| Fed/State Project Number: IMY-244-2(499)011 |
Project: 27146(04) |
Category: 0100/ROADWAY - IMY-244-2(499) 011 |
| 0120 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
42,000.000 |
42,000.000 |
488.000 |
11,764.000 |
$9.05 |
$4,416.40 |
$106,464.20 |
| 0121 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
2,000.000 |
2,000.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
| 0122 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
44,500.000 |
44,500.000 |
5,810.000 |
26,519.000 |
$2.56 |
$14,873.60 |
$67,888.64 |
| 0123 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
30.000 |
30.000 |
42.000 |
259.000 |
$7.11 |
$298.62 |
$1,841.49 |
| 0124 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
30,000.000 |
30,000.000 |
|
0.000 |
$1.44 |
$0.00 |
$0.00 |
| 0125 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
4.000 |
4.000 |
|
0.000 |
$207.34 |
$0.00 |
$0.00 |
| 0126 |
MOWING |
241 2832 |
AC |
255.000 |
255.000 |
|
0.000 |
$49.00 |
$0.00 |
$0.00 |
| 0127 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
31,124.000 |
31,124.000 |
0.000 |
21.300 |
$26.93 |
$0.00 |
$573.61 |
| 0128 |
LIME |
307(D) 4230 |
TON |
3,815.000 |
3,815.000 |
|
0.000 |
$156.37 |
$0.00 |
$0.00 |
| 0129 |
LIME STABILIZED SUBGRADE |
307(H) 4270 |
SY |
176,611.000 |
176,611.000 |
|
0.000 |
$1.96 |
$0.00 |
$0.00 |
| 0130 |
CEMENT TREATED BASE |
317 4270 |
SY |
176,611.000 |
176,611.000 |
|
0.000 |
$10.91 |
$0.00 |
$0.00 |
| 0131 |
SEPARATOR FABRIC |
325 5271 |
SY |
209,525.000 |
209,525.000 |
|
0.000 |
$1.10 |
$0.00 |
$0.00 |
| 0132 |
GEOGRID REINFORCEMENT |
326(B) 0100 |
SY |
5,000.000 |
5,000.000 |
|
0.000 |
$2.60 |
$0.00 |
$0.00 |
| 0133 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
7,000.000 |
7,000.000 |
|
0.000 |
$11.54 |
$0.00 |
$0.00 |
| 0134 |
PRIME COAT |
408 5774 |
GAL |
65,708.000 |
65,708.000 |
|
0.000 |
$3.94 |
$0.00 |
$0.00 |
| 0135 |
SUPERPAVE, TYPE S4(PG 76-28 OK) |
411(C) 5950 |
TON |
500.000 |
500.000 |
|
0.000 |
$90.00 |
$0.00 |
$0.00 |
| 0136 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
232.000 |
232.000 |
|
0.000 |
$80.00 |
$0.00 |
$0.00 |
| 0137 |
SUPERPAVE, TYPE S5(PG 64-22 OK) |
411(D) 5975 |
TON |
2,120.000 |
2,120.000 |
276.640 |
2,139.200 |
$90.00 |
$24,897.60 |
$192,528.00 |
| 0138 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
17,500.000 |
17,500.000 |
|
0.000 |
$1.11 |
$0.00 |
$0.00 |
| 0139 |
P.C.CONCRETE PAVEMENT(PLACEMENT) |
414(A) 0210 |
SY |
41,847.000 |
41,847.000 |
|
0.000 |
$11.58 |
$0.00 |
$0.00 |
| 0140 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) |
414(B) 5725 |
SY |
124,640.000 |
124,640.000 |
|
0.000 |
$12.67 |
$0.00 |
$0.00 |
| 0141 |
P.C. CONCRETE FOR PAVEMENT |
414(G) 5275 |
CY |
43,934.000 |
43,934.000 |
|
0.000 |
$89.79 |
$0.00 |
$0.00 |
| 0142 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
20,287.000 |
20,287.000 |
|
0.000 |
$51.97 |
