Fed/State Project Number: STPY-118C(096)SS |
Project: 24183(04) |
Category: 0100/ROADWAY |
0001 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
43,245.000 |
43,245.000 |
737.000 |
889.800 |
$8.00 |
$5,896.00 |
$7,118.40 |
0002 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
19,838.000 |
19,838.000 |
|
0.000 |
$8.00 |
$0.00 |
$0.00 |
0003 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.250 |
0.250 |
$100,000.00 |
$25,000.00 |
$25,000.00 |
0004 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
18,500.000 |
18,500.000 |
|
10,255.000 |
$2.00 |
$0.00 |
$20,510.00 |
0005 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
1,218.000 |
1,218.000 |
|
273.000 |
$10.00 |
$0.00 |
$2,730.00 |
0006 |
DITCH LINER PROTECTION |
229 4318 |
LF |
12,300.000 |
12,300.000 |
|
0.000 |
$1.25 |
$0.00 |
$0.00 |
0007 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
115,898.000 |
115,898.000 |
|
0.000 |
$1.50 |
$0.00 |
$0.00 |
0008 |
SEEDING METHOD A |
232(A) 2813 |
AC |
24.000 |
24.000 |
|
0.000 |
$200.00 |
$0.00 |
$0.00 |
0009 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
24.000 |
24.000 |
|
0.000 |
$200.00 |
$0.00 |
$0.00 |
0010 |
MOWING |
241 2832 |
AC |
48.000 |
48.000 |
|
0.000 |
$50.00 |
$0.00 |
$0.00 |
0011 |
FLY ASH |
307(A) 4200 |
TON |
4,567.000 |
4,567.000 |
|
0.000 |
$55.00 |
$0.00 |
$0.00 |
0012 |
LIME |
307(D) 4230 |
TON |
488.000 |
488.000 |
|
0.000 |
$90.00 |
$0.00 |
$0.00 |
0013 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
84,553.000 |
84,553.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0014 |
LIME PRETREATMENT |
307(G) 4260 |
SY |
34,826.000 |
34,826.000 |
|
0.000 |
$0.50 |
$0.00 |
$0.00 |
0015 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
1,362.000 |
1,362.000 |
14.940 |
14.940 |
$18.00 |
$268.92 |
$268.92 |
0016 |
TACK COAT |
407(B) 0250 |
GAL |
31,104.000 |
31,104.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0017 |
PRIME COAT |
408 5774 |
GAL |
20,651.000 |
20,651.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0018 |
FABRIC REINFORCEMENT |
409(A) 4242 |
SY |
93,495.000 |
93,495.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0019 |
BITUMINOUS BINDER |
409(B) 4268 |
GAL |
18,700.000 |
18,700.000 |
|
0.000 |
$3.50 |
$0.00 |
$0.00 |
0020 |
SUPERPAVE, TYPE S3(PG 70-28 OK) |
411(B) 5940 |
TON |
15,915.000 |
15,915.000 |
|
0.000 |
$61.00 |
$0.00 |
$0.00 |
0021 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
32,463.000 |
32,463.000 |
|
0.000 |
$54.00 |
$0.00 |
$0.00 |
0022 |
SUPERPAVE, TYPE S4(PG 70-28 OK) |
411(C) 5955 |
TON |
9,861.000 |
9,861.000 |
|
0.000 |
$82.00 |
$0.00 |
$0.00 |
0023 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
7,934.000 |
7,934.000 |
|
0.000 |
$73.00 |
$0.00 |
$0.00 |
0024 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
79,426.000 |
79,426.000 |
|
0.000 |
$1.50 |
$0.00 |
$0.00 |
0025 |
P.C.CONCRETE PAVEMENT(PLACEMENT) |
414(A) 0210 |
SY |
1,362.000 |
1,362.000 |
|
0.000 |
$35.00 |
$0.00 |
$0.00 |
0026 |
P.C. CONCRETE FOR PAVEMENT |
414(G) 5275 |
CY |
227.000 |
227.000 |
|
0.000 |
$110.00 |
$0.00 |
$0.00 |
0027 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
160.000 |
160.000 |
|
3.980 |
$15.00 |
$0.00 |
$59.70 |
0028 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
262.000 |
262.000 |
9.600 |
14.460 |
$550.00 |
$5,280.00 |
$7,953.00 |
0029 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
960.000 |
960.000 |
|
0.000 |
$360.00 |
$0.00 |
$0.00 |
0030 |
REINFORCING STEEL |
511(A) 0332 |
LB |
32,166.000 |
32,166.000 |
1,479.630 |
1,479.630 |
$1.30 |
$1,923.52 |
$1,923.52 |
0031 |
TYPE I PLAIN RIPRAP |
601(A) 0297 |
TON |
348.000 |
348.000 |
|
0.000 |
$40.00 |
$0.00 |
$0.00 |
0032 |
CONCRETE CURB (6" MNTBLE-INTEGRAL) |
609(A) 0288 |
LF |
3,501.000 |
3,501.000 |
|
0.000 |
$6.00 |
$0.00 |
$0.00 |
0033 |
6" CONCRETE DRIVEWAY |
610(B) 0604 |
SY |
144.000 |
144.000 |
|
0.000 |
$75.00 |
$0.00 |
$0.00 |
0034 |
INLET CI DES. 1 (STD) |
611(G) 5100 |
EA |
2.000 |
2.000 |
|
0.000 |
$3,500.00 |
$0.00 |
$0.00 |
0035 |
INLET CI DES. 1 (2C) |
611(G) 5111 |
EA |
1.000 |
