Contract ID: | 110422 | Estimate Number: | 0044 , Final | Spec Year: | 2009 | |||
Primary JP: | 10441(04) | Residency: | GARVER, LLC. (08011) | Contract No: | 810410 | |||
Date Created: | 08/21/2017 | Contractor FEI: | 420667649 | Account No: | 400800 |
Project Number(s): | BRFY-021C(256) | ||||||||
Contract Description: | BRIDGE AND APPROACHES SH-10: OVER ELK RIVER, 1.35 MILES SOUTH OF THE OTTAWA COUNTY LINE. PROJECT LENGTH = 0.892 MILE. | ||||||||
Primary County: | DELAWARE | ||||||||
Name of Road: | SH-10 | ||||||||
Prime Contractor: | JENSEN CONSTRUCTION COMPANY | Time Charged: | 685.00 | ||||||
11301 W. 57TH PLACE S. | Time Allowed: | 597.00 | |||||||
SAND SPRINGS , OK 74063 | Percent Time: | 114.74 % |
Paid To Date: | $14,815,217.69 | Payable This Statement: | $19,477.92 |
CONTRACTOR AFFIDAVIT |
STATE OF ___________________ | ) | |
) § | ||
COUNTY OF __________________ | ) |
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct. |
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or |
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid. |
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them. |
Further affiant sayeth not. |
JENSEN CONSTRUCTION COMPANY |
_________________________________________________ |
Affiant Signature |
_________________________________________________ |
Affiant Printed Name |
PE Seal |
_________________________________________________ |
Affiant Company Position |
Subscribed and sworn to before me this ______ day of ____________, 20____ |
My Commission Number: ____________ My Commission Expires: ______________ |
_________________________________________________ |
_________________________________________________ |
Professional Engineer Signature |
Oklahoma Department of Transportation |
Corporate Seal |
Notary Seal |
Contract ID: | 110422 | Estimate Number: | 0044 | Contract No: | 810410 | |||
Residency: | GARVER, LLC. (08011) | Estimate Type: | Final | Account No: | 400800 | |||
Project Number(s): | BRFY-021C(256) | ||||||||||||
Primary Job Piece No: | 10441(04) | ||||||||||||
Contract Description: | BRIDGE AND APPROACHES SH-10: OVER ELK RIVER, 1.35 MILES SOUTH OF THE OTTAWA COUNTY LINE. PROJECT LENGTH = 0.892 MILE. | ||||||||||||
Primary County: | DELAWARE | ||||||||||||
Name of Road: | SH-10 | ||||||||||||
Prime Contractor: | JENSEN CONSTRUCTION COMPANY | ||||||||||||
11301 W. 57TH PLACE S. | |||||||||||||
SAND SPRINGS , OK 74063 | |||||||||||||
Surety Company: | WESTERN SURETY COMPANY | ||||||||||||
Date Let: | 08/16/2012 | NTP Effective Date: | 11/26/2012 | Pay Period: | 01/07/2016 TO 05/12/2017 |
Date Awarded: | 09/10/2012 | Date Work Began: | 11/26/2012 | Original Contract Time: | 400 |
Date Contract Executed: | 09/27/2012 | Date Time Stopped: | 10/14/2015 | Current Time Charged: | 685.00 |
Date NTP Issued: | 10/15/2012 | Completion Date: | 10/14/2015 | Current Time Allowed: | 597.00 |
General Liability Expires: | 04/01/2018 | Workman's Comp Expires: | 04/01/2018 | Percent Time Used: | 114.74 % |
Specification Year: | 2009 | ||||
Bid Amount: | $15,741,148.27 | Total to Date | Prev to Date | This Estimate | |||
Funds Available (Bid + Positive C/O): | $15,974,308.16 | Participating: | $15,493,104.45 | $15,485,932.36 | $7,172.09 | ||
Percent Complete: | 92.74 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
Unearned Balance: | $1,159,090.47 | Total Earnings: | $15,493,104.45 | $15,485,932.36 | $7,172.09 | ||
Stockpiled Materials: | $0.00 | $-0.01 | $0.01 | ||||
Gross Earnings: | $15,493,104.45 | $15,485,932.35 | $7,172.10 | ||||
Other Adjustments: | $-6,886.76 | $-19,192.58 | $12,305.82 | ||||
Liq Dam/Disincentive: | $-671,000.00 | $-671,000.00 | $0.00 | ||||
TOTAL: | $14,815,217.69 | $14,795,739.77 | $19,477.92 |
Contract ID: | 110422 | Estimate Number: | 0044 | Primary JP: | 10441(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | Transmission Line Hot Connection | Approved | 03/05/2013 | 40.0 | $197,544.60 |
002 | Add Mech. Splices, Pier Markers, SPDI | Approved | 12/09/2013 | 0.0 | $9,929.47 |
003 | Misc. Deductions | Approved | 04/27/2016 | 0.0 | $-6,966.51 |
004 | Milestone Days | Approved | 01/10/2014 | 40.0 | $0.00 |
005 | Add Cement and Liime Stabilized Subgrade, Type 3 barricades | Approved | 05/05/2014 | 0.0 | $13,236.00 |
006 | Adverse Weather Days | Approved | 04/04/2014 | 66.0 | $0.00 |
007 | Substitute Multi-Plolymer Stripe | Approved | 06/03/2014 | 0.0 | $0.00 |
008 | Utility Delay | Approved | 07/07/2014 | 12.0 | $0.00 |
009 | Drilled shaft and beam deduction | Approved | 04/27/2016 | 0.0 | $-15,888.83 |
010 | Additional signs, pile splice,delineators, smoothness deduct | Approved | 04/08/2015 | 0.0 | $-18,350.46 |
011 | Negotiated Contractor Claim | Approved | 12/31/2015 | 186.0 | $0.00 |
012 | Dividing Strip and Pay Plan increases | Approved | 08/02/2016 | 0.0 | $12,449.82 |
013 | Final Quantity | Approved | 04/07/2017 | 0.0 | $-439,997.93 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
10441(04) | 0017 | Stockpiled Material Closure | 0044 | $0.01 | |
10441(04) | 0017 | FABRIC-GEOGRID | Stockpiled Material Adjustment | 0015 | $-1,834.33 |
10441(04) | 0017 | FABRIC-GEOGRID | Stockpiled Material Adjustment | 0012 | $-3,143.59 |
10441(04) | 0017 | FABRIC-GEOGRID | Stockpiled Material Adjustment | 0014 | $-5,567.20 |
10441(04) | 0017 | FABRIC-GEOGRID | Stockpiled Material Initial Payment | 0002 | $22,332.67 |
10441(04) | 0017 | FABRIC-GEOGRID | Stockpiled Material Adjustment | 0013 | $-11,787.56 |
10441(04) | 0046 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0010 | $-80,929.95 |
10441(04) | 0046 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0009 | $-202,324.87 |
