Fed/State Project Number: BRFY-022N(154)SS |
Project: 21732(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
0.900 |
$16,380.00 |
$0.00 |
$14,742.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
46,226.000 |
46,226.000 |
10,010.000 |
14,755.000 |
$6.20 |
$62,062.00 |
$91,481.00 |
0003 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.500 |
$32,392.50 |
$0.00 |
$16,196.25 |
0004 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
3,405.000 |
3,405.000 |
63.000 |
63.000 |
$1.21 |
$76.23 |
$76.23 |
0005 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
238.000 |
238.000 |
|
0.000 |
$8.03 |
$0.00 |
$0.00 |
0006 |
TEMPORARY ROCK FILTER DAM TYPE 1 |
221(G) 0150 |
CY |
14.000 |
14.000 |
|
0.000 |
$72.19 |
$0.00 |
$0.00 |
0007 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
53,024.000 |
53,024.000 |
|
0.000 |
$1.04 |
$0.00 |
$0.00 |
0008 |
WATERING |
230(F) 2812 |
KGAL |
2,121.000 |
2,121.000 |
|
0.000 |
$6.04 |
$0.00 |
$0.00 |
0009 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
19.150 |
19.150 |
|
0.000 |
$409.50 |
$0.00 |
$0.00 |
0010 |
FERTILIZING (10-20-10) |
234(A) 2824 |
TON |
5.300 |
5.300 |
|
0.000 |
$750.88 |
$0.00 |
$0.00 |
0011 |
MOWING |
241 2832 |
AC |
19.150 |
19.150 |
|
0.000 |
$65.10 |
$0.00 |
$0.00 |
0012 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
6,627.000 |
6,627.000 |
|
0.000 |
$46.16 |
$0.00 |
$0.00 |
0013 |
GEOGRID REINFORCEMENT |
326(B) 0100 |
SY |
2,000.000 |
2,000.000 |
|
0.000 |
$3.53 |
$0.00 |
$0.00 |
0014 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
3,849.000 |
3,849.000 |
0.000 |
30.000 |
$19.05 |
$0.00 |
$571.50 |
0015 |
TACK COAT |
407(B) 0250 |
GAL |
3,906.000 |
3,906.000 |
|
0.000 |
$3.94 |
$0.00 |
$0.00 |
0016 |
PRIME COAT |
408 5774 |
GAL |
10,055.000 |
10,055.000 |
|
0.000 |
$7.14 |
$0.00 |
$0.00 |
0017 |
FABRIC REINFORCEMENT |
409(A) 4242 |
SY |
22,872.000 |
22,872.000 |
|
0.000 |
$1.70 |
$0.00 |
$0.00 |
0018 |
SUPERPAVE, TYPE S3(PG 76-28 OK) |
411(B) 5935 |
TON |
1,592.000 |
1,592.000 |
|
0.000 |
$80.17 |
$0.00 |
$0.00 |
0019 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
7,094.000 |
7,094.000 |
|
0.000 |
$68.83 |
$0.00 |
$0.00 |
0020 |
SUPERPAVE, TYPE S4(PG 76-28 OK) |
411(C) 5950 |
TON |
1,062.000 |
1,062.000 |
|
0.000 |
$84.74 |
$0.00 |
$0.00 |
0021 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
1,915.000 |
1,915.000 |
|
0.000 |
$77.60 |
$0.00 |
$0.00 |
0022 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
45.000 |
45.000 |
|
0.000 |
$52.50 |
$0.00 |
$0.00 |
0023 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
177.000 |
177.000 |
147.840 |
147.840 |
$317.88 |
$46,995.38 |
$46,995.38 |
0024 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
356.000 |
356.000 |
|
0.000 |
$285.69 |
$0.00 |
$0.00 |
0025 |
REINFORCING STEEL |
511(A) 0332 |
LB |
25,686.000 |
25,686.000 |
21,687.600 |
21,687.600 |
$0.75 |
$16,265.70 |
$16,265.70 |
0026 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
398.000 |
398.000 |
|
0.000 |
$26.18 |
$0.00 |
$0.00 |
0027 |
24" CORR. GALV. STEEL PIPE |
613(B) 0690 |
LF |
524.000 |
524.000 |
|
0.000 |
$30.85 |
$0.00 |
$0.00 |
0028 |
8" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 0500 |
LF |
375.000 |
375.000 |
|
0.000 |
$7.46 |
$0.00 |
$0.00 |
0029 |
8" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1097 |
LF |
125.000 |
125.000 |
|
0.000 |
$7.46 |
$0.00 |
$0.00 |
0030 |
TYPE A6 CULVERT END TREATMENT |
613(M) 7196 |
EA |
4.000 |
4.000 |
|
0.000 |
$841.79 |
$0.00 |
$0.00 |
0031 |
TYPE B6 CULVERT END TREATMENT |
