Contract ID: | 110205 | Estimate Number: | 0010 | Contract No: | 611126 | |||
Residency: | TULSA (08100) | Estimate Type: | Progressive | Account No: | 400800 | |||
Project Number(s): | IM-TIGR(497)SS | ||||||||||||
Primary Job Piece No: | 26604(04) | ||||||||||||
Contract Description: | BRIDGE AND APPROACHES I-244: OVER THE ARKANSAS RIVER, IN THE CITY OF TULSA. PROJECT LENGTH = 0.968 MILES | ||||||||||||
Primary County: | TULSA | ||||||||||||
Name of Road: | I-244 | ||||||||||||
Prime Contractor: | MANHATTAN ROAD & BRIDGE CO. | ||||||||||||
5601 S. 122ND E. AVE. | |||||||||||||
TULSA , OK 74146 | |||||||||||||
Surety Company: | FEDERAL INSURANCE COMPANY | ||||||||||||
Date Let: | 02/17/2011 | NTP Effective Date: | 06/15/2011 | Pay Period: | 09/16/2011 TO 09/30/2011 |
Date Awarded: | 03/07/2011 | Date Work Began: | 05/13/2011 | Original Contract Time: | 740 |
Date Contract Executed: | 03/16/2011 | Date Time Stopped: | Current Time Charged: | 133.00 | |
Date NTP Issued: | 03/18/2011 | Completion Date: | Current Time Allowed: | 740.00 | |
General Liability Expires: | 10/01/2011 | Workman's Comp Expires: | 10/01/2011 | Percent Time Used: | 17.97 % |
Specification Year: | 2009 | Date Approved: | 10/07/2011 | ||
Current Contract Amount: | $63,637,567.76 | Total to Date | Prev to Date | This Estimate | |||
Bid Amount: | $63,637,567.76 | Participating: | $9,301,538.01 | $8,820,929.12 | $480,608.89 | ||
Percent Complete: | 29.23 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
Funds Available: | $45,037,147.82 | Total Earnings: | $9,301,538.01 | $8,820,929.12 | $480,608.89 | ||
Unearned Balance: | $45,037,147.82 | Stockpiled Materials: | $10,151,016.40 | $9,568,956.62 | $582,059.78 | ||
Gross Earnings: | $19,452,554.41 | $18,389,885.74 | $1,062,668.67 | ||||
Other Adjustments: | $-852,134.47 | $-1,052,599.72 | $200,465.25 | ||||
Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
TOTAL: | $18,600,419.94 | $17,337,286.02 | $1,263,133.92 |
Contract ID: | 110205 | Estimate Number: | 0010 | Primary JP: | 26604(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
No change orders have been created for this contract. |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
26604(04) | 0016 | 15 oz separator fabric | Stockpiled Material Initial Payment | 0004 | $29,147.67 |
26604(04) | 0017 | 6 oz separator fabric | Stockpiled Material Adjustment | 0010 | $-5,396.39 |
26604(04) | 0017 | 6 oz separator fabric | Stockpiled Material Initial Payment | 0004 | $17,189.09 |
26604(04) | 0033 | 6"Drain | Stockpiled Material Initial Payment | 0003 | $1,363.08 |
26604(04) | 0035 | 6"Pipe | Stockpiled Material Initial Payment | 0003 | $1,820.16 |
26604(04) | 0052 | 6"pipe | Stockpiled Material Initial Payment | 0003 | $3,640.47 |
26604(04) | 0053 | 6"pipe | Stockpiled Material Initial Payment | 0003 | $142.70 |
26604(04) | 0121 | 21"24"27"CMPx4'long(10"pile encasement) | Stockpiled Material Initial Payment | 0003 | $2,479.16 |
26604(04) | 0121 | 21"24"27"CMPx4'long(10"pile encasement) | Stockpiled Material Initial Payment | 0007 | $39,826.59 |
26604(04) | 0123 | Prestressed PC Beams type III | Stockpiled Material Initial Payment | 0010 | $246,388.54 |
26604(04) | 0123 | Prestressed PC Beams type III | Stockpiled Material Initial Payment | 0010 | $147,833.12 |
26604(04) | 0123 | Prestressed PC Beams type III | Stockpiled Material Initial Payment | 0005 | $246,388.54 |
26604(04) | 0123 | Prestressed PC Beams type III | Stockpiled Material Initial Payment | 0005 | $236,534.93 |
26604(04) | 0123 | Prestressed PC Beams type III | Stockpiled Material Initial Payment | 0006 | $197,110.83 |
26604(04) | 0123 | Prestressed PC Beams type III | Stockpiled Material Initial Payment | 0004 | $289,925.68 |
26604(04) | 0123 | Prestressed PC Beams type III | Stockpiled Material Initial Payment | 0009 | $246,388.54 |
26604(04) | 0123 | Prestressed PC Beams type III | Stockpiled Material Initial Payment | 0007 | $246,388.54 |
26604(04) | 0128 | Handrails and anchors | Stockpiled Material Initial Payment | 0009 | $43,373.20 |
26604(04) | 0130 | Structural steel - raw material | Stockpiled Material Initial Payment | 0004 | $2,203,269.42 |
26604(04) | 0130 | Structural steel - raw material | Stockpiled Material Initial Payment | 0008 | $777,426.67 |
26604(04) | 0130 | Structural steel - raw material | Stockpiled Material Initial Payment | 0008 | $14,520.00 |
26604(04) | 0130 | Structural steel - raw material | Stockpiled Material Initial Payment | 0008 | $1,479,312.75 |
26604(04) | 0130 | Structural steel - raw material | Stockpiled Material Initial Payment | 0009 | $188,494.25 |
26604(04) | 0130 | Structural steel - raw material | Stockpiled Material Initial Payment | 0008 | $282,741.38 |
26604(04) | 0131 | Anchor bolts, nuts, and washers | Stockpiled Material Initial Payment | 0008 | $132,222.10 |
26604(04) | 0131 | Anchor bolts, nuts, and washers | Stockpiled Material Initial Payment | 0005 | $113,017.50 |
26604(04) | 0131 | Anchor bolts, nuts, and washers | Stockpiled Material Initial Payment | 0004 | $20,126.35 |
26604(04) | 0131 | Anchor bolts, nuts, and washers | Stockpiled Material Initial Payment | 0008 | $34,673.75 |
26604(04) | 0132 | Anchor bolts, nuts, and washers | Stockpiled Material Initial Payment | 0005 | $169,402.50 |
26604(04) | 0132 | Anchor bolts, nuts, and washers | Stockpiled Material Initial Payment | 0008 | $92,463.34 |
26604(04) | 0132 | Anchor bolts, nuts, and washers | Stockpiled Material Initial Payment | 0004 | $26,761.90 |
26604(04) | 0132 | Anchor bolts, nuts, and washers | Stockpiled Material Initial Payment | 0008 | $282,613.37 |
26604(04) | 0137 | Bridge A Crashwall | Stockpiled Material Initial Payment | 0005 | $16,654.08 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0005 | $10,326.90 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0005 | $12,486.42 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0010 | $97,602.48 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0010 | $38,460.95 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0010 | $66,302.12 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Adjustment | 0010 | $-52.34 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0008 | $27,134.62 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0008 | $71,211.44 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0007 | $77,522.45 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0007 | $40,218.76 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0007 | $5,969.71 |
26604(04) | 0138 | Bridge A - Substructure | Stockpiled Material Initial Payment | 0007 | $76,288.85 |
26604(04) | 0141 | Piles, 10X42 | Stockpiled Material Initial Payment | 0003 | $4,850.00 |
26604(04) | 0142 | Piles,12X53 | Stockpiled Material Initial Payment | 0003 | $32,719.80 |