10441(04) | 0046 | PC BR ITM FABS (AML) | Stockpiled Material Initial Payment | 0006 | $101,891.29 |
10441(04) | 0046 | PC BR ITM FABS (AML) | Stockpiled Material Initial Payment | 0003 | $356,622.54 |
10441(04) | 0046 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0035 | $-3,383.51 |
10441(04) | 0046 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0034 | $-98,507.78 |
10441(04) | 0046 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0034 | $-12,737.24 |
10441(04) | 0046 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0012 | $-30,315.24 |
10441(04) | 0046 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0017 | $-30,315.24 |
10441(04) | 0053 | SSTL FABS (AML) | Stockpiled Material Adjustment | 0007 | $-19,593.60 |
10441(04) | 0053 | SSTL FABS (AML) | Stockpiled Material Initial Payment | 0003 | $19,593.60 |
10441(04) | 0054 | SSTL FABS (AML) | Stockpiled Material Initial Payment | 0003 | $15,674.40 |
10441(04) | 0054 | SSTL FABS (AML) | Stockpiled Material Adjustment | 0007 | $-15,674.40 | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | ||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount |
System Application of Liquidated Damages | 0025 | --9.0 | $2,000.00 | $-18,000.00 |
System Application of Liquidated Damages | 0026 | --24 | $2,000.00 | $-48,000.00 |
System Application of Liquidated Damages | 0027 | -33.0 | $2,000.00 | $66,000.00 |
System Application of Liquidated Damages | 0029 | --11 | $2,000.00 | $-22,000.00 |
System Application of Liquidated Damages | 0030 | --16 | $2,000.00 | $-32,000.00 |
System Application of Liquidated Damages | 0031 | --9.0 | $2,000.00 | $-18,000.00 |
System Application of Liquidated Damages | 0032 | --21 | $2,000.00 | $-42,000.00 |
System Application of Liquidated Damages | 0033 | --9.0 | $2,000.00 | $-18,000.00 |
System Application of Liquidated Damages | 0034 | --13 | $2,000.00 | $-26,000.00 |
System Application of Liquidated Damages | 0035 | --11 | $2,000.00 | $-22,000.00 |
System Application of Liquidated Damages | 0036 | --16 | $2,000.00 | $-32,000.00 |
System Application of Liquidated Damages | 0037 | --28 | $2,000.00 | $-56,000.00 |
System Application of Liquidated Damages | 0038 | --11 | $2,000.00 | $-22,000.00 |
System Application of Liquidated Damages | 0039 | --15 | $2,000.00 | $-30,000.00 |
System Application of Liquidated Damages | 0040 | --9.0 | $2,000.00 | $-18,000.00 |
System Application of Liquidated Damages | 0041 | --4.0 | $2,000.00 | $-8,000.00 |
System Application of Liquidated Damages | 0043 | -85.0 | $2,000.00 | $170,000.00 | Subtotals For Liquidated Damages | $-176,000.00 |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
Milestone Adjust. (Prog. Est. Only) | 0041 | $15,000.00 |
Smoothness Deduction | 0041 | $-16,900.00 |
Smoothness Deduction | 0041 | $-4,521.00 |
Smoothness Deduction | 0044 | $16,900.00 |
Smoothness Deduction | 0044 | $4,521.00 |
Milstone Adjust. (C/O) | 0044 | $-15,000.00 | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
10441(04) | 0010 | SOLID SLAB SODDING | * Permanent Erosion Control-Out of Season | 0041 | -1,465.30 | $1.95 | $-2,857.34 |
10441(04) | 0010 | SOLID SLAB SODDING | * Permanent Erosion Control-Out of Season | 0043 | 1,465.30 | $1.95 | $2,857.34 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | Asphalt Binder Adjustment | 0026 | 1,923.45 | $-0.76 | $-1,464.23 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | * HMA Deduction as per Sec. 411 | 0028 | 15.00 | $69.57 | $1,043.55 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | * HMA Deduction as per Sec. 411 | 0037 | -827.57 | $69.57 | $-57,574.04 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | Asphalt Binder Adjustment | 0037 | 1,316.89 | $0.44 | $587.66 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | * HMA Deduction as per Sec. 411 | 0037 | -489.32 | $69.57 | $-34,041.99 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | Asphalt Binder Adjustment | 0038 | 655.50 | $0.65 | $430.17 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | * HMA Deduction as per Sec. 411 | 0039 | 827.57 | $69.57 | $57,574.04 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | Asphalt Binder Adjustment | 0039 | -793.03 | $0.65 | $-520.43 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | * HMA Deduction as per Sec. 411 | 0039 | 489.32 | $69.57 | $34,041.99 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | Asphalt Binder Adjustment | 0043 | -0.88 | $-7.79 | $6.86 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | * HMA Deduction as per Sec. 411 | 0044 | -15.00 | $69.57 | $-1,043.55 |
10441(04) | 0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | * HMA Deduction as per Sec. 411 | 0044 | -15.00 | $69.57 | $-1,043.55 |
10441(04) | 0022 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0019 | 739.54 | $-0.55 | $-407.67 |
10441(04) | 0022 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0026 | 1,754.21 | $-0.76 | $-1,335.39 |
10441(04) | 0022 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0027 | 0.03 | $-1.18 | $-0.04 |
10441(04) | 0022 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0037 | 1,106.64 | $0.44 | $493.84 |
10441(04) | 0022 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * HMA Deduction as per Sec. 411 | 0037 | -18.00 | $70.32 | $-1,265.76 |
10441(04) | 0022 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0039 | 1,105.72 | $0.65 | $725.63 |
10441(04) | 0022 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0040 | 104.17 | $0.44 | $46.49 |
10441(04) | 0022 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * HMA Deduction as per Sec. 411 | 0041 | -14.56 | $70.32 | $-1,023.86 |
10441(04) | 0023 | SUPERPAVE, TYPE S4(PG 70-28 OK) | * HMA Deduction as per Sec. 411 | 0039 | -88.00 | $90.59 | $-7,971.92 |
