| Contract ID: | 110453 | Estimate Number: | 0006 | Contract No: | 710400 | |||
| Residency: | COBB ENGINEERING CO., INC. (08003) | Estimate Type: | Progressive | Account No: | 400800 | |||
| Project Number(s): | IMY-244-2(500)014, IMY-244-2(499)011 | ||||||||||||
| Primary Job Piece No: | 27146(04) | ||||||||||||
| Contract Description: | BRIDGE AND PAVEMENT REHABILITATION I-244: FROM 73RD ST., EXTEND EAST TO THE I-44 INTERCHANGE IN THE CITY OF TULSA. PROJECT LENGTH = 4.333 MILES. | ||||||||||||
| Primary County: | TULSA | ||||||||||||
| Name of Road: | I-244 | ||||||||||||
| Prime Contractor: | SHERWOOD CONSTRUCTION CO., INC. | ||||||||||||
| P.O. BOX 10 | |||||||||||||
| CATOOSA , OK 74015-0010 | |||||||||||||
| Surety Company: | TRAVELERS INDEMNITY COMPANY | ||||||||||||
| Date Let: | 09/15/2011 | NTP Effective Date: | 02/06/2012 | Pay Period: | 04/16/2012 TO 04/30/2012 |
| Date Awarded: | 10/03/2011 | Date Work Began: | 02/06/2012 | Original Contract Time: | 420 |
| Date Contract Executed: | 10/12/2011 | Date Time Stopped: | Current Time Charged: | 70.00 | |
| Date NTP Issued: | 10/20/2011 | Completion Date: | Current Time Allowed: | 420.00 | |
| General Liability Expires: | 01/01/2013 | Workman's Comp Expires: | 01/01/2013 | Percent Time Used: | 16.67 % |
| Specification Year: | 2009 | Date Approved: | |||
| Current Contract Amount: | $35,057,955.07 | Total to Date | Prev to Date | This Estimate | |||
| Bid Amount: | $35,057,955.07 | Participating: | $4,773,320.05 | $4,318,078.77 | $455,241.28 | ||
| Percent Complete: | 16.80 % | Non Participating: | $27,200.00 | $27,200.00 | $0.00 | ||
| Funds Available: | $29,166,606.07 | Total Earnings: | $4,800,520.05 | $4,345,278.77 | $455,241.28 | ||
| Unearned Balance: | $29,166,606.07 | Stockpiled Materials: | $1,090,232.38 | $1,024,558.92 | $65,673.46 | ||
| Gross Earnings: | $5,890,752.43 | $5,369,837.69 | $520,914.74 | ||||
| Other Adjustments: | $596.57 | $-50.96 | $647.53 | ||||
| Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
| TOTAL: | $5,891,349.00 | $5,369,786.73 | $521,562.27 | ||||
| Contract ID: | 110453 | Estimate Number: | 0006 | Primary JP: | 27146(04) | |||
| CHANGE ORDER HISTORY | |||||
| Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
| 001 | Adding seven new items & reducing the quantity on six items | Pending | 0 | 0.0 | $-177,705.20 |
| STOCKPILE PAYMENT HISTORY | |||||
| Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
| 26300(09) | 0011 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $34,501.59 |
| 26300(09) | 0011 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $46,049.04 |
| 26300(09) | 0011 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $46,049.04 |
| 26300(09) | 0011 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $46,049.04 |
| 26300(09) | 0012 | FABRIC-BASE SEP | Stockpiled Material Initial Payment | 0005 | $16,633.26 |
| 26300(09) | 0012 | FABRIC-BASE SEP | Stockpiled Material Initial Payment | 0005 | $47,269.86 |
| 26300(09) | 0012 | FABRIC-BASE SEP | Stockpiled Material Initial Payment | 0005 | $48,344.17 |
| 26300(09) | 0021 | 9.5 INCH PAVING DOWEL BASKETS | Stockpiled Material Initial Payment | 0005 | $12,926.38 |
| 26300(09) | 0021 | 9.5 INCH PAVING DOWEL BASKETS | Stockpiled Material Initial Payment | 0005 | $34,292.22 |
| 26300(09) | 0021 | 9.5" PAVING DOWEL BASKETS | Stockpiled Material Initial Payment | 0006 | $13,772.12 |
| 26300(09) | 0021 | 9.5" PAVING DOWEL BASKETS | Stockpiled Material Initial Payment | 0006 | $34,249.60 |
| 26300(09) | 0111 | Roadway Luminaire | Stockpiled Material Initial Payment | 0001 | $26,076.00 |
| 26300(09) | 0111 | ROADWAY LUMINAIRE | Stockpiled Material Initial Payment | 0002 | $20,615.76 |
| 26300(09) | 0111 | ROADWAY LUMINAIRE | Stockpiled Material Closure | 0005 | $-20,615.76 |
| 26300(09) | 0111 | ROADWAY LUMINAIRE | Stockpiled Material Closure | 0005 | $-1,650.00 |
| 26300(09) | 0111 | ROADWAY LUMINAIRE | Stockpiled Material Initial Payment | 0002 | $1,650.00 |
| 26300(09) | 0111 | ROADWAY LUMINAIRE | Stockpiled Material Initial Payment | 0005 | $27,060.00 |
| 26300(09) | 0111 | ROADWAY LUMINAIRE (Mast Arm) | Stockpiled Material Initial Payment | 0005 | $10,653.12 |
| 27146(04) | 0130 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $46,049.04 |
| 27146(04) | 0130 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $49,418.49 |
| 27146(04) | 0130 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $46,049.04 |
| 27146(04) | 0130 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $46,049.04 |
| 27146(04) | 0130 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $46,049.04 |
| 27146(04) | 0130 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $46,049.04 |
| 27146(04) | 0130 | FABRIC-CTB SEP | Stockpiled Material Initial Payment | 0005 | $11,547.45 |
| 27146(04) | 0131 | FABRIC-BASE SEP | Stockpiled Material Initial Payment | 0005 | $47,269.86 |
| 27146(04) | 0131 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0006 | $-17,831.24 |
| 27146(04) | 0131 | FABRIC-BASE SEP | Stockpiled Material Initial Payment | 0005 | $47,627.96 |
| 27146(04) | 0131 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0006 | $-17,831.23 |
| 27146(04) | 0131 | FABRIC-BASE SEP | Stockpiled Material Initial Payment | 0005 | $47,269.86 |
| 27146(04) | 0131 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0006 | $-17,831.24 |
| 27146(04) | 0131 | FABRIC-BASE SEP | Stockpiled Material Initial Payment | 0005 | $31,710.91 |
| 27146(04) | 0131 | FABRIC-BASE SEP | Stockpiled Material Adjustment | 0006 | $-17,831.23 |
| 27146(04) | 0140 | 9.5 INCH PAVING DOWEL BASKETS | Stockpiled Material Initial Payment | 0005 | $31,842.78 |