26604(04) | 0142 | Piles,12X53 | Stockpiled Material Initial Payment | 0004 | $20,810.40 |
26604(04) | 0142 | Piles,12X53 | Stockpiled Material Initial Payment | 0004 | $62,729.30 |
26604(04) | 0143 | piles, 14X89 | Stockpiled Material Initial Payment | 0003 | $20,311.90 |
26604(04) | 0148 | 16GaugeCSP18"DrillShaft | Stockpiled Material Initial Payment | 0003 | $4,510.08 |
26604(04) | 0149 | 16GaugeCSP36"DrillShaft | Stockpiled Material Initial Payment | 0003 | $7,574.60 |
26604(04) | 0150 | Rebar 48" Drilled Shafts | Stockpiled Material Initial Payment | 0003 | $16,547.76 |
26604(04) | 0150 | Rebar 48" Drilled Shafts | Stockpiled Material Initial Payment | 0003 | $2,785.41 |
26604(04) | 0151 | EpoxyReb.Dril.Shafts 60" | Stockpiled Material Adjustment | 0009 | $-5,381.21 |
26604(04) | 0151 | EpoxyReb.Dril.Shafts 60" | Stockpiled Material Adjustment | 0007 | $-1,793.74 |
26604(04) | 0151 | EpoxyReb.Dril.Shafts 60" | Stockpiled Material Adjustment | 0008 | $-7,060.46 |
26604(04) | 0151 | EpoxyReb.Dril.Shafts 60" | Stockpiled Material Adjustment | 0010 | $-8,468.35 |
26604(04) | 0151 | EpoxyReb.Dril.Shafts 60" | Stockpiled Material Initial Payment | 0003 | $47,982.55 |
26604(04) | 0151 | EpoxyReb.Dril.Shafts 60" | Stockpiled Material Initial Payment | 0003 | $82,771.73 |
26604(04) | 0151 | EpoxyReb.Dril.Shafts 60" | Stockpiled Material Initial Payment | 0003 | $48,798.09 |
26604(04) | 0151 | EpoxyReb.Dril.Shafts 60" | Stockpiled Material Initial Payment | 0005 | $5,847.19 |
26604(04) | 0151 | EpoxyReb.Dril.Shafts 60" | Stockpiled Material Initial Payment | 0005 | $24,680.63 |
26604(04) | 0152 | EpoxReb 72"DrillShaft | Stockpiled Material Initial Payment | 0003 | $21,796.13 |
26604(04) | 0152 | EpoxReb 72"DrillShaft | Stockpiled Material Initial Payment | 0003 | $11,582.73 |
26604(04) | 0152 | EpoxReb 72"DrillShaft | Stockpiled Material Initial Payment | 0003 | $10,522.19 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Initial Payment | 0003 | $4,408.33 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Initial Payment | 0003 | $56,400.00 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Initial Payment | 0003 | $196,206.46 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Initial Payment | 0003 | $36,194.75 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Initial Payment | 0004 | $39,670.00 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Initial Payment | 0004 | $47,000.00 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Initial Payment | 0004 | $16,450.00 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Adjustment | 0005 | $-134.89 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Initial Payment | 0005 | $67,316.29 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Initial Payment | 0005 | $468,966.19 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Adjustment | 0006 | $-817.37 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Adjustment | 0008 | $-542.77 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Adjustment | 0009 | $-549.19 |
26604(04) | 0153 | EpoxReb 84"DrillShaft | Stockpiled Material Adjustment | 0010 | $-264.96 |
26604(04) | 0155 | 2" SCH40 #150 Threaded pipe caps/couplers | Stockpiled Material Adjustment | 0006 | $-543.55 |
26604(04) | 0155 | 2" SCH40 #150 Threaded pipe caps/couplers | Stockpiled Material Adjustment | 0009 | $-472.46 |
26604(04) | 0155 | 2" SCH40 #150 Threaded pipe caps/couplers | Stockpiled Material Adjustment | 0008 | $-501.82 |
26604(04) | 0155 | 2" SCH40 #150 Threaded pipe caps/couplers | Stockpiled Material Adjustment | 0007 | $-35.77 |
26604(04) | 0155 | 2" SCH40 #150 Threaded pipe caps/couplers | Stockpiled Material Adjustment | 0010 | $-345.39 |
26604(04) | 0155 | 2" SCH40 #150 Threaded pipe caps/couplers | Stockpiled Material Initial Payment | 0005 | $154,839.07 |
26604(04) | 0155 | 2" SCH40 #150 Threaded pipe caps/couplers | Stockpiled Material Adjustment | 0005 | $-89.72 |
26604(04) | 0155 | 2" SCH40 #150 Threaded pipe caps/couplers | Stockpiled Material Initial Payment | 0004 | $4,478.99 |
26604(04) | 0159 | Canopy system hardware | Stockpiled Material Initial Payment | 0007 | $71,295.46 |
26604(04) | 0160 | Anchor bolts, nuts, washers | Stockpiled Material Initial Payment | 0007 | $29,322.50 |
26604(04) | 0160 | Anchor bolts, nuts, washers | Stockpiled Material Initial Payment | 0008 | $3,024.00 |
26604(04) | 0163 | 6"pipe | Stockpiled Material Initial Payment | 0003 | $587.29 |
26604(04) | 0164 | 6'pipe | Stockpiled Material Initial Payment | 0003 | $155.18 |
26604(04) | 0173 | 16GaugeCSP36"DrillShafts | Stockpiled Material Initial Payment | 0003 | $2,286.67 |
26604(04) | 0175 | anchor bolts, nuts, and washers | Stockpiled Material Initial Payment | 0007 | $804.81 |
26604(04) | 0179 | Sealed expansion joint w/ seal and anchors | Stockpiled Material Initial Payment | 0007 | $12,134.92 |
26604(04) | 0181 | Studs | Stockpiled Material Adjustment | 0007 | $-10,264.21 |
26604(04) | 0181 | Studs | Stockpiled Material Initial Payment | 0004 | $10,264.21 |
26604(04) | 0182 | Deck Forms | Stockpiled Material Initial Payment | 0007 | $21,268.20 |
26604(04) | 0184 | Deck rebar | Stockpiled Material Initial Payment | 0007 | $27,044.60 |
26604(04) | 0184 | Deck rebar | Stockpiled Material Initial Payment | 0007 | $65,558.54 |
26604(04) | 0217 | 12.5' PortableLong.Barr. | Stockpiled Material Adjustment | 0003 | $-72,860.62 |
26604(04) | 0217 | 12.5' PortableLong.Barr. | Stockpiled Material Initial Payment | 0003 | $76,640.63 |
26604(04) | 0217 | 12.5' PortableLong.Barr. | Stockpiled Material Adjustment | 0004 | $-3,780.01 |
26604(04) | 0258 | 1/C no. 4 Elect. Cond. | Stockpiled Material Adjustment | 0005 | $-410.35 |
26604(04) | 0258 | 1/C no. 4 Elect. Cond. | Stockpiled Material Initial Payment | 0003 | $78,479.49 | Subtotals For Stockpile Payments | $10,151,016.40 |
LIQUIDATED DAMAGES HISTORY | |||||||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
No liquidated damages have been assessed on this contract. |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
26604(04) | 0005 | TEMPORARY SILT FENCE | * Missing Material Certification | 0002 | 0.00 | $0.00 | $-1,332.00 |
26604(04) | 0005 | TEMPORARY SILT FENCE | * Material Discrepancy Adjustments | 0004 | 0.00 | $0.00 | $1,332.00 |
26604(04) | 0005 | TEMPORARY SILT FENCE | * Material Discrepancy Adjustments | 0007 | -167.00 | $2.25 | $-375.75 |
26604(04) | 0005 | TEMPORARY SILT FENCE | * Material Discrepancy Adjustments | 0010 | 167.00 | $2.25 | $375.75 |
26604(04) | 0007 | TEMPORARY SILT DIKE | * Missing Material Certification | 0005 | -56.00 | $8.00 | $-448.00 |
26604(04) | 0007 | TEMPORARY SILT DIKE | * Material Discrepancy Adjustments | 0006 | -168.00 | $8.00 | $-1,344.00 |
