| Fed/State Project Number: CIRB-114C(210)RB |
Project: 24829(04) |
Category: 0100/ROADWAY |
| 0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
0.083 |
0.336 |
$100,000.00 |
$8,300.00 |
$33,600.00 |
| 0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
115,000.000 |
115,000.000 |
10,454.000 |
19,166.000 |
$3.00 |
$31,362.00 |
$57,498.00 |
| 0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
1,000.000 |
1,000.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
| 0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.080 |
$47,500.00 |
$0.00 |
$3,942.50 |
| 0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
9,630.000 |
9,630.000 |
|
0.000 |
$1.39 |
$0.00 |
$0.00 |
| 0006 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
8,505.000 |
8,505.000 |
|
0.000 |
$6.40 |
$0.00 |
$0.00 |
| 0007 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
277,734.000 |
277,734.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
| 0008 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
57.400 |
57.400 |
|
0.000 |
$214.00 |
$0.00 |
$0.00 |
| 0009 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
1,720.000 |
1,720.000 |
0.000 |
139.280 |
$21.50 |
$0.00 |
$2,994.52 |
| 0010 |
STABILIZED SUBGRADE |
307(K) 4300 |
SY |
110,854.000 |
110,854.000 |
|
16,244.450 |
$3.00 |
$0.00 |
$48,733.35 |
| 0011 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
1,305.000 |
1,305.000 |
|
150.000 |
$19.00 |
$0.00 |
$2,850.00 |
| 0012 |
TACK COAT |
407(B) 0250 |
GAL |
8,305.000 |
8,305.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
| 0013 |
PRIME COAT |
408 5774 |
GAL |
27,600.000 |
27,600.000 |
|
5,150.000 |
$2.00 |
$0.00 |
$10,300.00 |
| 0014 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
23,950.000 |
23,950.000 |
231.610 |
4,218.750 |
$54.50 |
$12,622.75 |
$229,921.89 |
| 0015 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
13,230.000 |
13,230.000 |
|
2,011.240 |
$68.50 |
$0.00 |
$137,769.94 |
| 0016 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
73,730.000 |
73,730.000 |
|
26,146.110 |
$0.50 |
$0.00 |
$13,073.06 |
| 0017 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
500.000 |
500.000 |
|
0.000 |
$5.35 |
$0.00 |
$0.00 |
| 0018 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
497.600 |
497.600 |
|
0.000 |
$323.00 |
$0.00 |
$0.00 |
| 0019 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
1,070.600 |
1,070.600 |
24.400 |
131.600 |
$209.00 |
$5,099.60 |
$27,504.40 |
| 0020 |
REINFORCING STEEL |
511(A) 0332 |
LB |
70,960.000 |
70,960.000 |
|
0.000 |
$0.83 |
$0.00 |
$0.00 |
| 0021 |
TYPE I PLAIN RIPRAP |
601(A) 0297 |
TON |
472.000 |
472.000 |
|
0.000 |
$43.75 |
$0.00 |
$0.00 |
| 0022 |
6" CONCRETE DRIVEWAY |
610(B) 0604 |
SY |
916.700 |
916.700 |
0.000 |
356.090 |
$38.00 |
$0.00 |
$13,531.42 |
| 0023 |
INLET GPI TYPE 1 (DES. 3) |
611(G) 5329 |
EA |
1.000 |
1.000 |
|
0.000 |
$4,425.00 |
$0.00 |
$0.00 |
| 0024 |
30" R.C.PIPE CLASS III |
613(A) 0493 |
LF |
260.000 |
260.000 |
|
136.000 |
$44.00 |
$0.00 |
$5,984.00 |
| 0025 |
36" R.C.PIPE CLASS III |
613(A) 0494 |
LF |
244.000 |
244.000 |
|
248.000 |
$63.90 |
$0.00 |
$15,847.20 |
| 0026 |
42" R.C.PIPE CLASS III |
613(A) 0495 |
LF |
146.000 |
146.000 |
|
152.000 |
$70.20 |
$0.00 |
$10,670.40 |
| 0027 |
48" R.C.PIPE CLASS III |
613(A) 0496 |
LF |
294.000 |
294.000 |
|
288.000 |
$75.00 |
$0.00 |
$21,600.00 |
| 0028 |
54" R.C.PIPE CLASS III |
613(A) 0497 |
LF |
200.000 |
200.000 |
|
248.000 |
$92.00 |
$0.00 |
$22,816.00 |
| 0029 |
22" X 13" R.C.PIPE ARCH CLASS A-III |
613(A) 4495 |
LF |
522.000 |
522.000 |
|
520.000 |
$68.25 |
$0.00 |
$35,490.00 |
| 0030 |
28" X 18" R.C.PIPE ARCH CLASS A-III |
613(A) 4496 |
LF |
228.000 |
228.000 |
|
224.000 |
$51.36 |
$0.00 |
$11,504.64 |
| 0031 |
36" X 22" R.C.PIPE ARCH CLASS A-III |
613(A) 4497 |
LF |
160.000 |
160.000 |
|
160.000 |