| 27146(04) | 0140 | 9.5 INCH PAVING DOWEL BASKETS | Stockpiled Material Initial Payment | 0005 | $34,292.22 |
| 27146(04) | 0140 | 9.5 INCH PAVING DOWEL BASKETS | Stockpiled Material Initial Payment | 0005 | $21,365.83 |
| 27146(04) | 0140 | 9.5" PAVING DOWEL BASKETS | Stockpiled Material Initial Payment | 0006 | $34,249.60 |
| 27146(04) | 0140 | 9.5" PAVING DOWEL BASKETS | Stockpiled Material Initial Payment | 0006 | $34,249.60 |
| 27146(04) | 0140 | 9.5" PAVING DOWEL BASKETS | Stockpiled Material Initial Payment | 0006 | $20,477.48 |
| 27146(04) | 0375 | ROADWAY LUMINAIRE | Stockpiled Material Initial Payment | 0005 | $64,452.00 |
| 27146(04) | 0375 | ROADWAY LUMINAIRE | Stockpiled Material Closure | 0005 | $0.00 |
| 27146(04) | 0375 | ROADWAY LUMINAIRE (Mast Arm) | Stockpiled Material Initial Payment | 0005 | $9,962.64 |
| 27146(04) | 0375 | ROADWAY LUMINAIRE (Double Mast Arm) | Stockpiled Material Initial Payment | 0005 | $1,650.00 | Subtotals For Stockpile Payments | $1,090,232.38 |
| LIQUIDATED DAMAGES HISTORY | |||||||||
| Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
| No liquidated damages have been assessed on this contract. | Subtotals For Liquidated Damages | $ | |||||||
| CONTRACT ADJUSTMENTS HISTORY | ||
| Adjustment Description | Estimate Nbr | Adjustment Amount |
| No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
| LINE ITEM ADJUSTMENT HISTORY | |||||||
| Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
| 26300(09) | 0001 | UNCLASSIFIED EXCAVATION | Fuel Price Adjustment | 0006 | 7,732.00 | $0.05 | $414.05 |
| 26300(09) | 0018 | SUPERPAVE, TYPE S5(PG 64-22 OK) | Asphalt Binder Adjustment | 0002 | 1,237.65 | $-0.17 | $-214.83 |
| 27146(04) | 0120 | UNCLASSIFIED EXCAVATION | Fuel Price Adjustment | 0003 | 6,390.00 | $0.01 | $112.15 |
| 27146(04) | 0120 | UNCLASSIFIED EXCAVATION | Fuel Price Adjustment | 0004 | 488.00 | $0.01 | $8.56 |
| 27146(04) | 0120 | UNCLASSIFIED EXCAVATION | Fuel Price Adjustment | 0005 | 7,740.00 | $0.05 | $414.48 |
| 27146(04) | 0120 | UNCLASSIFIED EXCAVATION | Fuel Price Adjustment | 0006 | 4,360.00 | $0.05 | $233.48 |
| 27146(04) | 0137 | SUPERPAVE, TYPE S5(PG 64-22 OK) | Asphalt Binder Adjustment | 0001 | 886.84 | $-0.17 | $-153.94 |
| 27146(04) | 0137 | SUPERPAVE, TYPE S5(PG 64-22 OK) | Asphalt Binder Adjustment | 0002 | 739.16 | $-0.17 | $-128.30 |
| 27146(04) | 0137 | SUPERPAVE, TYPE S5(PG 64-22 OK) | Asphalt Binder Adjustment | 0003 | 236.56 | $-0.17 | $-41.06 |
| 27146(04) | 0137 | SUPERPAVE, TYPE S5(PG 64-22 OK) | Asphalt Binder Adjustment | 0004 | 276.64 | $-0.17 | $-48.02 | Subtotals For Line Item Adjustments | $596.57 |
| MILESTONE INFORMATION | |||||||||
| Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
| 01 | TIME 'B' BID | NOT ENTERED | NOT ENTERED | 400.00 DAYS | $15,000.00 | N | |||
| 02 | TIME 'C' BID | NOT ENTERED | NOT ENTERED | 130.00 DAYS | $10,000.00 | N | |||
| MILESTONE ADJUSTMENTS | |||||||||
| Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total | ||||||
| No milestones adjustments exist for this contract. | Subtotals For Milestones | $ | |||||||
| Contract ID: | 110453 | Estimate Number: | 0006 | Primary JP: | 27146(04) | |||
| Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
| Fed/State Project Number: IMY-244-2(500)014 | Project: 26300(09) | Category: 0100/ROADWAY - IMY-244-2(500)014 | ||||||||
| 0001 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 28,000.000 | 28,000.000 | 7,732.000 | 7,732.000 | $9.05 | $69,974.60 | $69,974.60 |
| 0002 | UNCLASSIFIED BORROW | 202(D) 0184 | CY | 2,000.000 | 2,000.000 | 0.000 | $2.00 | $0.00 | $0.00 | |
| 0003 | TEMPORARY SILT FENCE | 221(C) 2801 | LF | 41,900.000 | 41,900.000 | 20.000 | 2,796.000 | $2.56 | $51.20 | $7,157.76 |
| 0004 | TEMPORARY SILT DIKE | 221(F) 0100 | LF | 30.000 | 30.000 | 252.000 | $7.11 | $0.00 | $1,791.72 | |
| 0005 | SOLID SLAB SODDING | 230(A) 2806 | SY | 28,000.000 | 28,000.000 | 0.000 | $1.44 | $0.00 | $0.00 | |
| 0006 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 3.000 | 3.000 | 0.000 | $207.34 | $0.00 | $0.00 | |
| 0007 | MOWING | 241 2832 | AC | 225.000 | 225.000 | 0.000 | $49.00 | $0.00 | $0.00 | |
| 0008 | AGGREGATE BASE TYPE A | 303(A) 2100 | CY | 19,017.000 | 19,017.000 | 0.000 | $26.93 | $0.00 | $0.00 | |
| 0009 | LIME | 307(D) 4230 | TON | 2,261.000 | 2,261.000 | 0.000 | $156.37 | $0.00 | $0.00 | |
| 0010 | LIME STABILIZED SUBGRADE | 307(H) 4270 | SY | 104,690.000 | 104,690.000 | 0.000 | $1.96 | $0.00 | $0.00 | |
| 0011 | CEMENT TREATED BASE | 317 4270 | SY | 104,690.000 | 104,690.000 | 0.000 | $10.91 | $0.00 | $0.00 | |
| 0012 | SEPARATOR FABRIC | 325 5271 | SY | 135,270.000 | 135,270.000 | 0.000 | $1.10 | $0.00 | $0.00 | |
| 0013 | GEOGRID REINFORCEMENT | 326(B) 0100 | SY | 5,000.000 | 5,000.000 | 0.000 | $2.60 | $0.00 | $0.00 | |
| 0014 | TRAFFIC BOUND SURFACE COURSE TYPE E | 402(E) 0225 | TON | 3,176.000 | 3,176.000 | 0.000 | $11.54 | $0.00 | $0.00 | |
| 0015 | PRIME COAT | 408 5774 | GAL | 39,665.000 | 39,665.000 | 0.000 | $3.94 | $0.00 | $0.00 | |
| 0016 | SUPERPAVE, TYPE S4(PG 76-28 OK) | 411(C) 5950 | TON | 500.000 | 500.000 | 0.000 | $90.00 | $0.00 | $0.00 | |
| 0017 | SUPERPAVE, TYPE S4(PG 64-22 OK) | 411(C) 5960 | TON | 37.000 | 37.000 | 0.000 | $80.00 | $0.00 | $0.00 | |
| 0018 | SUPERPAVE, TYPE S5(PG 64-22 OK) | 411(D) 5975 | TON | 1,515.000 | 1,515.000 | 1,237.650 | $90.00 | $0.00 | $111,388.50 | |
| 0019 | COLD MILLING PAVEMENT | 412 5267 | SY | 15,200.000 | 15,200.000 | 0.000 | $1.11 | $0.00 | $0.00 | |
| 0020 | P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 28,031.000 | 28,031.000 | 0.000 | $11.58 | $0.00 | $0.00 | |
| 0021 | DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(B) 5725 | SY | 67,251.000 | 67,251.000 | 0.000 | 0.000 | $12.67 | $0.00 | $0.00 |
