Fed/State Project Number: IMY-0040-1(075)006 |
Project: 26239(07) |
Category: 0100/ROADWAY |
0001 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
300.000 |
300.000 |
|
0.000 |
$12.48 |
$0.00 |
$0.00 |
0002 |
MACHINE GRADING |
209 0120 |
LF |
2,612.000 |
2,612.000 |
|
0.000 |
$1.20 |
$0.00 |
$0.00 |
0003 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
2,500.000 |
2,500.000 |
|
0.000 |
$1.15 |
$0.00 |
$0.00 |
0004 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
752.000 |
752.000 |
|
0.000 |
$8.92 |
$0.00 |
$0.00 |
0005 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
61,800.000 |
61,800.000 |
|
0.000 |
$1.08 |
$0.00 |
$0.00 |
0006 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
12.770 |
12.770 |
|
0.000 |
$100.00 |
$0.00 |
$0.00 |
0007 |
MOWING |
241 2832 |
AC |
309.480 |
309.480 |
|
0.000 |
$24.08 |
$0.00 |
$0.00 |
0008 |
PERMEABLE FRICTION COURSE |
405 5200 |
TON |
10,027.000 |
10,027.000 |
|
0.000 |
$89.88 |
$0.00 |
$0.00 |
0009 |
TACK COAT |
407(B) 0250 |
GAL |
25,238.000 |
25,238.000 |
|
0.000 |
$2.19 |
$0.00 |
$0.00 |
0010 |
PRIME COAT |
408 5774 |
GAL |
317.000 |
317.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0011 |
SUPERPAVE, TYPE S4(PG 76-28 OK) |
411(C) 5950 |
TON |
19,437.000 |
19,437.000 |
|
0.000 |
$89.15 |
$0.00 |
$0.00 |
0012 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
5,947.000 |
5,947.000 |
|
0.000 |
$81.21 |
$0.00 |
$0.00 |
0013 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
201,635.000 |
201,635.000 |
11,569.000 |
11,569.000 |
$0.36 |
$4,164.84 |
$4,164.84 |
0014 |
DIAMOND GRINDING CONCRETE PAVEMENT |
425 5195 |
SY |
4,000.000 |
4,000.000 |
|
0.000 |
$10.00 |
$0.00 |
$0.00 |
0015 |
REMOVAL OF GUARDRAIL |
619(B) 4780 |
LF |
4,745.000 |
4,745.000 |
|
0.000 |
$1.45 |
$0.00 |
$0.00 |
0016 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
3,750.000 |
3,750.000 |
|
0.000 |
$15.10 |
$0.00 |
$0.00 |
0017 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
12.000 |
12.000 |
|
0.000 |
$2,065.00 |
$0.00 |
$0.00 |
0018 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
12.000 |
12.000 |
|
0.000 |
$1,265.00 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$4,164.84 |
$4,164.84 |
|
Fed/State Project Number: IMY-0040-1(075)006 |
Project: 26239(07) |
Category: 0202/BRIDGE 'E' |
0033 |
CLSM BACKFILL |
501(G) 6309 |
CY |
10.000 |
10.000 |
|
0.000 |
$305.00 |
$0.00 |
$0.00 |
0034 |
APPROACH SLAB |
504(A) 1304 |
SY |
169.000 |
169.000 |
|
0.000 |
$225.00 |
$0.00 |
$0.00 |
0035 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY |
505(C) 6075 |
SY |
640.000 |
640.000 |
|
0.000 |
$33.00 |
$0.00 |
$0.00 |
0036 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,770.000 |
1,770.000 |
|
0.000 |
$7.10 |
$0.00 |
$0.00 |
0037 |
CLASS C CONCRETE |
509(D) 1331 |
CY |
5.000 |
5.000 |
|
0.000 |
$510.00 |
$0.00 |