26604(04) | 0007 | TEMPORARY SILT DIKE | * Material Discrepancy Adjustments | 0007 | -70.00 | $8.00 | $-560.00 |
26604(04) | 0007 | TEMPORARY SILT DIKE | * Material Discrepancy Adjustments | 0010 | 294.00 | $8.00 | $2,352.00 |
26604(04) | 0019 | SUPERPAVE, TYPE S3(PG 76-28 OK) | Asphalt Binder Adjustment | 0002 | 202.50 | $1.65 | $334.25 |
26604(04) | 0019 | SUPERPAVE, TYPE S3(PG 76-28 OK) | Asphalt Binder Adjustment | 0003 | 112.50 | $4.38 | $492.82 |
26604(04) | 0020 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0002 | 195.90 | $1.65 | $323.35 |
26604(04) | 0020 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0003 | 135.12 | $4.38 | $591.91 |
26604(04) | 0021 | SUPERPAVE, TYPE S4(PG 76-28 OK) | Asphalt Binder Adjustment | 0001 | 1,391.44 | $1.88 | $2,624.81 |
26604(04) | 0021 | SUPERPAVE, TYPE S4(PG 76-28 OK) | Asphalt Binder Adjustment | 0002 | 231.08 | $1.88 | $435.91 |
26604(04) | 0021 | SUPERPAVE, TYPE S4(PG 76-28 OK) | Asphalt Binder Adjustment | 0003 | 113.27 | $5.00 | $567.08 |
26604(04) | 0050 | 24" R.C.PIPE CLASS III | * Material Discrepancy Adjustments | 0009 | -27.50 | $110.00 | $-3,025.00 |
26604(04) | 0050 | 24" R.C.PIPE CLASS III | * Material Discrepancy Adjustments | 0010 | 27.50 | $110.00 | $3,025.00 |
26604(04) | 0051 | 19" X 30" R.C.PIPE ELLIPTICAL CLASS HE-III | * Missing Material Certification | 0008 | -67.50 | $215.00 | $-14,512.50 |
26604(04) | 0051 | 19" X 30" R.C.PIPE ELLIPTICAL CLASS HE-III | * Material Discrepancy Adjustments | 0010 | 67.50 | $215.00 | $14,512.50 |
26604(04) | 0055 | 24" PREFAB. CULVERT END SECTION, ROUND | * Material Discrepancy Adjustments | 0009 | -1.00 | $900.00 | $-900.00 |
26604(04) | 0055 | 24" PREFAB. CULVERT END SECTION, ROUND | * Material Discrepancy Adjustments | 0010 | 1.00 | $900.00 | $900.00 |
26604(04) | 0099 | 30" DUCTILE IRON PIPE | * Missing Material Certification | 0003 | 0.00 | $0.00 | $-150,244.05 |
26604(04) | 0099 | 30" DUCTILE IRON PIPE | * Material Discrepancy Adjustments | 0004 | 0.00 | $0.00 | $150,244.05 |
26604(04) | 0101 | 6" GATE VALVE | * Missing Material Certification | 0003 | 0.00 | $0.00 | $-800.00 |
26604(04) | 0101 | 6" GATE VALVE | * Material Discrepancy Adjustments | 0004 | 0.00 | $0.00 | $800.00 |
26604(04) | 0102 | 12" GATE VALVE | * Missing Material Certification | 0003 | 0.00 | $0.00 | $-2,500.00 |
26604(04) | 0102 | 12" GATE VALVE | * Material Discrepancy Adjustments | 0004 | 0.00 | $0.00 | $2,500.00 |
26604(04) | 0105 | STANDARD VALVE BOX | * Missing Material Certification | 0003 | 0.00 | $0.00 | $-500.00 |
26604(04) | 0105 | STANDARD VALVE BOX | * Material Discrepancy Adjustments | 0004 | 0.00 | $0.00 | $500.00 |
26604(04) | 0106 | VALVE BOX EXTENSION | * Missing Material Certification | 0003 | 0.00 | $0.00 | $-400.00 |
26604(04) | 0106 | VALVE BOX EXTENSION | * Missing Material Certification | 0005 | 2.00 | $200.00 | $400.00 |
26604(04) | 0109 | MANHOLE (4' DIAMETER) | * Missing Material Certification | 0002 | 0.00 | $0.00 | $-4,000.00 |
26604(04) | 0109 | MANHOLE (4' DIAMETER) | * Missing Material Certification | 0005 | 2.00 | $2,000.00 | $4,000.00 |
26604(04) | 0110 | ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | * Missing Material Certification | 0002 | 0.00 | $0.00 | $-1,961.75 |
26604(04) | 0110 | ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | * Missing Material Certification | 0005 | 11.21 | $175.00 | $1,961.75 |
26604(04) | 0151 | DRILLED SHAFTS 60" DIAMETER | * Material Discrepancy Adjustments | 0008 | -92.00 | $500.00 | $-46,000.00 |
26604(04) | 0151 | DRILLED SHAFTS 60" DIAMETER | * Material Discrepancy Adjustments | 0009 | -49.00 | $500.00 | $-24,500.00 |
26604(04) | 0151 | DRILLED SHAFTS 60" DIAMETER | * Material Discrepancy Adjustments | 0010 | 141.00 | $500.00 | $70,500.00 |
26604(04) | 0153 | DRILLED SHAFTS 84" DIAMETER | * Material Discrepancy Adjustments | 0006 | -509.00 | $850.00 | $-432,650.00 |
26604(04) | 0153 | DRILLED SHAFTS 84" DIAMETER | * Material Discrepancy Adjustments | 0007 | -84.00 | $850.00 | $-71,400.00 |
26604(04) | 0153 | DRILLED SHAFTS 84" DIAMETER | * Material Discrepancy Adjustments | 0008 | -253.00 | $850.00 | $-215,050.00 |
26604(04) | 0153 | DRILLED SHAFTS 84" DIAMETER | * Material Discrepancy Adjustments | 0009 | -262.00 | $850.00 | $-222,700.00 |
26604(04) | 0153 | DRILLED SHAFTS 84" DIAMETER | * Material Discrepancy Adjustments | 0010 | 128.00 | $850.00 | $108,800.00 |
26604(04) | 0190 | (SP)CARBON FIBER-REINFORCED POLYMER | * Material Discrepancy Adjustments | 0006 | -408.41 | $60.00 | $-24,504.60 |
26604(04) | 0191 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | * Material Discrepancy Adjustments | 0006 | -45.38 | $25.00 | $-1,134.50 |
26604(04) | 0191 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | * Material Discrepancy Adjustments | 0009 | 45.38 | $25.00 | $1,134.50 |
26604(04) | 0220 | MODULAR GLARE SCREEN (TEMPORARY) | * Material Discrepancy Adjustments | 0004 | -2,880.00 | $0.17 | $-489.60 |
26604(04) | 0220 | MODULAR GLARE SCREEN (TEMPORARY) | * Material Discrepancy Adjustments | 0005 | 2,880.00 | $0.17 | $489.60 |
26604(04) | 0232 | (SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | * Material Discrepancy Adjustments | 0004 | -594.00 | $10.50 | $-6,237.00 |
26604(04) | 0232 | (SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | * Material Discrepancy Adjustments | 0005 | 594.00 | $10.50 | $6,237.00 |
26604(04) | 0233 | (SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | * Material Discrepancy Adjustments | 0004 | -468.00 | $10.50 | $-4,914.00 |
26604(04) | 0233 | (SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | * Material Discrepancy Adjustments | 0005 | 468.00 | $10.50 | $4,914.00 |
26604(04) | 0234 | (SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | * Material Discrepancy Adjustments | 0004 | -36.00 | $26.50 | $-954.00 |
26604(04) | 0234 | (SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | * Material Discrepancy Adjustments | 0005 | 36.00 | $26.50 | $954.00 |
26604(04) | 0235 | (SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | * Material Discrepancy Adjustments | 0004 | -18.00 | $445.00 | $-8,010.00 |
26604(04) | 0235 | (SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | * Material Discrepancy Adjustments | 0005 | 18.00 | $445.00 | $8,010.00 | Subtotals For Line Item Adjustments | $-852,134.47 | * = User applied Line Item Adjustments |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Description | Time Allowed | Time Used | Rate | Total | ||||
01 | TIME 'B' BID | 550.00 | 0.00 | $25,000.00 | $0.00 | ||||
02 | TIME 'C' BID | 60.00 | 0.00 | $10,000.00 | $0.00 |
Contract ID: | 110205 | Estimate Number: | 0010 | Primary JP: | 26604(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0100/ROADWAY | ||||||||
0001 | CLEARING AND GRUBBING | 201(A) 0102 | LSUM | 1.000 | 1.000 | 1.000 | $50,000.00 | $0.00 | $50,000.00 | |