| 0022 | P.C. CONCRETE FOR PAVEMENT | 414(G) 5275 | CY | 25,144.000 | 25,144.000 | 0.000 | $89.79 | $0.00 | $0.00 | |
| 0023 | CONCRETE PARAPET | 504(E) 1381 | LF | 842.000 | 842.000 | 0.000 | $61.35 | $0.00 | $0.00 | |
| 0024 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 5,271.000 | 5,271.000 | 0.000 | $52.16 | $0.00 | $0.00 | |
| 0025 | CLASS A CONCRETE | 509(B) 0321 | CY | 50.000 | 50.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
| 0026 | CLASS C CONCRETE | 509(D) 0325 | CY | 251.000 | 251.000 | 0.000 | $212.25 | $0.00 | $0.00 | |
| 0027 | REINFORCING STEEL | 511(A) 0332 | LB | 154,713.000 | 154,713.000 | 0.000 | $0.75 | $0.00 | $0.00 | |
| 0028 | CONCRETE CURB (6" BARRIER-INTEGRAL) | 609(A) 0300 | LF | 1,500.000 | 1,500.000 | 0.000 | $1.37 | $0.00 | $0.00 | |
| 0029 | 6" CONCRETE DIVIDING STRIP | 610(C) 0609 | SY | 4,000.000 | 4,000.000 | 0.000 | $34.15 | $0.00 | $0.00 | |
| 0030 | 18" R.C.PIPE CLASS III | 613(A) 0491 | LF | 500.000 | 500.000 | 0.000 | $57.41 | $0.00 | $0.00 | |
| 0031 | 24" R.C.PIPE CLASS III | 613(A) 0492 | LF | 500.000 | 500.000 | 0.000 | $69.37 | $0.00 | $0.00 | |
| 0032 | 30" R.C.PIPE CLASS III | 613(A) 0493 | LF | 500.000 | 500.000 | 0.000 | $99.60 | $0.00 | $0.00 | |
| 0033 | 36" R.C.PIPE CLASS III | 613(A) 0494 | LF | 500.000 | 500.000 | 0.000 | $119.73 | $0.00 | $0.00 | |
| 0034 | 8" PERFORATED PIPE UNDERDRAIN ROUND | 613(H) 0500 | LF | 8,500.000 | 8,500.000 | 0.000 | $14.66 | $0.00 | $0.00 | |
| 0035 | 8" NON-PERF.PIPE UNDERDRAIN RND. | 613(I) 1097 | LF | 500.000 | 500.000 | 0.000 | $9.77 | $0.00 | $0.00 | |
| 0036 | EDGE DRAIN CONDUIT-PERFORATED | 613(J) 5915 | LF | 42,342.000 | 42,342.000 | 0.000 | $4.65 | $0.00 | $0.00 | |
| 0037 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 613(K) 5916 | LF | 4,235.000 | 4,235.000 | 0.000 | $11.21 | $0.00 | $0.00 | |
| 0038 | OUTLET LATERAL HEADWALL | 613(Q) 5946 | EA | 212.000 | 212.000 | 0.000 | $190.36 | $0.00 | $0.00 | |
| 0039 | (PL)VIDEO INSPECTION OF CONDUIT | 613(Y) 0100 | LF | 5,000.000 | 5,000.000 | 2,161.100 | $2.00 | $0.00 | $4,322.20 | |
| 0040 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 36,421.000 | 36,421.000 | 4,805.830 | $2.50 | $0.00 | $12,014.58 | |
| 0041 | REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 619(B) 4763 | SY | 57,841.000 | 57,841.000 | 19,121.450 | $3.50 | $0.00 | $66,925.08 | |
| 0042 | REMOVAL OF GUARDRAIL | 619(B) 4780 | LF | 4,632.000 | 4,632.000 | 125.000 | $3.01 | $0.00 | $376.25 | |
| 0043 | REMOVAL OF CONCRETE MEDIAN BARRIER | 619(B) 4915 | LF | 210.000 | 210.000 | 0.000 | $23.27 | $0.00 | $0.00 | |
| 0044 | SAWING PAVEMENT | 619(C) 0924 | LF | 21,000.000 | 21,000.000 | 8,522.000 | $1.61 | $0.00 | $13,720.42 | |
| 0045 | CLEAN STORM DRAIN, 12" TO 30" DIAMETER | 619(H) 0200 | LF | 1,025.000 | 1,025.000 | 418.000 | $4.75 | $0.00 | $1,985.50 | |
| 0046 | CLEAN STORM DRAIN, 36" TO 60" DIAMETER | 619(H) 0210 | LF | 715.000 | 715.000 | 186.000 | $7.25 | $0.00 | $1,348.50 | |
| 0047 | BEAM GUARDRAIL W-BEAM SINGLE | 623(A) 1418 | LF | 400.000 | 400.000 | 0.000 | $15.64 | $0.00 | $0.00 | |
| 0048 | GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 623(F) 5686 | EA | 2.000 | 2.000 | 0.000 | $2,548.29 | $0.00 | $0.00 | |
| 0049 | GUARDRAIL END TREATMENT (GET) | 623(G) 8571 | EA | 1.000 | 1.000 | 0.000 | $2,200.79 | $0.00 | $0.00 | |
| 0050 | GUARDRAIL BRIDGE CONNECTION-TYPE A | 623(I) 8675 | EA | 1.000 | 1.000 | 0.000 | $1,476.85 | $0.00 | $0.00 | |
| 0051 | (SP)IMPACT ATTENUATOR | 871(A) 8325 | EA | 12.000 | 12.000 | 0.000 | $10,869.11 | $0.00 | $0.00 | |
| Subtotals For Category 0100/ROADWAY - IMY-244-2(500)014 | $70,025.80 | $291,005.11 | ||||||||
| Fed/State Project Number: IMY-244-2(500)014 | Project: 26300(09) | Category: 0200/BRIDGE 73 - IMY-244-2(500)014 | ||||||||
| 0052 | CLSM BACKFILL | 501(G) 6309 | CY | 229.200 | 229.200 | 0.000 | $125.00 | $0.00 | $0.00 | |
| 0053 | (PL)FALSEWORK JACKING | 502 6116 | LSUM | 1.000 | 1.000 | 0.000 | $16,053.55 | $0.00 | $0.00 | |
| 0054 | APPROACH SLAB | 504(A) 1304 | SY | 313.800 | 313.800 | 0.000 | $154.61 | $0.00 | $0.00 | |
| 0055 | SAW-CUT GROOVING | 504(B) 1305 | SY | 1,403.000 | 1,403.000 | 0.000 | $4.17 | $0.00 | $0.00 | |
| 0056 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 127.500 | 127.500 | 0.000 | $247.17 | $0.00 | $0.00 | |
| 0057 | CONCRETE PARAPET | 504(E) 1381 | LF | 378.300 | 378.300 | 0.000 | $39.04 | $0.00 | $0.00 | |
| 0058 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 387.100 | 387.100 | 0.000 | $50.18 | $0.00 | $0.00 | |
| 0059 | STRUCTURAL STEEL | 506(A) 1322 | LB | 5,030.000 | 5,030.000 | 0.000 | $8.25 | $0.00 | $0.00 | |
| 0060 | CLASS AA CONCRETE | 509(A) 1326 | CY | 243.300 | 243.300 | 0.000 | $741.28 | $0.00 | $0.00 | |
| 0061 | CLASS A CONCRETE | 509(B) 1328 | CY | 24.400 | 24.400 | 0.000 | $2,258.22 | $0.00 | $0.00 | |
| 0062 | SLOPE WALL (4") | 510(C) 6134 | SY | 35.000 | 35.000 | 0.000 | $81.68 | $0.00 | $0.00 | |
| 0063 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 77,110.000 | 77,110.000 | 0.000 | $0.84 | $0.00 | $0.00 | |
| 0064 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 0.000 | $103,784.71 | $0.00 | $0.00 | |
| 0065 | COLLECTION AND HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 0.000 | $25,946.18 | $0.00 | $0.00 | |
| 0066 | ANODE | 513(D) 6025 | EA | 360.000 | 360.000 | 0.000 | $90.64 | $0.00 | $0.00 | |
| 0067 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 721.000 | 721.000 | 0.000 | $4.05 | $0.00 | $0.00 | |
| 0068 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 100.000 | 100.000 | 0.000 | $35.02 | $0.00 | $0.00 | |
| 0069 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 2.600 | 2.600 | 0.000 | $80.81 | $0.00 | $0.00 | |
