Contract ID: | 110331 | Estimate Number: | 0012 , Final | Spec Year: | 2009 | |||
Primary JP: | 28175(04) | Residency: | PURCELL (03200) | Contract No: | 710200 | |||
Date Created: | 08/02/2013 | Contractor FEI: | 731427175 | Account No: | 404300 |
Project Number(s): | SBR-125C(197)SB | ||||||||
Contract Description: | BRIDGE REHABILITATION SH-74: OVER ROCK CREEK, 7.76 MILES NORTH OF THE CARTER COUNTY LINE. PROJECT LENGTH = 0.112 MILES. | ||||||||
Primary County: | GARVIN | ||||||||
Name of Road: | SH-74 | ||||||||
Prime Contractor: | K & R BUILDERS, INC. | Time Charged: | 142.00 | ||||||
P.O. BOX 656 | Time Allowed: | 144.00 | |||||||
WHEATLAND , OK 73097 | Percent Time: | 98.61 % |
Paid To Date: | $641,527.12 | Payable This Statement: | $-666.36 |
CONTRACTOR AFFIDAVIT |
STATE OF ___________________ | ) | |
) § | ||
COUNTY OF __________________ | ) |
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct. |
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or |
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid. |
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them. |
Further affiant sayeth not. |
K & R BUILDERS, INC. |
_________________________________________________ |
Affiant Signature |
_________________________________________________ |
Affiant Printed Name |
PE Seal |
_________________________________________________ |
Affiant Company Position |
Subscribed and sworn to before me this ______ day of ____________, 20____ |
My Commission Number: ____________ My Commission Expires: ______________ |
_________________________________________________ |
_________________________________________________ |
Professional Engineer Signature |
Oklahoma Department of Transportation |
Corporate Seal |
Notary Seal |
Contract ID: | 110331 | Estimate Number: | 0012 | Contract No: | 710200 | |||
Residency: | PURCELL (03200) | Estimate Type: | Final | Account No: | 404300 | |||
Project Number(s): | SBR-125C(197)SB | ||||||||||||
Primary Job Piece No: | 28175(04) | ||||||||||||
Contract Description: | BRIDGE REHABILITATION SH-74: OVER ROCK CREEK, 7.76 MILES NORTH OF THE CARTER COUNTY LINE. PROJECT LENGTH = 0.112 MILES. | ||||||||||||
Primary County: | GARVIN | ||||||||||||
Name of Road: | SH-74 | ||||||||||||
Prime Contractor: | K & R BUILDERS, INC. | ||||||||||||
P.O. BOX 656 | |||||||||||||
WHEATLAND , OK 73097 | |||||||||||||
Surety Company: | OHIO CASUALTY INSURANCE COMPANY | ||||||||||||
Date Let: | 07/21/2011 | NTP Effective Date: | 01/23/2012 | Pay Period: | 09/01/2012 TO 08/02/2013 |
Date Awarded: | 08/01/2011 | Date Work Began: | 01/23/2012 | Original Contract Time: | 120 |
Date Contract Executed: | 08/09/2011 | Date Time Stopped: | 08/31/2012 | Current Time Charged: | 142.00 |
Date NTP Issued: | 08/18/2011 | Completion Date: | 08/31/2012 | Current Time Allowed: | 144.00 |
General Liability Expires: | 05/01/2014 | Workman's Comp Expires: | 07/01/2014 | Percent Time Used: | 98.61 % |
Specification Year: | 2009 | ||||
Current Contract Amount: | $642,205.84 | Total to Date | Prev to Date | This Estimate | |||
Bid Amount: | $585,584.77 | Participating: | $0.00 | $0.00 | $0.00 | ||
Percent Complete: | 99.89 % | Non Participating: | $642,205.86 | $642,200.46 | $5.40 | ||
Funds Available: | $678.72 | Total Earnings: | $642,205.86 | $642,200.46 | $5.40 | ||
Unearned Balance: | $-55,942.35 | Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||
Gross Earnings: | $642,205.86 | $642,200.46 | $5.40 | ||||
Other Adjustments: | $-678.74 | $-6.98 | $-671.76 | ||||
Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
TOTAL: | $641,527.12 | $642,193.48 | $-666.36 |
Contract ID: | 110331 | Estimate Number: | 0012 | Primary JP: | 28175(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | extend work order effective date | Approved | 12/19/2011 | 0.0 | $0.00 |
002 | Add Additional Pay Item | Approved | 09/11/2012 | 24.0 | $70,235.00 |
003 | CO FINALIZING CONTRACT ITEM QUANTITIES | Approved | 08/01/2013 | 0.0 | $-13,613.93 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
28175(04) | 0015 | APPROACH SLAB - MOH | Stockpiled Material Adjustment | 0005 | $-2,536.23 |
28175(04) | 0015 | APPROACH SLAB - MOH | Stockpiled Material Adjustment | 0006 | $-932.97 |
28175(04) | 0015 | APPROACH SLAB - MOH | Stockpiled Material Initial Payment | 0004 | $3,469.20 |
28175(04) | 0017 | SEJ - MOH | Stockpiled Material Initial Payment | 0004 | $6,426.00 |
28175(04) | 0017 | SEJ - MOH | Stockpiled Material Adjustment | 0005 | $-3,213.00 |
28175(04) | 0017 | SEJ - MOH | Stockpiled Material Adjustment | 0008 | $-3,213.00 |
28175(04) | 0018 | CONCRETE RAIL - MOH | Stockpiled Material Initial Payment | 0004 | $1,420.00 |
28175(04) | 0018 | CONCRETE RAIL - MOH | Stockpiled Material Adjustment | 0006 | $-1,412.80 |
28175(04) | 0018 | CONCRETE RAIL - MOH | Stockpiled Material Adjustment | 0010 | $-7.20 |
28175(04) | 0019 | FIXED BEARING - MOH | Stockpiled Material Adjustment | 0007 | $-5,304.00 |
28175(04) | 0019 | FIXED BEARING - MOH | Stockpiled Material Adjustment | 0003 | $-5,304.00 |
28175(04) | 0019 | FIXED BEARING - MOH | Stockpiled Material Initial Payment | 0001 | $10,608.00 |
28175(04) | 0020 | EXPANSION BEARING - MOH | Stockpiled Material Adjustment | 0003 | $-10,608.00 |
28175(04) | 0020 | EXPANSION BEARING - MOH | Stockpiled Material Initial Payment | 0001 | $21,216.00 |
28175(04) | 0020 | EXPANSION BEARING - MOH | Stockpiled Material Adjustment | 0007 | $-10,608.00 |
28175(04) | 0022 | RESTEEL - MOH | Stockpiled Material Adjustment | 0004 | $-14.41 |
28175(04) | 0022 | RESTEEL - MOH | Stockpiled Material Initial Payment | 0004 | $12,988.99 |
28175(04) | 0022 | RESTEEL - MOH | Stockpiled Material Adjustment | 0006 | $-12,974.58 | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | ||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount |
System Application of Liquidated Damages | 0009 | --10 | $500.00 | $-5,000.00 |
System Application of Liquidated Damages | 0010 | --11 | $500.00 | $-5,500.00 |
System Application of Liquidated Damages | 0011 | -21.0 | $500.00 | $10,500.00 | Subtotals For Liquidated Damages | $0.00 |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
28175(04) | 0006 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0002 | 80.45 | $-0.24 | $-19.51 |
28175(04) | 0006 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0009 | 3.00 | $0.34 | $1.04 |
28175(04) | 0006 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * Asphalt Binder Adjustment | 0011 | 0.00 | $0.00 | $-1.04 |
28175(04) | 0018 | CONCRETE RAIL (TR4) | * COMPRESSIVE STRENGTH | 0008 | 0.00 | $0.00 | $-32.74 |
28175(04) | 0018 | CONCRETE RAIL (TR4) | * COMPRESSIVE STRENGTH | 0012 | 0.00 | $0.00 | $-671.76 |
28175(04) | 8000 | SUPERPAVE, TYPE S4(PG 64-22 OK) | * Asphalt Binder Adjustment | 0011 | 0.00 | $0.00 | $45.27 | Subtotals For Line Item Adjustments | $-678.74 | * = User applied Line Item Adjustments |
MILESTONE INFORMATION | |||||||||
Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
