004 488.00 $0.01 $8.56
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0005 7,740.00 $0.05 $414.48
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0006 4,360.00 $0.05 $233.48
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0007 752.00 $0.02 $17.71
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0008 788.00 $0.02 $18.56
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0009 2,184.00 $-0.01 $-25.23
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0010 340.50 $-0.01 $-3.93
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0011 879.50 $-0.06 $-57.65
27146(04) 0120 UNCLASSIFIED EXCAVATION Fuel Price Adjustment 0012 5,912.00 $-0.06 $-387.53
27146(04) 0135 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0010 16.06 $0.63 $10.23
27146(04) 0135 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0011 38.20 $0.63 $24.34
27146(04) 0135 SUPERPAVE, TYPE S4(PG 76-28 OK) Asphalt Binder Adjustment 0012 90.69 $0.63 $57.79
27146(04) 0136 SUPERPAVE, TYPE S4(PG 64-22 OK) Asphalt Binder Adjustment 0010 30.73 $0.63 $19.58
27146(04) 0136 SUPERPAVE, TYPE S4(PG 64-22 OK) Asphalt Binder Adjustment 0011 94.52 $0.63 $60.23
27146(04) 0136 SUPERPAVE, TYPE S4(PG 64-22 OK) Asphalt Binder Adjustment 0012 54.34 $0.63 $34.63
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0001 886.84 $-0.17 $-153.94
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0002 739.16 $-0.17 $-128.30
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0003 236.56 $-0.17 $-41.06
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0004 276.64 $-0.17 $-48.02
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0009 62.55 $0.70 $44.01
27146(04) 0137 SUPERPAVE, TYPE S5(PG 64-22 OK) Asphalt Binder Adjustment 0012 51.43 $0.70 $36.19
Subtotals For Line Item Adjustments $327.33


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
01 TIME 'B' BID NOT ENTERED NOT ENTERED 400.00 DYS $15,000.00 N
02 TIME 'C' BID NOT ENTERED NOT ENTERED 130.00 DYS $10,000.00 N


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
No milestones adjustments exist for this contract.
Subtotals For Milestones $

Line Item Detail

Contract ID: 110453   Estimate Number: 0017     Primary JP: 27146(04)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    IMY-244-2(500)014 Project:    26300(09) Category:    0100/ROADWAY - IMY-244-2(500)014
0001 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 28,000.000 28,000.000   26,596.280 $9.05 $0.00 $240,696.34
0002 UNCLASSIFIED BORROW 202(D) 0184 CY 2,000.000 2,000.000   0.000 $2.00 $0.00 $0.00
0003 TEMPORARY SILT FENCE 221(C) 2801 LF 41,900.000 41,900.000   12,389.000 $2.56 $0.00 $31,715.84
0004 TEMPORARY SILT DIKE 221(F) 0100 LF 30.000 30.000   252.000 $7.11 $0.00 $1,791.72
0005 SOLID SLAB SODDING 230(A) 2806 SY 28,000.000 28,000.000   0.000 $1.44 $0.00 $0.00
0006 VEGETATIVE MULCHING 233(A) 2817 AC 3.000 3.000   0.000 $207.34 $0.00 $0.00
0007 MOWING 241 2832 AC 225.000 225.000   0.000 $49.00 $0.00 $0.00
0008 AGGREGATE BASE TYPE A 303(A) 2100 CY 19,017.000 19,017.000   9,858.880 $26.93 $0.00 $265,499.65
0009 LIME 307(D) 4230 TON 2,261.000 100.000   0.000 $156.37 $0.00 $0.00
0010 LIME STABILIZED SUBGRADE 307(H) 4270 SY 104,690.000 4,630.000   0.000 $1.96 $0.00 $0.00
0011 CEMENT TREATED BASE 317 4270 SY 104,690.000 104,690.000 175.000 58,364.040 $10.91 $1,909.25 $636,751.67
0012 SEPARATOR FABRIC 325 5271 SY 135,270.000 135,270.000   77,567.000 $1.10 $0.00 $85,323.70
0013 GEOGRID REINFORCEMENT 326(B) 0100 SY 5,000.000 5,000.000   0.000 $2.60 $0.00 $0.00
0014 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 3,176.000 3,176.000 -0.230 1,137.170 $11.54 $-2.65 $13,122.94
0015 PRIME COAT 408 5774 GAL 39,665.000 39,665.000   0.000 $3.94 $0.00 $0.00
0016 SUPERPAVE, TYPE S4(PG 76-28 OK) 411(C) 5950 TON 500.000 500.000   103.360 $90.00 $0.00 $9,302.40
0017 SUPERPAVE, TYPE S4(PG 64-22 OK) 411(C) 5960 TON 37.000 37.000 0.000 69.390 $80.00 $0.00 $5,551.20
0018 SUPERPAVE, TYPE S5(PG 64-22 OK) 411(D) 5975 TON 1,515.000 1,515.000   1,204.650 $90.00 $0.00 $108,418.50
0019 COLD MILLING PAVEMENT 412 5267 SY 15,200.000 15,200.000   0.000 $1.11 $0.00 $0.00
0020 P.C.CONCRETE PAVEMENT(PLACEMENT) 414(A) 0210 SY 28,031.000 28,031.000 -430.390 11,642.860 $11.58 $-4,983.92 $134,824.32
0021 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(B) 5725 SY 67,251.000 67,251.000 -198.000 31,216.080 $12.67 $-2,508.66 $395,507.73
0022 P.C. CONCRETE FOR PAVEMENT 414(G) 5275 CY 25,144.000 25,144.000 -223.710 11,125.380 $89.79 $-20,086.92 $998,947.88
0023 CONCRETE PARAPET 504(E) 1381 LF 842.000 842.000   0.000 $61.35 $0.00 $0.00
0024 42" F-SHAPED PARAPET 504(E) 6190 LF 5,271.000 5,271.000 713.000 1,755.000 $52.16 $37,190.08 $91,540.80
0025 CLASS A CONCRETE 509(B) 0321 CY 50.000 50.000   0.000 $300.00 $0.00 $0.00
0026 CLASS C CONCRETE 509(D) 0325 CY 251.000 251.000 18.420 114.800 $212.25 $3,909.65 $24,366.32
0027 REINFORCING STEEL 511(A) 0332 LB 154,713.000 154,713.000   67,560.000 $0.75 $0.00 $50,670.00
0028 CONCRETE CURB (6" BARRIER-INTEGRAL) 609(A) 0300 LF 1,500.000 1,500.000 56.800 121.800 $1.37 $77.82 $166.87
0029 6" CONCRETE DIVIDING STRIP 610(C) 0609 SY 4,000.000 4,000.000 16.110 32.910 $34.15 $550.16 $1,123.88
0030 18" R.C.PIPE CLASS III 613(A) 0491 LF 500.000 500.000   0.000 $57.41 $0.00 $0.00
0031 24" R.C.PIPE CLASS III 613(A) 0492 LF 500.000 500.000   0.000 $69.37 $0.00 $0.00
0032 30" R.C.PIPE CLASS III 613(A) 0493 LF 500.000 500.000   0.000 $99.60 $0.00 $0.00
0033 36" R.C.PIPE CLASS III 613(A) 0494 LF 500.000 500.000   0.000 $119.73 $0.00 $0.00
0034 8" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 0500 LF 8,500.000 8,500.000   0.000 $14.66 $0.00 $0.00