| 0070 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 60.000 | 60.000 | 19.660 | $673.72 | $0.00 | $13,245.34 | |
| 0071 | (SP)CARBON FIBER-REINFORCED POLYMER | 524(A) 6610 | SF | 849.900 | 849.900 | 290.000 | 901.410 | $30.30 | $8,787.00 | $27,312.72 |
| 0072 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | 535 6130 | SY | 60.000 | 60.000 | 0.000 | $100.34 | $0.00 | $0.00 | |
| 0073 | (PL)REPAIR BRIDGE ITEM (TYPE A) | 540 4515 | EA | 1.000 | 1.000 | 0.000 | $13,940.43 | $0.00 | $0.00 | |
| 0074 | (PL)REPLACE BRIDGE ITEMS | 545 4805 | EA | 4.000 | 4.000 | 0.000 | $2,697.70 | $0.00 | $0.00 | |
| 0075 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 0.000 | $53,579.64 | $0.00 | $0.00 | |
| Subtotals For Category 0200/BRIDGE 73 - IMY-244-2(500)014 | $8,787.00 | $40,558.06 | ||||||||
| Fed/State Project Number: IMY-244-2(500)014 | Project: 26300(09) | Category: 0301/TRAFFIC SIGNING & STRIPING - IMY-244-2(500)014 | ||||||||
| 0076 | DRILLED SHAFTS 60" DIAMETER | 516(A) 6096 | LF | 140.000 | 140.000 | 0.000 | $360.77 | $0.00 | $0.00 | |
| 0077 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 12.580 | 12.580 | 0.000 | $679.32 | $0.00 | $0.00 | |
| 0078 | REINFORCING STEEL | 804(B) 2916 | LB | 2,072.000 | 2,072.000 | 0.000 | $1.70 | $0.00 | $0.00 | |
| 0079 | (PL)REMOVAL OF OVERHEAD SIGN STRUCTURE & SIGNS | 805(A) 8718 | LSUM | 1.000 | 1.000 | 0.000 | $13,586.39 | $0.00 | $0.00 | |
| 0080 | (PL)REMOVAL OF GROUND MOUNTED SIGNS | 805(A) 8720 | LSUM | 1.000 | 1.000 | 0.000 | $6,793.20 | $0.00 | $0.00 | |
| 0081 | (PL)REMOVAL OF EXISTING SIGNS | 805(A) 8722 | LSUM | 1.000 | 1.000 | 0.000 | $6,793.20 | $0.00 | $0.00 | |
| 0082 | (PL)REMOVE & RESET EXISTING SIGNS | 805(D) 8756 | EA | 3.000 | 3.000 | 0.000 | $1,358.64 | $0.00 | $0.00 | |
| 0083 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 536.970 | 536.970 | 0.000 | $16.30 | $0.00 | $0.00 | |
| 0084 | EXTRUDED ALUMINUM PANEL SIGNS | 850(B) 8112 | SF | 694.500 | 694.500 | 0.000 | $24.46 | $0.00 | $0.00 | |
| 0085 | EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 850(B) 8114 | SF | 757.750 | 757.750 | 0.000 | $24.46 | $0.00 | $0.00 | |
| 0086 | 4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 851(A) 3206 | LF | 105.000 | 105.000 | 0.000 | $38.04 | $0.00 | $0.00 | |
| 0087 | 6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 851(A) 3207 | LF | 188.750 | 188.750 | 0.000 | $40.76 | $0.00 | $0.00 | |
| 0088 | 6"@20 GALV.STEEL WIDE FLANGE BEAM POST | 851(A) 3208 | LF | 52.130 | 52.130 | 0.000 | $44.84 | $0.00 | $0.00 | |
| 0089 | 2 1/2"@5.79 GALV.STEEL PIPE POST | 851(B) 3217 | LF | 32.000 | 32.000 | 0.000 | $29.89 | $0.00 | $0.00 | |
| 0090 | 3"@7.58 GALV.STEEL PIPE POST | 851(B) 3218 | LF | 114.000 | 114.000 | 0.000 | $32.61 | $0.00 | $0.00 | |
| 0091 | 3 1/2"@9.11 GALV.STEEL PIPE POST | 851(B) 3219 | LF | 88.000 | 88.000 | 0.000 | $35.33 | $0.00 | $0.00 | |
| 0092 | 2" SQUARE TUBE POST | 851(C) 8324 | LF | 660.500 | 660.500 | 0.000 | $8.15 | $0.00 | $0.00 | |
| 0093 | OVHD.SN.STR., MONOTUBE TYPE B 75' | 852(D) 0305 | EA | 1.000 | 1.000 | 0.000 | $81,518.32 | $0.00 | $0.00 | |
| 0094 | OVHD.SN.STR., MONOTUBE TYPE B 95' | 852(D) 0325 | EA | 1.000 | 1.000 | 0.000 | $101,897.90 | $0.00 | $0.00 | |
| 0095 | OVHD.SN.STR., MONOTUBE TYPE C | 852(E) 0500 | EA | 1.000 | 1.000 | 0.000 | $61,138.74 | $0.00 | $0.00 | |
| 0096 | TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 856(A) 8530 | LF | 62,040.000 | 62,040.000 | 0.000 | $0.61 | $0.00 | $0.00 | |
| 0097 | TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 856(A) 8535 | LF | 19,608.000 | 19,608.000 | 0.000 | $0.88 | $0.00 | $0.00 | |
| 0098 | TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 856(A) 8540 | LF | 2,480.000 | 2,480.000 | 0.000 | $1.36 | $0.00 | $0.00 | |
| 0099 | TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 856(A) 8548 | LF | 1,308.000 | 1,308.000 | 0.000 | $4.08 | $0.00 | $0.00 | |
| 0100 | TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 856(A) 8555 | LF | 32.000 | 32.000 | 0.000 | $27.17 | $0.00 | $0.00 | |
| Subtotals For Category 0301/TRAFFIC SIGNING & STRIPING - IMY-244-2(500)014 | $0.00 | $0.00 | ||||||||
| Fed/State Project Number: IMY-244-2(500)014 | Project: 26300(09) | Category: 0302/TRAFFIC LIGHTING - IMY-244-2(500)014 | ||||||||
| 0101 | 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8306 | LF | 441.000 | 441.000 | 0.000 | $13.91 | $0.00 | $0.00 | |
| 0102 | 2" PVC SCH.40 PLASTIC CONDUIT BORED | 802(B) 8340 | LF | 360.000 | 360.000 | 0.000 | $21.77 | $0.00 | $0.00 | |
| 0103 | 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8342 | LF | 23,938.000 | 23,938.000 | 0.000 | $5.44 | $0.00 | $0.00 | |
| 0104 | JUNCTION BOX(8" X 8" X 6") | 802(E) 8372 | EA | 2.000 | 2.000 | 0.000 | $604.79 | $0.00 | $0.00 | |
| 0105 | PULL BOX(SIZE I) | 803(A) 8065 | EA | 8.000 | 8.000 | 0.000 | $332.63 | $0.00 | $0.00 | |
| 0106 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 62.640 | 62.640 | 0.000 | $689.46 | $0.00 | $0.00 | |
| 0107 | REINFORCING STEEL | 804(B) 2916 | LB | 3,607.200 | 3,607.200 | 0.000 | $1.63 | $0.00 | $0.00 | |
| 0108 | (PL)REMOVAL OF LIGHT POLE | 805(A) 8712 | EA | 92.000 | 92.000 | 18.000 | $217.73 | $0.00 | $3,919.14 | |
| 0109 | 38' MTG.HT.HL.PTP.(G.STL.) | 806(D) 8997 | EA | 108.000 | 108.000 | 0.000 | $1,487.78 | $0.00 | $0.00 | |
| 0110 | BREAKAWAY BASE (DES. B) | 807 8092 | EA | 108.000 | 108.000 | 0.000 | $489.88 | $0.00 | $0.00 | |
| 0111 | ROADWAY LUMINAIRE | 809(A) 8090 | EA | 108.000 | 108.000 | 0.000 | $1,120.07 | $0.00 | $0.00 | |
| 0112 | SERVICE POLE | 810(A) 3118 | EA | 2.000 | 2.000 | 2.000 | $7,106.29 | $0.00 | $14,212.58 | |
