Fed/State Project Number: SSP-150B(079)SS |
Project: 26241(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
0.950 |
$30,250.00 |
$0.00 |
$28,737.50 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
47,657.000 |
47,657.000 |
|
47,657.000 |
$2.75 |
$0.00 |
$131,056.76 |
0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
1,796.000 |
2,716.000 |
|
0.000 |
$5.70 |
$0.00 |
$0.00 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.700 |
$54,100.00 |
$0.00 |
$37,870.00 |
0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
1,036.000 |
1,036.000 |
0.000 |
530.000 |
$1.30 |
$0.00 |
$689.00 |
0006 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
455.000 |
455.000 |
0.000 |
154.000 |
$7.00 |
$0.00 |
$1,078.00 |
0007 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
72,286.000 |
72,286.000 |
0.000 |
18,192.890 |
$1.30 |
$0.00 |
$23,650.76 |
0008 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
15.000 |
15.000 |
|
0.000 |
$459.00 |
$0.00 |
$0.00 |
0009 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
4,938.000 |
4,938.000 |
375.980 |
4,410.440 |
$47.40 |
$17,821.45 |
$209,054.86 |
0010 |
LIME |
307(D) 4230 |
TON |
610.000 |
305.000 |
|
297.710 |
$158.00 |
$0.00 |
$47,038.18 |
0011 |
LIME STABILIZED SUBGRADE |
307(H) 4270 |
SY |
28,239.000 |
14,119.000 |
415.590 |
19,193.120 |
$2.20 |
$914.30 |
$42,224.87 |
0012 |
CEMENT TREATED BASE |
317 4270 |
SY |
16,250.000 |
16,250.000 |
4,800.210 |
15,478.420 |
$10.75 |
$51,602.26 |
$166,393.03 |
0013 |
SEPARATOR FABRIC |
325 5271 |
SY |
25,684.000 |
25,684.000 |
1,251.830 |
18,022.200 |
$1.00 |
$1,251.83 |
$18,022.20 |
0014 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
3,822.000 |
3,822.000 |
|
370.010 |
$16.90 |
$0.00 |
$6,253.17 |
0015 |
TACK COAT |
407(B) 0250 |
GAL |
342.000 |
342.000 |
|
0.000 |
$7.00 |
$0.00 |
$0.00 |
0016 |
PRIME COAT |
408 5774 |
GAL |
5,820.000 |
5,820.000 |
0.000 |
713.000 |
$5.00 |
$0.00 |
$3,565.00 |
0017 |
SUPERPAVE, TYPE S2(PG 64-22 OK) |
411(A) 5930 |
TON |
588.000 |
0.000 |
|
0.000 |
$57.80 |
$0.00 |
$0.00 |
0018 |
SUPERPAVE, TYPE S3(PG 70-28 OK) |
411(B) 5940 |
TON |
239.000 |
239.000 |
|
180.700 |
$79.65 |
$0.00 |
$14,392.75 |
0019 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
451.000 |
451.000 |
|
382.580 |
$76.80 |
$0.00 |
$29,382.14 |
0020 |
SUPERPAVE, TYPE S4(PG 70-28 OK) |
411(C) 5955 |
TON |
527.000 |
527.000 |
|
0.000 |
$77.50 |
$0.00 |
$0.00 |
0021 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
263.000 |
263.000 |
0.000 |
64.360 |
$96.50 |
$0.00 |
$6,210.74 |
0022 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
489.000 |
489.000 |
|
0.000 |
$4.00 |
$0.00 |
$0.00 |
0023 |
P.C.CONCRETE PAVEMENT(PLACEMENT) |
414(A) 0210 |
SY |
5,113.000 |
5,113.000 |
1,384.890 |
5,202.540 |
$12.90 |
$17,865.08 |
$67,112.77 |
0024 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) |
