Fed/State Project Number: BRFY-143C(078) |
Project: 23124(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
0.500 |
1.000 |
$4,950.00 |
$2,475.00 |
$4,950.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
13,062.000 |
13,062.000 |
1,212.000 |
3,715.000 |
$6.60 |
$7,999.20 |
$24,519.00 |
0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
15,964.000 |
15,964.000 |
|
13,164.000 |
$9.35 |
$0.00 |
$123,083.40 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.200 |
0.500 |
$6,710.00 |
$1,342.00 |
$3,355.00 |
0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
893.000 |
893.000 |
94.000 |
637.000 |
$1.32 |
$124.08 |
$840.84 |
0006 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
180.000 |
180.000 |
28.000 |
91.000 |
$8.45 |
$236.60 |
$768.95 |
0007 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
22,087.000 |
22,087.000 |
|
0.000 |
$1.16 |
$0.00 |
$0.00 |
0008 |
SEEDING METHOD B |
232(B) 2814 |
AC |
5.000 |
5.000 |
|
0.000 |
$489.50 |
$0.00 |
$0.00 |
0009 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
5.000 |
5.000 |
|
0.000 |
$489.50 |
$0.00 |
$0.00 |
0010 |
MOWING |
241 2832 |
AC |
10.000 |
10.000 |
|
0.000 |
$80.30 |
$0.00 |
$0.00 |
0011 |
FLY ASH |
307(A) 4200 |
TON |
445.000 |
445.000 |
|
203.090 |
$75.90 |
$0.00 |
$15,414.53 |
0012 |
LIME |
307(D) 4230 |
TON |
39.000 |
39.000 |
|
0.000 |
$170.50 |
$0.00 |
$0.00 |
0013 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
8,604.000 |
8,604.000 |
0.000 |
4,664.950 |
$2.75 |
$0.00 |
$12,828.61 |
0014 |
LIME PRETREATMENT |
307(G) 4260 |
SY |
2,151.000 |
2,151.000 |
|
0.000 |
$2.75 |
$0.00 |
$0.00 |
0015 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
20.000 |
20.000 |
|
25.260 |
$25.15 |
$0.00 |
$635.29 |
0016 |
TACK COAT |
407(B) 0250 |
GAL |
838.000 |
838.000 |
250.000 |
250.000 |
$2.75 |
$687.50 |
$687.50 |
0017 |
PRIME COAT |
408 5774 |
GAL |
1,880.000 |
1,880.000 |
|
0.000 |
$5.50 |
$0.00 |
$0.00 |
0018 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
2,277.000 |
2,277.000 |
74.130 |
966.190 |
$71.50 |
$5,300.30 |
$69,082.59 |
0019 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
983.000 |
983.000 |
520.590 |
520.590 |
$89.10 |
$46,384.57 |
$46,384.57 |
0020 |
24" CORR. GALV. STEEL PIPE |
613(B) 0690 |
LF |
28.000 |
28.000 |
|
48.000 |
$29.02 |
$0.00 |
$1,392.96 |
0021 |
21" X 15" CORR. GALV. STEEL PIPE ARCH |
613(B) 4527 |
LF |
40.000 |
40.000 |
|
0.000 |
$23.77 |
$0.00 |
$0.00 |
0022 |
120" CORR. GALV. STEEL PIPE |
613(B) 5747 |
LF |
272.000 |
272.000 |
|
272.000 |
$218.74 |
$0.00 |
$59,497.28 |
0023 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 0450 |
LF |
200.000 |
200.000 |
|
0.000 |
$12.58 |
$0.00 |
$0.00 |
0024 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1096 |
LF |
50.000 |
50.000 |
|
0.000 |
$12.58 |
$0.00 |
$0.00 |
0025 |
TYPE A6 CULVERT END TREATMENT |
613(M) 7196 |
EA |
4.000 |
4.000 |
|
0.000 |
$885.18 |
$0.00 |
$0.00 |
0026 |
OUTLET LATERAL HEADWALL |
613(Q) 5946 |
EA |
1.000 |
1.000 |
|
0.000 |
$318.05 |
$0.00 |
$0.00 |
0027 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
6,512.000 |