0002 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 39,618.000 | 39,618.000 | 2,300.000 | 26,825.680 | $5.00 | $11,500.00 | $134,128.40 |
0003 | UNCLASSIFIED BORROW | 202(D) 0184 | CY | 200.000 | 200.000 | 0.000 | $15.00 | $0.00 | $0.00 | |
0004 | TYPE A-SALVAGED TOPSOIL | 205(A) 4229 | LSUM | 1.000 | 1.000 | 0.000 | 0.500 | $15,000.00 | $0.00 | $7,500.00 |
0005 | TEMPORARY SILT FENCE | 221(C) 2801 | LF | 4,145.000 | 4,145.000 | 0.000 | 1,089.000 | $2.25 | $0.00 | $2,450.25 |
0006 | TEMPORARY SEDIMENT BASIN | 221(E) 2804 | EA | 2.000 | 2.000 | 0.000 | $1,500.00 | $0.00 | $0.00 | |
0007 | TEMPORARY SILT DIKE | 221(F) 0100 | LF | 497.000 | 497.000 | 84.000 | 378.000 | $8.00 | $672.00 | $3,024.00 |
0008 | DITCH LINER PROTECTION | 229 4318 | LF | 1,682.000 | 1,682.000 | 0.000 | $2.25 | $0.00 | $0.00 | |
0009 | SOLID SLAB SODDING | 230(A) 2806 | SY | 19,918.000 | 19,918.000 | 0.000 | $1.50 | $0.00 | $0.00 | |
0010 | SEEDING METHOD B | 232(B) 2814 | AC | 8.240 | 8.240 | 0.000 | $750.00 | $0.00 | $0.00 | |
0011 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 4.140 | 4.140 | 0.000 | $550.00 | $0.00 | $0.00 | |
0012 | MOWING | 241 2832 | AC | 8.240 | 8.240 | 0.000 | $60.00 | $0.00 | $0.00 | |
0013 | (PL)STABILIZED CONSTRUCTION EXIT | 242 0400 | EA | 2.000 | 2.000 | 2.000 | $2,500.00 | $0.00 | $5,000.00 | |
0014 | AGGREGATE BASE TYPE A | 303(A) 2100 | CY | 3,989.000 | 3,989.000 | 1,356.970 | 1,725.650 | $29.00 | $39,352.13 | $50,043.85 |
0015 | STABILIZED SUBGRADE | 307(K) 4300 | SY | 18,000.000 | 18,000.000 | 1.840 | 7,726.820 | $5.00 | $9.20 | $38,634.10 |
0016 | CEMENT TREATED BASE | 317 4270 | SY | 16,085.000 | 16,085.000 | 0.000 | $17.00 | $0.00 | $0.00 | |
0017 | SEPARATOR FABRIC | 325 5271 | SY | 21,504.000 | 21,504.000 | 6,075.990 | 6,075.990 | $1.25 | $7,594.99 | $7,594.99 |
0018 | TRAFFIC BOUND SURFACE COURSE TYPE E | 402(E) 0225 | TON | 110.000 | 110.000 | 0.000 | $20.00 | $0.00 | $0.00 | |
0019 | SUPERPAVE, TYPE S3(PG 76-28 OK) | 411(B) 5935 | TON | 110.000 | 110.000 | 315.000 | $125.00 | $0.00 | $39,375.00 | |
0020 | SUPERPAVE, TYPE S3(PG 64-22 OK) | 411(B) 5945 | TON | 316.000 | 316.000 | 331.020 | $240.00 | $0.00 | $79,444.80 | |
0021 | SUPERPAVE, TYPE S4(PG 76-28 OK) | 411(C) 5950 | TON | 1,220.000 | 1,220.000 | 1,735.790 | $120.00 | $0.00 | $208,294.80 | |
0022 | COLD MILLING PAVEMENT | 412 5267 | SY | 12,000.000 | 12,000.000 | 12,901.810 | $2.00 | $0.00 | $25,803.62 | |
0023 | P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 6,469.000 | 6,469.000 | 782.410 | $12.50 | $0.00 | $9,780.13 | |
0024 | DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(B) 5725 | SY | 8,878.000 | 8,878.000 | 0.000 | $19.95 | $0.00 | $0.00 | |
0025 | FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 414(E) 0225 | SY | 400.000 | 400.000 | 435.380 | $150.00 | $0.00 | $65,307.00 | |
0026 | PARTIAL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 414(F) 0230 | SY | 900.000 | 900.000 | 0.000 | $125.00 | $0.00 | $0.00 | |
0027 | P.C. CONCRETE FOR PAVEMENT | 414(G) 5275 | CY | 4,546.000 | 4,546.000 | 0.000 | 216.470 | $92.50 | $0.00 | $20,023.48 |
0028 | CLSM BACKFILL | 501(G) 6315 | CY | 25.000 | 25.000 | 0.000 | $80.00 | $0.00 | $0.00 | |
0029 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 4,221.000 | 4,221.000 | 0.000 | $55.00 | $0.00 | $0.00 | |
0030 | CLASS AA CONCRETE | 509(A) 0319 | CY | 28.900 | 28.900 | 0.000 | $1,000.00 | $0.00 | $0.00 | |
0031 | CLASS A CONCRETE | 509(B) 0321 | CY | 27.400 | 27.400 | 0.000 | $600.00 | $0.00 | $0.00 | |
0032 | CLASS C CONCRETE | 509(D) 0325 | CY | 95.600 | 95.600 | 0.000 | $350.00 | $0.00 | $0.00 | |
0033 | RETAINING WALL | 510(A) 6333 | SY | 3,733.000 | 3,733.000 | 0.000 | $925.00 | $0.00 | $0.00 | |
0034 | SLOPE WALL (5") | 510(C) 6135 | SY | 695.000 | 695.000 | 0.000 | $60.00 | $0.00 | $0.00 | |
0035 | MSE RETAINING WALL | 510(D) 6341 | SY | 1,683.700 | 1,683.700 | 0.000 | $450.00 | $0.00 | $0.00 | |
0036 | REINFORCING STEEL | 511(A) 0332 | LB | 2,198.000 | 2,198.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
0037 | EPOXY COATED REINFORCING STEEL | 511(B) 4269 | LB | 151,310.000 | 151,310.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
0038 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 2,677.300 | 2,677.300 | 0.000 | $4.00 | $0.00 | $0.00 | |
0039 | TYPE I-A PLAIN RIPRAP | 601(B) 0536 | TON | 30.000 | 30.000 | 0.000 | $40.00 | $0.00 | $0.00 | |
0040 | TYPE I-A FILTER BLANKET | 601(C) 0538 | TON | 8.000 | 8.000 | 0.000 | $30.00 | $0.00 | $0.00 | |
0041 | CONCRETE CURB (6" MNTBLE-INTEGRAL) | 609(A) 0288 | LF | 361.000 | 361.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0042 | MANHOLE (4' DIAMETER) | 611(A) 2657 | EA | 3.000 | 3.000 | 0.000 | $1,600.00 | $0.00 | $0.00 | |
0043 | MANHOLE (5' DIAMETER) | 611(A) 2658 | EA | 2.000 | 2.000 | 0.000 | 1.000 | $2,500.00 | $0.00 | $2,500.00 |
0044 | INLET CI DES. 2 (STD) | 611(G) 5112 | EA | 1.000 | 1.000 | 0.000 | $3,500.00 | $0.00 | $0.00 | |
0045 | INLET MEDIAN BARRIER DES. 1 | 611(G) 5690 | EA | 7.000 | 7.000 | 0.000 | 1.000 | $4,250.00 | $0.00 | $4,250.00 |
0046 | INLET (SMD-TYPE 1) | 611(G) 6000 | EA | 2.000 | 2.000 | 0.000 | $3,000.00 | $0.00 | $0.00 | |
0047 | INLET (SMD-TYPE 2A) | 611(G) 6004 | EA | 1.000 | 1.000 | 0.000 | $4,250.00 | $0.00 | $0.00 | |
0048 | 15" R.C.PIPE CLASS III | 613(A) 0403 | LF | 30.000 | 30.000 | 0.000 | $95.00 | $0.00 | $0.00 | |
0049 | 18" R.C.PIPE CLASS III | 613(A) 0491 | LF | 715.000 | 715.000 | 0.000 | $94.00 | $0.00 | $0.00 | |
0050 | 24" R.C.PIPE CLASS III | 613(A) 0492 | LF | 29.000 | 29.000 | 0.000 | 27.500 | $110.00 | $0.00 | $3,025.00 |
0051 | 19" X 30" R.C.PIPE ELLIPTICAL CLASS HE-III | 613(A) 4504 | LF | 78.000 | 78.000 | 0.000 | 67.500 | $215.00 | $0.00 | $14,512.50 |
0052 | EDGE DRAIN CONDUIT-PERFORATED | 613(J) 5915 | LF | 2,649.000 | 2,649.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0053 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 613(K) 5916 | LF | 65.000 | 65.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0054 | 18" PREFAB. CULVERT END SECTION, ROUND | 613(L) 5726 | EA | 4.000 | 4.000 | 0.000 | $750.00 | $0.00 | $0.00 | |
0055 | 24" PREFAB. CULVERT END SECTION, ROUND | 613(L) 5730 | EA | 1.000 | 1.000 | 0.000 | 1.000 | $900.00 | $0.00 | $900.00 |
0056 | SPECIAL END SECTION OF 19" X 30" RCP ELLIPTICAL | 613(O) 5157 | EA | 1.000 | 1.000 | 0.000 | $1,250.00 | $0.00 | $0.00 | |
0057 | OUTLET LATERAL HEADWALL | 613(Q) 5946 | EA | 2.000 | 2.000 | 0.000 | $400.00 | $0.00 | $0.00 | |
0058 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 0.950 | $150,000.00 | $0.00 | $142,500.00 | |
0059 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 8,468.000 | 8,468.000 | 1,216.440 | 6,993.650 | $5.00 | $6,082.20 | $34,968.25 |