$0.00 |
$0.00 |
| 0143 |
CLASS A CONCRETE |
509(B) 0321 |
CY |
50.000 |
50.000 |
|
0.000 |
$300.00 |
$0.00 |
$0.00 |
| 0144 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
663.000 |
663.000 |
|
0.000 |
$212.25 |
$0.00 |
$0.00 |
| 0145 |
SLOPE WALL (5") |
510(C) 6135 |
SY |
200.000 |
200.000 |
|
0.000 |
$70.00 |
$0.00 |
$0.00 |
| 0146 |
REINFORCING STEEL |
511(A) 0332 |
LB |
583,929.000 |
583,929.000 |
|
0.000 |
$0.75 |
$0.00 |
$0.00 |
| 0147 |
CONCRETE CURB (6" BARRIER-INTEGRAL) |
609(A) 0300 |
LF |
4,000.000 |
4,000.000 |
|
0.000 |
$1.37 |
$0.00 |
$0.00 |
| 0148 |
6" CONCRETE DIVIDING STRIP |
610(C) 0609 |
SY |
5,000.000 |
5,000.000 |
|
0.000 |
$39.56 |
$0.00 |
$0.00 |
| 0149 |
18" R.C.PIPE CLASS III |
613(A) 0491 |
LF |
500.000 |
500.000 |
|
0.000 |
$57.41 |
$0.00 |
$0.00 |
| 0150 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
500.000 |
500.000 |
|
0.000 |
$69.37 |
$0.00 |
$0.00 |
| 0151 |
30" R.C.PIPE CLASS III |
613(A) 0493 |
LF |
500.000 |
500.000 |
|
0.000 |
$99.60 |
$0.00 |
$0.00 |
| 0152 |
36" R.C.PIPE CLASS III |
613(A) 0494 |
LF |
500.000 |
500.000 |
|
0.000 |
$119.73 |
$0.00 |
$0.00 |
| 0153 |
8" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 0500 |
LF |
1,500.000 |
1,500.000 |
|
0.000 |
$14.66 |
$0.00 |
$0.00 |
| 0154 |
8" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1097 |
LF |
500.000 |
500.000 |
|
0.000 |
$9.77 |
$0.00 |
$0.00 |
| 0155 |
EDGE DRAIN CONDUIT-PERFORATED |
613(J) 5915 |
LF |
44,393.000 |
44,393.000 |
|
0.000 |
$4.65 |
$0.00 |
$0.00 |
| 0156 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED |
613(K) 5916 |
LF |
4,440.000 |
4,440.000 |
|
0.000 |
$11.21 |
$0.00 |
$0.00 |
| 0157 |
OUTLET LATERAL HEADWALL |
613(Q) 5946 |
EA |
214.000 |
214.000 |
|
0.000 |
$190.36 |
$0.00 |
$0.00 |
| 0158 |
(PL)VIDEO INSPECTION OF CONDUIT |
613(Y) 0100 |
LF |
5,000.000 |
5,000.000 |
|
5,226.100 |
$2.00 |
$0.00 |
$10,452.20 |
| 0159 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
47,972.000 |
47,972.000 |
2,029.590 |
24,642.740 |
$2.50 |
$5,073.98 |
$61,606.86 |
| 0160 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY |
619(B) 4763 |
SY |
114,775.000 |
114,775.000 |
22,512.460 |
55,826.470 |
$3.50 |
$78,793.61 |
$195,392.65 |
| 0161 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
21,137.000 |
21,137.000 |
|
9,107.000 |
$3.01 |
$0.00 |
$27,412.07 |
| 0162 |
REMOVAL OF CONCRETE MEDIAN BARRIER |
619(B) 4915 |
LF |
1,180.000 |
1,180.000 |
143.000 |
307.000 |
$20.08 |
$2,871.44 |
$6,164.56 |
| 0163 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
22,500.000 |
22,500.000 |
850.000 |
18,569.000 |
$1.61 |
$1,368.50 |
$29,896.09 |
| 0164 |
CLEAN STORM DRAIN, 12" TO 30" DIAMETER |
619(H) 0200 |
LF |
3,150.000 |
3,150.000 |
|
769.500 |
$4.75 |
$0.00 |
$3,655.13 |
| 0165 |
CLEAN STORM DRAIN, 36" TO 60" DIAMETER |
619(H) 0210 |
LF |
1,900.000 |
1,900.000 |
|
1,186.800 |
$7.25 |