0035 8" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 1097 LF 500.000 500.000 0.000 5,896.000 $9.77 $0.00 $57,603.92
0036 EDGE DRAIN CONDUIT-PERFORATED 613(J) 5915 LF 42,342.000 42,342.000   23,120.000 $4.65 $0.00 $107,508.00
0037 EDGE DRAIN OUTLET LATERAL-NONPERFORATED 613(K) 5916 LF 4,235.000 4,235.000   1,607.500 $11.21 $0.00 $18,020.08
0038 OUTLET LATERAL HEADWALL 613(Q) 5946 EA 212.000 212.000 0.000 27.000 $190.36 $0.00 $5,139.72
0039 (PL)VIDEO INSPECTION OF CONDUIT 613(Y) 0100 LF 5,000.000 5,000.000   2,161.100 $2.00 $0.00 $4,322.20
0040 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 36,421.000 36,421.000 73.830 19,127.610 $2.50 $184.58 $47,819.04
0041 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY 619(B) 4763 SY 57,841.000 57,841.000 8,095.000 45,411.130 $3.50 $28,332.50 $158,938.96
0042 REMOVAL OF GUARDRAIL 619(B) 4780 LF 4,632.000 4,632.000 3,143.000 4,248.000 $3.01 $9,460.43 $12,786.48
0043 REMOVAL OF CONCRETE MEDIAN BARRIER 619(B) 4915 LF 210.000 210.000 63.500 277.200 $23.27 $1,477.65 $6,450.45
0044 SAWING PAVEMENT 619(C) 0924 LF 21,000.000 21,000.000 820.000 14,342.000 $1.61 $1,320.20 $23,090.62
0045 CLEAN STORM DRAIN, 12" TO 30" DIAMETER 619(H) 0200 LF 1,025.000 1,025.000   418.000 $4.75 $0.00 $1,985.50
0046 CLEAN STORM DRAIN, 36" TO 60" DIAMETER 619(H) 0210 LF 715.000 715.000   186.000 $7.25 $0.00 $1,348.50
0047 BEAM GUARDRAIL W-BEAM SINGLE 623(A) 1418 LF 400.000 400.000   361.000 $15.64 $0.00 $5,646.04
0048 GUARDRAIL ANCHOR UNIT (TYPE D-BF) 623(F) 5686 EA 2.000 2.000   0.000 $2,548.29 $0.00 $0.00
0049 GUARDRAIL END TREATMENT (GET) 623(G) 8571 EA 1.000 1.000   1.000 $2,200.79 $0.00 $2,200.79
0050 GUARDRAIL BRIDGE CONNECTION-TYPE A 623(I) 8675 EA 1.000 1.000   0.000 $1,476.85 $0.00 $0.00
0051 (SP)IMPACT ATTENUATOR 871(A) 8325 EA 12.000 12.000   0.000 $10,869.11 $0.00 $0.00
8003 FLY ASH 307(A) 4200 TON 0.000 2,652.000 98.980 3,083.500 $71.01 $7,028.57 $218,959.33
8004 CEMENTITIOUS STABILIZED SUBGRADE 307(E) 4240 SY 0.000 104,690.000   62,617.970 $1.67 $0.00 $104,572.01
8005 CEMENT KILN DUST 307(B) 4210 TON 0.000 1,137.000   0.000 $90.44 $0.00 $0.00
Subtotals For Category     0100/ROADWAY - IMY-244-2(500)014    $63,858.74 $3,871,713.40
Fed/State Project Number:    IMY-244-2(500)014 Project:    26300(09) Category:    0200/BRIDGE 73 - IMY-244-2(500)014
0052 CLSM BACKFILL 501(G) 6309 CY 229.200 229.200   0.000 $125.00 $0.00 $0.00
0053 (PL)FALSEWORK JACKING 502 6116 LSUM 1.000 1.000   0.000 $16,053.55 $0.00 $0.00
0054 APPROACH SLAB 504(A) 1304 SY 313.800 313.800   0.000 $154.61 $0.00 $0.00
0055 SAW-CUT GROOVING 504(B) 1305 SY 1,403.000 1,403.000   0.000 $4.17 $0.00 $0.00
0056 SEALED EXPANSION JOINT 504(C) 6250 LF 127.500 127.500   0.000 $247.17 $0.00 $0.00
0057 CONCRETE PARAPET 504(E) 1381 LF 378.300 378.300   0.000 $39.04 $0.00 $0.00
0058 42" F-SHAPED PARAPET 504(E) 6190 LF 387.100 387.100   0.000 $50.18 $0.00 $0.00
0059 STRUCTURAL STEEL 506(A) 1322 LB 5,030.000 5,030.000   0.000 $8.25 $0.00 $0.00
0060 CLASS AA CONCRETE 509(A) 1326 CY 243.300 243.300   0.000 $741.28 $0.00 $0.00
0061 CLASS A CONCRETE 509(B) 1328 CY 24.400 24.400   0.000 $2,258.22 $0.00 $0.00
0062 SLOPE WALL (4") 510(C) 6134 SY 35.000 35.000   0.000 $81.68 $0.00 $0.00
0063 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 77,110.000 77,110.000   0.000 $0.84 $0.00 $0.00
0064 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   0.800 $103,784.71 $0.00 $83,027.76
0065 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   0.050 $25,946.18 $0.00 $1,297.31
0066 ANODE 513(D) 6025 EA 360.000 360.000   0.000 $90.64 $0.00 $0.00
0067 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 721.000 721.000   0.000 $4.05 $0.00 $0.00
0068 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 100.000 100.000   0.000 $35.02 $0.00 $0.00
0069 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 2.600 2.600   0.000 $80.81 $0.00 $0.00
0070 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 60.000 60.000   19.660 $673.72 $0.00 $13,245.34
0071 (SP)CARBON FIBER-REINFORCED POLYMER 524(A) 6610 SF 849.900 849.900   901.410 $30.30 $0.00 $27,312.72
0072 (SP)CORROSION INHIBITOR(SURFACE APPLIED) 535 6130 SY 60.000 60.000   0.000 $100.34 $0.00 $0.00
0073 (PL)REPAIR BRIDGE ITEM (TYPE A) 540 4515 EA 1.000 1.000   0.000 $13,940.43 $0.00 $0.00
0074 (PL)REPLACE BRIDGE ITEMS 545 4805 EA 4.000 4.000 4.000 4.000 $2,697.70 $10,790.80 $10,790.80
0075 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000 1.000 1.000 $53,579.64 $53,579.64 $53,579.64
Subtotals For Category     0200/BRIDGE 73 - IMY-244-2(500)014    $64,370.44 $189,253.57
Fed/State Project Number:    IMY-244-2(500)014 Project:    26300(09) Category:    0301/TRAFFIC SIGNING & STRIPING - IMY-244-2(500)014
0076 DRILLED SHAFTS 60" DIAMETER 516(A) 6096 LF 140.000 140.000   81.980 $360.77 $0.00 $29,575.92
0077 STRUCTURAL CONCRETE 804(A) 2915 CY 12.580 12.580   0.000 $679.32 $0.00 $0.00
0078 REINFORCING STEEL 804(B) 2916 LB 2,072.000 2,072.000   0.000 $1.70 $0.00 $0.00
0079 (PL)REMOVAL OF OVERHEAD SIGN STRUCTURE & SIGNS 805(A) 8718 LSUM 1.000 1.000   0.800 $13,586.39 $0.00 $10,869.11
0080 (PL)REMOVAL OF GROUND MOUNTED SIGNS 805(A) 8720 LSUM 1.000 1.000   0.800 $6,793.20 $0.00 $5,434.56
0081 (PL)REMOVAL OF EXISTING SIGNS 805(A) 8722 LSUM 1.000 1.000   0.800 $6,793.20 $0.00 $5,434.56
0082 (PL)REMOVE & RESET EXISTING SIGNS 805(D) 8756 EA 3.000 3.000   0.000 $1,358.64 $0.00 $0.00
0083 SHEET ALUMINUM SIGNS 850(A) 8110 SF 536.970 536.970   0.000 $16.30 $0.00 $0.00
0084 EXTRUDED ALUMINUM PANEL SIGNS 850(B) 8112 SF 694.500 694.500   0.000 $24.46 $0.00 $0.00
0085 EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) 850(B) 8114 SF 757.750 757.750   0.000 $24.46 $0.00 $0.00