6,512.000 |
1,971.550 |
1,971.550 |
$5.78 |
$11,395.56 |
$11,395.56 |
0028 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
554.000 |
554.000 |
570.000 |
570.000 |
$2.75 |
$1,567.50 |
$1,567.50 |
0029 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
387.000 |
387.000 |
|
0.000 |
$3.30 |
$0.00 |
$0.00 |
0030 |
(PL)GUARDRAIL CURBING |
623 0100 |
EA |
4.000 |
4.000 |
|
0.000 |
$330.00 |
$0.00 |
$0.00 |
0031 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
400.000 |
400.000 |
100.000 |
100.000 |
$16.50 |
$1,650.00 |
$1,650.00 |
0032 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
6.000 |
6.000 |
2.000 |
2.000 |
$2,255.00 |
$4,510.00 |
$4,510.00 |
0033 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
4.000 |
4.000 |
|
0.000 |
$1,485.00 |
$0.00 |
$0.00 |
0034 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
2,482.000 |
2,482.000 |
1,778.000 |
2,357.000 |
$3.72 |
$6,614.16 |
$8,768.04 |
0035 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
2.000 |
2.000 |
|
0.000 |
$93.50 |
$0.00 |
$0.00 |
0036 |
MAILBOX |
629(C) 4960 |
EA |
2.000 |
2.000 |
|
0.000 |
$49.50 |
$0.00 |
$0.00 |
0037 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
2.000 |
2.000 |
|
1.000 |
$27.50 |
$0.00 |
$27.50 |
Subtotals For Category 0100/ROADWAY |
$90,286.47 |
$391,359.12 |
|
Fed/State Project Number: BRFY-143C(078) |
Project: 23124(04) |
Category: 0200/BRIDGE 'A' |
0038 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
80.000 |
80.000 |
|
0.000 |
$23.00 |
$0.00 |
$0.00 |
0039 |
CLSM BACKFILL |
501(G) 6309 |
CY |
164.000 |
164.000 |
|
0.000 |
$178.08 |
$0.00 |
$0.00 |
0040 |
PRESTRESSED CONCRETE BEAMS (TYPE III) |
503(A) 1312 |
LF |
717.000 |
717.000 |
|
0.000 |
$189.90 |
$0.00 |
$0.00 |
0041 |
APPROACH SLAB |
504(A) 1304 |
SY |
224.800 |
224.800 |
|
0.000 |
$153.56 |
$0.00 |
$0.00 |
0042 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
1,024.500 |
1,024.500 |
|
0.000 |
$4.14 |
$0.00 |
$0.00 |
0043 |
CONCRETE RAIL (TR4) |
504(D) 6245 |
LF |
457.000 |
457.000 |
|
0.000 |
$69.36 |
$0.00 |
$0.00 |
0044 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,050.000 |
1,050.000 |
|
0.000 |
$3.34 |
$0.00 |
$0.00 |
0045 |
WEATHERING STEEL FIXED BEARING ASSEMBLY |
507(A) 6172 |
EA |
8.000 |
8.000 |
|
0.000 |
$680.58 |
$0.00 |
$0.00 |
0046 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY |
507(B) 6174 |
EA |
16.000 |
16.000 |
|
0.000 |
$2,528.48 |
$0.00 |
$0.00 |
0047 |
ELASTOMERIC BEARING PADS |
507(C) 6282 |
EA |
16.000 |
16.000 |
|
0.000 |
$406.36 |
$0.00 |
$0.00 |
0048 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
242.200 |
242.200 |
|
0.000 |
$486.64 |
$0.00 |
$0.00 |
0049 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
133.000 |
133.000 |
|
0.000 |
$496.74 |
$0.00 |
$0.00 |
0050 |
CLASS C CONCRETE |
509(D) 1331 |
CY |
25.000 |
25.000 |
|
0.000 |
$494.91 |
$0.00 |
$0.00 |
0051 |
REINFORCING STEEL |
511(A) 1332 |
LB |
680.000 |
680.000 |
|
0.000 |
$1.79 |
$0.00 |
$0.00 |
0052 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
74,450.000 |
74,450.000 |
|
0.000 |
$1.11 |
$0.00 |
$0.00 |