$0.00 |
$8,604.30 |
| 0166 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 1418 |
LF |
2,483.000 |
2,483.000 |
|
0.000 |
$15.64 |
$0.00 |
$0.00 |
| 0167 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) |
623(F) 5686 |
EA |
3.000 |
3.000 |
|
0.000 |
$2,200.00 |
$0.00 |
$0.00 |
| 0168 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
6.000 |
6.000 |
|
0.000 |
$1,275.00 |
$0.00 |
$0.00 |
| 0169 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 |
627(A) 4317 |
LF |
3,391.000 |
3,391.000 |
|
0.000 |
$52.62 |
$0.00 |
$0.00 |
| 0170 |
CONCRETE LONGITUDINAL BARRIER END SECTIONS |
627(B) 4410 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,178.07 |
$0.00 |
$0.00 |
| 0171 |
(SP)IMPACT ATTENUATOR |
871(A) 8325 |
EA |
22.000 |
22.000 |
|
0.000 |
$9,383.58 |
$0.00 |
$0.00 |
| Subtotals For Category 0100/ROADWAY - IMY-244-2(499) 011 |
$132,593.75 |
$712,479.80 |
|
| Fed/State Project Number: IMY-244-2(499)011 |
Project: 27146(04) |
Category: 0200/BRIDGE NO. 64 - IMY-244-2(499)011 |
| 0172 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
35.000 |
35.000 |
|
0.000 |
$39.39 |
$0.00 |
$0.00 |
| 0173 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
300.000 |
300.000 |
|
0.000 |
$0.87 |
$0.00 |
$0.00 |
| 0174 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
154.000 |
154.000 |
|
0.000 |
$4.05 |
$0.00 |
$0.00 |
| 0175 |
REMOVAL OF BRIDGE ITEMS |
619(B) 2500 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$22,105.57 |
$0.00 |
$0.00 |
| 0176 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8306 |
LF |
150.000 |
150.000 |
|
0.000 |
$13.79 |
$0.00 |
$0.00 |
| 0177 |
JUNCTION BOX(8" X 8" X 6") |
802(E) 8372 |
EA |
2.000 |
2.000 |
|
0.000 |
$368.92 |
$0.00 |
$0.00 |
| 0178 |
1/C NO.2 ELECTRICAL CONDUCTOR |
811 8036 |
LF |
150.000 |
150.000 |
|
0.000 |
$3.63 |
$0.00 |
$0.00 |
| 0179 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
150.000 |
150.000 |
|
0.000 |
$0.85 |
$0.00 |
$0.00 |
| Subtotals For Category 0200/BRIDGE NO. 64 - IMY-244-2(499)011 |
$0.00 |
$0.00 |
|
| Fed/State Project Number: IMY-244-2(499)011 |
Project: 27146(04) |
Category: 0201/BRIDGE NO. 65 - IMY-244-2(499)011 |
| 0180 |
(PL)FALSEWORK JACKING |
502 6116 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$15,767.18 |
$0.00 |
$7,883.59 |
| 0181 |
APPROACH SLAB |
504(A) 1304 |
SY |
687.800 |
687.800 |
343.900 |
343.900 |
$125.69 |
$43,224.79 |
$43,224.79 |
| 0182 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
1,528.000 |
1,528.000 |
|
0.000 |
$4.17 |
$0.00 |
$0.00 |
| 0183 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
159.700 |
159.700 |
|
80.000 |
$234.58 |
$0.00 |
$18,766.40 |
| 0184 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
416.600 |
416.600 |
|
0.000 |
$50.79 |
$0.00 |
$0.00 |
| 0185 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
247.500 |
247.500 |
0.000 |
123.750 |
$618.94 |
$0.00 |