10441(04) | 0023 | SUPERPAVE, TYPE S4(PG 70-28 OK) | Asphalt Binder Adjustment | 0039 | 336.38 | $0.75 | $252.29 |
10441(04) | 0023 | SUPERPAVE, TYPE S4(PG 70-28 OK) | Asphalt Binder Adjustment | 0040 | 1,839.08 | $0.51 | $937.93 |
10441(04) | 0023 | SUPERPAVE, TYPE S4(PG 70-28 OK) | * HMA Deduction as per Sec. 411 | 0041 | -32.75 | $90.59 | $-2,966.82 |
10441(04) | 0023 | SUPERPAVE, TYPE S4(PG 70-28 OK) | * HMA Deduction as per Sec. 411 | 0044 | 88.00 | $90.59 | $7,971.92 |
10441(04) | 0024 | SUPERPAVE, TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0020 | 556.44 | $-0.63 | $-350.56 |
10441(04) | 0024 | SUPERPAVE, TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0026 | 130.63 | $-0.87 | $-113.65 |
10441(04) | 0024 | SUPERPAVE, TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0040 | 243.79 | $0.51 | $124.33 |
10441(04) | 0041 | GUARDRAIL END TREATMENT (GET) | * SUBSTANDARD ITEM | 0042 | -2.00 | $1,945.00 | $-3,890.00 |
10441(04) | 0041 | GUARDRAIL END TREATMENT (GET) | * SUBSTANDARD ITEM | 0043 | 2.00 | $1,945.00 | $3,890.00 |
10441(04) | 0090 | (SP)CONST.ZONE IMPACT ATTEN. | * Contract In Liquidated Damages | 0029 | -22.00 | $5.00 | $-110.00 |
10441(04) | 0090 | (SP)CONST.ZONE IMPACT ATTEN. | * Contract In Liquidated Damages | 0030 | -32.00 | $5.00 | $-160.00 |
10441(04) | 0090 | (SP)CONST.ZONE IMPACT ATTEN. | * Contract In Liquidated Damages | 0031 | -18.00 | $5.00 | $-90.00 |
10441(04) | 0090 | (SP)CONST.ZONE IMPACT ATTEN. | * Contract In Liquidated Damages | 0032 | -42.00 | $5.00 | $-210.00 |
10441(04) | 0090 | (SP)CONST.ZONE IMPACT ATTEN. | * Contract In Liquidated Damages | 0033 | 114.00 | $5.00 | $570.00 |
10441(04) | 0092 | RELOCATION OF PORTABLE LONGITUDINAL BARRIER | * Missing Material Certification | 0027 | -4,060.00 | $5.00 | $-20,300.00 |
10441(04) | 0092 | RELOCATION OF PORTABLE LONGITUDINAL BARRIER | * Missing Material Certification | 0029 | 4,060.00 | $5.00 | $20,300.00 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0029 | -165.00 | $0.10 | $-16.50 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0030 | -240.00 | $0.10 | $-24.00 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0031 | -135.00 | $0.10 | $-13.50 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0032 | -315.00 | $0.10 | $-31.50 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0033 | -225.00 | $0.10 | $-22.50 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0034 | -240.00 | $0.10 | $-24.00 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0035 | -225.00 | $0.10 | $-22.50 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0036 | -240.00 | $0.10 | $-24.00 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0037 | -465.00 | $0.10 | $-46.50 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0038 | -240.00 | $0.10 | $-24.00 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0039 | -256.00 | $0.10 | $-25.60 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0040 | -240.00 | $0.10 | $-24.00 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0041 | -488.00 | $0.10 | $-48.80 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0042 | -186.00 | $0.10 | $-18.60 |
10441(04) | 0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | * Contract In Liquidated Damages | 0043 | 3,660.00 | $0.10 | $366.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0029 | -374.00 | $2.00 | $-748.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0030 | -544.00 | $2.00 | $-1,088.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0031 | -306.00 | $2.00 | $-612.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0032 | -714.00 | $2.00 | $-1,428.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0033 | -510.00 | $2.00 | $-1,020.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0034 | -544.00 | $2.00 | $-1,088.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0035 | -510.00 | $2.00 | $-1,020.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0036 | -544.00 | $2.00 | $-1,088.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0037 | -1,020.00 | $2.00 | $-2,040.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0038 | -510.00 | $2.00 | $-1,020.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0039 | -544.00 | $2.00 | $-1,088.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0040 | -510.00 | $2.00 | $-1,020.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0041 | -803.00 | $2.00 | $-1,606.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0042 | -216.00 | $2.00 | $-432.00 |
10441(04) | 0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | * Contract In Liquidated Damages | 0043 | 7,649.00 | $2.00 | $15,298.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0029 | -330.00 | $2.00 | $-660.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0030 | -480.00 | $2.00 | $-960.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0031 | -270.00 | $2.00 | $-540.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0032 | -630.00 | $2.00 | $-1,260.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0033 | -450.00 | $2.00 | $-900.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0034 | -480.00 | $2.00 | $-960.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0035 | -450.00 | $2.00 | $-900.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0036 | -480.00 | $2.00 | $-960.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0037 | -990.00 | $2.00 | $-1,980.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0038 | -492.00 | $2.00 | $-984.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0039 | -528.00 | $2.00 | $-1,056.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0040 | -495.00 | $2.00 | $-990.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0041 | -1,080.00 | $2.00 | $-2,160.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0042 | -452.00 | $2.00 | $-904.00 |