414(B) 5725 |
SY |
9,233.000 |
9,233.000 |
2,582.650 |
7,417.610 |
$13.15 |
$33,961.85 |
$97,541.59 |
0025 |
P.C. CONCRETE FOR PAVEMENT |
414(G) 5275 |
CY |
3,587.000 |
3,587.000 |
991.900 |
3,183.900 |
$90.00 |
$89,271.00 |
$286,551.00 |
0026 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
232.000 |
232.000 |
|
231.100 |
$15.20 |
$0.00 |
$3,512.72 |
0027 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
796.000 |
796.000 |
|
797.610 |
$330.00 |
$0.00 |
$263,211.30 |
0028 |
CLASS A CONCRETE |
509(B) 0321 |
CY |
93.000 |
93.000 |
|
93.150 |
$675.00 |
$0.00 |
$62,876.25 |
0029 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
652.000 |
652.000 |
|
0.000 |
$215.00 |
$0.00 |
$0.00 |
0030 |
REINFORCING STEEL |
511(A) 0332 |
LB |
114,452.000 |
114,452.000 |
|
114,368.050 |
$0.77 |
$0.00 |
$88,063.40 |
0031 |
TYPE I-A PLAIN RIPRAP |
601(B) 0536 |
TON |
922.000 |
922.000 |
203.670 |
875.960 |
$41.00 |
$8,350.47 |
$35,914.36 |
0032 |
TYPE I-A FILTER BLANKET |
601(C) 0538 |
TON |
216.000 |
216.000 |
44.060 |
245.780 |
$41.00 |
$1,806.46 |
$10,076.98 |
0033 |
MANHOLE (5' DIAMETER) |
611(A) 2658 |
EA |
2.000 |
2.000 |
|
2.000 |
$1,621.11 |
$0.00 |
$3,242.22 |
0034 |
18" R.C.PIPE CLASS III |
613(A) 0491 |
LF |
36.000 |
36.000 |
0.000 |
36.000 |
$30.40 |
$0.00 |
$1,094.40 |
0035 |
54" R.C.PIPE CLASS III |
613(A) 0497 |
LF |
212.000 |
212.000 |
0.000 |
212.000 |
$106.39 |
$0.00 |
$22,554.68 |
0036 |
36" X 22" R.C.PIPE ARCH CLASS A-III |
613(A) 4497 |
LF |
76.000 |
76.000 |
0.000 |
76.000 |
$91.19 |
$0.00 |
$6,930.44 |
0037 |
43" X 26" R.C.PIPE ARCH CLASS A-III |
613(A) 4498 |
LF |
226.000 |
226.000 |
0.000 |
226.000 |
$101.32 |
$0.00 |
$22,898.32 |
0038 |
8" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 0500 |
LF |
500.000 |
500.000 |
|
0.000 |
$9.00 |
$0.00 |
$0.00 |
0039 |
8" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1097 |
LF |
50.000 |
50.000 |
|
0.000 |
$34.00 |
$0.00 |
$0.00 |
0040 |
36" X 23" PREFAB. CULVERT END SECTION, ARCH |
613(L) 4528 |
EA |
2.000 |
0.000 |
|
0.000 |
$875.00 |
$0.00 |
$0.00 |
0041 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH |
613(L) 4531 |
EA |
2.000 |
2.000 |
0.000 |
2.000 |
$709.24 |
$0.00 |
$1,418.48 |
0042 |
18" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5726 |
EA |
2.000 |
0.000 |
|
0.000 |
$303.96 |
$0.00 |
$0.00 |
0043 |
54" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5740 |
EA |
2.000 |
2.000 |
0.000 |
2.000 |
$810.56 |
$0.00 |
$1,621.12 |
0044 |
STANDARD BEDDING MATERIAL, CLASS B |
613(S) 1186 |
CY |
239.000 |
239.000 |
|
238.710 |
$40.00 |
$0.00 |
$9,548.40 |
0045 |
TRENCH EXCAVATION |
613(V) 1180 |
CY |
356.000 |
356.000 |
|
204.750 |
$10.13 |
$0.00 |
$2,074.12 |
0046 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.250 |
$15,100.00 |
$0.00 |
$3,775.00 |
0047 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