0086 4"@13 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3206 LF 105.000 105.000   0.000 $38.04 $0.00 $0.00
0087 6"@15 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3207 LF 188.750 188.750   0.000 $40.76 $0.00 $0.00
0088 6"@20 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3208 LF 52.130 52.130   0.000 $44.84 $0.00 $0.00
0089 2 1/2"@5.79 GALV.STEEL PIPE POST 851(B) 3217 LF 32.000 32.000   0.000 $29.89 $0.00 $0.00
0090 3"@7.58 GALV.STEEL PIPE POST 851(B) 3218 LF 114.000 114.000   0.000 $32.61 $0.00 $0.00
0091 3 1/2"@9.11 GALV.STEEL PIPE POST 851(B) 3219 LF 88.000 88.000   0.000 $35.33 $0.00 $0.00
0092 2" SQUARE TUBE POST 851(C) 8324 LF 660.500 660.500   0.000 $8.15 $0.00 $0.00
0093 OVHD.SN.STR., MONOTUBE TYPE B 75' 852(D) 0305 EA 1.000 1.000   0.000 $81,518.32 $0.00 $0.00
0094 OVHD.SN.STR., MONOTUBE TYPE B 95' 852(D) 0325 EA 1.000 1.000   0.000 $101,897.90 $0.00 $0.00
0095 OVHD.SN.STR., MONOTUBE TYPE C 852(E) 0500 EA 1.000 1.000   0.000 $61,138.74 $0.00 $0.00
0096 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 856(A) 8530 LF 62,040.000 62,040.000   0.000 $0.61 $0.00 $0.00
0097 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) 856(A) 8535 LF 19,608.000 19,608.000   0.000 $0.88 $0.00 $0.00
0098 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) 856(A) 8540 LF 2,480.000 2,480.000   0.000 $1.36 $0.00 $0.00
0099 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) 856(A) 8548 LF 1,308.000 1,308.000   0.000 $4.08 $0.00 $0.00
0100 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) 856(A) 8555 LF 32.000 32.000   0.000 $27.17 $0.00 $0.00
Subtotals For Category     0301/TRAFFIC SIGNING & STRIPING - IMY-244-2(500)014    $0.00 $51,314.15
Fed/State Project Number:    IMY-244-2(500)014 Project:    26300(09) Category:    0302/TRAFFIC LIGHTING - IMY-244-2(500)014
0101 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 441.000 441.000   0.000 $13.91 $0.00 $0.00
0102 2" PVC SCH.40 PLASTIC CONDUIT BORED 802(B) 8340 LF 360.000 360.000   140.000 $21.77 $0.00 $3,047.80
0103 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8342 LF 23,938.000 23,938.000   7,614.000 $5.44 $0.00 $41,420.16
0104 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   0.000 $604.79 $0.00 $0.00
0105 PULL BOX(SIZE I) 803(A) 8065 EA 8.000 8.000   6.000 $332.63 $0.00 $1,995.78
0106 STRUCTURAL CONCRETE 804(A) 2915 CY 62.640 62.640 0.000 8.120 $689.46 $0.00 $5,598.42
0107 REINFORCING STEEL 804(B) 2916 LB 3,607.200 3,607.200   0.000 $1.63 $0.00 $0.00
0108 (PL)REMOVAL OF LIGHT POLE 805(A) 8712 EA 92.000 92.000   18.000 $217.73 $0.00 $3,919.14
0109 38' MTG.HT.HL.PTP.(G.STL.) 806(D) 8997 EA 108.000 108.000   0.000 $1,487.78 $0.00 $0.00
0110 BREAKAWAY BASE (DES. B) 807 8092 EA 108.000 108.000   0.000 $489.88 $0.00 $0.00
0111 ROADWAY LUMINAIRE 809(A) 8090 EA 108.000 108.000   0.000 $1,120.07 $0.00 $0.00
0112 SERVICE POLE 810(A) 3118 EA 2.000 2.000   2.000 $7,106.29 $0.00 $14,212.58
0113 1/C NO.4 ELECTRICAL CONDUCTOR 811 8038 LF 69,852.000 69,852.000   0.000 $2.54 $0.00 $0.00
0114 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 10,260.000 10,260.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0302/TRAFFIC LIGHTING - IMY-244-2(500)014    $0.00 $70,193.88
Fed/State Project Number:    IMY-244-2(500)014 Project:    26300(09) Category:    0304/CABLE BARRIER - IMY-244-2(500)014
0115 SUPERPAVE, TYPE S3(PG 64-22 OK) 411(B) 5945 TON 1,660.000 1,660.000 91.160 1,757.970 $80.00 $7,292.80 $140,637.60
0116 CLASS AA CONCRETE 509(A) 0319 CY 100.000 100.000   0.000 $521.24 $0.00 $0.00
0117 REMOVAL OF CABLE BARRIER 619(B) 5190 LF 9,115.000 9,115.000   9,142.000 $3.47 $0.00 $31,722.74
0118 INSTALLATION OF CABLE BARRIER SYSTEM 628 5180 LF 7,002.000 7,002.000   0.000 $5.79 $0.00 $0.00
0119 END ANCHORS 628(C) 5110 EA 2.000 2.000   0.000 $2,895.78 $0.00 $0.00
Subtotals For Category     0304/CABLE BARRIER - IMY-244-2(500)014    $7,292.80 $172,360.34
Subtotals For Project IMY-244-2(500)014 /26300(09) $135,521.98 $4,354,835.34


Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0100/ROADWAY - IMY-244-2(499) 011
0120 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 42,000.000 42,000.000   39,220.000 $9.05 $0.00 $354,941.01
0121 UNCLASSIFIED BORROW 202(D) 0184 CY 2,000.000 2,000.000   0.000 $2.00 $0.00 $0.00
0122 TEMPORARY SILT FENCE 221(C) 2801 LF 44,500.000 44,500.000   35,140.500 $2.56 $0.00 $89,959.68
0123 TEMPORARY SILT DIKE 221(F) 0100 LF 30.000 30.000   259.000 $7.11 $0.00 $1,841.49
0124 SOLID SLAB SODDING 230(A) 2806 SY 30,000.000 30,000.000   4,625.420 $1.44 $0.00 $6,660.60
0125 VEGETATIVE MULCHING 233(A) 2817 AC 4.000 4.000   0.000 $207.34 $0.00 $0.00
0126 MOWING 241 2832 AC 255.000 255.000   0.000 $49.00 $0.00 $0.00
0127 AGGREGATE BASE TYPE A 303(A) 2100 CY 31,124.000 31,124.000 1,214.080 23,168.650 $26.93 $32,695.17 $623,931.74
0128 LIME 307(D) 4230 TON 3,815.000 100.000   0.000 $156.37 $0.00 $0.00
0129 LIME STABILIZED SUBGRADE 307(H) 4270 SY 176,611.000 3,815.000   0.000 $1.96 $0.00 $0.00
0130 CEMENT TREATED BASE 317 4270 SY 176,611.000 176,611.000 13,311.710 130,167.940 $10.91 $145,230.76 $1,420,132.23
0131 SEPARATOR FABRIC 325 5271 SY 209,525.000 209,525.000 15,946.000 177,260.000 $1.10 $17,540.60 $194,986.00
0132 GEOGRID REINFORCEMENT 326(B) 0100 SY 5,000.000 5,000.000   0.000 $2.60 $0.00 $0.00
0133 TRAFFIC BOUND SURFACE COURSE TYPE E 402(E) 0225 TON 7,000.000 7,000.000 60.800 1,277.630 $11.54 $701.63 $14,743.85
0134 PRIME COAT 408 5774 GAL 65,708.000 65,708.000   0.000 $3.94 $0.00 $0.00
0135 SUPERPAVE, TYPE S4(PG 76-28 OK) 411(C) 5950 TON 500.000 500.000   232.840 $90.00 $0.00 $20,955.60