0060 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 631.000 | 631.000 | 2,593.380 | $7.50 | $0.00 | $19,450.36 | |
0061 | REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 619(B) 4763 | SY | 6,966.000 | 6,966.000 | 4,469.440 | $7.00 | $0.00 | $31,286.08 | |
0062 | BEAM GUARDRAIL W-BEAM SINGLE | 623(A) 0932 | LF | 12.500 | 12.500 | 0.000 | $50.00 | $0.00 | $0.00 | |
0063 | GUARDRAIL BRIDGE CONNECTION-TYPE A | 623(I) 8675 | EA | 1.000 | 1.000 | 0.000 | $3,000.00 | $0.00 | $0.00 | |
0064 | FENCE-STYLE CLF (5'HIGH, CLASS B) | 624(E) 4291 | LF | 50.000 | 50.000 | 0.000 | $35.00 | $0.00 | $0.00 | |
0065 | CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 627(A) 4317 | LF | 545.000 | 545.000 | 0.000 | $50.00 | $0.00 | $0.00 | |
0066 | CONCRETE LONGITUDINAL BARRIER END SECTIONS | 627(B) 4410 | EA | 2.000 | 2.000 | 0.000 | $2,000.00 | $0.00 | $0.00 | |
0067 | (SP)IMPACT ATTENUATOR | 871(A) 8325 | EA | 2.000 | 2.000 | 0.000 | $30,000.00 | $0.00 | $0.00 | |
Subtotals For Category 0100/ROADWAY | $65,210.52 | $999,796.61 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0101/TRAIL | ||||||||
0068 | CLEARING AND GRUBBING | 201(A) 0102 | LSUM | 1.000 | 1.000 | 0.200 | $15,000.00 | $0.00 | $3,000.00 | |
0069 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 124.000 | 124.000 | 0.000 | $35.00 | $0.00 | $0.00 | |
0070 | UNCLASSIFIED BORROW | 202(D) 0184 | CY | 200.000 | 200.000 | 0.000 | $70.00 | $0.00 | $0.00 | |
0071 | SOLID SLAB SODDING | 230(A) 2806 | SY | 391.000 | 391.000 | 0.000 | $2.75 | $0.00 | $0.00 | |
0072 | AGGREGATE BASE TYPE A | 303(A) 2100 | CY | 370.000 | 370.000 | 0.000 | $62.50 | $0.00 | $0.00 | |
0073 | SUPERPAVE, TYPE S4(PG 64-22 OK) | 411(C) 5960 | TON | 22.000 | 22.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
0074 | CLSM BACKFILL | 501(G) 6315 | CY | 37.000 | 37.000 | 0.000 | $75.00 | $0.00 | $0.00 | |
0075 | HANDRAILING | 504(F) 6006 | LF | 371.000 | 371.000 | 0.000 | $80.00 | $0.00 | $0.00 | |
0076 | 6" CONCRETE SIDEWALK | 610(A) 0605 | SY | 1,853.000 | 1,853.000 | 0.000 | $62.50 | $0.00 | $0.00 | |
0077 | REMOVAL OF CURB AND GUTTER | 619(B) 4726 | LF | 41.000 | 41.000 | 0.000 | $12.50 | $0.00 | $0.00 | |
0078 | REMOVAL OF SIDEWALK | 619(B) 4792 | SY | 36.000 | 36.000 | 0.000 | $17.50 | $0.00 | $0.00 | |
0079 | (PL)REMOVE & RESET GROUND MOUNTED SIGN | 805(D) 8760 | EA | 1.000 | 1.000 | 0.000 | $600.00 | $0.00 | $0.00 | |
0080 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 45.000 | 45.000 | 0.000 | $15.00 | $0.00 | $0.00 | |
0081 | 2 1/4" SQUARE TUBE POST | 851(C) 8327 | LF | 172.000 | 172.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
0082 | TRAFFIC STRIPE(PAINT)(4" WIDE) | 854(A) 8800 | LF | 3,824.000 | 3,824.000 | 0.000 | $2.70 | $0.00 | $0.00 | |
0083 | TRAFFIC STRIPE(PAINT)(WORDS) | 854(B) 8806 | EA | 2.000 | 2.000 | 0.000 | $1,050.00 | $0.00 | $0.00 | |
0084 | TRAFFIC STRIPE(PAINT)(SYMBOLS) | 854(B) 8809 | EA | 6.000 | 6.000 | 0.000 | $215.00 | $0.00 | $0.00 | |
0085 | TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 856(A) 8555 | LF | 80.000 | 80.000 | 0.000 | $11.00 | $0.00 | $0.00 | |
0086 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 857(F) 8006 | LF | 84.000 | 84.000 | 0.000 | $2.15 | $0.00 | $0.00 | |
0087 | CONSTRUCTION TRAFFIC CONTROL | 880(J) 8905 | LSUM | 1.000 | 1.000 | 0.150 | $5,300.00 | $0.00 | $795.00 | |
Subtotals For Category 0101/TRAIL | $0.00 | $3,795.00 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0110/WATERLINE | ||||||||
0088 | CLEARING AND GRUBBING | 201(A) 0102 | LSUM | 1.000 | 1.000 | 0.480 | $15,000.00 | $0.00 | $7,200.00 | |
0089 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 1,275.000 | 1,275.000 | 1,061.440 | $7.50 | $0.00 | $7,960.80 | |
0090 | SUBGRADE, METHOD B | 310(B) 0149 | SY | 44.000 | 44.000 | 0.000 | $2.25 | $0.00 | $0.00 | |
0091 | FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 414(E) 0225 | SY | 44.000 | 44.000 | 0.000 | $70.00 | $0.00 | $0.00 | |
0092 | P.C. CONCRETE FOR PAVEMENT | 414(G) 5275 | CY | 8.000 | 8.000 | 0.000 | $95.00 | $0.00 | $0.00 | |
0093 | CLSM BACKFILL | 501(G) 6315 | CY | 165.000 | 165.000 | 0.000 | $73.00 | $0.00 | $0.00 | |
0094 | 1'-8" COMB. CURB & GUTTER (6" BARRIER) | 609(B) 1513 | LF | 29.000 | 29.000 | 0.000 | $20.00 | $0.00 | $0.00 | |
0095 | 4" CONCRETE SIDEWALK | 610(A) 0602 | SY | 7.000 | 7.000 | 0.000 | $55.00 | $0.00 | $0.00 | |
0096 | 48" JACKED CONDUIT | 613(W) 4508 | LF | 60.000 | 60.000 | 179.000 | $1,000.00 | $0.00 | $179,000.00 | |
0097 | 6" DUCTILE IRON PIPE | 616(A) 5121 | LF | 29.000 | 29.000 | 0.000 | $180.00 | $0.00 | $0.00 | |
0098 | 12" DUCTILE IRON PIPE | 616(A) 5124 | LF | 10.000 | 10.000 | 0.000 | $210.00 | $0.00 | $0.00 | |
0099 | 30" DUCTILE IRON PIPE | 616(A) 5160 | LF | 947.000 | 947.000 | 435.490 | $345.00 | $0.00 | $150,244.05 | |
0100 | 16" DUCTILE IRON PIPE | 616(A) 5894 | LF | 10.000 | 10.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
0101 | 6" GATE VALVE | 616(D) 1070 | EA | 1.000 | 1.000 | 1.000 | $800.00 | $0.00 | $800.00 | |
0102 | 12" GATE VALVE | 616(D) 1100 | EA | 1.000 | 1.000 | 1.000 | $2,500.00 | $0.00 | $2,500.00 | |
0103 | 16" GATE VALVE | 616(D) 1125 | EA | 1.000 | 1.000 | 1.000 | $6,500.00 | $0.00 | $6,500.00 | |
0104 | 24" GATE VALVE | 616(D) 1140 | EA | 2.000 | 2.000 | 1.000 | $21,000.00 | $0.00 | $21,000.00 | |
0105 | STANDARD VALVE BOX | 616(D) 7051 | EA | 5.000 | 5.000 | 4.000 | $250.00 | $0.00 | $1,000.00 | |
0106 | VALVE BOX EXTENSION | 616(D) 7078 | EA | 5.000 | 5.000 | 4.000 | $200.00 | $0.00 | $800.00 | |
Subtotals For Category 0110/WATERLINE | $0.00 | $377,004.85 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0120/SANITARY SEWER | ||||||||
0107 | CLEARING AND GRUBBING | 201(A) 0102 | LSUM | 1.000 | 1.000 | 0.500 | $5,000.00 | $0.00 | $2,500.00 | |
0108 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 133.000 | 133.000 | 73.890 | $7.50 | $0.00 | $554.18 | |
0109 | MANHOLE (4' DIAMETER) | 611(A) 2657 | EA | 2.000 | 2.000 | 0.000 | 2.000 | $2,000.00 | $0.00 | $4,000.00 |
0110 | ADD'L.DEPTH IN MANHOLE (4' DIAMETER) | 611(B) 2680 | VF | 11.210 | 11.210 | 11.210 | $175.00 | $0.00 | $1,961.75 | |
0111 | 12" DUCTILE IRON PIPE | 616(A) 5124 | LF | 67.000 | 67.000 | 67.000 | $200.00 | $0.00 | $13,400.00 | |
0112 | REMOVAL OF MANHOLES | 619(B) 4742 | EA | 2.000 | 2.000 | 1.000 | $1,100.00 | $0.00 | $1,100.00 | |
0113 | PLUGGING ABANDONED SEWER | 619(B) 8660 | EA | 1.000 | 1.000 | 0.000 | $1,250.00 | $0.00 | $0.00 | |
Subtotals For Category 0120/SANITARY SEWER | $0.00 | $23,515.93 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0130/UTILITY DUCT | ||||||||
0114 | CLEARING AND GRUBBING | 201(A) 0102 | LSUM | 1.000 | 1.000 | 0.000 | $10,000.00 | $0.00 | $0.00 | |
0115 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 751.000 | 751.000 | 0.000 | $7.50 | $0.00 | $0.00 | |