3,301.000 |
3,301.000 |
|
3,608.620 |
$3.00 |
$0.00 |
$10,825.86 |
0048 |
REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY |
619(B) 4763 |
SY |
2,465.000 |
2,465.000 |
|
1,958.000 |
$8.40 |
$0.00 |
$16,447.20 |
0049 |
REMOVAL OF CONCRETE DITCH LINER |
619(B) 5881 |
LF |
687.000 |
687.000 |
|
582.000 |
$10.50 |
$0.00 |
$6,111.00 |
0050 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
4,810.000 |
4,810.000 |
|
2,510.000 |
$3.95 |
$0.00 |
$9,914.50 |
0051 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
2.000 |
2.000 |
|
0.000 |
$2,040.00 |
$0.00 |
$0.00 |
0052 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,275.00 |
$0.00 |
$0.00 |
0053 |
FENCE-STYLE WWF |
624(A) 4281 |
LF |
2,947.000 |
2,947.000 |
|
2,285.000 |
$3.70 |
$0.00 |
$8,454.50 |
0054 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
1,291.000 |
1,291.000 |
|
0.000 |
$3.55 |
$0.00 |
$0.00 |
0055 |
GATE, GALVANIZED STEEL |
624(D) 4470 |
EA |
3.000 |
3.000 |
|
0.000 |
$765.00 |
$0.00 |
$0.00 |
8000 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
0.000 |
588.000 |
|
436.420 |
$57.80 |
$0.00 |
$25,225.08 |
8001 |
TYPE A6 CULVERT END TREATMENT |
613(M) 7196 |
EA |
0.000 |
2.000 |
|
0.000 |
$975.00 |
$0.00 |
$0.00 |
8002 |
TYPE B6 CULVERT END TREATMENT |
613(M) 7197 |
EA |
0.000 |
2.000 |
|
0.000 |
$1,275.00 |
$0.00 |
$0.00 |
8003 |
CEMENT KILN DUST |
307(B) 4210 |
TON |
0.000 |
565.000 |
50.600 |
220.910 |
$37.35 |
$1,889.91 |
$8,250.99 |
8004 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
0.000 |
14,120.000 |
1,479.640 |
5,344.500 |
$2.15 |
$3,181.23 |
$11,490.68 |
Subtotals For Category 0100/ROADWAY |
$227,915.84 |
$1,852,356.32 |
|
Fed/State Project Number: SSP-150B(079)SS |
Project: 26241(04) |
Category: 0300/SIGNING AND STRIPING |
0056 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
16.680 |
16.680 |
|
0.000 |
$510.00 |
$0.00 |
$0.00 |
0057 |
REINFORCING STEEL |
804(B) 2916 |
LB |
3,870.000 |
3,870.000 |
|
0.000 |
$1.00 |
$0.00 |
$0.00 |
0058 |
(PL)REMOVAL OF EXISTING SIGNS |
805(A) 8724 |
EA |
4.000 |
4.000 |
|
2.000 |
$51.00 |
$0.00 |
$102.00 |
0059 |
(PL)REMOVE & RESET EXISTING SIGNS |
805(D) 8756 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,122.00 |
$0.00 |
$0.00 |
0060 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
379.730 |
379.730 |
|
0.000 |
$9.20 |
$0.00 |
$0.00 |
0061 |
EXTRUDED ALUMINUM PANEL SIGNS |
850(B) 8112 |
SF |
921.240 |
921.240 |
|
0.000 |
$14.30 |
$0.00 |
$0.00 |
0062 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST |
851(A) 3206 |
LF |
30.000 |
30.000 |
|
0.000 |
$13.30 |
$0.00 |
$0.00 |
0063 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST |
851(A) 3207 |
LF |
44.000 |
44.000 |
|
0.000 |
$15.30 |
$0.00 |
$0.00 |
0064 |
8"@40 GALV.STEEL WIDE FLANGE BEAM POST |
851(A) 3212 |
LF |
207.000 |
207.000 |
|
0.000 |
$40.80 |
$0.00 |
$0.00 |
0065 |