$0.00 |
0038 |
CLASS B BRIDGE DECK REPAIR |
513(B) 6019 |
SY |
20.000 |
20.000 |
|
0.000 |
$215.00 |
$0.00 |
$0.00 |
0039 |
CLASS C BRIDGE DECK REPAIR |
513(C) 6020 |
SY |
34.000 |
34.000 |
|
0.000 |
$430.00 |
$0.00 |
$0.00 |
0040 |
PREPARATION OF CRACKS, ABOVE WATER |
520(A) 6058 |
LF |
50.000 |
50.000 |
|
0.000 |
$23.00 |
$0.00 |
$0.00 |
0041 |
EPOXY RESIN, ABOVE WATER |
520(C) 6060 |
GAL |
2.000 |
2.000 |
|
0.000 |
$70.00 |
$0.00 |
$0.00 |
0042 |
PNEUMATICALLY PLACED MORTAR |
521(A) 6210 |
SY |
20.000 |
20.000 |
|
0.000 |
$525.00 |
$0.00 |
$0.00 |
0043 |
(PL)REPAIR BRIDGE ITEM (TYPE A) |
540 4515 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,450.00 |
$0.00 |
$0.00 |
0044 |
(PL)REPAIR BRIDGE ITEM (TYPE C) |
540 4535 |
EA |
2.000 |
2.000 |
|
0.000 |
$20,500.00 |
$0.00 |
$0.00 |
Subtotals For Category 0202/BRIDGE 'E' |
$0.00 |
$0.00 |
|
Fed/State Project Number: IMY-0040-1(075)006 |
Project: 26239(07) |
Category: 0203/BRIDGE 'F' |
0045 |
CLSM BACKFILL |
501(G) 6309 |
CY |
10.000 |
10.000 |
|
0.000 |
$305.00 |
$0.00 |
$0.00 |
0046 |
APPROACH SLAB |
504(A) 1304 |
SY |
169.000 |
169.000 |
|
0.000 |
$225.00 |
$0.00 |
$0.00 |
0047 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY |
505(C) 6075 |
SY |
640.000 |
640.000 |
|
0.000 |
$33.00 |
$0.00 |
$0.00 |
0048 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,770.000 |
1,770.000 |
|
0.000 |
$7.10 |
$0.00 |
$0.00 |
0049 |
CLASS C CONCRETE |
509(D) 1331 |
CY |
5.000 |
5.000 |
|
0.000 |
$510.00 |
$0.00 |
$0.00 |
0050 |
CLASS B BRIDGE DECK REPAIR |
513(B) 6019 |
SY |
20.000 |
20.000 |
|
0.000 |
$215.00 |
$0.00 |
$0.00 |
0051 |
CLASS C BRIDGE DECK REPAIR |
513(C) 6020 |
SY |
34.000 |
34.000 |
|
0.000 |
$430.00 |
$0.00 |
$0.00 |
0052 |
PREPARATION OF CRACKS, ABOVE WATER |
520(A) 6058 |
LF |
50.000 |
50.000 |
|
0.000 |
$23.00 |
$0.00 |
$0.00 |
0053 |
EPOXY RESIN, ABOVE WATER |
520(C) 6060 |
GAL |
2.000 |
2.000 |
|
0.000 |
$70.00 |
$0.00 |
$0.00 |
0054 |
PNEUMATICALLY PLACED MORTAR |
521(A) 6210 |
SY |
15.000 |
15.000 |
|
0.000 |
$525.00 |
$0.00 |
$0.00 |
0055 |
(PL)REPAIR BRIDGE ITEM (TYPE A) |
540 4515 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,450.00 |
$0.00 |
$0.00 |
0056 |
(PL)REPAIR BRIDGE ITEM (TYPE C) |
540 4535 |
EA |
2.000 |
2.000 |
|
0.000 |
$20,500.00 |
$0.00 |
$0.00 |
Subtotals For Category 0203/BRIDGE 'F' |
$0.00 |
$0.00 |
|
Fed/State Project Number: IMY-0040-1(075)006 |
Project: 26239(07) |
Category: 0204/BRIDGE 'G' |
0057 |
CLSM BACKFILL |
501(G) 6309 |
CY |
15.000 |
15.000 |
|
0.000 |
$305.00 |
$0.00 |
$0.00 |
0058 |
APPROACH SLAB |
504(A) 1304 |
SY |
278.000 |
278.000 |
|
0.000 |
$225.00 |
$0.00 |
$0.00 |
0059 |
RAPID CURE JOINT SEALANT |
504(G) 6390 |
LF |
79.000 |
79.000 |
|
0.000 |
$31.00 |
$0.00 |
$0.00 |
0060 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY |
505(C) 6075 |
SY |
