| Fed/State Project Number: BRFY-119C(102) |
Project: 20890(04) |
Category: 0100/ROADWAY |
| 0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
0.500 |
0.500 |
$8,160.00 |
$4,080.00 |
$4,080.00 |
| 0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
13,183.000 |
13,183.000 |
0.500 |
0.500 |
$4.48 |
$2.24 |
$2.24 |
| 0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
22,444.000 |
22,444.000 |
12,000.000 |
12,000.000 |
$5.27 |
$63,240.00 |
$63,240.00 |
| 0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.250 |
0.250 |
$7,140.00 |
$1,785.00 |
$1,785.00 |
| 0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
1,890.000 |
1,890.000 |
0.000 |
200.000 |
$2.03 |
$0.00 |
$406.00 |
| 0006 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
210.000 |
210.000 |
|
0.000 |
$10.15 |
$0.00 |
$0.00 |
| 0007 |
DITCH LINER PROTECTION |
229 4318 |
LF |
108.000 |
108.000 |
|
0.000 |
$1.78 |
$0.00 |
$0.00 |
| 0008 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
13,186.000 |
13,186.000 |
|
0.000 |
$1.27 |
$0.00 |
$0.00 |
| 0009 |
SEEDING METHOD A |
232(A) 2813 |
AC |
7.210 |
7.210 |
|
0.000 |
$402.90 |
$0.00 |
$0.00 |
| 0010 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
7.210 |
7.210 |
|
0.000 |
$504.90 |
$0.00 |
$0.00 |
| 0011 |
MOWING |
241 2832 |
AC |
14.420 |
14.420 |
|
0.000 |
$55.08 |
$0.00 |
$0.00 |
| 0012 |
AGGREGATE BASE TYPE B |
303(B) 2110 |
CY |
664.000 |
664.000 |
|
0.000 |
$53.12 |
$0.00 |
$0.00 |
| 0013 |
FLY ASH |
307(A) 4200 |
TON |
350.000 |
350.000 |
|
0.000 |
$60.67 |
$0.00 |
$0.00 |
| 0014 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
6,745.000 |
6,745.000 |
|
0.000 |
$2.63 |
$0.00 |
$0.00 |
| 0015 |
SEPARATOR FABRIC |
325 5271 |
SY |
3,632.000 |
3,632.000 |
|
0.000 |
$1.61 |
$0.00 |
$0.00 |
| 0016 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
519.000 |
519.000 |
|
0.000 |
$20.53 |
$0.00 |
$0.00 |
| 0017 |
TACK COAT |
407(B) 0250 |
GAL |
621.000 |
621.000 |
|
0.000 |
$2.34 |
$0.00 |
$0.00 |
| 0018 |
PRIME COAT |
408 5774 |
GAL |
1,886.000 |
1,886.000 |
|
0.000 |
$4.25 |
$0.00 |
$0.00 |
| 0019 |
SUPERPAVE, TYPE S3(PG 70-28 OK) |
411(B) 5940 |
TON |
230.000 |
230.000 |
|
0.000 |
$87.16 |
$0.00 |
$0.00 |
| 0020 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
1,335.000 |
1,335.000 |
|
0.000 |
$78.63 |
$0.00 |
$0.00 |
| 0021 |
SUPERPAVE, TYPE S4(PG 70-28 OK) |
411(C) 5955 |
TON |
151.000 |
151.000 |
|
0.000 |
$100.13 |
$0.00 |
$0.00 |
| 0022 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
472.000 |
472.000 |
|
0.000 |
$82.36 |
$0.00 |
$0.00 |
| 0023 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
21.000 |
21.000 |
|
0.000 |
$295.47 |
$0.00 |
$0.00 |
| 0024 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
128.000 |
128.000 |
|
0.000 |
$55.99 |
$0.00 |
$0.00 |
| 0025 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 0450 |
LF |
75.000 |
75.000 |
|
0.000 |
$22.44 |
$0.00 |
$0.00 |
| 0026 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1096 |
LF |
25.000 |
25.000 |
|
0.000 |
$22.44 |
$0.00 |
$0.00 |
| 0027 |
24" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5730 |
EA |
1.000 |
1.000 |
|
0.000 |
$780.30 |
$0.00 |
$0.00 |
| 0028 |
TYPE B6 CULVERT END TREATMENT |
613(M) 7197 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,187.71 |
$0.00 |
$0.00 |
| 0029 |
OUTLET LATERAL HEADWALL |
613(Q) 5946 |
EA |
2.000 |
2.000 |
|
0.000 |
$470.41 |
$0.00 |
$0.00 |
| 0030 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
0.500 |
0.500 |
$4,590.00 |
$2,295.00 |
$2,295.00 |
| 0031 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
4,401.000 |
4,401.000 |
|
0.000 |
$2.04 |
$0.00 |
$0.00 |
| 0032 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
1,144.000 |
1,144.000 |
|
0.000 |
$4.08 |
$0.00 |
$0.00 |
| 0033 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
1,986.000 |
1,986.000 |
|
0.000 |
$3.96 |
$0.00 |
$0.00 |
| Subtotals For Category 0100/ROADWAY |
$71,402.24 |
$71,808.24 |
|
| Fed/State Project Number: BRFY-119C(102) |
Project: 20890(04) |
Category: 0300/TRAFFIC |
| 0039 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) |
856(A) 8530 |
LF |
2,000.000 |
2,000.000 |
|
0.000 |
$1.53 |
$0.00 |
$0.00 |
| 0040 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
5,300.000 |
5,300.000 |
|
0.000 |
$0.26 |
$0.00 |
$0.00 |
| 0041 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
1,600.000 |
1,600.000 |
|
0.000 |
$0.26 |
$0.00 |
$0.00 |
| 0042 |
(PL)TRUCK MOUNTED ATTENUATOR |
876(A) 8482 |
SD |
180.000 |
180.000 |
|
0.000 |
$1.02 |
$0.00 |
$0.00 |
| 0043 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
180.000 |
180.000 |
|
0.000 |
$1.02 |
$0.00 |
$0.00 |
| 0044 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
1,530.000 |
1,530.000 |
224.000 |
802.000 |
$0.51 |
$114.24 |
$409.02 |
| 0045 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
810.000 |
810.000 |
32.000 |
94.000 |
$2.04 |
$65.28 |
$191.76 |
| 0046 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
1,620.000 |
1,620.000 |
192.000 |
684.000 |
$1.02 |
$195.84 |
$697.68 |
| 0047 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
270.000 |
270.000 |
|
0.000 |
$3.06 |
$0.00 |
$0.00 |
| 0048 |
WING BARRICADES |
880(C) 8848 |
SD |
450.000 |
450.000 |
64.000 |
236.000 |
$0.26 |
$16.64 |
$61.36 |
| 0049 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
1,620.000 |
1,620.000 |
160.000 |
542.000 |
$0.51 |
$81.60 |
$276.42 |
| 0050 |
DRUMS |
880(F) 8878 |
SD |
4,050.000 |
4,050.000 |
|
0.000 |
$0.10 |
$0.00 |
$0.00 |
| 0051 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
675.000 |
675.000 |
|
0.000 |
$0.26 |
$0.00 |
$0.00 |
| 0052 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
180.000 |
180.000 |
|
0.000 |
$5.10 |
$0.00 |
$0.00 |
| Subtotals For Category 0300/TRAFFIC |
$473.60 |
$1,636.24 |
|