2 1/2"@5.79 GALV.STEEL PIPE POST |
851(B) 3217 |
LF |
435.000 |
435.000 |
|
0.000 |
$10.20 |
$0.00 |
$0.00 |
0066 |
3"@7.58 GALV.STEEL PIPE POST |
851(B) 3218 |
LF |
88.000 |
88.000 |
|
0.000 |
$14.30 |
$0.00 |
$0.00 |
0067 |
2" SQUARE TUBE POST |
851(C) 8324 |
LF |
11.000 |
11.000 |
|
0.000 |
$7.15 |
$0.00 |
$0.00 |
0068 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) |
855(A) 8812 |
LF |
15,178.000 |
15,178.000 |
|
0.000 |
$0.65 |
$0.00 |
$0.00 |
0069 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) |
855(A) 8814 |
LF |
2,160.000 |
2,160.000 |
|
0.000 |
$1.25 |
$0.00 |
$0.00 |
0070 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) |
855(A) 8825 |
LF |
35.000 |
35.000 |
|
0.000 |
$3.70 |
$0.00 |
$0.00 |
0071 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) |
855(B) 8818 |
EA |
4.000 |
4.000 |
|
0.000 |
$77.00 |
$0.00 |
$0.00 |
0072 |
TRAFFIC STRIPE(PLASTIC)(SYMBOLS) |
855(B) 8824 |
EA |
10.000 |
10.000 |
|
0.000 |
$26.00 |
$0.00 |
$0.00 |
Subtotals For Category 0300/SIGNING AND STRIPING |
$0.00 |
$102.00 |
|
Fed/State Project Number: SSP-150B(079)SS |
Project: 26241(04) |
Category: 0301/TRAFFIC CONTROL |
0073 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
20,525.000 |
20,525.000 |
|
42,440.000 |
$0.15 |
$0.00 |
$6,366.00 |
0074 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 |
857(E) 8890 |
EA |
5,515.000 |
5,515.000 |
|
2,547.700 |
$0.70 |
$0.00 |
$1,783.39 |
0075 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
75.000 |
75.000 |
|
0.000 |
$6.15 |
$0.00 |
$0.00 |
0076 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
970.000 |
970.000 |
279.000 |
1,383.000 |
$1.50 |
$418.50 |
$2,074.50 |
0077 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
1,360.000 |
1,360.000 |
795.000 |
2,003.000 |
$1.50 |
$1,192.50 |
$3,004.50 |
0078 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
1,340.000 |
1,340.000 |
805.000 |
3,783.000 |
$1.50 |
$1,207.50 |
$5,674.50 |
0079 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
800.000 |
800.000 |
480.000 |
1,587.000 |
$1.05 |
$504.00 |
$1,666.35 |
0080 |
WING BARRICADES |
880(C) 8848 |
SD |
1,410.000 |
1,410.000 |
248.000 |
1,328.000 |
$0.03 |
$7.44 |
$39.84 |
0081 |
VERTICAL PANELS |
880(D) 8854 |
SD |
840.000 |
840.000 |
1,643.000 |
10,691.000 |
$0.45 |
$739.35 |
$4,810.95 |
0082 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
2,620.000 |
2,620.000 |
1,890.000 |
6,534.000 |
$0.45 |
$850.50 |
$2,940.30 |
0083 |
DRUMS |
880(F) 8878 |
SD |
5,160.000 |
5,160.000 |
6,975.000 |
24,957.000 |
$0.45 |
$3,138.75 |
$11,230.65 |
0084 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
2,910.000 |
2,910.000 |
|
0.000 |
$0.03 |
$0.00 |
$0.00 |
0085 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
45.000 |
45.000 |
|
0.000 |
$29.00 |
$0.00 |
$0.00 |
Subtotals For Category 0301/TRAFFIC CONTROL |
$8,058.54 |
$39,590.98 |
|