613(M) 7197 |
EA |
12.000 |
12.000 |
|
0.000 |
$1,055.85 |
$0.00 |
$0.00 |
0032 |
OUTLET LATERAL HEADWALL |
613(Q) 5946 |
EA |
1.000 |
1.000 |
|
0.000 |
$351.42 |
$0.00 |
$0.00 |
0033 |
PIPE UNDERDRAIN COVER MAT'L. |
613(U) 1100 |
CY |
113.000 |
113.000 |
|
0.000 |
$41.67 |
$0.00 |
$0.00 |
0034 |
TRENCH EXCAVATION |
613(V) 1180 |
CY |
150.000 |
150.000 |
|
0.000 |
$8.19 |
$0.00 |
$0.00 |
0035 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$5,250.00 |
$0.00 |
$0.00 |
0036 |
REMOVAL OF HEADWALL |
619(B) 0291 |
EA |
1.000 |
1.000 |
|
0.000 |
$2,100.00 |
$0.00 |
$0.00 |
0037 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
21,069.000 |
21,069.000 |
|
0.000 |
$1.10 |
$0.00 |
$0.00 |
0038 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
4,140.000 |
4,140.000 |
|
0.000 |
$3.15 |
$0.00 |
$0.00 |
0039 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
963.000 |
963.000 |
|
0.000 |
$15.33 |
$0.00 |
$0.00 |
0040 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
4.000 |
4.000 |
|
0.000 |
$2,152.50 |
$0.00 |
$0.00 |
0041 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
4.000 |
4.000 |
|
0.000 |
$1,359.75 |
$0.00 |
$0.00 |
0042 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
5,870.000 |
5,870.000 |
0.000 |
3,468.000 |
$3.45 |
$0.00 |
$11,964.60 |
0043 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
3.000 |
3.000 |
|
0.000 |
$3.15 |
$0.00 |
$0.00 |
0044 |
MAILBOX INSTALLATION-MULTIPLE |
629(B) 4959 |
EA |
1.000 |
1.000 |
|
0.000 |
$194.25 |
$0.00 |
$0.00 |
0045 |
MAILBOX |
629(C) 4960 |
EA |
5.000 |
5.000 |
|
0.000 |
$47.25 |
$0.00 |
$0.00 |
0046 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
4.000 |
4.000 |
|
0.000 |
$52.50 |
$0.00 |
$0.00 |
0047 |
DELINEATORS(TYPE 2, CODE 1) |
853 9033 |
EA |
27.000 |
27.000 |
|
0.000 |
$8.40 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$125,399.31 |
$198,292.66 |
|
Fed/State Project Number: BRFY-022N(154)SS |
Project: 21732(04) |
Category: 0200/BRIDGE 'A' |
0048 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
196.000 |
196.000 |
|
0.000 |
$21.00 |
$0.00 |
$0.00 |
0049 |
CLSM BACKFILL |
501(G) 6309 |
CY |
298.000 |
298.000 |
|
0.000 |
$126.82 |
$0.00 |
$0.00 |
0050 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) |
503(A) 1313 |
LF |
1,395.000 |
1,395.000 |
0.000 |
0.000 |
$206.76 |
$0.00 |
$0.00 |
0051 |
APPROACH SLAB |
504(A) 1304 |
SY |
313.400 |
313.400 |
|
0.000 |
$131.95 |
$0.00 |
$0.00 |
0052 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
1,519.000 |
1,519.000 |
|
0.000 |
$3.78 |
$0.00 |
$0.00 |
0053 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
47.000 |
47.000 |
0.000 |
0.000 |
$302.99 |
$0.00 |
$0.00 |
0054 |
42" F-SHAPED PARAPET |
504(E) 6190 |
LF |
683.400 |
683.400 |
|
0.000 |
$67.25 |
$0.00 |
$0.00 |
0055 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,560.000 |
1,560.000 |
0.000 |
0.000 |
$3.18 |
$0.00 |
$0.00 |
0056 |
STAINLESS STEEL FIXED BEARING ASSEMBLY |
507(A) 6170 |
EA |
20.000 |
20.000 |
0.000 |
0.000 |
$2,874.70 |
$0.00 |
$0.00 |
0057 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY |
507(B) 6174 |
EA |
10.000 |
10.000 |
0.000 |
0.000 |
$2,874.70 |
$0.00 |
$0.00 |
0058 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
353.400 |
353.400 |
|
0.000 |
$423.33 |
$0.00 |
$0.00 |
0059 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
199.200 |
199.200 |
|
0.000 |
$417.67 |
$0.00 |
$0.00 |
0060 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
96,820.000 |
96,820.000 |
0.000 |
0.000 |
$0.97 |