1,000.000 |
1,000.000 |
|
0.000 |
$33.00 |
$0.00 |
$0.00 |
0061 |
CLASS C CONCRETE |
509(D) 1331 |
CY |
5.000 |
5.000 |
|
0.000 |
$510.00 |
$0.00 |
$0.00 |
0062 |
CLASS B BRIDGE DECK REPAIR |
513(B) 6019 |
SY |
45.000 |
45.000 |
|
0.000 |
$215.00 |
$0.00 |
$0.00 |
0063 |
PREPARATION OF CRACKS, ABOVE WATER |
520(A) 6058 |
LF |
90.000 |
90.000 |
|
0.000 |
$23.00 |
$0.00 |
$0.00 |
0064 |
EPOXY RESIN, ABOVE WATER |
520(C) 6060 |
GAL |
3.000 |
3.000 |
|
0.000 |
$70.00 |
$0.00 |
$0.00 |
0065 |
PNEUMATICALLY PLACED MORTAR |
521(A) 6210 |
SY |
25.000 |
25.000 |
|
0.000 |
$525.00 |
$0.00 |
$0.00 |
0066 |
(PL)REPAIR BRIDGE ITEM (TYPE A) |
540 4515 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,450.00 |
$0.00 |
$0.00 |
0067 |
(PL)REPAIR BRIDGE ITEM (TYPE B) |
540 4525 |
EA |
2.000 |
2.000 |
|
0.000 |
$24,500.00 |
$0.00 |
$0.00 |
Subtotals For Category 0204/BRIDGE 'G' |
$0.00 |
$0.00 |
|
Fed/State Project Number: IMY-0040-1(075)006 |
Project: 26239(07) |
Category: 0205/BRIDGE 'H' |
0068 |
CLSM BACKFILL |
501(G) 6309 |
CY |
15.000 |
15.000 |
|
0.000 |
$305.00 |
$0.00 |
$0.00 |
0069 |
APPROACH SLAB |
504(A) 1304 |
SY |
278.000 |
278.000 |
|
0.000 |
$225.00 |
$0.00 |
$0.00 |
0070 |
RAPID CURE JOINT SEALANT |
504(G) 6390 |
LF |
79.000 |
79.000 |
|
0.000 |
$31.00 |
$0.00 |
$0.00 |
0071 |
MULTIPLE LAYER POLYMER CONCRETE OVERLAY |
505(C) 6075 |
SY |
1,000.000 |
1,000.000 |
|
0.000 |
$33.00 |
$0.00 |
$0.00 |
0072 |
CLASS C CONCRETE |
509(D) 1331 |
CY |
5.000 |
5.000 |
|
0.000 |
$510.00 |
$0.00 |
$0.00 |
0073 |
CLASS B BRIDGE DECK REPAIR |
513(B) 6019 |
SY |
45.000 |
45.000 |
|
0.000 |
$215.00 |
$0.00 |
$0.00 |
0074 |
PREPARATION OF CRACKS, ABOVE WATER |
520(A) 6058 |
LF |
50.000 |
50.000 |
|
0.000 |
$23.00 |
$0.00 |
$0.00 |
0075 |
EPOXY RESIN, ABOVE WATER |
520(C) 6060 |
GAL |
2.000 |
2.000 |
|
0.000 |
$70.00 |
$0.00 |
$0.00 |
0076 |
PNEUMATICALLY PLACED MORTAR |
521(A) 6210 |
SY |
10.000 |
10.000 |
|
0.000 |
$525.00 |
$0.00 |
$0.00 |
0077 |
(PL)REPAIR BRIDGE ITEM (TYPE A) |
540 4515 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,450.00 |
$0.00 |
$0.00 |
0078 |
(PL)REPAIR BRIDGE ITEM (TYPE B) |
540 4525 |
EA |
2.000 |
2.000 |
|
0.000 |
$24,500.00 |
$0.00 |
$0.00 |
Subtotals For Category 0205/BRIDGE 'H' |
$0.00 |
$0.00 |
|
Fed/State Project Number: IMY-0040-1(075)006 |
Project: 26239(07) |
Category: 0300/TRAFFIC - SIGNING & STRIPING |
0079 |
(PL)REMOVE & RESET EXISTING SIGNS |
805(D) 8756 |
EA |
8.000 |
8.000 |
|
0.000 |
$50.00 |
$0.00 |
$0.00 |
0080 |
DELINEATORS(TYPE 1, CODE 1, FLEXIBLE) |
853 9042 |
EA |
84.000 |
84.000 |
|
0.000 |
$35.00 |
$0.00 |
$0.00 |
0081 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) |
856(A) 8530 |
LF |
92,188.000 |
92,188.000 |
|
0.000 |
$0.36 |
$0.00 |
$0.00 |
0082 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) |
856(A) 8535 |
LF |
14,160.000 |