$76,593.83 |
| 0186 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
77,790.000 |
77,790.000 |
|
38,895.000 |
$0.84 |
$0.00 |
$32,671.80 |
| 0187 |
PAINTING EXISTING STRUCTURES |
512(A) 1323 |
LSUM |
1.000 |
1.000 |
|
0.450 |
$20,849.61 |
$0.00 |
$9,382.32 |
| 0188 |
COLLECTION AND HANDLING OF WASTE |
512(B) 6303 |
LSUM |
1.000 |
1.000 |
|
0.100 |
$5,212.40 |
$0.00 |
$521.24 |
| 0189 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
299.000 |
299.000 |
|
0.000 |
$4.05 |
$0.00 |
$0.00 |
| 0190 |
PREPARATION OF CRACKS, ABOVE WATER |
520(A) 6058 |
LF |
30.000 |
30.000 |
|
45.740 |
$30.23 |
$0.00 |
$1,382.72 |
| 0191 |
EPOXY RESIN, ABOVE WATER |
520(C) 6060 |
GAL |
3.000 |
3.000 |
|
1.500 |
$69.76 |
$0.00 |
$104.64 |
| 0192 |
PNEUMATICALLY PLACED MORTAR |
521(A) 6210 |
SY |
30.000 |
30.000 |
|
11.960 |
$581.64 |
$0.00 |
$6,956.41 |
| 0193 |
REMOVAL OF BRIDGE ITEMS |
619(B) 2500 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$50,011.80 |
$0.00 |
$25,005.90 |
| 0194 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8306 |
LF |
160.000 |
160.000 |
|
0.000 |
$13.79 |
$0.00 |
$0.00 |
| 0195 |
JUNCTION BOX(8" X 8" X 6") |
802(E) 8372 |
EA |
2.000 |
2.000 |
|
0.000 |
$368.92 |
$0.00 |
$0.00 |
| 0196 |
1/C NO.2 ELECTRICAL CONDUCTOR |
811 8036 |
LF |
160.000 |
160.000 |
|
0.000 |
$3.63 |
$0.00 |
$0.00 |
| 0197 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
160.000 |
160.000 |
|
0.000 |
$0.85 |
$0.00 |
$0.00 |
| Subtotals For Category 0201/BRIDGE NO. 65 - IMY-244-2(499)011 |
$43,224.79 |
$222,493.64 |
|
| Fed/State Project Number: IMY-244-2(499)011 |
Project: 27146(04) |
Category: 0202/BRIDGE NO. 66 - IMY-244-2(499)011 |
| 0198 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
70.000 |
70.000 |
|
0.000 |
$50.63 |
$0.00 |
$0.00 |
| 0199 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
600.000 |
600.000 |
|
0.000 |
$0.87 |
$0.00 |
$0.00 |
| 0200 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
308.000 |
308.000 |
|
0.000 |
$4.05 |
$0.00 |
$0.00 |
| 0201 |
REMOVAL OF BRIDGE ITEMS |
619(B) 2500 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$18,643.20 |
$0.00 |
$0.00 |
| 0202 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8306 |
LF |
180.000 |
180.000 |
|
0.000 |
$13.79 |
$0.00 |
$0.00 |
| 0203 |
JUNCTION BOX(8" X 8" X 6") |
802(E) 8372 |
EA |
2.000 |
2.000 |
|
0.000 |
$368.92 |
$0.00 |
$0.00 |
| 0204 |
1/C NO.2 ELECTRICAL CONDUCTOR |
811 8036 |
LF |
180.000 |
180.000 |
|
0.000 |
$3.63 |
$0.00 |
$0.00 |
| 0205 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
180.000 |
180.000 |
|
0.000 |
$0.85 |
$0.00 |
$0.00 |
| Subtotals For Category 0202/BRIDGE NO. 66 - IMY-244-2(499)011 |
$0.00 |
$0.00 |
|
| Fed/State Project Number: IMY-244-2(499)011 |
Project: 27146(04) |
Category: 0203/BRIDGE NO. 67 -IMY-244-2(499)011 |
| 0206 |
(PL)FALSEWORK JACKING |
502 6116 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$18,384.41 |