10441(04) | 0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | * Contract In Liquidated Damages | 0043 | 7,607.00 | $2.00 | $15,214.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0029 | -44.00 | $1.50 | $-66.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0030 | -64.00 | $1.50 | $-96.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0031 | -36.00 | $1.50 | $-54.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0032 | -84.00 | $1.50 | $-126.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0033 | -60.00 | $1.50 | $-90.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0034 | -64.00 | $1.50 | $-96.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0035 | -60.00 | $1.50 | $-90.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0036 | -64.00 | $1.50 | $-96.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0037 | -120.00 | $1.50 | $-180.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0038 | -60.00 | $1.50 | $-90.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0039 | -64.00 | $1.50 | $-96.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0040 | -60.00 | $1.50 | $-90.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0041 | -180.00 | $1.50 | $-270.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0042 | -124.00 | $1.50 | $-186.00 |
10441(04) | 0096 | WING BARRICADES | * Contract In Liquidated Damages | 0043 | 1,084.00 | $1.50 | $1,626.00 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0029 | -473.00 | $0.02 | $-9.46 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0030 | -688.00 | $0.02 | $-13.76 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0031 | -387.00 | $0.02 | $-7.74 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0032 | -903.00 | $0.02 | $-18.06 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0033 | -645.00 | $0.02 | $-12.90 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0034 | -688.00 | $0.02 | $-13.76 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0035 | -645.00 | $0.02 | $-12.90 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0036 | -688.00 | $0.02 | $-13.76 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0037 | -1,290.00 | $0.02 | $-25.80 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0038 | -645.00 | $0.02 | $-12.90 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0039 | -688.00 | $0.02 | $-13.76 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0040 | -645.00 | $0.02 | $-12.90 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0041 | -1,050.00 | $0.02 | $-21.00 |
10441(04) | 0097 | VERTICAL PANELS | * Contract In Liquidated Damages | 0043 | 9,435.00 | $0.02 | $188.70 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0029 | -825.00 | $0.05 | $-41.25 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0030 | -1,200.00 | $0.05 | $-60.00 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0031 | -675.00 | $0.05 | $-33.75 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0032 | -1,575.00 | $0.05 | $-78.75 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0033 | -1,125.00 | $0.05 | $-56.25 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0034 | -1,200.00 | $0.05 | $-60.00 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0035 | -1,125.00 | $0.05 | $-56.25 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0036 | -1,200.00 | $0.05 | $-60.00 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0037 | -2,250.00 | $0.05 | $-112.50 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0038 | -1,125.00 | $0.05 | $-56.25 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0039 | -1,200.00 | $0.05 | $-60.00 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0040 | -1,125.00 | $0.05 | $-56.25 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0041 | -1,830.00 | $0.05 | $-91.50 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0042 | -449.00 | $0.05 | $-22.45 |
10441(04) | 0098 | WARNING LIGHTS(TYPE A) | * Contract In Liquidated Damages | 0043 | 16,904.00 | $0.05 | $845.20 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0029 | -1,441.00 | $0.02 | $-28.82 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0030 | -2,096.00 | $0.02 | $-41.92 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0031 | -1,179.00 | $0.02 | $-23.58 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0032 | -2,751.00 | $0.02 | $-55.02 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0033 | -1,965.00 | $0.02 | $-39.30 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0034 | -2,096.00 | $0.02 | $-41.92 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0035 | -1,965.00 | $0.02 | $-39.30 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0036 | -2,096.00 | $0.02 | $-41.92 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0037 | -3,930.00 | $0.02 | $-78.60 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0038 | -1,965.00 | $0.02 | $-39.30 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0039 | -2,136.00 | $0.02 | $-42.72 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0040 | -1,987.00 | $0.02 | $-39.74 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0041 | -2,535.00 | $0.02 | $-50.70 |