$61.00 |
$0.00 |
$9,760.00 |
| 0032 |
51" X 31" R.C.PIPE ARCH CLASS A-III |
613(A) 4499 |
LF |
70.000 |
70.000 |
|
72.000 |
$94.00 |
$0.00 |
$6,768.00 |
| 0033 |
43" X 68" R.C.PIPE ELLIPTICAL CLASS HE-III |
613(A) 4509 |
LF |
176.000 |
176.000 |
|
176.000 |
$117.70 |
$0.00 |
$20,715.20 |
| 0034 |
21" X 15" CORR. GALV. STEEL PIPE ARCH |
613(B) 4527 |
LF |
2,332.000 |
2,332.000 |
30.000 |
2,648.000 |
$24.25 |
$727.50 |
$64,214.00 |
| 0035 |
28" X 20" CORR. GALV. STEEL PIPE ARCH |
613(B) 4528 |
LF |
1,378.000 |
1,378.000 |
|
1,200.000 |
$30.00 |
$0.00 |
$36,000.00 |
| 0036 |
42" X 29" CORR. GALV. STEEL PIPE ARCH |
613(B) 4530 |
LF |
114.000 |
114.000 |
|
54.000 |
$48.00 |
$0.00 |
$2,592.00 |
| 0037 |
30" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5732 |
EA |
3.000 |
3.000 |
|
1.000 |
$555.00 |
$0.00 |
$555.00 |
| 0038 |
36" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5734 |
EA |
1.000 |
1.000 |
|
1.000 |
$728.00 |
$0.00 |
$728.00 |
| 0039 |
42" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5736 |
EA |
1.000 |
1.000 |
|
1.000 |
$968.25 |
$0.00 |
$968.25 |
| 0040 |
48" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5738 |
EA |
1.000 |
1.000 |
|
1.000 |
$1,100.00 |
$0.00 |
$1,100.00 |
| 0041 |
54" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5740 |
EA |
6.000 |
6.000 |
|
6.000 |
$1,295.00 |
$0.00 |
$7,770.00 |
| 0042 |
TYPE A4 CULVERT END TREATMENT |
613(M) 7186 |
EA |
108.000 |
108.000 |
2.000 |
2.000 |
$490.00 |
$980.00 |
$980.00 |
| 0043 |
TYPE B4 CULVERT END TREATMENT |
613(M) 7187 |
EA |
55.000 |
55.000 |
|
0.000 |
$655.00 |
$0.00 |
$0.00 |
| 0044 |
TYPE C4 CULVERT END TREATMENT |
613(M) 7188 |
EA |
9.000 |
9.000 |
|
0.000 |
$840.00 |
$0.00 |
$0.00 |
| 0045 |
TYPE D4 CULVERT END TREATMENT |
613(M) 7189 |
EA |
8.000 |
8.000 |
|
0.000 |
$970.00 |
$0.00 |
$0.00 |
| 0046 |
TYPE E4 CULVERT END TREATMENT |
613(M) 7190 |
EA |
5.000 |
5.000 |
|
0.000 |
$1,120.00 |
$0.00 |
$0.00 |
| 0047 |
TYPE AA4 CULVERT END TREATMENT |
613(M) 7191 |
EA |
2.000 |
2.000 |
2.000 |
2.000 |
$980.00 |
$1,960.00 |
$1,960.00 |
| 0048 |
TYPE BB4 CULVERT END TREATMENT |
613(M) 7192 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,060.00 |
$0.00 |
$0.00 |
| 0049 |
TYPE EE4 CULVERT END TREATMENT |
613(M) 7195 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,790.00 |
$0.00 |
$0.00 |
| 0050 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
0.170 |
0.340 |
$8,650.00 |
$1,470.50 |
$2,941.00 |
| 0051 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
4,000.000 |
4,000.000 |
|
255.850 |
$1.00 |
$0.00 |
$255.85 |
| 0052 |
REMOVAL OF CONCRETE DRIVEWAY |
619(B) 4766 |
SY |
916.000 |
916.000 |
|
300.500 |
$4.80 |
$0.00 |
$1,442.40 |
| 0053 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
54.000 |
54.000 |
|
0.000 |
$69.50 |
$0.00 |
$0.00 |
| 0054 |
MAILBOX INSTALLATION-MULTIPLE |
629(B) 4959 |
EA |
5.000 |
5.000 |
|
0.000 |
$160.00 |
$0.00 |
$0.00 |
| 0055 |
MAILBOX |
629(C) 4960 |
EA |
67.000 |
67.000 |
|
0.000 |
$32.00 |
$0.00 |
$0.00 |
| 0056 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
82.000 |
82.000 |
|
0.000 |
$10.75 |
$0.00 |
$0.00 |
| 0057 |
REMOVE AND RESET MAILBOX |
629(E) 5048 |
EA |
2.000 |
2.000 |
|
0.000 |
$50.00 |
$0.00 |
$0.00 |
| 0058 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
292.000 |
292.000 |
|
0.000 |
$26.75 |
$0.00 |
$0.00 |
| 0059 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) |
855(A) 8840 |
LF |
125,210.000 |
125,210.000 |
|
0.000 |
$0.37 |
$0.00 |
$0.00 |
| 0060 |
CONSTRUCTION TRAFFIC CONTROL |
880(J) 8905 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$19,875.00 |
$0.00 |
$9,937.50 |
| 8001 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
0.000 |
120.000 |
|
40.000 |
$55.00 |
$0.00 |
$2,200.00 |
| Subtotals For Category 0100/ROADWAY |
$62,522.35 |
$876,518.52 |
|