14,160.000 |
|
0.000 |
$0.55 |
$0.00 |
$0.00 |
0083 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) |
856(A) 8540 |
LF |
800.000 |
800.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0084 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) |
856(A) 8555 |
LF |
48.000 |
48.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC - SIGNING & STRIPING |
$0.00 |
$0.00 |
|
Fed/State Project Number: IMY-0040-1(075)006 |
Project: 26239(07) |
Category: 0301/TRAFFIC CONTROL |
0085 |
RUMBLE STRIP-METHOD HMA-CON |
413(A) 4861 |
LF |
89,014.000 |
89,014.000 |
|
0.000 |
$0.08 |
$0.00 |
$0.00 |
0086 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
142,200.000 |
142,200.000 |
|
0.000 |
$0.09 |
$0.00 |
$0.00 |
0087 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
5,000.000 |
5,000.000 |
|
0.000 |
$0.45 |
$0.00 |
$0.00 |
0088 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
5,000.000 |
5,000.000 |
|
0.000 |
$0.20 |
$0.00 |
$0.00 |
0089 |
SAND FILLED IMPACT ATTENUATION MODULE |
870(A) 8485 |
SD |
7,125.000 |
7,125.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0090 |
DELIVER PORTABLE LONGITUDINAL BARRIER |
877(B) 8484 |
LF |
3,400.000 |
3,400.000 |
3,402.000 |
3,402.000 |
$17.50 |
$59,535.00 |
$59,535.00 |
0091 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER |
877(C) 8486 |
LF |
6,800.000 |
6,800.000 |
|
0.000 |
$1.04 |
$0.00 |
$0.00 |
0092 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
250.000 |
250.000 |
18.000 |
18.000 |
$4.00 |
$72.00 |
$72.00 |
0093 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
14,375.000 |
14,375.000 |
666.000 |
666.000 |
$0.05 |
$33.30 |
$33.30 |
0094 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
3,125.000 |
3,125.000 |
720.000 |
720.000 |
$1.00 |
$720.00 |
$720.00 |
0095 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
4,375.000 |
4,375.000 |
270.000 |
270.000 |
$0.75 |
$202.50 |
$202.50 |
0096 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
3,125.000 |
3,125.000 |
90.000 |
90.000 |
$0.15 |
$13.50 |
$13.50 |
0097 |
WING BARRICADES |
880(C) 8848 |
SD |
500.000 |
500.000 |
36.000 |
36.000 |
$1.00 |
$36.00 |
$36.00 |
0098 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
10,625.000 |
10,625.000 |
360.000 |
360.000 |
$0.05 |
$18.00 |
$18.00 |
0099 |
DRUMS |
880(F) 8878 |
SD |
6,250.000 |
6,250.000 |
1,080.000 |
1,080.000 |
$0.25 |
$270.00 |
$270.00 |
0100 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
37,500.000 |
37,500.000 |
11,385.000 |
11,385.000 |
$0.30 |
$3,415.50 |
$3,415.50 |
0101 |
TRAFFIC SURVEILLANCE, POLICE |
880(L) 8911 |
HOUR |
420.000 |
420.000 |
|
0.000 |
$40.00 |
$0.00 |
$0.00 |
0102 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
250.000 |
250.000 |
|
0.000 |
$20.00 |
$0.00 |
$0.00 |
Subtotals For Category 0301/TRAFFIC CONTROL |
$64,315.80 |
$64,315.80 |
|