0116 | CLASS A CONCRETE | 509(B) 0321 | CY | 83.140 | 83.140 | 0.000 | $125.00 | $0.00 | $0.00 | |
0117 | JUNCTION BOXES | 611(L) 0487 | CF | 890.000 | 890.000 | 0.000 | $85.00 | $0.00 | $0.00 | |
0118 | 24" JACKED CONDUIT | 613(W) 4500 | LF | 209.000 | 209.000 | 0.000 | $350.00 | $0.00 | $0.00 | |
0119 | 5" PVC SCH.40 PLASTIC CONDUIT, EXPOSED | 802(B) 8600 | LF | 5,946.000 | 5,946.000 | 0.000 | $18.50 | $0.00 | $0.00 | |
Subtotals For Category 0130/UTILITY DUCT | $0.00 | $0.00 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0201/BRIDGE "A" | ||||||||
0120 | EARTHWORK | 202(H) 0185 | LSUM | 1.000 | 1.000 | 0.000 | 0.750 | $500,000.00 | $0.00 | $375,000.00 |
0121 | SUBSTRUCTURE EXCAVATION COMMON | 501(B) 1307 | CY | 3,172.800 | 3,172.800 | 0.000 | $65.00 | $0.00 | $0.00 | |
0122 | CLSM BACKFILL | 501(G) 6309 | CY | 573.700 | 573.700 | 0.000 | $100.00 | $0.00 | $0.00 | |
0123 | PRESTRESSED CONCRETE BEAMS (TYPE III) | 503(A) 1312 | LF | 16,658.700 | 16,658.700 | 0.000 | 0.000 | $160.00 | $0.00 | $0.00 |
0124 | APPROACH SLAB | 504(A) 1304 | SY | 949.200 | 949.200 | 0.000 | $150.00 | $0.00 | $0.00 | |
0125 | SAW-CUT GROOVING | 504(B) 1305 | SY | 29,088.600 | 29,088.600 | 0.000 | $3.50 | $0.00 | $0.00 | |
0126 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 1,122.100 | 1,122.100 | 0.000 | $225.00 | $0.00 | $0.00 | |
0127 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 8,296.100 | 8,296.100 | 0.000 | $70.00 | $0.00 | $0.00 | |
0128 | HANDRAILING | 504(F) 6006 | LF | 5,542.000 | 5,542.000 | 0.000 | $40.00 | $0.00 | $0.00 | |
0129 | RAPID CURE JOINT SEALANT | 504(G) 6390 | LF | 221.000 | 221.000 | 0.000 | $50.00 | $0.00 | $0.00 | |
0130 | STRUCTURAL STEEL | 506(A) 1322 | LB | 8,757,798.000 | 8,757,798.000 | 0.000 | $1.44 | $0.00 | $0.00 | |
0131 | STAINLESS STEEL FIXED BEARING ASSEMBLY | 507(A) 6170 | EA | 491.000 | 491.000 | 0.000 | $2,200.00 | $0.00 | $0.00 | |
0132 | STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 507(B) 6174 | EA | 649.000 | 649.000 | 0.000 | $2,200.00 | $0.00 | $0.00 | |
0133 | SPECIAL CONCRETE FINISH | 509 6152 | SY | 1,723.600 | 1,723.600 | 0.000 | $32.00 | $0.00 | $0.00 | |
0134 | CLASS AA CONCRETE | 509(A) 1326 | CY | 9,571.000 | 9,571.000 | 0.000 | $400.00 | $0.00 | $0.00 | |
0135 | CLASS A CONCRETE | 509(B) 1328 | CY | 9,252.800 | 9,252.800 | 94.570 | 116.200 | $450.00 | $42,556.50 | $52,290.00 |
0136 | SLOPE WALL (5") | 510(C) 6138 | SY | 1,867.500 | 1,867.500 | 0.000 | 34.320 | $75.00 | $0.00 | $2,574.00 |
0137 | REINFORCING STEEL | 511(A) 1332 | LB | 111,031.000 | 111,031.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
0138 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 4,793,502.000 | 4,793,502.000 | 18,112.000 | 18,112.000 | $0.84 | $15,214.08 | $15,214.08 |
0139 | CLASS B BRIDGE DECK REPAIR | 513(B) 6019 | SY | 843.900 | 843.900 | 20.100 | 190.310 | $250.00 | $5,025.00 | $47,577.50 |
0140 | CLASS C BRIDGE DECK REPAIR | 513(C) 6020 | SY | 422.000 | 422.000 | 0.650 | $375.00 | $0.00 | $243.75 | |
0141 | PILES, FURNISHED (HP 10X42) | 514(A) 6010 | LF | 241.000 | 241.000 | 0.000 | $40.00 | $0.00 | $0.00 | |
0142 | PILES, FURNISHED (HP 12X53) | 514(A) 6011 | LF | 4,168.000 | 4,168.000 | 0.000 | $42.50 | $0.00 | $0.00 | |
0143 | PILES, FURNISHED (HP 14X89) | 514(A) 6016 | LF | 448.000 | 448.000 | 0.000 | $65.00 | $0.00 | $0.00 | |
0144 | PILES, DRIVEN (HP 10X42) | 514(B) 6292 | LF | 241.000 | 241.000 | 0.000 | $15.00 | $0.00 | $0.00 | |
0145 | PILES, DRIVEN (HP 12X53) | 514(B) 6294 | LF | 4,168.000 | 4,168.000 | 0.000 | $15.00 | $0.00 | $0.00 | |
0146 | PILES, DRIVEN (HP 14X89) | 514(B) 6297 | LF | 448.000 | 448.000 | 0.000 | $15.00 | $0.00 | $0.00 | |
0147 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 37,022.000 | 37,022.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
0148 | DRILLED SHAFTS 18" DIAMETER | 516(A) 6089 | LF | 330.000 | 330.000 | 0.000 | $225.00 | $0.00 | $0.00 | |
0149 | DRILLED SHAFTS 36" DIAMETER | 516(A) 6092 | LF | 322.000 | 322.000 | 0.000 | $350.00 | $0.00 | $0.00 | |
0150 | DRILLED SHAFTS 48" DIAMETER | 516(A) 6094 | LF | 534.000 | 534.000 | 0.000 | $400.00 | $0.00 | $0.00 | |
0151 | DRILLED SHAFTS 60" DIAMETER | 516(A) 6096 | LF | 1,397.000 | 1,397.000 | 221.890 | 594.890 | $500.00 | $110,945.00 | $297,445.00 |
0152 | DRILLED SHAFTS 72" DIAMETER | 516(A) 6098 | LF | 231.000 | 231.000 | 0.000 | $750.00 | $0.00 | $0.00 | |
0153 | DRILLED SHAFTS 84" DIAMETER | 516(A) 6100 | LF | 3,051.000 | 3,051.000 | 165.000 | 1,438.000 | $850.00 | $140,250.00 | $1,222,300.00 |
0154 | CROSSHOLE SONIC LOGGING | 516(C) 6200 | EA | 89.000 | 89.000 | 7.000 | 36.000 | $700.00 | $4,900.00 | $25,200.00 |
0155 | CSL ACCESS TUBES | 516(D) 6400 | LF | 33,391.000 | 33,391.000 | 2,317.450 | 13,343.450 | $8.00 | $18,539.60 | $106,747.60 |
0156 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 1,713.100 | 1,713.100 | 0.000 | $4.00 | $0.00 | $0.00 | |
0157 | SEALER RESIN | 523(B) 6560 | GAL | 14.300 | 14.300 | 0.000 | $200.00 | $0.00 | $0.00 | |
0158 | (PL)INSTALLATION OF BRIDGE ITEMS | 542 4600 | LSUM | 1.000 | 1.000 | 0.000 | $1,300,000.00 | $0.00 | $0.00 | |
0159 | (PL)INSTALLATION OF BRIDGE ITEMS(TYPE A) | 542 4610 | LSUM | 1.000 | 1.000 | 0.000 | $4,900,000.00 | $0.00 | $0.00 | |
0160 | (PL)INSTALLATION OF BRIDGE ITEMS(TYPE C) | 542 4635 | EA | 63.000 | 63.000 | 0.000 | $13,000.00 | $0.00 | $0.00 | |
0161 | TYPE I-A PLAIN RIPRAP | 601(B) 1353 | TON | 242.000 | 242.000 | 0.000 | $27.50 | $0.00 | $0.00 | |
0162 | TYPE I-A FILTER BLANKET | 601(C) 1355 | TON | 46.000 | 46.000 | 0.000 | $20.00 | $0.00 | $0.00 | |
0163 | 6" PERFORATED PIPE UNDERDRAIN ROUND | 613(H) 6204 | LF | 377.000 | 377.000 | 0.000 | $17.50 | $0.00 | $0.00 | |
0164 | 6" NON-PERF.PIPE UNDERDRAIN RND. | 613(I) 6207 | LF | 102.000 | 102.000 | 0.000 | $12.50 | $0.00 | $0.00 | |
0165 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 0.980 | $2,250,000.00 | $0.00 | $2,205,000.00 | |
0166 | FENCE-STYLE CLF (7' HIGH, CLASS B) | 624(E) 4298 | LF | 339.000 | 339.000 | 0.000 | $60.00 | $0.00 | $0.00 | |
0167 | GATES-STYLE CLF (8'HIGH X 8'LONG) | 624(F) 5990 | EA | 4.000 | 4.000 | 0.000 | $800.00 | $0.00 | $0.00 | |
Subtotals For Category 0201/BRIDGE "A" | $337,430.18 | $4,349,591.93 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0202/BRIDGE "C" | ||||||||
0168 | SUBSTRUCTURE EXCAVATION COMMON | 501(B) 1307 | CY | 580.000 | 580.000 | 0.000 | $75.00 | $0.00 | $0.00 | |
0169 | CLASS A CONCRETE | 509(B) 1328 | CY | 129.400 | 129.400 | 0.000 | $500.00 | $0.00 | $0.00 | |
0170 | REINFORCING STEEL | 511(A) 1332 | LB | 320.000 | 320.000 | 0.000 | $2.00 | $0.00 | $0.00 | |
0171 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 15,420.000 | 15,420.000 | 0.000 | $1.25 | $0.00 | $0.00 | |