1.000 |
|
0.000 |
$8,500.00 |
$0.00 |
$0.00 |
0036 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
58.000 |
58.000 |
64.000 |
64.000 |
$60.00 |
$3,840.00 |
$3,840.00 |
0037 |
36" R.C.PIPE CLASS III |
613(A) 0494 |
LF |
60.000 |
60.000 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0038 |
28 1/2" X 18" R.C.PIPE ARCH CLASS A-III |
613(A) 4410 |
LF |
868.000 |
868.000 |
157.260 |
317.260 |
$70.00 |
$11,008.20 |
$22,208.20 |
0039 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
136.000 |
136.000 |
|
0.000 |
$38.00 |
$0.00 |
$0.00 |
0040 |
28 1/2" X 18" PREFAB. CULVERT END SECTION, ARCH |
613(L) 4584 |
EA |
50.000 |
50.000 |
3.000 |
3.000 |
$1,000.00 |
$3,000.00 |
$3,000.00 |
0041 |
24" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5730 |
EA |
2.000 |
2.000 |
|
0.000 |
$700.00 |
$0.00 |
$0.00 |
0042 |
36" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5734 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,300.00 |
$0.00 |
$0.00 |
0043 |
STANDARD BEDDING MATERIAL, CLASS C |
613(T) 1187 |
CY |
98.000 |
98.000 |
68.710 |
68.710 |
$50.00 |
$3,435.50 |
$3,435.50 |
0044 |
TRENCH EXCAVATION |
613(V) 1180 |
CY |
138.000 |
138.000 |
89.770 |
89.770 |
$25.00 |
$2,244.25 |
$2,244.25 |
0045 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.250 |
$20,000.00 |
$0.00 |
$5,000.00 |
0046 |
REMOVAL OF HEADWALL |
619(B) 0291 |
EA |
32.000 |
32.000 |
|
2.000 |
$1,500.00 |
$0.00 |
$3,000.00 |
0047 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
68,877.000 |
68,877.000 |
5,619.000 |
11,598.000 |
$1.00 |
$5,619.00 |
$11,598.00 |
0048 |
FENCE-STYLE WWF |
624(A) 4281 |
LF |
405.000 |
405.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
0049 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
16,880.000 |
16,880.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
0050 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
9.000 |
9.000 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0051 |
MAILBOX INSTALLATION-MULTIPLE |
629(B) 4959 |
EA |
3.000 |
3.000 |
|
0.000 |
$250.00 |
$0.00 |
$0.00 |
0052 |
MAILBOX |
629(C) 4960 |
EA |
15.000 |
15.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
0053 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
15.000 |
15.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$67,515.39 |
$119,889.49 |
|
Fed/State Project Number: STPY-118C(096)SS |
Project: 24183(04) |
Category: 0300/TRAFFIC CONTROL |
0054 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
20,000.000 |
20,000.000 |
|
0.000 |
$0.11 |
$0.00 |
$0.00 |
0055 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
5,000.000 |
5,000.000 |
|
0.000 |
$0.54 |
$0.00 |
$0.00 |
0056 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
20,000.000 |
20,000.000 |
|
0.000 |
$0.16 |
$0.00 |
$0.00 |
0057 |
(PL)TRUCK MOUNTED ATTENUATOR |
876(A) 8482 |
SD |
540.000 |
540.000 |
4.000 |
4.000 |
$5.40 |
$21.60 |
$21.60 |
0058 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
3,240.000 |
3,240.000 |
221.000 |
563.000 |
$0.85 |
$187.85 |
$478.55 |
0059 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
1,620.000 |
1,620.000 |
405.000 |
1,134.000 |
$1.08 |
$437.40 |
$1,224.72 |
0060 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
5,400.000 |
5,400.000 |
596.000 |
1,429.000 |
$2.16 |
$1,287.36 |
$3,086.64 |
0061 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
1,620.000 |
1,620.000 |
|
0.000 |
$0.27 |
$0.00 |
$0.00 |
0062 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
6,750.000 |
6,750.000 |
440.000 |
1,180.000 |
$0.11 |
$48.40 |
$129.80 |
0063 |
DRUMS |
880(F) 8878 |
SD |
13,770.000 |
13,770.000 |
|
0.000 |
$0.11 |
$0.00 |
$0.00 |
0064 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
36,990.000 |
36,990.000 |
2,644.000 |
5,833.000 |
$0.05 |
$132.20 |
$291.65 |
0065 |
FLAGGER |
880(I) 8902 |
SD |
540.000 |
540.000 |
20.000 |
32.000 |
$100.00 |
$2,000.00 |
$3,200.00 |
0066 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
540.000 |
540.000 |
|
0.000 |
$8.00 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC CONTROL |
$4,114.81 |
$8,432.96 |
|