| 0113 | 1/C NO.4 ELECTRICAL CONDUCTOR | 811 8038 | LF | 69,852.000 | 69,852.000 | 0.000 | $2.54 | $0.00 | $0.00 | |
| 0114 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 10,260.000 | 10,260.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
| Subtotals For Category 0302/TRAFFIC LIGHTING - IMY-244-2(500)014 | $0.00 | $18,131.72 | ||||||||
| Fed/State Project Number: IMY-244-2(500)014 | Project: 26300(09) | Category: 0304/CABLE BARRIER - IMY-244-2(500)014 | ||||||||
| 0115 | SUPERPAVE, TYPE S3(PG 64-22 OK) | 411(B) 5945 | TON | 1,660.000 | 1,660.000 | 0.000 | $80.00 | $0.00 | $0.00 | |
| 0116 | CLASS AA CONCRETE | 509(A) 0319 | CY | 100.000 | 100.000 | 0.000 | $521.24 | $0.00 | $0.00 | |
| 0117 | REMOVAL OF CABLE BARRIER | 619(B) 5190 | LF | 9,115.000 | 9,115.000 | 7,002.000 | $3.47 | $0.00 | $24,296.94 | |
| 0118 | INSTALLATION OF CABLE BARRIER SYSTEM | 628 5180 | LF | 7,002.000 | 7,002.000 | 0.000 | $5.79 | $0.00 | $0.00 | |
| 0119 | END ANCHORS | 628(C) 5110 | EA | 2.000 | 2.000 | 0.000 | $2,895.78 | $0.00 | $0.00 | |
| Subtotals For Category 0304/CABLE BARRIER - IMY-244-2(500)014 | $0.00 | $24,296.94 | ||||||||
| Subtotals For Project IMY-244-2(500)014 /26300(09) | $78,812.80 | $373,991.83 | ||||||||
| Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
| Fed/State Project Number: IMY-244-2(499)011 | Project: 27146(04) | Category: 0100/ROADWAY - IMY-244-2(499) 011 | ||||||||
| 0120 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 42,000.000 | 42,000.000 | 4,360.000 | 23,864.000 | $9.05 | $39,458.00 | $215,969.20 |
| 0121 | UNCLASSIFIED BORROW | 202(D) 0184 | CY | 2,000.000 | 2,000.000 | 0.000 | $2.00 | $0.00 | $0.00 | |
| 0122 | TEMPORARY SILT FENCE | 221(C) 2801 | LF | 44,500.000 | 44,500.000 | 384.000 | 29,175.000 | $2.56 | $983.04 | $74,688.00 |
| 0123 | TEMPORARY SILT DIKE | 221(F) 0100 | LF | 30.000 | 30.000 | 259.000 | $7.11 | $0.00 | $1,841.49 | |
| 0124 | SOLID SLAB SODDING | 230(A) 2806 | SY | 30,000.000 | 30,000.000 | 0.000 | $1.44 | $0.00 | $0.00 | |
| 0125 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 4.000 | 4.000 | 0.000 | $207.34 | $0.00 | $0.00 | |
| 0126 | MOWING | 241 2832 | AC | 255.000 | 255.000 | 0.000 | $49.00 | $0.00 | $0.00 | |
| 0127 | AGGREGATE BASE TYPE A | 303(A) 2100 | CY | 31,124.000 | 31,124.000 | 3,422.220 | 3,443.520 | $26.93 | $92,160.38 | $92,733.99 |
| 0128 | LIME | 307(D) 4230 | TON | 3,815.000 | 3,815.000 | 0.000 | $156.37 | $0.00 | $0.00 | |
| 0129 | LIME STABILIZED SUBGRADE | 307(H) 4270 | SY | 176,611.000 | 176,611.000 | 0.000 | $1.96 | $0.00 | $0.00 | |
| 0130 | CEMENT TREATED BASE | 317 4270 | SY | 176,611.000 | 176,611.000 | 0.000 | $10.91 | $0.00 | $0.00 | |
| 0131 | SEPARATOR FABRIC | 325 5271 | SY | 209,525.000 | 209,525.000 | 24,896.660 | 24,896.660 | $1.10 | $27,386.33 | $27,386.33 |
| 0132 | GEOGRID REINFORCEMENT | 326(B) 0100 | SY | 5,000.000 | 5,000.000 | 0.000 | $2.60 | $0.00 | $0.00 | |
| 0133 | TRAFFIC BOUND SURFACE COURSE TYPE E | 402(E) 0225 | TON | 7,000.000 | 7,000.000 | 0.000 | $11.54 | $0.00 | $0.00 | |
| 0134 | PRIME COAT | 408 5774 | GAL | 65,708.000 | 65,708.000 | 0.000 | $3.94 | $0.00 | $0.00 | |
| 0135 | SUPERPAVE, TYPE S4(PG 76-28 OK) | 411(C) 5950 | TON | 500.000 | 500.000 | 0.000 | $90.00 | $0.00 | $0.00 | |
| 0136 | SUPERPAVE, TYPE S4(PG 64-22 OK) | 411(C) 5960 | TON | 232.000 | 232.000 | 0.000 | $80.00 | $0.00 | $0.00 | |
| 0137 | SUPERPAVE, TYPE S5(PG 64-22 OK) | 411(D) 5975 | TON | 2,120.000 | 2,120.000 | 2,139.200 | $90.00 | $0.00 | $192,528.00 | |
| 0138 | COLD MILLING PAVEMENT | 412 5267 | SY | 17,500.000 | 17,500.000 | 0.000 | $1.11 | $0.00 | $0.00 | |
| 0139 | P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 41,847.000 | 41,847.000 | 0.000 | $11.58 | $0.00 | $0.00 | |
| 0140 | DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(B) 5725 | SY | 124,640.000 | 124,640.000 | 0.000 | 0.000 | $12.67 | $0.00 | $0.00 |
| 0141 | P.C. CONCRETE FOR PAVEMENT | 414(G) 5275 | CY | 43,934.000 | 43,934.000 | 0.000 | $89.79 | $0.00 | $0.00 | |
| 0142 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 20,287.000 | 20,287.000 | 0.000 | $51.97 | $0.00 | $0.00 | |
| 0143 | CLASS A CONCRETE | 509(B) 0321 | CY | 50.000 | 50.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
| 0144 | CLASS C CONCRETE | 509(D) 0325 | CY | 663.000 | 663.000 | 0.000 | $212.25 | $0.00 | $0.00 | |
| 0145 | SLOPE WALL (5") | 510(C) 6135 | SY | 200.000 | 200.000 | 0.000 | $70.00 | $0.00 | $0.00 | |
| 0146 | REINFORCING STEEL | 511(A) 0332 | LB | 583,929.000 | 583,929.000 | 0.000 | $0.75 | $0.00 | $0.00 | |
| 0147 | CONCRETE CURB (6" BARRIER-INTEGRAL) | 609(A) 0300 | LF | 4,000.000 | 4,000.000 | 0.000 | $1.37 | $0.00 | $0.00 | |
| 0148 | 6" CONCRETE DIVIDING STRIP | 610(C) 0609 | SY | 5,000.000 | 5,000.000 | 0.000 | $39.56 | $0.00 | $0.00 | |
| 0149 | 18" R.C.PIPE CLASS III | 613(A) 0491 | LF | 500.000 | 500.000 | 62.250 | 62.250 | $57.41 | $3,573.77 | $3,573.77 |
| 0150 | 24" R.C.PIPE CLASS III | 613(A) 0492 | LF | 500.000 | 500.000 | 73.500 | 73.500 | $69.37 | $5,098.70 | $5,098.70 |
| 0151 | 30" R.C.PIPE CLASS III | 613(A) 0493 | LF | 500.000 | 500.000 | 0.000 | $99.60 | $0.00 | $0.00 | |
| 0152 | 36" R.C.PIPE CLASS III | 613(A) 0494 | LF | 500.000 | 500.000 | 0.000 | $119.73 | $0.00 | $0.00 | |
| 0153 | 8" PERFORATED PIPE UNDERDRAIN ROUND | 613(H) 0500 | LF | 1,500.000 | 1,500.000 | 830.000 | 830.000 | $14.66 | $12,167.80 | $12,167.80 |
| 0154 | 8" NON-PERF.PIPE UNDERDRAIN RND. | 613(I) 1097 | LF | 500.000 | 500.000 | 32.000 | 32.000 | $9.77 | $312.64 | $312.64 |
| 0155 | EDGE DRAIN CONDUIT-PERFORATED | 613(J) 5915 | LF | 44,393.000 | 44,393.000 | 4,622.000 | 4,622.000 | $4.65 | $21,492.30 | $21,492.30 |
