| Fed/State Project Number: ERSTP-139C(096)ER |
Project: 00464(16) |
Category: 0100/ROADWAY |
| 0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
1.000 |
$42,187.90 |
$0.00 |
$42,187.90 |
| 0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
360,000.000 |
360,000.000 |
10,000.000 |
273,111.118 |
$4.32 |
$43,200.00 |
$1,179,840.04 |
| 0003 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.500 |
$26,526.89 |
$0.00 |
$13,263.45 |
| 0004 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
5,750.000 |
5,750.000 |
|
2,023.000 |
$1.18 |
$0.00 |
$2,387.14 |
| 0005 |
TEMPORARY SEDIMENT BASIN |
221(E) 2804 |
EA |
3.000 |
3.000 |
|
4.000 |
$493.50 |
$0.00 |
$1,974.00 |
| 0006 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
500.000 |
500.000 |
|
161.000 |
$6.58 |
$0.00 |
$1,059.38 |
| 0007 |
DITCH LINER PROTECTION |
229 4318 |
LF |
3,215.000 |
3,215.000 |
|
0.000 |
$1.16 |
$0.00 |
$0.00 |
| 0008 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
104,908.000 |
104,908.000 |
|
0.000 |
$1.09 |
$0.00 |
$0.00 |
| 0009 |
SEEDING METHOD A |
232(A) 2813 |
AC |
12.000 |
12.000 |
|
6.730 |
$329.00 |
$0.00 |
$2,214.17 |
| 0010 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
14.000 |
14.000 |
|
6.730 |
$274.17 |
$0.00 |
$1,845.16 |
| 0011 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
8,495.000 |
8,495.000 |
|
0.000 |
$42.21 |
$0.00 |
$0.00 |
| 0012 |
AGGREGATE BASE TYPE B |
303(B) 2110 |
CY |
600.000 |
600.000 |
|
0.000 |
$36.30 |
$0.00 |
$0.00 |
| 0013 |
SEPARATOR FABRIC |
325 5271 |
SY |
25,694.000 |
25,694.000 |
|
0.000 |
$1.16 |
$0.00 |
$0.00 |
| 0014 |
GEOGRID REINFORCEMENT |
326(B) 0100 |
SY |
25,694.000 |
25,694.000 |
|
0.000 |
$2.25 |
$0.00 |
$0.00 |
| 0015 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
1,258.000 |
1,258.000 |
|
0.000 |
$20.77 |
$0.00 |
$0.00 |
| 0016 |
TACK COAT |
407(B) 0250 |
GAL |
2,600.000 |
2,600.000 |
|
200.000 |
$3.67 |
$0.00 |
$734.00 |
| 0017 |
PRIME COAT |
408 5774 |
GAL |
9,839.000 |
9,839.000 |
|
1,700.000 |
$4.17 |
$0.00 |
$7,089.00 |
| 0018 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
8,605.000 |
8,605.000 |
|
1,263.180 |
$64.51 |
$0.00 |
$81,487.74 |
| 0019 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
3,500.000 |
3,500.000 |
|
598.190 |
$70.90 |
$0.00 |
$42,411.67 |
| 0020 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
3,066.000 |
3,066.000 |
|
0.000 |
$2.91 |
$0.00 |
$0.00 |
| 0021 |
RUMBLE STRIP-METHOD HMA-CON |
413(A) 4861 |
LF |
7,400.000 |
7,400.000 |
|
0.000 |
$0.86 |
$0.00 |
$0.00 |
| 0022 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
32.000 |
32.000 |
|
32.000 |
$7.68 |
$0.00 |
$245.76 |
| 0023 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
75.300 |
75.300 |
|
61.980 |
$329.00 |
$0.00 |
$20,391.42 |
| 0024 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
300.000 |
300.000 |
|
0.000 |
$263.20 |
$0.00 |
$0.00 |
| 0025 |
REINFORCING STEEL |
511(A) 0332 |
LB |
13,827.000 |
13,827.000 |
|
13,827.000 |
$0.82 |
$0.00 |
$11,338.14 |
| 0026 |
TYPE I PLAIN RIPRAP |
601(A) 0297 |
TON |
21,250.000 |
21,250.000 |
|
0.000 |
$30.22 |
$0.00 |
$0.00 |
| 0027 |
FILTER FABRIC |
602(C) 4155 |
SY |
10,585.000 |
10,585.000 |
|
0.000 |
$1.24 |
$0.00 |
$0.00 |
| 0028 |
36" CORR. GALV. STEEL PIPE |
613(B) 0692 |
LF |
200.000 |
200.000 |
|
200.000 |
$70.40 |
$0.00 |
$14,080.00 |
| 0029 |
12" P.V.C. PIPE ROUND |
613(G) 1081 |
LF |
106.000 |
106.000 |
|
106.000 |