No milestones exist for this contract. |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total | ||||||
No milestones adjustments exist for this contract. | Subtotals For Milestones | $ |
Contract ID: | 110331 | Estimate Number: | 0012 | Primary JP: | 28175(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: SBR-125C(197)SB | Project: 28175(04) | Category: 0100/ROADWAY | ||||||||
0001 | TYPE A-SALVAGED TOPSOIL | 205(A) 4229 | LSUM | 1.000 | 1.000 | 1.000 | $1,600.00 | $0.00 | $1,600.00 | |
0002 | TEMPORARY SILT FENCE | 221(C) 2801 | LF | 832.000 | 400.000 | 400.000 | $1.00 | $0.00 | $400.00 | |
0003 | TEMPORARY SILT DIKE | 221(F) 0100 | LF | 40.000 | 0.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0004 | SOLID SLAB SODDING | 230(A) 2806 | SY | 820.000 | 1,506.000 | 1,506.000 | $3.35 | $0.00 | $5,045.10 | |
0005 | TRAFFIC BOUND SURFACE COURSE TYPE A | 402(A) 0217 | TON | 340.000 | 361.510 | 361.510 | $23.00 | $0.00 | $8,314.73 | |
0006 | SUPERPAVE, TYPE S3(PG 64-22 OK) | 411(B) 5945 | TON | 69.000 | 145.610 | 145.610 | $440.00 | $0.00 | $64,068.40 | |
0007 | CLASS C CONCRETE | 509(D) 0325 | CY | 12.800 | 8.350 | 8.350 | $525.00 | $0.00 | $4,383.75 | |
0008 | REMOVAL OF GUARDRAIL | 619(B) 4780 | LF | 600.000 | 600.000 | 600.000 | $2.75 | $0.00 | $1,650.00 | |
0009 | SAWING PAVEMENT | 619(C) 0924 | LF | 832.000 | 532.000 | 532.000 | $3.75 | $0.00 | $1,995.00 | |
0010 | BEAM GUARDRAIL W-BEAM SINGLE | 623(A) 0932 | LF | 200.000 | 200.000 | 200.000 | $16.75 | $0.00 | $3,350.00 | |
0011 | GUARDRAIL END TREATMENT (GET) | 623(G) 8571 | EA | 4.000 | 4.000 | 4.000 | $2,100.00 | $0.00 | $8,400.00 | |
0012 | GUARDRAIL BRIDGE CONNECTION-TYPE A | 623(I) 8675 | EA | 4.000 | 4.000 | 4.000 | $1,850.00 | $0.00 | $7,400.00 | |
8000 | SUPERPAVE, TYPE S4(PG 64-22 OK) | 411(C) 5960 | TON | 0.000 | 156.260 | 156.260 | $250.47 | $0.00 | $39,138.44 | |
8001 | SUPERPAVE, TYPE S3(PG 64-22 OK) | 411(B) 5945 | TON | 0.000 | 59.360 | 59.360 | $-44.00 | $0.00 | $-2,611.84 | |
Subtotals For Category 0100/ROADWAY | $0.00 | $143,133.58 | ||||||||
Fed/State Project Number: SBR-125C(197)SB | Project: 28175(04) | Category: 0200/BRIDGE 'A' | ||||||||
0013 | UNCLASSIFIED BORROW | 202(D) 0184 | CY | 25.000 | 0.000 | 0.000 | $50.00 | $0.00 | $0.00 | |
0014 | (PL)FALSEWORK JACKING | 502 6116 | LSUM | 1.000 | 1.000 | 1.000 | $16,000.00 | $0.00 | $16,000.00 | |
0015 | APPROACH SLAB | 504(A) 1304 | SY | 168.000 | 168.000 | 168.000 | $215.00 | $0.00 | $36,120.00 | |
0016 | SAW-CUT GROOVING | 504(B) 1305 | SY | 617.200 | 585.230 | 585.230 | $4.50 | $0.00 | $2,633.54 | |
0017 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 36.000 | 36.000 | 36.000 | $265.00 | $0.00 | $9,540.00 | |
0018 | CONCRETE RAIL (TR4) | 504(D) 6245 | LF | 355.000 | 355.000 | 0.000 | 355.000 | $81.00 | $0.00 | $28,755.00 |
0019 | STAINLESS STEEL FIXED BEARING ASSEMBLY | 507(A) 6170 | EA | 8.000 | 8.000 | 8.000 | $2,600.00 | $0.00 | $20,800.00 | |
0020 | STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 507(B) 6174 | EA | 16.000 | 16.000 | 16.000 | $2,600.00 | $0.00 | $41,600.00 | |
0021 | CLASS AA CONCRETE | 509(A) 1326 | CY | 122.200 | 122.200 | 122.200 | $775.00 | $0.00 | $94,705.00 | |
0022 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 45,900.000 | 45,900.000 | 45,900.000 | $1.05 | $0.00 | $48,195.01 | |
0023 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 269.200 | 269.200 | 269.200 | $4.40 | $0.00 | $1,184.48 | |
0024 | PNEUMATICALLY PLACED MORTAR | 521(A) 6210 | SY | 31.000 | 30.670 | 30.670 | $665.00 | $0.00 | $20,395.55 | |