0172 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 9.000 | 9.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
0173 | DRILLED SHAFTS 36" DIAMETER | 516(A) 6092 | LF | 132.000 | 132.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0174 | DRILLED SHAFTS 72" DIAMETER | 516(A) 6098 | LF | 47.000 | 47.000 | 0.000 | $1,100.00 | $0.00 | $0.00 | |
0175 | (PL)INSTALLATION OF BRIDGE ITEMS | 542 4600 | LSUM | 1.000 | 1.000 | 0.000 | $125,000.00 | $0.00 | $0.00 | |
0176 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 0.200 | 0.300 | $100,000.00 | $20,000.00 | $30,000.00 |
Subtotals For Category 0202/BRIDGE "C" | $20,000.00 | $30,000.00 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0203/BRIDGE "D" | ||||||||
0177 | APPROACH SLAB | 504(A) 1304 | SY | 104.000 | 104.000 | 0.000 | $200.00 | $0.00 | $0.00 | |
0178 | SAW-CUT GROOVING | 504(B) 1305 | SY | 1,246.500 | 1,246.500 | 0.000 | $4.00 | $0.00 | $0.00 | |
0179 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 63.000 | 63.000 | 0.000 | $245.00 | $0.00 | $0.00 | |
0180 | 42" F-SHAPED PARAPET | 504(E) 6190 | LF | 1,134.600 | 1,134.600 | 0.000 | $55.00 | $0.00 | $0.00 | |
0181 | STRUCTURAL STEEL | 506(A) 1322 | LB | 5,480.000 | 5,480.000 | 7,112.320 | 12,592.320 | $4.50 | $32,005.44 | $56,665.44 |
0182 | CLASS AA CONCRETE | 509(A) 1326 | CY | 349.000 | 349.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0183 | SLOPE WALL (4") | 510(C) 6137 | SY | 6.000 | 6.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
0184 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 133,440.000 | 133,440.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
0185 | PAINTING EXISTING STRUCTURES | 512(A) 1323 | LSUM | 1.000 | 1.000 | 1.000 | $8,500.00 | $0.00 | $8,500.00 | |
0186 | COLLECTION AND HANDLING OF WASTE | 512(B) 6303 | LSUM | 1.000 | 1.000 | 0.000 | $500.00 | $0.00 | $0.00 | |
0187 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 1,589.000 | 1,589.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
0188 | SEALER CRACK PREPARATION | 523(A) 6550 | LF | 160.000 | 160.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
0189 | SEALER RESIN | 523(B) 6560 | GAL | 2.000 | 2.000 | 0.000 | $200.00 | $0.00 | $0.00 | |
0190 | (SP)CARBON FIBER-REINFORCED POLYMER | 524(A) 6610 | SF | 409.000 | 409.000 | 408.410 | $60.00 | $0.00 | $24,504.60 | |
0191 | (SP)CORROSION INHIBITOR(SURFACE APPLIED) | 535 6130 | SY | 46.000 | 46.000 | 45.380 | $25.00 | $0.00 | $1,134.50 | |
0192 | REMOVAL OF BRIDGE ITEMS | 619(B) 2500 | LSUM | 1.000 | 1.000 | 1.000 | $200,000.00 | $0.00 | $200,000.00 | |
Subtotals For Category 0203/BRIDGE "D" | $32,005.44 | $290,804.54 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0300/TRAFFIC PERMANENT | ||||||||
0193 | DRILLED SHAFTS 60" DIAMETER | 516(A) 6096 | LF | 50.500 | 50.500 | 0.000 | $500.00 | $0.00 | $0.00 | |
0194 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 1.960 | 1.960 | 0.000 | $375.00 | $0.00 | $0.00 | |
0195 | REINFORCING STEEL | 804(B) 2916 | LB | 336.000 | 336.000 | 0.000 | $1.60 | $0.00 | $0.00 | |
0196 | (PL)REMOVAL OF OVERHEAD SIGN STRUCTURE & SIGNS | 805(A) 8718 | LSUM | 1.000 | 1.000 | 0.000 | $6,500.00 | $0.00 | $0.00 | |
0197 | (PL)REMOVAL OF GROUND MOUNTED SIGNS | 805(A) 8720 | LSUM | 1.000 | 1.000 | 0.000 | $1,100.00 | $0.00 | $0.00 | |
0198 | (PL)REMOVAL OF EXISTING SIGNS | 805(A) 8724 | EA | 14.000 | 14.000 | 0.000 | $55.00 | $0.00 | $0.00 | |
0199 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 248.690 | 248.690 | 0.000 | $15.00 | $0.00 | $0.00 | |
0200 | EXTRUDED ALUMINUM PANEL SIGNS | 850(B) 8112 | SF | 123.750 | 123.750 | 0.000 | $21.50 | $0.00 | $0.00 | |
0201 | EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 850(B) 8114 | SF | 887.250 | 887.250 | 0.000 | $21.50 | $0.00 | $0.00 | |
0202 | 4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 851(A) 3206 | LF | 57.000 | 57.000 | 0.000 | $32.00 | $0.00 | $0.00 | |
0203 | 3 1/2"@9.11 GALV.STEEL PIPE POST | 851(B) 3219 | LF | 38.750 | 38.750 | 0.000 | $21.00 | $0.00 | $0.00 | |
0204 | 2" SQUARE TUBE POST | 851(C) 8324 | LF | 132.750 | 132.750 | 0.000 | $7.00 | $0.00 | $0.00 | |
0205 | OVHD.SN.STR.TYPE C-1 ALUM./G.STL.65' | 852A/B 8952 | EA | 1.000 | 1.000 | 0.000 | $50,000.00 | $0.00 | $0.00 | |
0206 | OVHD.SN.STR.TYPE C-1 ALUM./G.STL.75' | 852A/B 8958 | EA | 1.000 | 1.000 | 0.000 | $61,000.00 | $0.00 | $0.00 | |
0207 | OVHD.SN.STR.TYPE C-1 ALUM./G.STL.80' | 852A/B 8964 | EA | 1.000 | 1.000 | 0.000 | $62,000.00 | $0.00 | $0.00 | |
0208 | OVHD.SN.STR.TYPE E-1 ALUM./G.STL. | 852A/B 9015 | EA | 1.000 | 1.000 | 0.000 | $16,000.00 | $0.00 | $0.00 | |
0209 | TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 856(A) 8530 | LF | 30,656.000 | 30,656.000 | 0.000 | $0.70 | $0.00 | $0.00 | |
0210 | TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 856(A) 8535 | LF | 13,098.000 | 13,098.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
0211 | TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 856(A) 8540 | LF | 6,908.000 | 6,908.000 | 0.000 | $1.35 | $0.00 | $0.00 | |
0212 | TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 856(A) 8548 | LF | 4,481.000 | 4,481.000 | 0.000 | $2.15 | $0.00 | $0.00 | |
0213 | TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 856(B) 8525 | EA | 9.000 | 9.000 | 0.000 | $215.00 | $0.00 | $0.00 | |
Subtotals For Category 0300/TRAFFIC PERMANENT | $0.00 | $0.00 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0301/TRAFFIC CONTROL | ||||||||
0214 | REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 857(C) 8851 | LF | 61,730.000 | 61,730.000 | 42,906.500 | $0.45 | $0.00 | $19,307.93 | |
0215 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 857(F) 8006 | LF | 25,199.000 | 25,199.000 | 24,047.000 | $0.55 | $0.00 | $13,225.85 | |
0216 | (SP)CONST.ZONE IMPACT ATTEN. | 871(B) 8705 | SD | 5,540.000 | 5,540.000 | 30.000 | 243.000 | $2.15 | $64.50 | $522.45 |
0217 | PORTABLE LONGITUDINAL BARRIER | 877(A) 8483 | LF | 2,805.000 | 2,805.000 | 2,860.000 | $33.00 | $0.00 | $94,380.00 | |
0218 | DELIVER PORTABLE LONGITUDINAL BARRIER | 877(B) 8484 | LF | 11,091.000 | 11,091.000 | 10,355.000 | $15.00 | $0.00 | $155,325.00 | |
0219 | RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 877(C) 8486 | LF | 8,201.000 | 8,201.000 | 2,066.000 | $2.50 | $0.00 | $5,165.00 | |
0220 | MODULAR GLARE SCREEN (TEMPORARY) | 878(B) 8487 | SD | 85,440.000 | 85,440.000 | 2,400.000 | 17,920.000 | $0.17 | $408.00 | $3,046.40 |
0221 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 2,600.000 | 2,600.000 | 52.000 | 537.000 | $3.15 | $163.80 | $1,691.55 |
0222 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 139,480.000 | 139,480.000 | 2,580.000 | 23,691.000 | $0.17 | $438.60 | $4,027.47 |
0223 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 31,880.000 | 31,880.000 | 1,995.000 | 17,293.000 | $0.80 | $1,596.00 | $13,834.40 |