0136 SUPERPAVE, TYPE S4(PG 64-22 OK) 411(C) 5960 TON 232.000 232.000 20.330 199.920 $80.00 $1,626.40 $15,993.60
0137 SUPERPAVE, TYPE S5(PG 64-22 OK) 411(D) 5975 TON 2,120.000 2,120.000   2,289.260 $90.00 $0.00 $206,033.40
0138 COLD MILLING PAVEMENT 412 5267 SY 17,500.000 17,500.000   0.000 $1.11 $0.00 $0.00
0139 P.C.CONCRETE PAVEMENT(PLACEMENT) 414(A) 0210 SY 41,847.000 41,847.000 2,568.170 24,922.060 $11.58 $29,739.41 $288,597.45
0140 DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) 414(B) 5725 SY 124,640.000 124,640.000 9,069.320 78,415.360 $12.67 $114,908.28 $993,522.62
0141 P.C. CONCRETE FOR PAVEMENT 414(G) 5275 CY 43,934.000 43,934.000 3,121.550 28,586.130 $89.79 $280,283.97 $2,566,748.61
0142 42" F-SHAPED PARAPET 504(E) 6190 LF 20,287.000 20,287.000 1,652.000 14,463.500 $51.97 $85,854.44 $751,668.10
0143 CLASS A CONCRETE 509(B) 0321 CY 50.000 50.000   0.000 $300.00 $0.00 $0.00
0144 CLASS C CONCRETE 509(D) 0325 CY 663.000 663.000 43.400 406.130 $212.25 $9,211.65 $86,201.10
0145 SLOPE WALL (5") 510(C) 6135 SY 200.000 200.000   154.150 $70.00 $0.00 $10,790.50
0146 REINFORCING STEEL 511(A) 0332 LB 583,929.000 583,929.000   466,359.000 $0.75 $0.00 $349,769.25
0147 CONCRETE CURB (6" BARRIER-INTEGRAL) 609(A) 0300 LF 4,000.000 4,000.000 230.000 2,132.400 $1.37 $315.10 $2,921.40
0148 6" CONCRETE DIVIDING STRIP 610(C) 0609 SY 5,000.000 5,000.000 71.480 601.290 $39.56 $2,827.75 $23,787.04
0149 18" R.C.PIPE CLASS III 613(A) 0491 LF 500.000 500.000   100.250 $57.41 $0.00 $5,755.35
0150 24" R.C.PIPE CLASS III 613(A) 0492 LF 500.000 500.000 120.000 243.500 $69.37 $8,324.40 $16,891.60
0151 30" R.C.PIPE CLASS III 613(A) 0493 LF 500.000 500.000   200.600 $99.60 $0.00 $19,979.76
0152 36" R.C.PIPE CLASS III 613(A) 0494 LF 500.000 500.000   48.000 $119.73 $0.00 $5,747.04
0153 8" PERFORATED PIPE UNDERDRAIN ROUND 613(H) 0500 LF 1,500.000 1,500.000   830.000 $14.66 $0.00 $12,167.80
0154 8" NON-PERF.PIPE UNDERDRAIN RND. 613(I) 1097 LF 500.000 500.000   3,110.000 $9.77 $0.00 $30,384.70
0155 EDGE DRAIN CONDUIT-PERFORATED 613(J) 5915 LF 44,393.000 44,393.000 2,388.000 31,316.000 $4.65 $11,104.20 $145,619.41
0156 EDGE DRAIN OUTLET LATERAL-NONPERFORATED 613(K) 5916 LF 4,440.000 4,440.000   2,584.000 $11.21 $0.00 $28,966.65
0157 OUTLET LATERAL HEADWALL 613(Q) 5946 EA 214.000 214.000   71.000 $190.36 $0.00 $13,515.56
0158 (PL)VIDEO INSPECTION OF CONDUIT 613(Y) 0100 LF 5,000.000 5,000.000   5,226.100 $2.00 $0.00 $10,452.20
0159 REMOVAL OF ASPHALT PAVEMENT 619(B) 4728 SY 47,972.000 47,972.000 1,282.000 51,745.460 $2.50 $3,205.00 $129,363.67
0160 REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY 619(B) 4763 SY 114,775.000 114,775.000 1,418.000 112,366.640 $3.50 $4,963.00 $393,283.26
0161 REMOVAL OF GUARDRAIL 619(B) 4780 LF 21,137.000 21,137.000 495.000 19,388.000 $3.01 $1,489.95 $58,357.88
0162 REMOVAL OF CONCRETE MEDIAN BARRIER 619(B) 4915 LF 1,180.000 1,180.000   1,652.600 $20.08 $0.00 $33,184.21
0163 SAWING PAVEMENT 619(C) 0924 LF 22,500.000 22,500.000 2,778.000 24,649.400 $1.61 $4,472.58 $39,685.53
0164 CLEAN STORM DRAIN, 12" TO 30" DIAMETER 619(H) 0200 LF 3,150.000 3,150.000   769.500 $4.75 $0.00 $3,655.13
0165 CLEAN STORM DRAIN, 36" TO 60" DIAMETER 619(H) 0210 LF 1,900.000 1,900.000   1,186.800 $7.25 $0.00 $8,604.30
0166 BEAM GUARDRAIL W-BEAM SINGLE 623(A) 1418 LF 2,483.000 2,483.000 96.000 981.000 $15.64 $1,501.44 $15,342.84
0167 GUARDRAIL ANCHOR UNIT (TYPE D-BF) 623(F) 5686 EA 3.000 3.000   0.000 $2,200.00 $0.00 $0.00
0168 GUARDRAIL BRIDGE CONNECTION-TYPE A 623(I) 8675 EA 6.000 6.000   3.000 $1,275.00 $0.00 $3,825.00
0169 CONCRETE LONGITUDINAL BARRIER, DESIGN 1 627(A) 4317 LF 3,391.000 3,391.000   0.000 $52.62 $0.00 $0.00
0170 CONCRETE LONGITUDINAL BARRIER END SECTIONS 627(B) 4410 EA 2.000 2.000   0.000 $1,178.07 $0.00 $0.00
0171 (SP)IMPACT ATTENUATOR 871(A) 8325 EA 22.000 22.000   0.000 $9,383.58 $0.00 $0.00
8006 FLY ASH 307(A) 4200 TON 0.000 4,473.000 145.000 6,549.560 $71.01 $10,296.45 $465,084.24
8007 CEMENTITIOUS STABILIZED SUBGRADE 307(E) 4240 SY 0.000 176,611.000 1,600.000 148,321.420 $1.67 $2,672.00 $247,696.78
8008 CEMENT KILN DUST 307(B) 4210 TON 0.000 1,917.000   204.420 $90.44 $0.00 $18,487.74
8010 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) 857(C) 8851 LF 0.000 75,000.000   44,865.000 $0.93 $0.00 $41,724.45
Subtotals For Category     0100/ROADWAY - IMY-244-2(499) 011    $768,964.18 $9,771,960.37
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0200/BRIDGE NO. 64 - IMY-244-2(499)011
0172 42" F-SHAPED PARAPET 504(E) 6190 LF 35.000 35.000 0.000 54.000 $39.39 $0.00 $2,127.06
0173 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 300.000 300.000   300.000 $0.87 $0.00 $261.00
0174 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 154.000 154.000   0.000 $4.05 $0.00 $0.00
0175 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   0.500 $22,105.57 $0.00 $11,052.79
0176 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 150.000 150.000   0.000 $13.79 $0.00 $0.00
0177 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   0.000 $368.92 $0.00 $0.00
0178 1/C NO.2 ELECTRICAL CONDUCTOR 811 8036 LF 150.000 150.000   0.000 $3.63 $0.00 $0.00
0179 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 150.000 150.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0200/BRIDGE NO. 64 - IMY-244-2(499)011    $0.00 $13,440.85
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0201/BRIDGE NO. 65 - IMY-244-2(499)011
0180 (PL)FALSEWORK JACKING 502 6116 LSUM 1.000 1.000   1.000 $15,767.18 $0.00 $15,767.18
0181 APPROACH SLAB 504(A) 1304 SY 687.800 687.800   687.800 $125.69 $0.00 $86,449.59
0182 SAW-CUT GROOVING 504(B) 1305 SY 1,528.000 1,528.000   764.000 $4.17 $0.00 $3,185.88