10441(04) | 0099 | WARNING LIGHTS(TYPE C) | * Contract In Liquidated Damages | 0043 | 28,142.00 | $0.02 | $562.84 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0029 | -1,683.00 | $0.15 | $-252.45 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0030 | -2,448.00 | $0.15 | $-367.20 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0031 | -1,377.00 | $0.15 | $-206.55 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0032 | -3,213.00 | $0.15 | $-481.95 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0033 | -2,295.00 | $0.15 | $-344.25 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0034 | -2,448.00 | $0.15 | $-367.20 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0035 | -2,295.00 | $0.15 | $-344.25 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0036 | -2,448.00 | $0.15 | $-367.20 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0037 | -4,590.00 | $0.15 | $-688.50 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0038 | -2,775.00 | $0.15 | $-416.25 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0039 | -3,408.00 | $0.15 | $-511.20 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0040 | -3,195.00 | $0.15 | $-479.25 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0041 | -3,645.00 | $0.15 | $-546.75 |
10441(04) | 0100 | DRUMS | * Contract In Liquidated Damages | 0043 | 35,820.00 | $0.15 | $5,373.00 |
10441(04) | 0101 | PORT.CHANGEABLE MESSAGE SIGN | * Contract In Liquidated Damages | 0029 | -22.00 | $5.00 | $-110.00 |
10441(04) | 0101 | PORT.CHANGEABLE MESSAGE SIGN | * Contract In Liquidated Damages | 0030 | -32.00 | $5.00 | $-160.00 |
10441(04) | 0101 | PORT.CHANGEABLE MESSAGE SIGN | * Contract In Liquidated Damages | 0031 | -18.00 | $5.00 | $-90.00 |
10441(04) | 0101 | PORT.CHANGEABLE MESSAGE SIGN | * Contract In Liquidated Damages | 0032 | -42.00 | $5.00 | $-210.00 |
10441(04) | 0101 | PORT.CHANGEABLE MESSAGE SIGN | * Contract In Liquidated Damages | 0033 | 114.00 | $5.00 | $570.00 |
10441(04) | 0101 | PORT.CHANGEABLE MESSAGE SIGN | * Contract In Liquidated Damages | 0041 | -24.00 | $5.00 | $-120.00 |
10441(04) | 0101 | PORT.CHANGEABLE MESSAGE SIGN | * Contract In Liquidated Damages | 0043 | 24.00 | $5.00 | $120.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0029 | -264.00 | $1.00 | $-264.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0030 | -384.00 | $1.00 | $-384.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0031 | -216.00 | $1.00 | $-216.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0032 | -504.00 | $1.00 | $-504.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0034 | -1,023.00 | $1.00 | $-1,023.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0036 | -1,023.00 | $1.00 | $-1,023.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0037 | -990.00 | $1.00 | $-990.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0038 | -495.00 | $1.00 | $-495.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0039 | -528.00 | $1.00 | $-528.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0040 | -495.00 | $1.00 | $-495.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0041 | -75.00 | $1.00 | $-75.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0042 | -30.00 | $1.00 | $-30.00 |
10441(04) | 8011 | CONSTRUCTION BARRICADES(TYPE III) | * Contract In Liquidated Damages | 0043 | 6,027.00 | $1.00 | $6,027.00 | Subtotals For Line Item Adjustments | $-6,886.76 | * = User applied Line Item Adjustments |
MILESTONE INFORMATION | |||||||||
Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
01 | Incentive/Disincentive for Early/Late Completion | 11/26/2012 | 11/21/2014 | 527.00 DYS | $2,500.00 | Y |
MILESTONE ADJUSTMENTS | |||
Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total |
01 | System Application of Disincentive Adj | 0020 | $-10,000.00 |
01 | System Application of Disincentive Adj | 0021 | $-40,000.00 |
01 | System Application of Disincentive Adj | 0022 | $10,000.00 |
01 | System Application of Disincentive Adj | 0022 | $40,000.00 |
01 | System Application of Disincentive Adj | 0023 | $-27,500.00 |
01 | System Application of Disincentive Adj | 0024 | $-37,500.00 |
01 | System Application of Disincentive Adj | 0025 | $-32,500.00 |
01 | System Application of Disincentive Adj | 0026 | $-77,500.00 |
01 | System Application of Disincentive Adj | 0027 | $-37,500.00 |
01 | System Application of Disincentive Adj | 0028 | $-37,500.00 |
01 | System Application of Disincentive Adj | 0029 | $-37,500.00 |
01 | System Application of Disincentive Adj | 0030 | $-40,000.00 |
01 | System Application of Disincentive Adj | 0031 | $-22,500.00 |
01 | System Application of Disincentive Adj | 0032 | $-52,500.00 |
01 | System Application of Disincentive Adj | 0033 | $-37,500.00 |
01 | System Application of Disincentive Adj | 0034 | $-40,000.00 |
01 | System Application of Disincentive Adj | 0035 | $-37,500.00 |
01 | System Application of Disincentive Adj | 0036 | $-40,000.00 |
01 | System Application of Disincentive Adj | 0037 | $-75,000.00 |
01 | System Application of Disincentive Adj | 0038 | $-37,500.00 |
01 | System Application of Disincentive Adj | 0039 | $-40,000.00 |
01 | System Application of Disincentive Adj | 0040 | $-37,500.00 |
01 | System Application of Disincentive Adj | 0041 | $-15,000.00 |
01 | System Application of Disincentive Adj | 0043 | $3,508.20 |
01 | System Application of Disincentive Adj | 0043 | $9,647.54 |
01 | System Application of Disincentive Adj | 0043 | $13,155.74 |
01 | System Application of Disincentive Adj | 0043 | $27,188.52 |
01 | System Application of Disincentive Adj | 0043 | $-3,508.20 |
01 | System Application of Disincentive Adj | 0043 | $13,155.74 |
01 | System Application of Disincentive Adj | 0043 | $7,893.44 |
01 | System Application of Disincentive Adj | 0043 | $13,155.74 |
01 | System Application of Disincentive Adj | 0043 | $13,155.74 |
01 | System Application of Disincentive Adj | 0043 | $14,032.79 |
01 | System Application of Disincentive Adj | 0043 | $14,032.79 |
01 | System Application of Disincentive Adj | 0043 | $13,155.74 |
01 | System Application of Disincentive Adj | 0043 | $18,418.03 |