$0.00 |
$0.00 |
0061 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
98.000 |
98.000 |
0.000 |
0.000 |
$27.41 |
$0.00 |
$0.00 |
0062 |
PILES, FURNISHED (HP 12X53) |
514(A) 6011 |
LF |
445.000 |
445.000 |
0.000 |
0.000 |
$33.60 |
$0.00 |
$0.00 |
0063 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
98.000 |
98.000 |
|
0.000 |
$15.75 |
$0.00 |
$0.00 |
0064 |
PILES, DRIVEN (HP 12X53) |
514(B) 6294 |
LF |
445.000 |
445.000 |
|
0.000 |
$15.75 |
$0.00 |
$0.00 |
0065 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
1,380.000 |
1,380.000 |
|
0.000 |
$3.68 |
$0.00 |
$0.00 |
0066 |
DRILLED SHAFTS 18" DIAMETER |
516(A) 6089 |
LF |
18.000 |
18.000 |
0.000 |
0.000 |
$163.14 |
$0.00 |
$0.00 |
0067 |
DRILLED SHAFTS 30" DIAMETER |
516(A) 6091 |
LF |
80.000 |
80.000 |
0.000 |
0.000 |
$258.44 |
$0.00 |
$0.00 |
0068 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
282.000 |
282.000 |
75.000 |
75.000 |
$412.78 |
$30,958.50 |
$30,958.50 |
0069 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
141.000 |
141.000 |
|
0.000 |
$3.15 |
$0.00 |
$0.00 |
0070 |
SEALER RESIN |
523(B) 6560 |
GAL |
1.000 |
1.000 |
|
0.000 |
$105.00 |
$0.00 |
$0.00 |
0071 |
TYPE I-A PLAIN RIPRAP |
601(B) 1353 |
TON |
1,350.000 |
1,350.000 |
|
0.000 |
$27.64 |
$0.00 |
$0.00 |
0072 |
TYPE I-A FILTER BLANKET |
601(C) 1355 |
TON |
205.000 |
205.000 |
|
0.000 |
$34.03 |
$0.00 |
$0.00 |
0073 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
94.000 |
94.000 |
|
0.000 |
$22.70 |
$0.00 |
$0.00 |
0074 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 6207 |
LF |
42.000 |
42.000 |
|
0.000 |
$24.39 |
$0.00 |
$0.00 |
0075 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$26,250.00 |
$0.00 |
$0.00 |
Subtotals For Category 0200/BRIDGE 'A' |
$30,958.50 |
$30,958.50 |
|
Fed/State Project Number: BRFY-022N(154)SS |
Project: 21732(04) |
Category: 0300/TRAFFIC CONTROL |
0076 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
24,800.000 |
24,800.000 |
|
0.000 |
$0.13 |
$0.00 |
$0.00 |
0077 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 |
857(E) 8890 |
EA |
1,000.000 |
1,000.000 |
|
0.000 |
$0.53 |
$0.00 |
$0.00 |
0078 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
800.000 |
800.000 |
|
0.000 |
$0.47 |
$0.00 |
$0.00 |
0079 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
1,800.000 |
1,800.000 |
60.000 |
156.000 |
$0.26 |
$15.60 |
$40.56 |
0080 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
6,900.000 |
6,900.000 |
270.000 |
702.000 |
$0.26 |
$70.20 |
$182.52 |
0081 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
2,100.000 |
2,100.000 |
210.000 |
546.000 |
$1.95 |
$409.50 |
$1,064.70 |
0082 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
5,100.000 |
5,100.000 |
|
0.000 |
$0.84 |
$0.00 |
$0.00 |
0083 |
WING BARRICADES |
880(C) 8848 |
SD |
600.000 |
600.000 |
60.000 |
156.000 |
$2.10 |
$126.00 |
$327.60 |
0084 |
VERTICAL PANELS |
880(D) 8854 |
SD |
10,500.000 |
10,500.000 |
|
0.000 |
$0.09 |
$0.00 |
$0.00 |
0085 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
11,700.000 |
11,700.000 |
150.000 |
390.000 |
$0.11 |
$16.50 |
$42.90 |
0086 |
DRUMS |
880(F) 8878 |
SD |
10,200.000 |
10,200.000 |
|
0.000 |
$0.13 |
$0.00 |
$0.00 |
0087 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
25,800.000 |
25,800.000 |
225.000 |
365.000 |
$0.09 |
$20.25 |
$32.85 |
0088 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
300.000 |
300.000 |
|
0.000 |
$10.50 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC CONTROL |
$658.05 |
$1,691.13 |
|