0183 SEALED EXPANSION JOINT 504(C) 6250 LF 159.700 159.700   159.700 $234.58 $0.00 $37,462.43
0184 42" F-SHAPED PARAPET 504(E) 6190 LF 416.600 416.600   208.300 $50.79 $0.00 $10,579.56
0185 CLASS AA CONCRETE 509(A) 1326 CY 247.500 247.500   247.500 $618.94 $0.00 $153,187.66
0186 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 77,790.000 77,790.000   77,790.000 $0.84 $0.00 $65,343.60
0187 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   1.000 $20,849.61 $0.00 $20,849.61
0188 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   0.100 $5,212.40 $0.00 $521.24
0189 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 299.000 299.000   0.000 $4.05 $0.00 $0.00
0190 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 30.000 30.000   45.740 $30.23 $0.00 $1,382.72
0191 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 3.000 3.000   1.500 $69.76 $0.00 $104.64
0192 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 30.000 30.000   11.960 $581.64 $0.00 $6,956.41
0193 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   1.000 $50,011.80 $0.00 $50,011.80
0194 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 160.000 160.000   0.000 $13.79 $0.00 $0.00
0195 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   0.000 $368.92 $0.00 $0.00
0196 1/C NO.2 ELECTRICAL CONDUCTOR 811 8036 LF 160.000 160.000   0.000 $3.63 $0.00 $0.00
0197 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 160.000 160.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0201/BRIDGE NO. 65 - IMY-244-2(499)011    $0.00 $451,802.32
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0202/BRIDGE NO. 66 - IMY-244-2(499)011
0198 42" F-SHAPED PARAPET 504(E) 6190 LF 70.000 70.000   35.000 $50.63 $0.00 $1,772.05
0199 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 600.000 600.000   600.000 $0.87 $0.00 $522.00
0200 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 308.000 308.000   0.000 $4.05 $0.00 $0.00
0201 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   0.500 $18,643.20 $0.00 $9,321.60
0202 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 180.000 180.000   0.000 $13.79 $0.00 $0.00
0203 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   0.000 $368.92 $0.00 $0.00
0204 1/C NO.2 ELECTRICAL CONDUCTOR 811 8036 LF 180.000 180.000   0.000 $3.63 $0.00 $0.00
0205 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 180.000 180.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0202/BRIDGE NO. 66 - IMY-244-2(499)011    $0.00 $11,615.65
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0203/BRIDGE NO. 67 -IMY-244-2(499)011
0206 (PL)FALSEWORK JACKING 502 6116 LSUM 1.000 1.000   1.000 $18,384.41 $0.00 $18,384.42
0207 APPROACH SLAB 504(A) 1304 SY 433.400 433.400   433.400 $130.49 $0.00 $56,554.36
0208 SAW-CUT GROOVING 504(B) 1305 SY 1,279.000 1,279.000   639.500 $4.17 $0.00 $2,666.72
0209 SEALED EXPANSION JOINT 504(C) 6250 LF 124.130 124.130   124.130 $234.58 $0.00 $29,118.42
0210 42" F-SHAPED PARAPET 504(E) 6190 LF 425.600 425.600   212.800 $50.47 $0.00 $10,740.02
0211 CLASS AA CONCRETE 509(A) 1326 CY 245.200 245.200   245.200 $642.19 $0.00 $157,464.98
0212 MECHANICAL SPLICES 511 6306 EA 700.000 700.000   700.000 $12.28 $0.00 $8,596.00
0213 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 74,000.000 74,000.000   74,000.000 $0.84 $0.00 $62,160.00
0214 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   1.000 $19,459.63 $0.00 $19,459.64
0215 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   0.100 $4,864.91 $0.00 $486.49
0216 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 298.000 298.000   0.000 $4.05 $0.00 $0.00
0217 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 30.000 30.000   29.900 $30.23 $0.00 $903.88
0218 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 3.000 3.000   1.250 $69.76 $0.00 $87.20
0219 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 30.000 30.000   40.500 $581.64 $0.00 $23,556.42
0220 SEALER CRACK PREPARATION 523(A) 6550 LF 345.100 345.100   0.000 $3.47 $0.00 $0.00
0221 SEALER RESIN 523(B) 6560 GAL 4.000 4.000   0.000 $115.83 $0.00 $0.00
0222 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   1.000 $50,236.56 $0.00 $50,236.56
0223 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 170.000 170.000   163.000 $13.79 $0.00 $2,247.77
0224 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   2.000 $368.92 $0.00 $737.84
0225 1/C NO.2 ELECTRICAL CONDUCTOR 811 8036 LF 170.000 170.000   0.000 $3.63 $0.00 $0.00
0226 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 170.000 170.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0203/BRIDGE NO. 67 -IMY-244-2(499)011    $0.00 $443,400.72
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0204/BRIDGE NO. 68 - IMY-244-2(499)011
0227 (PL)FALSEWORK JACKING 502 6116 LSUM 1.000 1.000 -4.500 1.000 $48,259.08 $-217,165.86 $48,259.08
0228 APPROACH SLAB 504(A) 1304 SY 486.500 486.500   243.500 $128.92 $0.00 $31,392.02
0229 SAW-CUT GROOVING 504(B) 1305 SY 1,921.000 1,921.000   960.500 $4.17 $0.00 $4,005.29
0230 SEALED EXPANSION JOINT 504(C) 6250 LF 151.850 151.850   77.300 $234.58 $0.00 $18,133.03
0231 42" F-SHAPED PARAPET 504(E) 6190 LF 533.300 533.300   266.650 $50.56 $0.00 $13,481.82
0232 CLASS AA CONCRETE 509(A) 1326 CY 405.600 405.600   203.000 $623.22 $0.00 $126,513.66
0233 MECHANICAL SPLICES 511 6306 EA 1,390.000 1,390.000   1,390.000 $16.38 $0.00 $22,768.20
0234 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 138,200.000 138,200.000 71,970.000 138,200.000 $0.84 $60,454.80 $116,088.00
0235 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000 0.300 0.700 $22,702.91 $6,810.87 $15,892.03