$0.00 |
$9,192.21 |
| 0207 |
APPROACH SLAB |
504(A) 1304 |
SY |
433.400 |
433.400 |
|
0.000 |
$130.49 |
$0.00 |
$0.00 |
| 0208 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
1,279.000 |
1,279.000 |
|
0.000 |
$4.17 |
$0.00 |
$0.00 |
| 0209 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
124.130 |
124.130 |
62.130 |
62.130 |
$234.58 |
$14,574.46 |
$14,574.46 |
| 0210 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
425.600 |
425.600 |
|
0.000 |
$50.47 |
$0.00 |
$0.00 |
| 0211 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
245.200 |
245.200 |
122.600 |
122.600 |
$642.19 |
$78,732.49 |
$78,732.49 |
| 0212 |
MECHANICAL SPLICES |
511 6306 |
EA |
700.000 |
700.000 |
700.000 |
700.000 |
$12.28 |
$8,596.00 |
$8,596.00 |
| 0213 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
74,000.000 |
74,000.000 |
37,000.000 |
37,000.000 |
$0.84 |
$31,080.00 |
$31,080.00 |
| 0214 |
PAINTING EXISTING STRUCTURES |
512(A) 1323 |
LSUM |
1.000 |
1.000 |
|
0.450 |
$19,459.63 |
$0.00 |
$8,756.84 |
| 0215 |
COLLECTION AND HANDLING OF WASTE |
512(B) 6303 |
LSUM |
1.000 |
1.000 |
|
0.100 |
$4,864.91 |
$0.00 |
$486.49 |
| 0216 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
298.000 |
298.000 |
|
0.000 |
$4.05 |
$0.00 |
$0.00 |
| 0217 |
PREPARATION OF CRACKS, ABOVE WATER |
520(A) 6058 |
LF |
30.000 |
30.000 |
|
24.740 |
$30.23 |
$0.00 |
$747.89 |
| 0218 |
EPOXY RESIN, ABOVE WATER |
520(C) 6060 |
GAL |
3.000 |
3.000 |
|
1.000 |
$69.76 |
$0.00 |
$69.76 |
| 0219 |
PNEUMATICALLY PLACED MORTAR |
521(A) 6210 |
SY |
30.000 |
30.000 |
|
40.500 |
$581.64 |
$0.00 |
$23,556.42 |
| 0220 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
345.100 |
345.100 |
|
0.000 |
$3.47 |
$0.00 |
$0.00 |
| 0221 |
SEALER RESIN |
523(B) 6560 |
GAL |
4.000 |
4.000 |
|
0.000 |
$115.83 |
$0.00 |
$0.00 |
| 0222 |
REMOVAL OF BRIDGE ITEMS |
619(B) 2500 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$50,236.56 |
$0.00 |
$25,118.28 |
| 0223 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8306 |
LF |
170.000 |
170.000 |
|
0.000 |
$13.79 |
$0.00 |
$0.00 |
| 0224 |
JUNCTION BOX(8" X 8" X 6") |
802(E) 8372 |
EA |
2.000 |
2.000 |
|
0.000 |
$368.92 |
$0.00 |
$0.00 |
| 0225 |
1/C NO.2 ELECTRICAL CONDUCTOR |
811 8036 |
LF |
170.000 |
170.000 |
|
0.000 |
$3.63 |
$0.00 |
$0.00 |
| 0226 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
170.000 |
170.000 |
|
0.000 |
$0.85 |
$0.00 |
$0.00 |
| Subtotals For Category 0203/BRIDGE NO. 67 -IMY-244-2(499)011 |
$132,982.95 |
$200,910.84 |
|
| Fed/State Project Number: IMY-244-2(499)011 |
Project: 27146(04) |
Category: 0204/BRIDGE NO. 68 - IMY-244-2(499)011 |
| 0227 |
(PL)FALSEWORK JACKING |
502 6116 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$48,259.08 |
$0.00 |
$0.00 |
| 0228 |
APPROACH SLAB |
504(A) 1304 |
SY |
486.500 |
486.500 |
|
0.000 |
$128.92 |
$0.00 |
$0.00 |