0224 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 48,080.000 | 48,080.000 | 1,349.000 | 10,975.000 | $2.10 | $2,832.90 | $23,047.50 |
0225 | CONSTRUCTION SIGNS 33.0 SF & OVER | 880(B) 8827 | SD | 5,200.000 | 5,200.000 | 120.000 | 1,128.000 | $2.65 | $318.00 | $2,989.20 |
0226 | CONSTRUCTION BARRICADES(TYPE III) | 880(C) 8842 | SD | 45,900.000 | 45,900.000 | 1,141.000 | 9,624.000 | $0.27 | $308.07 | $2,598.48 |
0227 | WING BARRICADES | 880(C) 8848 | SD | 5,200.000 | 5,200.000 | 150.000 | 1,352.000 | $0.55 | $82.50 | $743.60 |
0228 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 35,600.000 | 35,600.000 | 1,874.000 | 17,361.000 | $0.52 | $974.48 | $9,027.72 |
0229 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 120,960.000 | 120,960.000 | 2,145.000 | 20,003.000 | $0.01 | $21.45 | $200.03 |
0230 | DRUMS | 880(F) 8878 | SD | 177,900.000 | 177,900.000 | 6,545.000 | 53,752.000 | $0.21 | $1,374.45 | $11,287.92 |
0231 | TRAFFIC SURVEILLANCE, POLICE | 880(L) 8911 | HOUR | 320.000 | 320.000 | 8.000 | 147.500 | $57.50 | $460.00 | $8,481.25 |
0232 | (SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 882 8370 | SD | 25,380.000 | 25,380.000 | 495.000 | 4,605.000 | $10.50 | $5,197.50 | $48,352.50 |
0233 | (SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 882 8372 | SD | 12,960.000 | 12,960.000 | 390.000 | 3,666.000 | $10.50 | $4,095.00 | $38,493.00 |
0234 | (SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 882 8374 | SD | 1,080.000 | 1,080.000 | 30.000 | 288.000 | $26.50 | $795.00 | $7,632.00 |
0235 | (SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 882 8376 | SD | 540.000 | 540.000 | 15.000 | 144.000 | $445.00 | $6,675.00 | $64,080.00 |
0236 | PORT.CHANGEABLE MESSAGE SIGN | 882(A) 8306 | SD | 3,620.000 | 3,620.000 | 15.000 | 103.000 | $10.50 | $157.50 | $1,081.50 |
Subtotals For Category 0301/TRAFFIC CONTROL | $25,962.75 | $528,540.75 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0330/LIGHTING | ||||||||
0237 | (SP) EMERGENCY CALL BOX | 630 0100 | EA | 7.000 | 7.000 | 0.000 | $10,500.00 | $0.00 | $0.00 | |
0238 | (SP) UTILITY BUILDING (ELECTRICAL) | 648(C) 0300 | LSUM | 1.000 | 1.000 | 0.000 | $300,000.00 | $0.00 | $0.00 | |
0239 | 3/4" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8300 | LF | 7,400.000 | 7,400.000 | 0.000 | $35.75 | $0.00 | $0.00 | |
0240 | 1" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8302 | LF | 2,400.000 | 2,400.000 | 0.000 | $40.00 | $0.00 | $0.00 | |
0241 | 2" GALV. STEEL ELECTRICAL CONDUIT EXPOSED | 802(A) 8310 | LF | 14,000.000 | 14,000.000 | 0.000 | $25.25 | $0.00 | $0.00 | |
0242 | 1" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8334 | LF | 500.000 | 500.000 | 0.000 | $5.50 | $0.00 | $0.00 | |
0243 | 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8342 | LF | 9,000.000 | 9,000.000 | 332.000 | $5.95 | $0.00 | $1,975.40 | |
0244 | 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8346 | LF | 1,100.000 | 1,100.000 | 0.000 | $12.65 | $0.00 | $0.00 | |
0245 | 4" PVC SCH.40 PLASTIC CONDUIT BORED | 802(B) 8348 | LF | 300.000 | 300.000 | 160.000 | $42.15 | $0.00 | $6,744.00 | |
0246 | 4" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8350 | LF | 100.000 | 100.000 | 0.000 | $18.50 | $0.00 | $0.00 | |
0247 | (PL)LIQUID TIGHT FLEXIBLE CONDUIT | 802(B) 8570 | LF | 800.000 | 800.000 | 0.000 | $44.75 | $0.00 | $0.00 | |
0248 | (PL)JUNCTION BOX(SPECIAL) | 802(E) 8374 | EA | 86.000 | 86.000 | 0.000 | $3,200.00 | $0.00 | $0.00 | |
0249 | PULL BOX(SIZE II) | 803(A) 8066 | EA | 13.000 | 13.000 | 2.000 | $635.00 | $0.00 | $1,270.00 | |
0250 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 20.000 | 20.000 | 0.000 | $800.00 | $0.00 | $0.00 | |
0251 | REINFORCING STEEL | 804(B) 2916 | LB | 1,050.000 | 1,050.000 | 0.000 | $2.15 | $0.00 | $0.00 | |
0252 | (PL)REMOVAL OF LIGHT POLE | 805(A) 8712 | EA | 35.000 | 35.000 | 38.000 | $800.00 | $0.00 | $30,400.00 | |
0253 | 40' MTG & 6' HLMA(G.STL.) | 806(C) 8920 | EA | 62.000 | 62.000 | 0.000 | $7,350.00 | $0.00 | $0.00 | |
0254 | 40' MTG & 8' HLMA(G.STL.) | 806(C) 8922 | EA | 8.000 | 8.000 | 0.000 | $7,900.00 | $0.00 | $0.00 | |
0255 | 40' MTG & 10' HLMA(G.STL.) | 806(C) 8924 | EA | 4.000 | 4.000 | 0.000 | $8,500.00 | $0.00 | $0.00 | |
0256 | BREAKAWAY BASE (DES. B) | 807 8092 | EA | 6.000 | 6.000 | 0.000 | $850.00 | $0.00 | $0.00 | |
0257 | 1/C NO.2 ELECTRICAL CONDUCTOR | 811 8036 | LF | 31,000.000 | 31,000.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
0258 | 1/C NO.4 ELECTRICAL CONDUCTOR | 811 8038 | LF | 76,500.000 | 76,500.000 | 0.000 | 360.000 | $3.40 | $0.00 | $1,224.00 |
0259 | 1/C NO.6 ELECTRICAL CONDUCTOR | 811 8040 | LF | 20,000.000 | 20,000.000 | 0.000 | $2.40 | $0.00 | $0.00 | |
0260 | 1/C NO.10 ELECTRICAL CONDUCTOR | 811 8044 | LF | 13,500.000 | 13,500.000 | 0.000 | $1.60 | $0.00 | $0.00 | |
0261 | (SP)CCTV CAMERA, WEB | 815(A) 8615 | EA | 14.000 | 14.000 | 0.000 | $9,500.00 | $0.00 | $0.00 | |
0262 | (SP)FIBER OPTIC CABLE, 12 SMF | 818(A) 8710 | LF | 4,000.000 | 4,000.000 | 0.000 | $12.65 | $0.00 | $0.00 | |
Subtotals For Category 0330/LIGHTING | $0.00 | $41,613.40 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0600/STAKING | ||||||||
0263 | CONSTRUCTION STAKING LEVEL II | 642(B) 0096 | LSUM | 1.000 | 1.000 | 0.500 | $150,000.00 | $0.00 | $75,000.00 | |
Subtotals For Category 0600/STAKING | $0.00 | $75,000.00 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0640/CONSTRUCTION | ||||||||
0264 | SWPPP DOCUMENTATION AND MANAGEMENT | 220 2800 | LSUM | 1.000 | 1.000 | 0.250 | $7,500.00 | $0.00 | $1,875.00 | |
0265 | CONTRACTOR HEALTH SAFETY PLAN | 620(C) 5910 | LSUM | 1.000 | 1.000 | 1.000 | $15,000.00 | $0.00 | $15,000.00 | |
0266 | CONTAMINATED MATERIALS MANAGEMENT PLAN | 620(C) 5920 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0267 | FIELD OFFICE | 640(A) 1398 | EA | 1.000 | 1.000 | 1.000 | $40,000.00 | $0.00 | $40,000.00 | |
0268 | MOBILIZATION | 641 1399 | LSUM | 1.000 | 1.000 | 1.000 | $2,500,000.00 | $0.00 | $2,500,000.00 | |
Subtotals For Category 0640/CONSTRUCTION | $0.00 | $2,581,875.00 | ||||||||
Fed/State Project Number: IM-TIGR(497)SS | Project: 26604(04) | Category: 0900/NON-PARTICIPATING ITEMS | ||||||||
0269 | 15' MTG.HT.HL.PTP.(G.STL.) | 806(D) 8987 | EA | 20.000 | 20.000 | 0.000 | $8,200.00 | $0.00 | $0.00 | |
0270 | ROADWAY LUMINAIRE | 809(A) 8090 | EA | 74.000 | 74.000 | 0.000 | $2,200.00 | $0.00 | $0.00 | |
0271 | UNDERPASS LUMINIARE | 809(B) 8098 | EA | 119.000 | 119.000 | 0.000 | $2,300.00 | $0.00 | $0.00 | |
0272 | POST TOP LUMINAIRE | 809(C) 8399 | EA | 22.000 | 22.000 | 0.000 | $3,000.00 | $0.00 | $0.00 | |
Subtotals For Category 0900/NON-PARTICIPATING ITEMS | $0.00 | $0.00 | ||||||||
Subtotals For Project IM-TIGR(497)SS /26604(04) | $480,608.89 | $9,301,538.01 |