0236 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   0.100 $5,675.72 $0.00 $567.57
0237 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 402.000 402.000   0.000 $4.05 $0.00 $0.00
0238 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 50.000 50.000   0.000 $30.23 $0.00 $0.00
0239 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 5.000 5.000   0.000 $69.76 $0.00 $0.00
0240 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 50.000 50.000   9.640 $581.64 $0.00 $5,607.01
0241 SEALER CRACK PREPARATION 523(A) 6550 LF 313.000 313.000   0.000 $3.47 $0.00 $0.00
0242 SEALER RESIN 523(B) 6560 GAL 4.000 4.000   0.000 $115.83 $0.00 $0.00
0243 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000 0.500 1.000 $80,891.59 $40,445.80 $80,891.60
0244 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 230.000 230.000   0.000 $13.79 $0.00 $0.00
0245 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   0.000 $368.92 $0.00 $0.00
0246 1/C NO.2 ELECTRICAL CONDUCTOR 811 8036 LF 230.000 230.000   0.000 $3.63 $0.00 $0.00
0247 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 230.000 230.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0204/BRIDGE NO. 68 - IMY-244-2(499)011    $-109,454.39 $483,599.31
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0205/BRIDGE NO. 69 - IMY-244-2(499)011
0248 (PL)FALSEWORK JACKING 502 6116 LSUM 1.000 1.000   0.500 $39,880.77 $0.00 $19,940.39
0249 APPROACH SLAB 504(A) 1304 SY 289.200 289.200 0.000 289.200 $134.95 $0.00 $39,027.54
0250 SAW-CUT GROOVING 504(B) 1305 SY 1,501.800 1,501.800   750.900 $4.17 $0.00 $3,131.25
0251 SEALED EXPANSION JOINT 504(C) 6250 LF 124.000 124.000   124.000 $234.58 $0.00 $29,087.92
0252 42" F-SHAPED PARAPET 504(E) 6190 LF 500.000 500.000   250.000 $50.37 $0.00 $12,592.50
0253 CLASS AA CONCRETE 509(A) 1326 CY 341.700 341.700   341.700 $609.35 $0.00 $208,214.90
0254 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 121,940.000 121,940.000   121,940.000 $0.84 $0.00 $102,429.60
0255 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000   1.000 $22,702.91 $0.00 $22,702.91
0256 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   0.100 $5,675.72 $0.00 $567.57
0257 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 394.000 394.000   0.000 $4.05 $0.00 $0.00
0258 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 50.000 50.000   0.000 $30.23 $0.00 $0.00
0259 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 5.000 5.000   0.000 $69.76 $0.00 $0.00
0260 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 50.000 50.000   16.320 $581.64 $0.00 $9,492.36
0261 SEALER CRACK PREPARATION 523(A) 6550 LF 256.000 256.000   0.000 $3.47 $0.00 $0.00
0262 SEALER RESIN 523(B) 6560 GAL 4.000 4.000   0.000 $115.83 $0.00 $0.00
0263 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   1.000 $68,582.32 $0.00 $68,582.32
0264 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 230.000 230.000   128.000 $13.79 $0.00 $1,765.12
0265 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   2.000 $368.92 $0.00 $737.84
0266 1/C NO.2 ELECTRICAL CONDUCTOR 811 8036 LF 230.000 230.000   0.000 $3.63 $0.00 $0.00
0267 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 230.000 230.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0205/BRIDGE NO. 69 - IMY-244-2(499)011    $0.00 $518,272.22
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0206/BRIDGE NO. 70 - IMY-244-2(499)011
0268 42" F-SHAPED PARAPET 504(E) 6190 LF 52.500 52.500 0.000 72.200 $48.98 $0.00 $3,536.36
0269 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 450.000 450.000   450.000 $0.87 $0.00 $391.50
0270 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 231.000 231.000   0.000 $4.05 $0.00 $0.00
0271 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   1.000 $11,604.81 $0.00 $11,604.82
0272 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 220.000 220.000   0.000 $13.79 $0.00 $0.00
0273 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   0.000 $368.92 $0.00 $0.00
0274 1/C NO.2 ELECTRICAL CONDUCTOR 811 8036 LF 220.000 220.000   0.000 $3.63 $0.00 $0.00
0275 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 220.000 220.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0206/BRIDGE NO. 70 - IMY-244-2(499)011    $0.00 $15,532.68
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0207/BRIDGE NO. 71- IMY-244-2(499)011
0276 (PL)FALSEWORK JACKING 502 6116 LSUM 1.000 1.000   1.000 $23,172.02 $0.00 $23,172.03
0277 APPROACH SLAB 504(A) 1304 SY 474.400 474.400   237.000 $130.19 $0.00 $30,855.03
0278 SAW-CUT GROOVING 504(B) 1305 SY 1,532.500 1,532.500   1,532.500 $4.17 $0.00 $6,390.52
0279 SEALED EXPANSION JOINT 504(C) 6250 LF 117.740 117.740   59.000 $234.58 $0.00 $13,840.22
0280 42" F-SHAPED PARAPET 504(E) 6190 LF 532.600 532.600   266.000 $50.34 $0.00 $13,390.44
0281 CLASS AA CONCRETE 509(A) 1326 CY 297.400 297.400   148.700 $614.34 $0.00 $91,352.35
0282 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 102,240.000 102,240.000   102,240.000 $0.84 $0.00 $85,881.60
0283 PAINTING EXISTING STRUCTURES 512(A) 1323 LSUM 1.000 1.000 0.550 1.000 $25,482.85 $14,015.57 $25,482.85
0284 COLLECTION AND HANDLING OF WASTE 512(B) 6303 LSUM 1.000 1.000   0.050 $6,384.61 $0.00 $319.23
0285 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 421.000 421.000   0.000 $4.05 $0.00 $0.00
0286 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 30.000 30.000   0.000 $30.23 $0.00 $0.00
0287 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 3.000 3.000   0.250 $69.76 $0.00 $17.44
0288 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 30.000 30.000   87.560 $581.64 $0.00 $50,928.40