| 0156 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 613(K) 5916 | LF | 4,440.000 | 4,440.000 | 368.500 | 368.500 | $11.21 | $4,130.89 | $4,130.89 |
| 0157 | OUTLET LATERAL HEADWALL | 613(Q) 5946 | EA | 214.000 | 214.000 | 0.000 | $190.36 | $0.00 | $0.00 | |
| 0158 | (PL)VIDEO INSPECTION OF CONDUIT | 613(Y) 0100 | LF | 5,000.000 | 5,000.000 | 5,226.100 | $2.00 | $0.00 | $10,452.20 | |
| 0159 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 47,972.000 | 47,972.000 | 26,002.550 | $2.50 | $0.00 | $65,006.39 | |
| 0160 | REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 619(B) 4763 | SY | 114,775.000 | 114,775.000 | 58,847.770 | $3.50 | $0.00 | $205,967.20 | |
| 0161 | REMOVAL OF GUARDRAIL | 619(B) 4780 | LF | 21,137.000 | 21,137.000 | 10,210.000 | $3.01 | $0.00 | $30,732.10 | |
| 0162 | REMOVAL OF CONCRETE MEDIAN BARRIER | 619(B) 4915 | LF | 1,180.000 | 1,180.000 | 428.000 | $20.08 | $0.00 | $8,594.24 | |
| 0163 | SAWING PAVEMENT | 619(C) 0924 | LF | 22,500.000 | 22,500.000 | 81.000 | 18,650.000 | $1.61 | $130.41 | $30,026.50 |
| 0164 | CLEAN STORM DRAIN, 12" TO 30" DIAMETER | 619(H) 0200 | LF | 3,150.000 | 3,150.000 | 769.500 | $4.75 | $0.00 | $3,655.13 | |
| 0165 | CLEAN STORM DRAIN, 36" TO 60" DIAMETER | 619(H) 0210 | LF | 1,900.000 | 1,900.000 | 1,186.800 | $7.25 | $0.00 | $8,604.30 | |
| 0166 | BEAM GUARDRAIL W-BEAM SINGLE | 623(A) 1418 | LF | 2,483.000 | 2,483.000 | 0.000 | $15.64 | $0.00 | $0.00 | |
| 0167 | GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 623(F) 5686 | EA | 3.000 | 3.000 | 0.000 | $2,200.00 | $0.00 | $0.00 | |
| 0168 | GUARDRAIL BRIDGE CONNECTION-TYPE A | 623(I) 8675 | EA | 6.000 | 6.000 | 0.000 | $1,275.00 | $0.00 | $0.00 | |
| 0169 | CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 627(A) 4317 | LF | 3,391.000 | 3,391.000 | 0.000 | $52.62 | $0.00 | $0.00 | |
| 0170 | CONCRETE LONGITUDINAL BARRIER END SECTIONS | 627(B) 4410 | EA | 2.000 | 2.000 | 0.000 | $1,178.07 | $0.00 | $0.00 | |
| 0171 | (SP)IMPACT ATTENUATOR | 871(A) 8325 | EA | 22.000 | 22.000 | 0.000 | $9,383.58 | $0.00 | $0.00 | |
| Subtotals For Category 0100/ROADWAY - IMY-244-2(499) 011 | $206,894.26 | $1,014,961.17 | ||||||||
| Fed/State Project Number: IMY-244-2(499)011 | Project: 27146(04) | Category: 0200/BRIDGE NO. 64 - IMY-244-2(499)011 | ||||||||
| 0172 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 35.000 | 35.000 | 0.000 | $39.39 | $0.00 | $0.00 | |
| 0173 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 300.000 | 300.000 | 0.000 | $0.87 | $0.00 | $0.00 | |
| 0174 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 154.000 | 154.000 | 0.000 | $4.05 | $0.00 | $0.00 | |
| 0175 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 0.000 | $22,105.57 | $0.00 | $0.00 | |
| 0176 | 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8306 | LF | 150.000 | 150.000 | 0.000 | $13.79 | $0.00 | $0.00 | |
| 0177 | JUNCTION BOX(8" X 8" X 6") | 802(E) 8372 | EA | 2.000 | 2.000 | 0.000 | $368.92 | $0.00 | $0.00 | |
| 0178 | 1/C NO.2 ELECTRICAL CONDUCTOR | 811 8036 | LF | 150.000 | 150.000 | 0.000 | $3.63 | $0.00 | $0.00 | |
| 0179 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 150.000 | 150.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
| Subtotals For Category 0200/BRIDGE NO. 64 - IMY-244-2(499)011 | $0.00 | $0.00 | ||||||||
| Fed/State Project Number: IMY-244-2(499)011 | Project: 27146(04) | Category: 0201/BRIDGE NO. 65 - IMY-244-2(499)011 | ||||||||
| 0180 | (PL)FALSEWORK JACKING | 502 6116 | LSUM | 1.000 | 1.000 | 0.500 | $15,767.18 | $0.00 | $7,883.59 | |
| 0181 | APPROACH SLAB | 504(A) 1304 | SY | 687.800 | 687.800 | 343.900 | $125.69 | $0.00 | $43,224.79 | |
| 0182 | SAW-CUT GROOVING | 504(B) 1305 | SY | 1,528.000 | 1,528.000 | 0.000 | $4.17 | $0.00 | $0.00 | |
| 0183 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 159.700 | 159.700 | 80.000 | $234.58 | $0.00 | $18,766.40 | |
| 0184 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 416.600 | 416.600 | 0.000 | $50.79 | $0.00 | $0.00 | |
| 0185 | CLASS AA CONCRETE | 509(A) 1326 | CY | 247.500 | 247.500 | 123.750 | $618.94 | $0.00 | $76,593.83 | |
| 0186 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 77,790.000 | 77,790.000 | 38,895.000 | $0.84 | $0.00 | $32,671.80 | |
| 0187 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 0.450 | $20,849.61 | $0.00 | $9,382.32 | |
| 0188 | COLLECTION AND HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 0.100 | $5,212.40 | $0.00 | $521.24 | |
| 0189 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 299.000 | 299.000 | 0.000 | $4.05 | $0.00 | $0.00 | |
| 0190 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 30.000 | 30.000 | 45.740 | $30.23 | $0.00 | $1,382.72 | |
| 0191 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 3.000 | 3.000 | 1.500 | $69.76 | $0.00 | $104.64 | |
| 0192 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 30.000 | 30.000 | 11.960 | $581.64 | $0.00 | $6,956.41 | |
| 0193 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 0.500 | $50,011.80 | $0.00 | $25,005.90 | |
| 0194 | 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8306 | LF | 160.000 | 160.000 | 0.000 | $13.79 | $0.00 | $0.00 | |
| 0195 | JUNCTION BOX(8" X 8" X 6") | 802(E) 8372 | EA | 2.000 | 2.000 | 0.000 | $368.92 | $0.00 | $0.00 | |
| 0196 | 1/C NO.2 ELECTRICAL CONDUCTOR | 811 8036 | LF | 160.000 | 160.000 | 0.000 | $3.63 | $0.00 | $0.00 | |
| 0197 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 160.000 | 160.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
| Subtotals For Category 0201/BRIDGE NO. 65 - IMY-244-2(499)011 | $0.00 | $222,493.64 | ||||||||
| Fed/State Project Number: IMY-244-2(499)011 | Project: 27146(04) | Category: 0202/BRIDGE NO. 66 - IMY-244-2(499)011 | ||||||||