01 | System Application of Disincentive Adj | 0043 | $14,032.79 |
01 | System Application of Disincentive Adj | 0043 | $5,262.27 |
01 | System Application of Disincentive Adj | 0043 | $13,155.74 |
01 | System Application of Disincentive Adj | 0043 | $14,032.79 |
01 | System Application of Disincentive Adj | 0043 | $13,155.74 |
01 | System Application of Disincentive Adj | 0043 | $-14,032.79 |
01 | System Application of Disincentive Adj | 0043 | $14,032.79 |
01 | System Application of Disincentive Adj | 0043 | $11,401.64 |
01 | System Application of Disincentive Adj | 0043 | $26,311.48 |
01 | System Application of Disincentive Adj | 0043 | $13,155.74 | Subtotals For Milestones | $-495,000.00 |
Contract ID: | 110422 | Estimate Number: | 0044 | Primary JP: | 10441(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: BRFY-021C(256) | Project: 10441(04) | Category: 0100/ROADWAY | ||||||||
0001 | CLEARING AND GRUBBING | 201(A) 0102 | LSUM | 1.000 | 1.000 | 1.000 | $300,000.00 | $0.00 | $300,000.00 | |
0002 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 13,295.000 | 14,533.530 | 14,533.530 | $12.50 | $0.00 | $181,669.13 | |
0003 | MUCK EXCAVATION | 202(B) 0105 | CY | 42,059.000 | 42,059.000 | 42,059.000 | $18.00 | $0.00 | $757,062.00 | |
0004 | UNCLASSIFIED BORROW | 202(D) 0184 | CY | 3,986.000 | 5,224.530 | 5,224.530 | $15.00 | $0.00 | $78,367.95 | |
0005 | SELECT BORROW | 202(E) 0186 | CY | 49,024.000 | 49,024.000 | 49,024.000 | $10.00 | $0.00 | $490,240.00 | |
0006 | TEST ROLLING | 203 7116 | LSUM | 1.000 | 1.000 | 1.000 | $10,000.00 | $0.00 | $10,000.00 | |
0007 | TYPE A-SALVAGED TOPSOIL | 205(A) 4229 | LSUM | 1.000 | 1.000 | 1.000 | $22,000.00 | $0.00 | $22,000.00 | |
0008 | TEMPORARY SILT FENCE | 221(C) 2801 | LF | 6,835.000 | 455.000 | 455.000 | $2.00 | $0.00 | $910.00 | |
0009 | TEMPORARY SILT DIKE | 221(F) 0100 | LF | 504.000 | 273.000 | 273.000 | $7.50 | $0.00 | $2,047.50 | |
0010 | SOLID SLAB SODDING | 230(A) 2806 | SY | 10,365.000 | 34,216.590 | 34,216.590 | $1.95 | $0.00 | $66,722.35 | |
0011 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 3.000 | 0.000 | 0.000 | $1,795.00 | $0.00 | $0.00 | |
0012 | MOWING | 241 2832 | AC | 7.000 | 0.000 | 0.000 | $69.00 | $0.00 | $0.00 | |
0013 | AGGREGATE BASE TYPE B | 303(B) 2110 | CY | 5,849.000 | 5,336.680 | 88.940 | 5,336.680 | $33.95 | $3,019.51 | $181,180.28 |
0014 | CEMENTITIOUS STABILIZED SUBGRADE | 307(E) 4240 | SY | 25,990.000 | 11,863.420 | 25.780 | 11,863.420 | $5.00 | $128.90 | $59,317.10 |
0015 | LIME PRETREATMENT | 307(G) 4260 | SY | 5,201.000 | 2,135.370 | 2,135.370 | $3.85 | $0.00 | $8,221.17 | |
0016 | SEPARATOR FABRIC | 325 5271 | SY | 25,990.000 | 25,990.000 | 25,990.000 | $1.45 | $0.00 | $37,685.50 | |
0017 | GEOGRID REINFORCEMENT | 326(B) 0100 | SY | 12,235.000 | 12,781.330 | 0.000 | 12,781.330 | $3.00 | $0.00 | $38,343.99 |
0018 | TRAFFIC BOUND SURFACE COURSE TYPE E | 402(E) 0225 | TON | 502.000 | 1,272.460 | 1,272.460 | $17.50 | $0.00 | $22,268.07 | |
0019 | TACK COAT | 407(B) 0250 | GAL | 7,705.000 | 4,125.770 | 4,125.770 | $2.75 | $0.00 | $11,345.87 | |
0020 | PRIME COAT | 408 5774 | GAL | 10,317.000 | 0.000 | 0.000 | $3.00 | $0.00 | $0.00 | |
0021 | SUPERPAVE, TYPE S3(PG 70-28 OK) | 411(B) 5940 | TON | 3,081.000 | 3,101.930 | 0.000 | 3,101.930 | $69.57 | $0.00 | $215,801.28 |
0022 | SUPERPAVE, TYPE S3(PG 64-22 OK) | 411(B) 5945 | TON | 4,705.000 | 4,810.310 | 4,810.310 | $70.32 | $0.00 | $338,260.99 | |
0023 | SUPERPAVE, TYPE S4(PG 70-28 OK) | 411(C) 5955 | TON | 2,366.000 | 2,383.600 | 0.000 | 2,383.600 | $90.59 | $0.00 | $215,930.32 |
0024 | SUPERPAVE, TYPE S4(PG 64-22 OK) | 411(C) 5960 | TON | 942.000 | 930.860 | 930.860 | $81.53 | $0.00 | $75,893.01 | |
0025 | CLASS C CONCRETE | 509(D) 0325 | CY | 10.000 | 0.000 | 0.000 | $480.00 | $0.00 | $0.00 | |
0026 | TYPE I PLAIN RIPRAP | 601(A) 0297 | TON | 180,256.000 | 168,072.710 | 5.000 | 168,072.710 | $17.00 | $85.00 | $2,857,236.07 |
0027 | TYPE I-A PLAIN RIPRAP | 601(B) 0536 | TON | 12,067.000 | 9,776.340 | 9,776.340 | $27.00 | $0.00 | $263,961.18 | |
0028 | TYPE I-A FILTER BLANKET | 601(C) 0538 | TON | 3,117.000 | 3,019.970 | 3,019.970 | $22.00 | $0.00 | $66,439.34 | |
0029 | 2'-8" COMB. CURB & GUTTER (4" MNTBLE) | 609(B) 1523 | LF | 404.000 | 404.000 | 404.000 | $22.50 | $0.00 | $9,090.00 | |
0030 | 6" CONCRETE DIVIDING STRIP | 610(C) 0609 | SY | 1,069.000 | 120.000 | 120.000 | $31.00 | $0.00 | $3,720.00 | |
0031 | 18" R.C.PIPE CLASS III | 613(A) 0491 | LF | 181.000 | 179.000 | 179.000 | $60.00 | $0.00 | $10,740.00 | |
0032 | 24" R.C.PIPE CLASS III | 613(A) 0492 | LF | 133.000 | 133.000 | 133.000 | $72.50 | $0.00 | $9,642.50 | |
0033 | 18" CORR. GALV. STEEL PIPE | 613(B) 0689 | LF | 114.000 | 174.000 | 174.000 | $45.00 | $0.00 | $7,830.00 | |
0034 | 18" PREFAB. CULVERT END SECTION, ROUND | 613(L) 5726 | EA | 6.000 | 6.000 | 6.000 | $325.00 | $0.00 | $1,950.00 | |
0035 | 24" PREFAB. CULVERT END SECTION, ROUND | 613(L) 5730 | EA | 4.000 | 4.000 | 4.000 | $650.00 | $0.00 | $2,600.00 | |
0036 | TYPE A4 CULVERT END TREATMENT | 613(M) 7186 | EA | 4.000 | 4.000 | 4.000 | $1,100.00 | $0.00 | $4,400.00 | |
0037 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 1.000 | $43,500.00 | $0.00 | $43,500.00 | |
0038 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 20,964.000 | 22,048.390 | -3,252.010 | 22,048.390 | $2.25 | $-7,317.02 | $49,608.89 |
0039 | REMOVE AND RELOCATE UTILITIES | 619(B) 7250 | LSUM | 1.000 | 1.000 | 1.000 | $1,370,000.00 | $0.00 | $1,370,000.00 | |
0040 | BEAM GUARDRAIL W-BEAM SINGLE | 623(A) 0932 | LF | 3,322.000 | 3,347.000 | 3,347.000 | $12.95 | $0.00 | $43,343.65 | |
0041 | GUARDRAIL END TREATMENT (GET) | 623(G) 8571 | EA | 4.000 | 4.000 | 4.000 | $1,945.00 | $0.00 | $7,780.00 | |