0053 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
826.000 |
826.000 |
|
0.000 |
$25.54 |
$0.00 |
$0.00 |
0054 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
826.000 |
826.000 |
|
0.000 |
$17.25 |
$0.00 |
$0.00 |
0055 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
828.000 |
828.000 |
|
0.000 |
$4.03 |
$0.00 |
$0.00 |
0056 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
258.000 |
258.000 |
|
0.000 |
$584.53 |
$0.00 |
$0.00 |
0057 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
163.000 |
163.000 |
|
0.000 |
$4.60 |
$0.00 |
$0.00 |
0058 |
SEALER RESIN |
523(B) 6560 |
GAL |
1.800 |
1.800 |
|
0.000 |
$115.00 |
$0.00 |
$0.00 |
0059 |
TYPE I-A PLAIN RIPRAP |
601(B) 1353 |
TON |
2,182.000 |
2,182.000 |
|
0.000 |
$36.48 |
$0.00 |
$0.00 |
0060 |
TYPE I-A FILTER BLANKET |
601(C) 1355 |
TON |
455.000 |
455.000 |
|
0.000 |
$29.56 |
$0.00 |
$0.00 |
0061 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
84.000 |
84.000 |
|
0.000 |
$24.84 |
$0.00 |
$0.00 |
0062 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 6207 |
LF |
108.000 |
108.000 |
|
0.000 |
$24.84 |
$0.00 |
$0.00 |
0063 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
1.000 |
1.000 |
$46,000.00 |
$46,000.00 |
$46,000.00 |
Subtotals For Category 0200/BRIDGE 'A' |
$46,000.00 |
$46,000.00 |
|
Fed/State Project Number: BRFY-143C(078) |
Project: 23124(04) |
Category: 0300/TRAFFIC CONTROL |
0064 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
6,000.000 |
6,000.000 |
5,984.000 |
12,688.000 |
$0.17 |
$1,017.28 |
$2,156.96 |
0065 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
500.000 |
500.000 |
|
0.000 |
$0.55 |
$0.00 |
$0.00 |
0066 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
800.000 |
800.000 |
1,167.000 |
1,167.000 |
$0.94 |
$1,096.98 |
$1,096.98 |
0067 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
4,860.000 |
4,860.000 |
272.000 |
652.000 |
$0.11 |
$29.92 |
$71.72 |
0068 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
3,420.000 |
3,420.000 |
246.000 |
546.000 |
$0.61 |
$150.06 |
$333.06 |
0069 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
3,240.000 |
3,240.000 |
262.000 |
726.000 |
$0.94 |
$246.28 |
$682.44 |
0070 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
2,160.000 |
2,160.000 |
118.000 |
118.000 |
$1.65 |
$194.70 |
$194.70 |
0071 |
WING BARRICADES |
880(C) 8848 |
SD |
720.000 |
720.000 |
64.000 |
216.000 |
$1.65 |
$105.60 |
$356.40 |
0072 |
VERTICAL PANELS |
880(D) 8854 |
SD |
9,900.000 |
9,900.000 |
378.000 |
378.000 |
$0.22 |
$83.16 |
$83.16 |
0073 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
6,480.000 |
6,480.000 |
396.000 |
776.000 |
$0.11 |
$43.56 |
$85.36 |
0074 |
DRUMS |
880(F) 8878 |
SD |
6,300.000 |
6,300.000 |
514.000 |
1,239.000 |
$0.17 |
$87.38 |
$210.63 |
0075 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
3,600.000 |
3,600.000 |
|
0.000 |
$0.17 |
$0.00 |
$0.00 |
0076 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
360.000 |
360.000 |
|
0.000 |
$16.50 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC CONTROL |
$3,054.92 |
$5,271.41 |
|