| 0198 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 70.000 | 70.000 | 0.000 | $50.63 | $0.00 | $0.00 | |
| 0199 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 600.000 | 600.000 | 0.000 | $0.87 | $0.00 | $0.00 | |
| 0200 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 308.000 | 308.000 | 0.000 | $4.05 | $0.00 | $0.00 | |
| 0201 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 0.000 | $18,643.20 | $0.00 | $0.00 | |
| 0202 | 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8306 | LF | 180.000 | 180.000 | 0.000 | $13.79 | $0.00 | $0.00 | |
| 0203 | JUNCTION BOX(8" X 8" X 6") | 802(E) 8372 | EA | 2.000 | 2.000 | 0.000 | $368.92 | $0.00 | $0.00 | |
| 0204 | 1/C NO.2 ELECTRICAL CONDUCTOR | 811 8036 | LF | 180.000 | 180.000 | 0.000 | $3.63 | $0.00 | $0.00 | |
| 0205 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 180.000 | 180.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
| Subtotals For Category 0202/BRIDGE NO. 66 - IMY-244-2(499)011 | $0.00 | $0.00 | ||||||||
| Fed/State Project Number: IMY-244-2(499)011 | Project: 27146(04) | Category: 0203/BRIDGE NO. 67 -IMY-244-2(499)011 | ||||||||
| 0206 | (PL)FALSEWORK JACKING | 502 6116 | LSUM | 1.000 | 1.000 | 0.500 | $18,384.41 | $0.00 | $9,192.21 | |
| 0207 | APPROACH SLAB | 504(A) 1304 | SY | 433.400 | 433.400 | 216.700 | $130.49 | $0.00 | $28,277.18 | |
| 0208 | SAW-CUT GROOVING | 504(B) 1305 | SY | 1,279.000 | 1,279.000 | 0.000 | $4.17 | $0.00 | $0.00 | |
| 0209 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 124.130 | 124.130 | 62.130 | $234.58 | $0.00 | $14,574.46 | |
| 0210 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 425.600 | 425.600 | 0.000 | $50.47 | $0.00 | $0.00 | |
| 0211 | CLASS AA CONCRETE | 509(A) 1326 | CY | 245.200 | 245.200 | 122.600 | $642.19 | $0.00 | $78,732.49 | |
| 0212 | MECHANICAL SPLICES | 511 6306 | EA | 700.000 | 700.000 | 700.000 | $12.28 | $0.00 | $8,596.00 | |
| 0213 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 74,000.000 | 74,000.000 | 37,000.000 | $0.84 | $0.00 | $31,080.00 | |
| 0214 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 0.450 | $19,459.63 | $0.00 | $8,756.84 | |
| 0215 | COLLECTION AND HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 0.100 | $4,864.91 | $0.00 | $486.49 | |
| 0216 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 298.000 | 298.000 | 0.000 | $4.05 | $0.00 | $0.00 | |
| 0217 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 30.000 | 30.000 | 5.160 | 29.900 | $30.23 | $155.99 | $903.88 |
| 0218 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 3.000 | 3.000 | 0.250 | 1.250 | $69.76 | $17.44 | $87.20 |
| 0219 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 30.000 | 30.000 | 40.500 | $581.64 | $0.00 | $23,556.42 | |
| 0220 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 345.100 | 345.100 | 0.000 | $3.47 | $0.00 | $0.00 | |
| 0221 | SEALER RESIN | 523(B) 6560 | GAL | 4.000 | 4.000 | 0.000 | $115.83 | $0.00 | $0.00 | |
| 0222 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 0.500 | $50,236.56 | $0.00 | $25,118.28 | |
| 0223 | 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8306 | LF | 170.000 | 170.000 | 0.000 | $13.79 | $0.00 | $0.00 | |
| 0224 | JUNCTION BOX(8" X 8" X 6") | 802(E) 8372 | EA | 2.000 | 2.000 | 0.000 | $368.92 | $0.00 | $0.00 | |
| 0225 | 1/C NO.2 ELECTRICAL CONDUCTOR | 811 8036 | LF | 170.000 | 170.000 | 0.000 | $3.63 | $0.00 | $0.00 | |
| 0226 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 170.000 | 170.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
| Subtotals For Category 0203/BRIDGE NO. 67 -IMY-244-2(499)011 | $173.43 | $229,361.45 | ||||||||
| Fed/State Project Number: IMY-244-2(499)011 | Project: 27146(04) | Category: 0204/BRIDGE NO. 68 - IMY-244-2(499)011 | ||||||||
| 0227 | (PL)FALSEWORK JACKING | 502 6116 | LSUM | 1.000 | 1.000 | 0.500 | $48,259.08 | $0.00 | $24,129.54 | |
| 0228 | APPROACH SLAB | 504(A) 1304 | SY | 486.500 | 486.500 | 0.000 | $128.92 | $0.00 | $0.00 | |
| 0229 | SAW-CUT GROOVING | 504(B) 1305 | SY | 1,921.000 | 1,921.000 | 0.000 | $4.17 | $0.00 | $0.00 | |
| 0230 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 151.850 | 151.850 | 0.000 | $234.58 | $0.00 | $0.00 | |
| 0231 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 533.300 | 533.300 | 0.000 | $50.56 | $0.00 | $0.00 | |
| 0232 | CLASS AA CONCRETE | 509(A) 1326 | CY | 405.600 | 405.600 | 0.000 | $623.22 | $0.00 | $0.00 | |
| 0233 | MECHANICAL SPLICES | 511 6306 | EA | 1,390.000 | 1,390.000 | 0.000 | $16.38 | $0.00 | $0.00 | |
| 0234 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 138,200.000 | 138,200.000 | 0.000 | $0.84 | $0.00 | $0.00 | |
| 0235 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 0.400 | 0.400 | $22,702.91 | $9,081.16 | $9,081.16 |
| 0236 | COLLECTION AND HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 0.100 | 0.100 | $5,675.72 | $567.57 | $567.57 |
| 0237 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 402.000 | 402.000 | 0.000 | $4.05 | $0.00 | $0.00 | |
| 0238 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 50.000 | 0.000 | $30.23 | $0.00 | $0.00 | |
| 0239 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 5.000 | 5.000 | 0.000 | $69.76 | $0.00 | $0.00 | |
| 0240 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 50.000 | 50.000 | 9.640 | $581.64 | $0.00 | $5,607.01 | |
| 0241 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 313.000 | 313.000 | 0.000 | $3.47 | $0.00 | $0.00 | |
| 0242 | SEALER RESIN | 523(B) 6560 | GAL | 4.000 | 4.000 | 0.000 | $115.83 | $0.00 | $0.00 | |
| 0243 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 0.500 | $80,891.59 | $0.00 | $40,445.80 | |