0042 | GUARDRAIL BRIDGE CONNECTION-TYPE A | 623(I) 8675 | EA | 4.000 | 4.000 | 4.000 | $1,485.00 | $0.00 | $5,940.00 | |
0043 | FENCE-STYLE SWF (5 BARBED WIRE) | 624(C) 4459 | LF | 437.000 | 435.000 | 435.000 | $13.00 | $0.00 | $5,655.00 | |
8000 | REMOVE AND RELOCATE UTILITIES | 619(B) 7250 | LSUM | 0.000 | 1.000 | 1.000 | $197,544.60 | $0.00 | $197,544.60 | |
8003 | CONSTRUCTION MISCELLANEOUS | 104 0600 | EA | 0.000 | 1.000 | 1.000 | $6,569.47 | $0.00 | $6,569.47 | |
8008 | CEMENTITIOUS STABILIZED SUBGRADE | 307(E) 4240 | SY | 0.000 | 11,863.420 | 39.030 | 11,863.420 | $5.48 | $213.88 | $65,011.54 |
8009 | LIME STABILIZED SUBGRADE | 307(H) 4270 | SY | 0.000 | 2,135.370 | 2,135.370 | $4.69 | $0.00 | $10,014.89 | |
8017 | PAVEMENT/BRIDGE SMOOTHNESS ADJUSTMENT | 430 5010 | LSUM | 0.000 | 1.000 | 1.000 | $-4,521.77 | $0.00 | $-4,521.77 | |
8018 | GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 853 9069 | EA | 0.000 | 68.000 | 68.000 | $14.85 | $0.00 | $1,009.80 | |
8019 | 6" CONCRETE DIVIDING STRIP | 610(C) 0609 | SY | 0.000 | 120.000 | 120.000 | 120.000 | $63.00 | $7,560.00 | $7,560.00 |
Subtotals For Category 0100/ROADWAY | $3,690.27 | $8,159,891.67 | ||||||||
Fed/State Project Number: BRFY-021C(256) | Project: 10441(04) | Category: 0200/BRIDGE 'A' | ||||||||
0044 | SUBSTRUCTURE EXCAVATION COMMON | 501(B) 1307 | CY | 220.000 | 220.000 | 220.000 | $15.00 | $0.00 | $3,300.00 | |
0045 | CLSM BACKFILL | 501(G) 6309 | CY | 280.000 | 280.000 | 280.000 | $125.00 | $0.00 | $35,000.00 | |
0046 | PRESTRESSED CONCRETE BEAMS (TYPE IV) | 503(A) 1313 | LF | 5,082.200 | 5,082.200 | 4.220 | 5,082.200 | $225.00 | $949.50 | $1,143,495.00 |
0047 | APPROACH SLAB | 504(A) 1304 | SY | 361.200 | 361.200 | 361.200 | $150.00 | $0.00 | $54,180.00 | |
0048 | SAW-CUT GROOVING | 504(B) 1305 | SY | 5,267.600 | 5,267.600 | 5,267.600 | $4.00 | $0.00 | $21,070.40 | |
0049 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 220.600 | 220.600 | 220.600 | $200.00 | $0.00 | $44,120.00 | |
0050 | CONCRETE RAIL (TR4) | 504(D) 6245 | LF | 1,823.400 | 1,823.400 | 1,823.400 | $75.00 | $0.00 | $136,755.00 | |
0051 | HANDRAILING | 504(F) 6006 | LF | 910.700 | 910.700 | 910.700 | $64.00 | $0.00 | $58,284.80 | |
0052 | STRUCTURAL STEEL | 506(A) 1322 | LB | 5,680.000 | 5,680.000 | 5,680.000 | $0.95 | $0.00 | $5,396.00 | |
0053 | STAINLESS STEEL FIXED BEARING ASSEMBLY | 507(A) 6170 | EA | 60.000 | 60.000 | 60.000 | $3,000.00 | $0.00 | $180,000.00 | |
0054 | STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 507(B) 6174 | EA | 48.000 | 48.000 | 48.000 | $3,000.00 | $0.00 | $144,000.00 | |
0055 | CLASS AA CONCRETE | 509(A) 1326 | CY | 1,303.900 | 1,303.900 | 6.500 | 1,303.900 | $610.00 | $3,965.00 | $795,379.00 |
0056 | CLASS A CONCRETE | 509(B) 1328 | CY | 665.600 | 665.600 | 1.490 | 665.600 | $610.00 | $908.90 | $406,016.00 |
0057 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 385,800.000 | 385,800.000 | 385,800.000 | $1.00 | $0.00 | $385,800.00 | |
0058 | CLASS B BRIDGE DECK REPAIR | 513(B) 6019 | SY | 40.000 | 0.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0059 | CLASS C BRIDGE DECK REPAIR | 513(C) 6020 | SY | 40.000 | 0.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0060 | PILES, FURNISHED (HP 10X42) | 514(A) 6010 | LF | 240.000 | 240.000 | 240.000 | $24.00 | $0.00 | $5,760.00 | |
0061 | PILES, FURNISHED (HP 12X53) | 514(A) 6011 | LF | 1,018.000 | 1,018.000 | 1,018.000 | $28.00 | $0.00 | $28,504.00 | |
0062 | PILES, DRIVEN (HP 10X42) | 514(B) 6292 | LF | 240.000 | 235.340 | 235.340 | $11.00 | $0.00 | $2,588.74 | |
0063 | PILES, DRIVEN (HP 12X53) | 514(B) 6294 | LF | 1,018.000 | 1,002.660 | 1,002.660 | $12.00 | $0.00 | $12,031.92 | |
0064 | (PL)PILOT HOLES | 514(K) 6260 | LF | 646.000 | 330.000 | 330.000 | $25.00 | $0.00 | $8,250.00 | |
0065 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 3,902.000 | 3,902.000 | 3,902.000 | $5.00 | $0.00 | $19,510.00 | |
0066 | DRILLED SHAFTS 60" DIAMETER | 516(A) 6096 | LF | 312.000 | 313.160 | 1.380 | 313.160 | $800.00 | $1,104.00 | $250,528.00 |
0067 | DRILLED SHAFTS 72" DIAMETER | 516(A) 6098 | LF | 1,202.000 | 1,170.910 | 10.610 | 1,170.910 | $1,400.00 | $14,854.00 | $1,639,274.00 |
0068 | DRILLED SHAFTS 96" DIAMETER | 516(A) 6105 | LF | 164.000 | 161.500 | 1.300 | 161.500 | $1,000.00 | $1,300.00 | $161,500.00 |
0069 | DRILLED SHAFTS 144" DIAMETER | 516(A) 6135 | LF | 102.000 | 73.000 | 1.830 | 73.000 | $2,000.00 | $3,660.00 | $146,000.00 |
0070 | CROSSHOLE SONIC LOGGING | 516(C) 6200 | EA | 24.000 | 24.000 | 24.000 | $2,000.00 | $0.00 | $48,000.00 | |
0071 | CSL ACCESS TUBES | 516(D) 6400 | LF | 8,004.000 | 8,004.000 | 8,004.000 | $10.00 | $0.00 | $80,040.00 | |
0072 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 1,129.000 | 1,129.000 | 1,129.000 | $2.50 | $0.00 | $2,822.50 | |
0073 | SEALER RESIN | 523(B) 6560 | GAL | 23.000 | 23.000 | 0.000 | 23.000 | $70.00 | $0.00 | $1,610.00 |
0074 | TYPE I-A PLAIN RIPRAP | 601(B) 1353 | TON | 3,900.000 | 2,042.380 | 2,042.380 | $35.00 | $0.00 | $71,483.30 | |
0075 | TYPE I-A FILTER BLANKET | 601(C) 1355 | TON | 1,100.000 | 525.860 | 525.860 | $30.00 | $0.00 | $15,775.80 | |
0076 | 6" PERFORATED PIPE UNDERDRAIN ROUND | 613(H) 6204 | LF | 108.000 | 108.000 | 108.000 | $15.00 | $0.00 | $1,620.00 | |
0077 | 6" NON-PERF.PIPE UNDERDRAIN RND. | 613(I) 6207 | LF | 60.000 | 60.000 | 60.000 | $15.00 | $0.00 | $900.00 | |
0078 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $375,000.00 | $0.00 | $375,000.00 | |
8001 | MECHANICAL SPLICES | 511 6306 | EA | 0.000 | 20.000 | 20.000 | $100.00 | $0.00 | $2,000.00 | |
8002 | CONSTRUCTION MISCELLANEOUS | 104 0600 | EA | 0.000 | 16.000 | 16.000 | $85.00 | $0.00 | $1,360.00 | |