| 0229 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
1,921.000 |
1,921.000 |
|
0.000 |
$4.17 |
$0.00 |
$0.00 |
| 0230 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
151.850 |
151.850 |
|
0.000 |
$234.58 |
$0.00 |
$0.00 |
| 0231 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
533.300 |
533.300 |
|
0.000 |
$50.56 |
$0.00 |
$0.00 |
| 0232 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
405.600 |
405.600 |
|
0.000 |
$623.22 |
$0.00 |
$0.00 |
| 0233 |
MECHANICAL SPLICES |
511 6306 |
EA |
1,390.000 |
1,390.000 |
|
0.000 |
$16.38 |
$0.00 |
$0.00 |
| 0234 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
138,200.000 |
138,200.000 |
|
0.000 |
$0.84 |
$0.00 |
$0.00 |
| 0235 |
PAINTING EXISTING STRUCTURES |
512(A) 1323 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$22,702.91 |
$0.00 |
$0.00 |
| 0236 |
COLLECTION AND HANDLING OF WASTE |
512(B) 6303 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$5,675.72 |
$0.00 |
$0.00 |
| 0237 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
402.000 |
402.000 |
|
0.000 |
$4.05 |
$0.00 |
$0.00 |
| 0238 |
PREPARATION OF CRACKS, ABOVE WATER |
520(A) 6058 |
LF |
50.000 |
50.000 |
|
0.000 |
$30.23 |
$0.00 |
$0.00 |
| 0239 |
EPOXY RESIN, ABOVE WATER |
520(C) 6060 |
GAL |
5.000 |
5.000 |
|
0.000 |
$69.76 |
$0.00 |
$0.00 |
| 0240 |
PNEUMATICALLY PLACED MORTAR |
521(A) 6210 |
SY |
50.000 |
50.000 |
9.640 |
9.640 |
$581.64 |
$5,607.01 |
$5,607.01 |
| 0241 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
313.000 |
313.000 |
|
0.000 |
$3.47 |
$0.00 |
$0.00 |
| 0242 |
SEALER RESIN |
523(B) 6560 |
GAL |
4.000 |
4.000 |
|
0.000 |
$115.83 |
$0.00 |
$0.00 |
| 0243 |
REMOVAL OF BRIDGE ITEMS |
619(B) 2500 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$80,891.59 |
$0.00 |
$0.00 |
| 0244 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8306 |
LF |
230.000 |
230.000 |
|
0.000 |
$13.79 |
$0.00 |
$0.00 |
| 0245 |
JUNCTION BOX(8" X 8" X 6") |
802(E) 8372 |
EA |
2.000 |
2.000 |
|
0.000 |
$368.92 |
$0.00 |
$0.00 |
| 0246 |
1/C NO.2 ELECTRICAL CONDUCTOR |
811 8036 |
LF |
230.000 |
230.000 |
|
0.000 |
$3.63 |
$0.00 |
$0.00 |
| 0247 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
230.000 |
230.000 |
|
0.000 |
$0.85 |
$0.00 |
$0.00 |
| Subtotals For Category 0204/BRIDGE NO. 68 - IMY-244-2(499)011 |
$5,607.01 |
$5,607.01 |
|
| Fed/State Project Number: IMY-244-2(499)011 |
Project: 27146(04) |
Category: 0205/BRIDGE NO. 69 - IMY-244-2(499)011 |
| 0248 |
(PL)FALSEWORK JACKING |
502 6116 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$39,880.77 |
$0.00 |
$19,940.39 |
| 0249 |
APPROACH SLAB |
504(A) 1304 |
SY |
289.200 |
289.200 |
|
0.000 |
$134.95 |
$0.00 |
$0.00 |
| 0250 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
1,501.800 |
1,501.800 |
|
0.000 |
$4.17 |
$0.00 |
$0.00 |
| 0251 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
124.000 |