| 0244 | 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8306 | LF | 230.000 | 230.000 | 0.000 | $13.79 | $0.00 | $0.00 | |
| 0245 | JUNCTION BOX(8" X 8" X 6") | 802(E) 8372 | EA | 2.000 | 2.000 | 0.000 | $368.92 | $0.00 | $0.00 | |
| 0246 | 1/C NO.2 ELECTRICAL CONDUCTOR | 811 8036 | LF | 230.000 | 230.000 | 0.000 | $3.63 | $0.00 | $0.00 | |
| 0247 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 230.000 | 230.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
| Subtotals For Category 0204/BRIDGE NO. 68 - IMY-244-2(499)011 | $9,648.73 | $79,831.08 | ||||||||
| Fed/State Project Number: IMY-244-2(499)011 | Project: 27146(04) | Category: 0205/BRIDGE NO. 69 - IMY-244-2(499)011 | ||||||||
| 0248 | (PL)FALSEWORK JACKING | 502 6116 | LSUM | 1.000 | 1.000 | 0.500 | $39,880.77 | $0.00 | $19,940.39 | |
| 0249 | APPROACH SLAB | 504(A) 1304 | SY | 289.200 | 289.200 | 0.000 | 144.600 | $134.95 | $0.00 | $19,513.77 |
| 0250 | SAW-CUT GROOVING | 504(B) 1305 | SY | 1,501.800 | 1,501.800 | 0.000 | $4.17 | $0.00 | $0.00 | |
| 0251 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 124.000 | 124.000 | 62.000 | $234.58 | $0.00 | $14,543.96 | |
| 0252 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 500.000 | 500.000 | 0.000 | $50.37 | $0.00 | $0.00 | |
| 0253 | CLASS AA CONCRETE | 509(A) 1326 | CY | 341.700 | 341.700 | 170.850 | $609.35 | $0.00 | $104,107.45 | |
| 0254 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 121,940.000 | 121,940.000 | 60,970.000 | $0.84 | $0.00 | $51,214.80 | |
| 0255 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 0.450 | $22,702.91 | $0.00 | $10,216.31 | |
| 0256 | COLLECTION AND HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 0.100 | $5,675.72 | $0.00 | $567.57 | |
| 0257 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 394.000 | 394.000 | 0.000 | $4.05 | $0.00 | $0.00 | |
| 0258 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 50.000 | 50.000 | 0.000 | $30.23 | $0.00 | $0.00 | |
| 0259 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 5.000 | 5.000 | 0.000 | $69.76 | $0.00 | $0.00 | |
| 0260 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 50.000 | 50.000 | 16.320 | $581.64 | $0.00 | $9,492.36 | |
| 0261 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 256.000 | 256.000 | 0.000 | $3.47 | $0.00 | $0.00 | |
| 0262 | SEALER RESIN | 523(B) 6560 | GAL | 4.000 | 4.000 | 0.000 | $115.83 | $0.00 | $0.00 | |
| 0263 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 0.500 | $68,582.32 | $0.00 | $34,291.16 | |
| 0264 | 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8306 | LF | 230.000 | 230.000 | 0.000 | $13.79 | $0.00 | $0.00 | |
| 0265 | JUNCTION BOX(8" X 8" X 6") | 802(E) 8372 | EA | 2.000 | 2.000 | 0.000 | $368.92 | $0.00 | $0.00 | |
| 0266 | 1/C NO.2 ELECTRICAL CONDUCTOR | 811 8036 | LF | 230.000 | 230.000 | 0.000 | $3.63 | $0.00 | $0.00 | |
| 0267 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 230.000 | 230.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
| Subtotals For Category 0205/BRIDGE NO. 69 - IMY-244-2(499)011 | $0.00 | $263,887.77 | ||||||||
| Fed/State Project Number: IMY-244-2(499)011 | Project: 27146(04) | Category: 0206/BRIDGE NO. 70 - IMY-244-2(499)011 | ||||||||
| 0268 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 52.500 | 52.500 | 0.000 | $48.98 | $0.00 | $0.00 | |
| 0269 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 450.000 | 450.000 | 0.000 | $0.87 | $0.00 | $0.00 | |
| 0270 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 231.000 | 231.000 | 0.000 | $4.05 | $0.00 | $0.00 | |
| 0271 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 0.000 | $11,604.81 | $0.00 | $0.00 | |
| 0272 | 1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8306 | LF | 220.000 | 220.000 | 0.000 | $13.79 | $0.00 | $0.00 | |
| 0273 | JUNCTION BOX(8" X 8" X 6") | 802(E) 8372 | EA | 2.000 | 2.000 | 0.000 | $368.92 | $0.00 | $0.00 | |
| 0274 | 1/C NO.2 ELECTRICAL CONDUCTOR | 811 8036 | LF | 220.000 | 220.000 | 0.000 | $3.63 | $0.00 | $0.00 | |
| 0275 | 1/C NO.12 ELECTRICAL CONDUCTOR | 811 8046 | LF | 220.000 | 220.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
| Subtotals For Category 0206/BRIDGE NO. 70 - IMY-244-2(499)011 | $0.00 | $0.00 | ||||||||
| Fed/State Project Number: IMY-244-2(499)011 | Project: 27146(04) | Category: 0207/BRIDGE NO. 71- IMY-244-2(499)011 | ||||||||
| 0276 | (PL)FALSEWORK JACKING | 502 6116 | LSUM | 1.000 | 1.000 | 0.500 | $23,172.02 | $0.00 | $11,586.02 | |
| 0277 | APPROACH SLAB | 504(A) 1304 | SY | 474.400 | 474.400 | 237.000 | 237.000 | $130.19 | $30,855.03 | $30,855.03 |
| 0278 | SAW-CUT GROOVING | 504(B) 1305 | SY | 1,532.500 | 1,532.500 | 0.000 | $4.17 | $0.00 | $0.00 | |
| 0279 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 117.740 | 117.740 | 54.160 | $234.58 | $0.00 | $12,704.85 | |
| 0280 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 532.600 | 532.600 | 0.000 | $50.34 | $0.00 | $0.00 | |
| 0281 | CLASS AA CONCRETE | 509(A) 1326 | CY | 297.400 | 297.400 | 51.570 | 148.700 | $614.34 | $31,681.51 | $91,352.35 |
| 0282 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 102,240.000 | 102,240.000 | 49,440.000 | $0.84 | $0.00 | $41,529.60 | |
| 0283 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 0.450 | $25,482.85 | $0.00 | $11,467.28 | |
| 0284 | COLLECTION AND HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 0.050 | $6,384.61 | $0.00 | $319.23 | |
| 0285 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 421.000 | 421.000 | 0.000 | $4.05 | $0.00 | $0.00 | |
| 0286 | PREPARATION OF CRACKS, ABOVE WATER | 520(A) 6058 | LF | 30.000 | 30.000 | 0.000 | $30.23 | $0.00 | $0.00 | |
| 0287 | EPOXY RESIN, ABOVE WATER | 520(C) 6060 | GAL | 3.000 | 3.000 | 0.250 | $69.76 | $0.00 | $17.44 | |