8004 | DEDUCTION FOR FAILING MATERIAL | 105 2275 | CY | 0.000 | 24.840 | 24.840 | 24.840 | $-36.60 | $-909.14 | $-909.14 |
8005 | ADJUSTMENT FOR NON-CONFORMING MATERIALS | 105 2100 | LSUM | 0.000 | 1.000 | 1.000 | 1.000 | $-1,107.37 | $-1,107.37 | $-1,107.37 |
8006 | DRILLED SHAFTS 96" DIAMETER | 516(A) 6105 | LF | 0.000 | 26.000 | 26.000 | 26.000 | $-50.00 | $-1,300.00 | $-1,300.00 |
8007 | DRILLED SHAFTS 144" DIAMETER | 516(A) 6135 | LF | 0.000 | 36.500 | 36.500 | 36.500 | $-100.00 | $-3,650.00 | $-3,650.00 |
8012 | ADJUSTMENT FOR NON-CONFORMING MATERIALS | 105 2100 | LSUM | 0.000 | 1.000 | 1.000 | 1.000 | $-14,983.82 | $-14,983.82 | $-14,983.82 |
8013 | ADJUSTMENT FOR NON-CONFORMING MATERIALS | 105 2100 | LSUM | 0.000 | 1.000 | 1.000 | 1.000 | $-905.01 | $-905.01 | $-905.01 |
8015 | PILE SPLICE, H-PILE (NON-BIDDABLE) | 514(L) 6220 | EA | 0.000 | 1.000 | 0.000 | 1.000 | $400.00 | $0.00 | $400.00 |
8016 | PAVEMENT/BRIDGE SMOOTHNESS ADJUSTMENT | 430 5010 | LSUM | 0.000 | 1.000 | 1.000 | $-16,916.74 | $0.00 | $-16,916.74 | |
Subtotals For Category 0200/BRIDGE 'A' | $3,886.06 | $6,247,982.38 | ||||||||
Fed/State Project Number: BRFY-021C(256) | Project: 10441(04) | Category: 0300/SIGNING & STRIPING | ||||||||
0079 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 4.000 | 4.060 | 4.060 | $200.00 | $0.00 | $812.00 | |
0080 | REINFORCING STEEL | 804(B) 2916 | LB | 224.000 | 224.000 | 224.000 | $1.00 | $0.00 | $224.00 | |
0081 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 287.000 | 292.180 | 292.180 | $18.00 | $0.00 | $5,259.24 | |
0082 | 2"@3.65 GALV.STEEL PIPE POST | 851(B) 3216 | LF | 384.000 | 396.000 | 396.000 | $12.00 | $0.00 | $4,752.00 | |
0083 | 2 1/2"@5.79 GALV.STEEL PIPE POST | 851(B) 3217 | LF | 56.000 | 56.000 | 56.000 | $15.00 | $0.00 | $840.00 | |
0084 | 3"@7.58 GALV.STEEL PIPE POST | 851(B) 3218 | LF | 56.000 | 56.000 | 56.000 | $20.00 | $0.00 | $1,120.00 | |
0085 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 20,418.000 | 20,273.000 | 20,273.000 | $0.85 | $0.00 | $17,232.05 | |
0086 | TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 855(A) 8814 | LF | 1,294.000 | 959.000 | 959.000 | $1.70 | $0.00 | $1,630.30 | |
8010 | TRAFFIC STRIPE(MULTI-POLY.)(4" WIDE) | 856(A) 8530 | LF | 0.000 | 0.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
8014 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 0.000 | 47.500 | 47.500 | $31.58 | $0.00 | $1,500.05 | |
Subtotals For Category 0300/SIGNING & STRIPING | $0.00 | $33,369.64 | ||||||||
Fed/State Project Number: BRFY-021C(256) | Project: 10441(04) | Category: 0301/TRAFFIC OPERATIONS | ||||||||
0087 | TRAFFIC STRIPE(PAINT)(4" WIDE) | 854(A) 8800 | LF | 24,240.000 | 56,569.000 | 56,569.000 | $0.10 | $0.00 | $5,656.90 | |
0088 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 857(E) 8887 | EA | 4,700.000 | 1,809.000 | 1,809.000 | $0.45 | $0.00 | $814.05 | |
0089 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 857(F) 8006 | LF | 18,832.000 | 19,549.000 | 19,549.000 | $0.10 | $0.00 | $1,954.90 | |
0090 | (SP)CONST.ZONE IMPACT ATTEN. | 871(B) 8705 | SD | 800.000 | 1,252.000 | 1,252.000 | $5.00 | $0.00 | $6,260.00 | |
0091 | DELIVER PORTABLE LONGITUDINAL BARRIER | 877(B) 8484 | LF | 3,772.000 | 4,527.000 | 4,527.000 | $35.00 | $0.00 | $158,445.00 | |
0092 | RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 877(C) 8486 | LF | 1,874.000 | 4,060.000 | 4,060.000 | $5.00 | $0.00 | $20,300.00 | |
0093 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 9,200.000 | 4,625.000 | 180.000 | 4,625.000 | $0.10 | $18.00 | $462.50 |
0094 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 2,400.000 | 11,612.000 | 408.000 | 11,612.000 | $2.00 | $816.00 | $23,224.00 |
0095 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 5,600.000 | 15,904.000 | 360.000 | 15,904.000 | $2.00 | $720.00 | $31,808.00 |
0096 | WING BARRICADES | 880(C) 8848 | SD | 1,600.000 | 2,492.000 | 48.000 | 2,492.000 | $1.50 | $72.00 | $3,738.00 |
0097 | VERTICAL PANELS | 880(D) 8854 | SD | 30,800.000 | 5,674.000 | 516.000 | 5,674.000 | $0.02 | $10.32 | $113.48 |
0098 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 6,400.000 | 25,451.000 | 900.000 | 25,451.000 | $0.05 | $45.00 | $1,272.55 |
0099 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 61,600.000 | 21,309.000 | 1,572.000 | 21,309.000 | $0.02 | $31.44 | $426.18 |
0100 | DRUMS | 880(F) 8878 | SD | 30,800.000 | 58,388.000 | -17,560.000 | 58,388.000 | $0.15 | $-2,634.00 | $8,758.20 |
0101 | PORT.CHANGEABLE MESSAGE SIGN | 882(A) 8306 | SD | 1,200.000 | 1,476.000 | 1,476.000 | $5.00 | $0.00 | $7,380.00 | |
8011 | CONSTRUCTION BARRICADES(TYPE III) | 880(C) 8842 | SD | 0.000 | 6,247.000 | 517.000 | 6,247.000 | $1.00 | $517.00 | $6,247.00 |
Subtotals For Category 0301/TRAFFIC OPERATIONS | $-404.24 | $276,860.76 | ||||||||
Fed/State Project Number: BRFY-021C(256) | Project: 10441(04) | Category: 0600/STAKING | ||||||||
0102 | CONSTRUCTION STAKING LEVEL II | 642(B) 0096 | LSUM | 1.000 | 1.000 | 1.000 | $100,000.00 | $0.00 | $100,000.00 | |
Subtotals For Category 0600/STAKING | $0.00 | $100,000.00 | ||||||||
Fed/State Project Number: BRFY-021C(256) | Project: 10441(04) | Category: 0640/CONSTRUCTION | ||||||||
0103 | SWPPP DOCUMENTATION AND MANAGEMENT | 220 2800 | LSUM | 1.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
0104 | FIELD OFFICE | 640(A) 1426 | EA | 1.000 | 1.000 | 1.000 | $20,000.00 | $0.00 | $20,000.00 | |
0105 | MOBILIZATION | 641 1552 | LSUM | 1.000 | 1.000 | 1.000 | $650,000.00 | $0.00 | $650,000.00 | |
Subtotals For Category 0640/CONSTRUCTION | $0.00 | $675,000.00 | ||||||||
Subtotals For Project BRFY-021C(256) /10441(04) | $7,172.09 | $15,493,104.45 |