124.000 |
|
0.000 |
$234.58 |
$0.00 |
$0.00 |
| 0252 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
500.000 |
500.000 |
|
0.000 |
$50.37 |
$0.00 |
$0.00 |
| 0253 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
341.700 |
341.700 |
|
0.000 |
$609.35 |
$0.00 |
$0.00 |
| 0254 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
121,940.000 |
121,940.000 |
60,970.000 |
60,970.000 |
$0.84 |
$51,214.80 |
$51,214.80 |
| 0255 |
PAINTING EXISTING STRUCTURES |
512(A) 1323 |
LSUM |
1.000 |
1.000 |
|
0.450 |
$22,702.91 |
$0.00 |
$10,216.31 |
| 0256 |
COLLECTION AND HANDLING OF WASTE |
512(B) 6303 |
LSUM |
1.000 |
1.000 |
|
0.100 |
$5,675.72 |
$0.00 |
$567.57 |
| 0257 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
394.000 |
394.000 |
|
0.000 |
$4.05 |
$0.00 |
$0.00 |
| 0258 |
PREPARATION OF CRACKS, ABOVE WATER |
520(A) 6058 |
LF |
50.000 |
50.000 |
|
0.000 |
$30.23 |
$0.00 |
$0.00 |
| 0259 |
EPOXY RESIN, ABOVE WATER |
520(C) 6060 |
GAL |
5.000 |
5.000 |
|
0.000 |
$69.76 |
$0.00 |
$0.00 |
| 0260 |
PNEUMATICALLY PLACED MORTAR |
521(A) 6210 |
SY |
50.000 |
50.000 |
16.320 |
16.320 |
$581.64 |
$9,492.36 |
$9,492.36 |
| 0261 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
256.000 |
256.000 |
|
0.000 |
$3.47 |
$0.00 |
$0.00 |
| 0262 |
SEALER RESIN |
523(B) 6560 |
GAL |
4.000 |
4.000 |
|
0.000 |
$115.83 |
$0.00 |
$0.00 |
| 0263 |
REMOVAL OF BRIDGE ITEMS |
619(B) 2500 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$68,582.32 |
$0.00 |
$34,291.16 |
| 0264 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8306 |
LF |
230.000 |
230.000 |
|
0.000 |
$13.79 |
$0.00 |
$0.00 |
| 0265 |
JUNCTION BOX(8" X 8" X 6") |
802(E) 8372 |
EA |
2.000 |
2.000 |
|
0.000 |
$368.92 |
$0.00 |
$0.00 |
| 0266 |
1/C NO.2 ELECTRICAL CONDUCTOR |
811 8036 |
LF |
230.000 |
230.000 |
|
0.000 |
$3.63 |
$0.00 |
$0.00 |
| 0267 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
230.000 |
230.000 |
|
0.000 |
$0.85 |
$0.00 |
$0.00 |
| Subtotals For Category 0205/BRIDGE NO. 69 - IMY-244-2(499)011 |
$60,707.16 |
$125,722.59 |
|
| Fed/State Project Number: IMY-244-2(499)011 |
Project: 27146(04) |
Category: 0206/BRIDGE NO. 70 - IMY-244-2(499)011 |
| 0268 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
52.500 |
52.500 |
|
0.000 |
$48.98 |
$0.00 |
$0.00 |
| 0269 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
450.000 |
450.000 |
|
0.000 |
$0.87 |
$0.00 |
$0.00 |
| 0270 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
231.000 |
231.000 |
|
0.000 |
$4.05 |
$0.00 |
$0.00 |
| 0271 |
REMOVAL OF BRIDGE ITEMS |
619(B) 2500 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$11,604.81 |
$0.00 |
$0.00 |
| 0272 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8306 |
LF |
220.000 |
220.000 |
|
0.000 |
$13.79 |
$0.00 |
$0.00 |
| 0273 |
JUNCTION BOX(8" X 8" X 6") |
802(E) 8372 |
EA |
2.000 |
2.000 |
|
0.000 |
$368.92 |
$0.00 |
$0.00 |
| 0274 |