0289 SEALER CRACK PREPARATION 523(A) 6550 LF 243.500 243.500   0.000 $3.47 $0.00 $0.00
0290 SEALER RESIN 523(B) 6560 GAL 4.000 4.000   0.000 $115.83 $0.00 $0.00
0291 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000 0.500 1.000 $60,139.83 $30,069.92 $60,139.84
0292 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 220.000 220.000   0.000 $13.79 $0.00 $0.00
0293 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   0.000 $368.92 $0.00 $0.00
0294 1/C NO.2 ELECTRICAL CONDUCTOR 811 8036 LF 220.000 220.000   0.000 $3.63 $0.00 $0.00
0295 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 220.000 220.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0207/BRIDGE NO. 71- IMY-244-2(499)011    $44,085.49 $401,769.95
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0208/BRIDGE NO. 72 - IMY-244-2(499)011
0296 CLSM BACKFILL 501(G) 6309 CY 50.000 50.000   55.000 $98.24 $0.00 $5,403.20
0297 (PL)FALSEWORK JACKING 502 6116 LSUM 1.000 1.000   0.500 $5,745.13 $0.00 $2,872.57
0298 APPROACH SLAB 504(A) 1304 SY 230.100 230.100   115.050 $145.51 $0.00 $16,740.93
0299 SAW-CUT GROOVING 504(B) 1305 SY 579.200 579.200   289.600 $4.17 $0.00 $1,207.63
0300 CONCRETE PARAPET 504(E) 1381 LF 167.800 167.800   0.000 $39.44 $0.00 $0.00
0301 42" F-SHAPED PARAPET 504(E) 6190 LF 184.000 184.000 0.000 184.000 $50.15 $0.00 $9,227.60
0302 RAPID CURE JOINT SEALANT 504(G) 6390 LF 83.700 83.700   0.000 $28.96 $0.00 $0.00
0303 HYDRODEMOLITION 505(E) 1000 SY 557.200 557.200   557.200 $105.63 $0.00 $58,857.04
0304 CLASS AA CONCRETE 509(A) 1326 CY 77.500 77.500   44.800 $549.22 $0.00 $24,605.06
0305 EPOXY COATED REINFORCING STEEL 511(B) 6010 LB 12,600.000 12,600.000   6,544.000 $0.84 $0.00 $5,496.96
0306 WATER REPELLENT (VISUALLY INSPECTED) 515(A) 6013 SY 165.000 165.000   0.000 $4.05 $0.00 $0.00
0307 PREPARATION OF CRACKS, ABOVE WATER 520(A) 6058 LF 30.000 30.000   0.000 $30.23 $0.00 $0.00
0308 EPOXY RESIN, ABOVE WATER 520(C) 6060 GAL 3.000 3.000   0.000 $69.76 $0.00 $0.00
0309 PNEUMATICALLY PLACED MORTAR 521(A) 6210 SY 30.000 30.000   0.000 $581.64 $0.00 $0.00
0310 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   0.500 $6,810.68 $0.00 $3,405.34
0311 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 140.000 140.000   0.000 $13.79 $0.00 $0.00
0312 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   0.000 $368.92 $0.00 $0.00
0313 1/C NO.2 ELECTRICAL CONDUCTOR 811 8036 LF 140.000 140.000   0.000 $3.63 $0.00 $0.00
0314 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 140.000 140.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0208/BRIDGE NO. 72 - IMY-244-2(499)011    $0.00 $127,816.33
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0300/TRAFFIC CONTROL - IMY-244-2(499)011
0315 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) 857(A) 8839 LF 190,185.000 115,185.000 390.000 112,482.000 $0.27 $105.30 $30,370.14
0316 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) 857(F) 8006 LF 109,300.000 34,300.000 390.000 61,321.000 $0.34 $132.60 $20,849.14
0317 (SP)IMPACT ATTENUATOR 871(A) 8325 EA 21.000 21.000   10.000 $9,383.58 $0.00 $93,835.80
0318 (SP)CONST.ZONE IMPACT ATTEN. 871(B) 8705 SD 6,660.000 6,660.000 150.000 1,829.000 $27.17 $4,075.50 $49,693.93
0319 (PL)TRUCK MOUNTED ATTENUATOR 876(A) 8482 SD 2.000 2.000   0.000 $16,982.98 $0.00 $0.00
0320 DELIVER PORTABLE LONGITUDINAL BARRIER 877(B) 8484 LF 43,835.000 43,835.000 215.000 43,828.500 $10.51 $2,259.65 $460,637.55
0321 RELOCATION OF PORTABLE LONGITUDINAL BARRIER 877(C) 8486 LF 35,915.000 35,915.000 371.000 35,262.000 $3.12 $1,157.52 $110,017.44
0322 ARROW DISPLAY(TYPE C) 880(A) 8812 SD 2,226.000 2,226.000 74.000 1,063.000 $33.97 $2,513.78 $36,110.11
0323 CONSTRUCTION SIGNS 0 TO 6.25 SF 880(B) 8818 SD 109,490.000 109,490.000 2,654.000 39,261.000 $0.41 $1,088.14 $16,097.01
0324 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF 880(B) 8821 SD 12,535.000 12,535.000 1,453.000 24,495.000 $5.43 $7,889.79 $133,007.85
0325 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF 880(B) 8824 SD 20,075.000 20,075.000 2,167.000 31,344.000 $6.79 $14,713.93 $212,825.76
0326 CONSTRUCTION BARRICADES(TYPE III) 880(C) 8842 SD 7,895.000 7,895.000 564.000 8,526.000 $2.72 $1,534.08 $23,190.72
0327 WING BARRICADES 880(C) 8848 SD 3,280.000 3,280.000 180.000 2,897.000 $2.72 $489.60 $7,879.84
0328 WARNING LIGHTS(TYPE A) 880(E) 8860 SD 21,160.000 21,160.000 2,608.000 37,926.000 $0.68 $1,773.44 $25,789.68
0329 DRUMS 880(F) 8878 SD 243,215.000 243,215.000 10,406.000 124,179.000 $0.14 $1,456.84 $17,385.06
0330 CHANNELIZER CONES 880(G) 8890 SD 12,000.000 12,000.000 7,396.000 70,674.000 $0.34 $2,514.64 $24,029.16
0331 TRAFFIC SURVEILLANCE, POLICE 880(L) 8911 HOUR 5,400.000 5,400.000   153.250 $75.29 $0.00 $11,538.19
0332 (SP)TEMPORARY ROADWAY LIGHTING ASSEMBLY 880(M) 8340 LMDY 108,600.000 108,600.000   47,766.000 $4.54 $0.00 $216,857.64
0333 (SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN 882 8370 SD 12,000.000 12,000.000 420.000 7,152.000 $20.79 $8,731.80 $148,690.08
0334 (SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) 882 8372 SD 6,000.000 6,000.000 360.000 5,956.000 $34.65 $12,474.00 $206,375.40
0335 (SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) 882 8374 SD 1,200.000 1,200.000 30.000 508.000 $6.79 $203.70 $3,449.32
0336 (SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM 882 8376 SD 600.000 600.000 15.000 254.000 $6.79 $101.85 $1,724.66
0337 PORT.CHANGEABLE MESSAGE SIGN 882(A) 8306 SD 4,530.000 4,530.000 45.000 755.000 $27.17 $1,222.65 $20,513.35
Subtotals For Category     0300/TRAFFIC CONTROL - IMY-244-2(499)011    $64,438.81 $1,870,867.83
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0301/SIGNING & STRIPING - IMY-244-2(499)011