$13.62 |
$0.00 |
$1,443.72 |
| 0030 |
8" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 0500 |
LF |
1,315.000 |
1,315.000 |
|
0.000 |
$10.14 |
$0.00 |
$0.00 |
| 0031 |
8" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1097 |
LF |
415.000 |
415.000 |
|
0.000 |
$10.14 |
$0.00 |
$0.00 |
| 0032 |
12" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1099 |
LF |
400.000 |
400.000 |
|
375.000 |
$12.77 |
$0.00 |
$4,788.75 |
| 0033 |
OUTLET LATERAL HEADWALL |
613(Q) 5946 |
EA |
1.000 |
1.000 |
|
1.000 |
$383.84 |
$0.00 |
$383.84 |
| 0034 |
PIPE UNDERDRAIN COVER MAT'L. |
613(U) 1100 |
CY |
358.000 |
358.000 |
|
0.000 |
$38.10 |
$0.00 |
$0.00 |
| 0035 |
TRENCH EXCAVATION |
613(V) 1180 |
CY |
955.000 |
955.000 |
|
185.138 |
$1.00 |
$0.00 |
$185.14 |
| 0036 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$4,217.83 |
$0.00 |
$0.00 |
| 0037 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
43,577.000 |
43,577.000 |
|
18,911.105 |
$1.97 |
$0.00 |
$37,254.87 |
| 0038 |
REMOVAL OF EXISTING STRUCTURES |
619(B) 4778 |
EA |
1.000 |
1.000 |
|
1.000 |
$4,217.83 |
$0.00 |
$4,217.83 |
| 0039 |
REMOVAL OF CONCRETE DITCH LINER |
619(B) 5881 |
LF |
1,740.000 |
1,740.000 |
|
1,400.000 |
$1.68 |
$0.00 |
$2,352.00 |
| 0040 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
492.000 |
492.000 |
|
0.000 |
$3.84 |
$0.00 |
$0.00 |
| Subtotals For Category 0100/ROADWAY |
$43,200.00 |
$1,473,175.12 |
|
| Fed/State Project Number: ERSTP-139C(096)ER |
Project: 00464(16) |
Category: 0300/TRAFFIC |
| 0041 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM |
823 8478 |
SD |
270.000 |
270.000 |
15.000 |
178.000 |
$191.92 |
$2,878.80 |
$34,161.76 |
| 0042 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
25,000.000 |
25,000.000 |
|
13,626.000 |
$0.13 |
$0.00 |
$1,771.38 |
| 0043 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
5,200.000 |
5,200.000 |
|
1,167.000 |
$0.16 |
$0.00 |
$186.72 |
| 0044 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
270.000 |
270.000 |
|
0.000 |
$10.97 |
$0.00 |
$0.00 |
| 0045 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
7,560.000 |
7,560.000 |
225.000 |
2,545.000 |
$0.02 |
$4.50 |
$50.90 |
| 0046 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
1,620.000 |
1,620.000 |
360.000 |
4,582.000 |
$2.74 |
$986.40 |
$12,554.68 |
| 0047 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
5,940.000 |
5,940.000 |
330.000 |
3,667.000 |
$1.10 |
$363.00 |
$4,033.70 |
| 0048 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
4,320.000 |
4,320.000 |
225.000 |
3,072.000 |
$0.11 |
$24.75 |
$337.92 |
| 0049 |
WING BARRICADES |
880(C) 8848 |
SD |
1,080.000 |
1,080.000 |
60.000 |
756.000 |
$2.19 |
$131.40 |
$1,655.64 |
| 0050 |
VERTICAL PANELS |
880(D) 8854 |
SD |
29,600.000 |
29,600.000 |
2,040.000 |
15,640.000 |
$0.11 |
$224.40 |
$1,720.40 |
| 0051 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
7,560.000 |
7,560.000 |
270.000 |
3,099.000 |
$0.16 |
$43.20 |
$495.84 |
| 0052 |
DRUMS |
880(F) 8878 |
SD |
29,160.000 |
29,160.000 |
945.000 |
9,290.000 |
$0.11 |
$103.95 |
$1,021.90 |
| 0053 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
3,600.000 |
3,600.000 |
480.000 |
13,569.000 |
$0.11 |
$52.80 |
$1,492.59 |
| 0054 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
540.000 |
540.000 |
30.000 |
378.000 |
$21.93 |
$657.90 |
$8,289.54 |
| Subtotals For Category 0300/TRAFFIC |
$5,471.10 |
$67,772.97 |
|