1/C NO.2 ELECTRICAL CONDUCTOR |
811 8036 |
LF |
220.000 |
220.000 |
|
0.000 |
$3.63 |
$0.00 |
$0.00 |
| 0275 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
220.000 |
220.000 |
|
0.000 |
$0.85 |
$0.00 |
$0.00 |
| Subtotals For Category 0206/BRIDGE NO. 70 - IMY-244-2(499)011 |
$0.00 |
$0.00 |
|
| Fed/State Project Number: IMY-244-2(499)011 |
Project: 27146(04) |
Category: 0207/BRIDGE NO. 71- IMY-244-2(499)011 |
| 0276 |
(PL)FALSEWORK JACKING |
502 6116 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$23,172.02 |
$0.00 |
$11,586.02 |
| 0277 |
APPROACH SLAB |
504(A) 1304 |
SY |
474.400 |
474.400 |
|
0.000 |
$130.19 |
$0.00 |
$0.00 |
| 0278 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
1,532.500 |
1,532.500 |
|
0.000 |
$4.17 |
$0.00 |
$0.00 |
| 0279 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
117.740 |
117.740 |
|
0.000 |
$234.58 |
$0.00 |
$0.00 |
| 0280 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
532.600 |
532.600 |
|
0.000 |
$50.34 |
$0.00 |
$0.00 |
| 0281 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
297.400 |
297.400 |
|
0.000 |
$614.34 |
$0.00 |
$0.00 |
| 0282 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
102,240.000 |
102,240.000 |
|
0.000 |
$0.84 |
$0.00 |
$0.00 |
| 0283 |
PAINTING EXISTING STRUCTURES |
512(A) 1323 |
LSUM |
1.000 |
1.000 |
|
0.450 |
$25,482.85 |
$0.00 |
$11,467.28 |
| 0284 |
COLLECTION AND HANDLING OF WASTE |
512(B) 6303 |
LSUM |
1.000 |
1.000 |
|
0.050 |
$6,384.61 |
$0.00 |
$319.23 |
| 0285 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
421.000 |
421.000 |
|
0.000 |
$4.05 |
$0.00 |
$0.00 |
| 0286 |
PREPARATION OF CRACKS, ABOVE WATER |
520(A) 6058 |
LF |
30.000 |
30.000 |
|
0.000 |
$30.23 |
$0.00 |
$0.00 |
| 0287 |
EPOXY RESIN, ABOVE WATER |
520(C) 6060 |
GAL |
3.000 |
3.000 |
|
0.250 |
$69.76 |
$0.00 |
$17.44 |
| 0288 |
PNEUMATICALLY PLACED MORTAR |
521(A) 6210 |
SY |
30.000 |
30.000 |
36.970 |
68.000 |
$581.64 |
$21,503.23 |
$39,551.52 |
| 0289 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
243.500 |
243.500 |
|
0.000 |
$3.47 |
$0.00 |
$0.00 |
| 0290 |
SEALER RESIN |
523(B) 6560 |
GAL |
4.000 |
4.000 |
|
0.000 |
$115.83 |
$0.00 |
$0.00 |
| 0291 |
REMOVAL OF BRIDGE ITEMS |
619(B) 2500 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$60,139.83 |
$0.00 |
$30,069.92 |
| 0292 |
1 1/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED |
802(A) 8306 |
LF |
220.000 |
220.000 |
|
0.000 |
$13.79 |
$0.00 |
$0.00 |
| 0293 |
JUNCTION BOX(8" X 8" X 6") |
802(E) 8372 |
EA |
2.000 |
2.000 |
|
0.000 |
$368.92 |
$0.00 |
$0.00 |
| 0294 |
1/C NO.2 ELECTRICAL CONDUCTOR |
811 8036 |
LF |
220.000 |
220.000 |
|
0.000 |
$3.63 |
$0.00 |
$0.00 |
| 0295 |
1/C NO.12 ELECTRICAL CONDUCTOR |
811 8046 |
LF |
220.000 |
220.000 |
|
0.000 |
$0.85 |
$0.00 |
$0.00 |
| Subtotals For Category 0207/BRIDGE NO. 71- IMY-244-2(499)011 |
$21,503.23 |
$93,011.41 |
|