0338 DRILLED SHAFTS 60" DIAMETER 516(A) 6096 LF 392.000 392.000   262.930 $354.85 $0.00 $93,300.71
0339 STRUCTURAL CONCRETE 804(A) 2915 CY 9.650 9.650   0.000 $679.32 $0.00 $0.00
0340 REINFORCING STEEL 804(B) 2916 LB 1,488.000 1,488.000   0.000 $1.70 $0.00 $0.00
0341 (PL)REMOVAL OF OVERHEAD SIGN STRUCTURE & SIGNS 805(A) 8718 LSUM 1.000 1.000   0.800 $13,586.39 $0.00 $10,869.12
0342 (PL)REMOVAL OF GROUND MOUNTED SIGNS 805(A) 8720 LSUM 1.000 1.000   0.800 $6,793.20 $0.00 $5,434.56
0343 (PL)REMOVAL OF EXISTING SIGNS 805(A) 8722 LSUM 1.000 1.000   0.800 $6,793.20 $0.00 $5,434.56
0344 (PL)REMOVE & RESET EXISTING SIGNS 805(D) 8756 EA 5.000 5.000   0.000 $1,358.64 $0.00 $0.00
0345 SHEET ALUMINUM SIGNS 850(A) 8110 SF 611.180 611.180   0.000 $16.30 $0.00 $0.00
0346 EXTRUDED ALUMINUM PANEL SIGNS 850(B) 8112 SF 596.500 596.500   0.000 $24.46 $0.00 $0.00
0347 EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) 850(B) 8114 SF 4,234.250 4,234.250   0.000 $24.46 $0.00 $0.00
0348 4"@13 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3206 LF 393.980 393.980   0.000 $38.04 $0.00 $0.00
0349 6"@20 GALV.STEEL WIDE FLANGE BEAM POST 851(A) 3208 LF 52.250 52.250   0.000 $44.84 $0.00 $0.00
0350 2 1/2"@5.79 GALV.STEEL PIPE POST 851(B) 3217 LF 36.000 36.000   0.000 $29.89 $0.00 $0.00
0351 3"@7.58 GALV.STEEL PIPE POST 851(B) 3218 LF 38.000 38.000   0.000 $32.61 $0.00 $0.00
0352 3 1/2"@9.11 GALV.STEEL PIPE POST 851(B) 3219 LF 44.000 44.000   0.000 $35.33 $0.00 $0.00
0353 2" SQUARE TUBE POST 851(C) 8324 LF 701.500 701.500   0.000 $8.15 $0.00 $0.00
0354 OVHD.SN.STR., MONOTUBE TYPE B 85' 852(D) 0315 EA 1.000 1.000   0.000 $88,311.51 $0.00 $0.00
0355 OVHD.SN.STR., MONOTUBE TYPE B 90' 852(D) 0320 EA 1.000 1.000   0.000 $95,104.71 $0.00 $0.00
0356 OVHD.SN.STR., MONOTUBE TYPE B 105' 852(D) 0335 EA 2.000 2.000   0.000 $101,897.90 $0.00 $0.00
0357 OVHD.SN.STR., MONOTUBE TYPE B 110' 852(D) 0340 EA 1.000 1.000   0.000 $122,277.48 $0.00 $0.00
0358 OVHD.SN.STR., MONOTUBE TYPE C 852(E) 0500 EA 4.000 4.000   0.000 $61,138.74 $0.00 $0.00
0359 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) 856(A) 8530 LF 89,352.000 89,352.000   1,095.000 $0.61 $0.00 $667.95
0360 TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) 856(A) 8535 LF 21,984.000 21,984.000   0.000 $0.88 $0.00 $0.00
0361 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) 856(A) 8540 LF 13,840.000 13,840.000   1,317.000 $1.36 $0.00 $1,791.12
0362 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) 856(A) 8548 LF 1,800.000 1,800.000   0.000 $4.08 $0.00 $0.00
0363 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) 856(A) 8555 LF 48.000 48.000   0.000 $27.17 $0.00 $0.00
0364 TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) 856(B) 8525 EA 5.000 5.000   0.000 $679.32 $0.00 $0.00
Subtotals For Category     0301/SIGNING & STRIPING - IMY-244-2(499)011    $0.00 $117,498.02
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0302/HIGHWAY LIGHTING - IMY-244-2(499)011
0365 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED 802(A) 8306 LF 1,000.000 1,000.000   0.000 $13.91 $0.00 $0.00
0366 2" PVC SCH.40 PLASTIC CONDUIT BORED 802(B) 8340 LF 985.000 985.000   990.000 $21.77 $0.00 $21,552.30
0367 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED 802(B) 8342 LF 36,621.000 36,621.000   9,179.000 $4.84 $0.00 $44,426.36
0368 JUNCTION BOX(8" X 8" X 6") 802(E) 8372 EA 2.000 2.000   0.000 $368.92 $0.00 $0.00
0369 PULL BOX(SIZE I) 803(A) 8065 EA 29.000 29.000   18.000 $332.63 $0.00 $5,987.34
0370 STRUCTURAL CONCRETE 804(A) 2915 CY 67.280 67.280   26.580 $689.46 $0.00 $18,325.85
0371 REINFORCING STEEL 804(B) 2916 LB 3,826.600 3,826.600   2,037.400 $1.63 $0.00 $3,320.95
0372 (PL)REMOVAL OF LIGHT POLE 805(A) 8712 EA 94.000 94.000   66.000 $217.73 $0.00 $14,370.18
0373 38' MTG.HT.HL.PTP.(G.STL.) 806(D) 8997 EA 116.000 116.000   45.000 $1,487.78 $0.00 $66,950.10
0374 BREAKAWAY BASE (DES. B) 807 8092 EA 116.000 116.000   45.000 $489.88 $0.00 $22,044.60
0375 ROADWAY LUMINAIRE 809(A) 8090 EA 131.000 131.000   45.000 $1,120.07 $0.00 $50,403.15
0376 SERVICE POLE 810(A) 3118 EA 2.000 2.000   2.000 $7,106.29 $0.00 $14,212.58
0377 1/C NO.4 ELECTRICAL CONDUCTOR 811 8038 LF 75,943.000 75,943.000   0.000 $2.54 $0.00 $0.00
0378 1/C NO.12 ELECTRICAL CONDUCTOR 811 8046 LF 12,445.000 12,445.000   0.000 $0.85 $0.00 $0.00
Subtotals For Category     0302/HIGHWAY LIGHTING - IMY-244-2(499)011    $0.00 $261,593.41
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0600/STAKING - IMY-244-2(499)011
0379 CONSTRUCTION STAKING LEVEL II 642(B) 0096 LSUM 1.000 1.000 0.250 0.750 $165,000.00 $41,250.00 $123,750.00
Subtotals For Category     0600/STAKING - IMY-244-2(499)011    $41,250.00 $123,750.00
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0640/CONSTRUCTION - IMY-244-2(499)011
0380 SWPPP DOCUMENTATION AND MANAGEMENT 220 2800 LSUM 1.000 1.000 0.250 0.500 $5,000.00 $1,250.00 $2,500.00
0381 FIELD OFFICE 640(A) 1426 EA 1.000 1.000   1.000 $8,687.33 $0.00 $8,687.33
0382 MOBILIZATION 641 1552 LSUM 1.000 1.000   1.000 $1,400,000.00 $0.00 $1,400,000.00
Subtotals For Category     0640/CONSTRUCTION - IMY-244-2(499)011    $1,250.00 $1,411,187.33
Fed/State Project Number:    IMY-244-2(499)011 Project:    27146(04) Category:    0900/NON-PARTICIPATING - IMY-244-2(499)011
0383 STRUCTURAL STEEL 506(A) 1322 LB 3,400.000 3,400.000   3,400.000 $8.00 $0.00 $27,200.00
0384 REMOVAL OF BRIDGE ITEMS 619(B) 2500 LSUM 1.000 1.000   1.000 $25,000.00 $0.00 $25,000.00
Subtotals For Category     0900/NON-PARTICIPATING - IMY-244-2(499)011    $0.00 $52,200.00
Subtotals For Project IMY-244-2(499)011 /27146(04) $810,534.09 $16,076,306.99