0025 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 172.500 | 172.500 | 172.500 | $4.40 | $0.00 | $759.00 | |
0026 | SEALER RESIN | 523(B) 6560 | GAL | 2.000 | 2.000 | 2.000 | $150.00 | $0.00 | $300.00 | |
0027 | TYPE I-A PLAIN RIPRAP | 601(B) 1353 | TON | 500.000 | 612.430 | 612.430 | $31.50 | $0.00 | $19,291.55 | |
0028 | TYPE I-A FILTER BLANKET | 601(C) 1355 | TON | 134.000 | 119.000 | 119.000 | $24.00 | $0.00 | $2,856.00 | |
0029 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $80,000.00 | $0.00 | $80,000.00 | |
Subtotals For Category 0200/BRIDGE 'A' | $0.00 | $423,135.13 | ||||||||
Fed/State Project Number: SBR-125C(197)SB | Project: 28175(04) | Category: 0300/TRAFFIC | ||||||||
0030 | (PL)REMOVAL OF EXISTING SIGNS | 805(A) 8722 | LSUM | 1.000 | 1.000 | 1.000 | $350.00 | $0.00 | $350.00 | |
0031 | (SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 823 8478 | SD | 240.000 | 142.000 | 142.000 | $94.00 | $0.00 | $13,348.00 | |
0032 | 2" SQUARE TUBE POST | 851(C) 8324 | LF | 880.000 | 0.000 | 0.000 | $6.00 | $0.00 | $0.00 | |
0033 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 2,376.000 | 3,717.000 | 3,717.000 | $2.70 | $0.00 | $10,035.90 | |
0034 | CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 857(A) 8839 | LF | 10,727.000 | 632.000 | 632.000 | $0.22 | $0.00 | $139.04 | |
0035 | REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 857(C) 8851 | LF | 2,586.000 | 2,604.000 | 4.000 | 2,604.000 | $1.35 | $5.40 | $3,515.40 |
0036 | PORTABLE LONGITUDINAL BARRIER | 877(A) 8483 | LF | 675.000 | 675.000 | 675.000 | $17.75 | $0.00 | $11,981.25 | |
0037 | RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 877(C) 8486 | LF | 675.000 | 675.000 | 675.000 | $3.00 | $0.00 | $2,025.00 | |
0038 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 120.000 | 0.000 | 0.000 | $7.15 | $0.00 | $0.00 | |
0039 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 720.000 | 284.000 | 284.000 | $1.65 | $0.00 | $468.60 | |
0040 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 960.000 | 1,420.000 | 1,420.000 | $0.55 | $0.00 | $781.00 | |
0041 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 2,640.000 | 3,976.000 | 3,976.000 | $0.83 | $0.00 | $3,300.08 | |
0042 | CONSTRUCTION BARRICADES(TYPE III) | 880(C) 8842 | SD | 480.000 | 284.000 | 284.000 | $1.90 | $0.00 | $539.60 | |
0043 | WING BARRICADES | 880(C) 8848 | SD | 480.000 | 568.000 | 568.000 | $2.20 | $0.00 | $1,249.60 | |
0044 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 1,440.000 | 3,692.000 | 3,692.000 | $0.19 | $0.00 | $701.48 | |
0045 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 8,760.000 | 2,556.000 | 2,556.000 | $0.22 | $0.00 | $562.32 | |
0046 | DRUMS | 880(F) 8878 | SD | 2,160.000 | 3,692.000 | 3,692.000 | $0.39 | $0.00 | $1,439.88 | |
Subtotals For Category 0300/TRAFFIC | $5.40 | $50,437.15 | ||||||||
Fed/State Project Number: SBR-125C(197)SB | Project: 28175(04) | Category: 0600/STAKING | ||||||||
0047 | CONSTRUCTION STAKING LEVEL I | 642(A) 0095 | LSUM | 1.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
Subtotals For Category 0600/STAKING | $0.00 | $5,000.00 | ||||||||
Fed/State Project Number: SBR-125C(197)SB | Project: 28175(04) | Category: 0640/CONSTRUCTION | ||||||||
0048 | MOBILIZATION | 641 1399 | LSUM | 1.000 | 1.000 | 1.000 | $20,500.00 | $0.00 | $20,500.00 | |
Subtotals For Category 0640/CONSTRUCTION | $0.00 | $20,500.00 | ||||||||
Subtotals For Project SBR-125C(197)SB /28175(04) | $5.40 | $642,205.86 |