| Contract ID: | 110022 | Estimate Number: | 0001 | Contract No: | 611201 | |||
| Residency: | ARDMORE (07200) | Estimate Type: | Progressive | Account No: | 400700 | |||
| Project Number(s): | BRFY-110B(170), STPY-110B(232), CIRB-110C(204)RB, SSP-110B(218)SS | ||||||||||||
| Primary Job Piece No: | 09477(08) | ||||||||||||
| Contract Description: | GRADE, DRAIN, SURFACE, AND BRIDGE US-70: FROM MERIDAN RD IN LONE GROVE, EXTEND EAST. CITY STREET (MERIDIAN RD): FROM US-70, EXT N IN LONE GROVE. PROJECT LENGTH = 1.694 MILES | ||||||||||||
| Primary County: | CARTER | ||||||||||||
| Name of Road: | US-70 | ||||||||||||
| Prime Contractor: | SILVER STAR CONSTRUCTION COMPANY, INC. | ||||||||||||
| 2401 S. BROADWAY | |||||||||||||
| MOORE , OK 73160 | |||||||||||||
| Surety Company: | LIBERTY MUTUAL INSURANCE COMPANY | ||||||||||||
| Date Let: | 02/17/2011 | NTP Effective Date: | 05/09/2011 | Pay Period: | 03/30/2011 TO 04/30/2011 |
| Date Awarded: | 03/07/2011 | Date Work Began: | 04/12/2011 | Original Contract Time: | 180 |
| Date Contract Executed: | 03/24/2011 | Date Time Stopped: | Current Time Charged: | 18.00 | |
| Date NTP Issued: | 03/30/2011 | Completion Date: | Current Time Allowed: | 180.00 | |
| General Liability Expires: | 05/19/2011 | Workman's Comp Expires: | 05/19/2011 | Percent Time Used: | 10.00 % |
| Specification Year: | 2009 | Date Approved: | |||
| Current Contract Amount: | $6,498,225.78 | Total to Date | Prev to Date | This Estimate | |||
| Bid Amount: | $6,498,225.78 | Participating: | $369,549.84 | $0.00 | $369,549.84 | ||
| Percent Complete: | 5.69 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
| Funds Available: | $6,128,675.94 | Total Earnings: | $369,549.84 | $0.00 | $369,549.84 | ||
| Unearned Balance: | $6,128,675.94 | Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||
| Gross Earnings: | $369,549.84 | $0.00 | $369,549.84 | ||||
| Other Adjustments: | $0.00 | $0.00 | $0.00 | ||||
| Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
| TOTAL: | $369,549.84 | $0.00 | $369,549.84 | ||||
| Contract ID: | 110022 | Estimate Number: | 0001 | Primary JP: | 09477(08) | |||
| CHANGE ORDER HISTORY | |||||
| Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
| No change orders have been created for this contract. | |||||
| STOCKPILE PAYMENT HISTORY | |||||
| Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
| No material stockpiles have been created for this contract. | Subtotals For Stockpile Payments | $0.00 | |||
| LIQUIDATED DAMAGES HISTORY | |||||||||
| Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
| No liquidated damages have been assessed on this contract. | |||||||||
| CONTRACT ADJUSTMENTS HISTORY | ||
| Adjustment Description | Estimate Nbr | Adjustment Amount |
| No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
| LINE ITEM ADJUSTMENT HISTORY | |||||||
| Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
| No line item adjustments have been created on this contract. | Subtotals For Line Item Adjustments | $0.00 | |||||
| MILESTONE ADJUSTMENTS | |||||||||
| Milestone Number | Milestone Description | Time Allowed | Time Used | Rate | Total | ||||
| 02 | Internal Milestone CIRB-110C(204)RB | 08/16/2011 | 0.00 | $5,000.00 | $0.00 | ||||
| Contract ID: | 110022 | Estimate Number: | 0001 | Primary JP: | 09477(08) | |||
| Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
| Fed/State Project Number: BRFY-110B(170) | Project: 09477(08) | Category: 0100/ROADWAY - BRFY-110B(170) | ||||||||
| 0001 | AGGREGATE BASE TYPE A | 303(A) 2100 | CY | 599.000 | 599.000 | 0.000 | $34.00 | $0.00 | $0.00 | |
| 0002 | LIME | 307(D) 4230 | TON | 126.000 | 126.000 | 29.900 | 29.900 | $140.00 | $4,186.00 | $4,186.00 |
| 0003 | LIME STABILIZED SUBGRADE | 307(H) 4270 | SY | 6,346.000 | 6,346.000 | 1,737.780 | 1,737.780 | $3.20 | $5,560.90 | $5,560.90 |
| 0004 | CEMENT TREATED BASE | 317 4270 | SY | 2,933.000 | 2,933.000 | 0.000 | $14.00 | $0.00 | $0.00 | |
| 0005 | SEPARATOR FABRIC | 325 5271 | SY | 4,032.000 | 4,032.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
| 0006 | TRAFFIC BOUND SURFACE COURSE TYPE E | 402(E) 0225 | TON | 885.000 | 885.000 | 0.000 | $14.00 | $0.00 | $0.00 | |
| 0007 | PRIME COAT | 408 5774 | GAL | 1,546.000 | 1,546.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
| 0008 | SUPERPAVE, TYPE S3(PG 64-22 OK) | 411(B) 5945 | TON | 47.000 | 47.000 | 0.000 | $125.00 | $0.00 | $0.00 | |
| 0009 | P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 3,231.000 | 3,231.000 | 1,671.330 | 1,671.330 | $15.00 | $25,069.95 | $25,069.95 |
| 0010 | DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(B) 5725 | SY | 578.000 | 578.000 | 0.000 | $30.00 | $0.00 | $0.00 | |
| 0011 | P.C. CONCRETE FOR PAVEMENT | 414(G) 5275 | CY | 724.000 | 724.000 | 228.560 | 228.560 | $95.00 | $21,713.20 | $21,713.20 |
| 0012 | CLASS C CONCRETE | 509(D) 0325 | CY | 28.000 | 28.000 | 0.000 | $275.00 | $0.00 | $0.00 | |
| 0013 | 18" CORR. GALV. STEEL PIPE | 613(B) 0689 | LF | 532.000 | 532.000 | 492.000 | 492.000 | $22.00 | $10,824.00 | $10,824.00 |
| 0014 | 24" CORR. GALV. STEEL PIPE | 613(B) 0690 | LF | 152.000 | 152.000 | 0.000 | $28.00 | $0.00 | $0.00 | |
| 0015 | 28" X 20" CORR. GALV. STEEL PIPE ARCH | 613(B) 4528 | LF | 360.000 | 360.000 | 180.000 | 180.000 | $29.00 | $5,220.00 | $5,220.00 |
| 0016 | TYPE A6 CULVERT END TREATMENT | 613(M) 7196 | EA | 2.000 | 2.000 | 0.000 | $850.00 | $0.00 | $0.00 | |
| 0017 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 2,098.000 | 2,098.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
| 0018 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 1,712.000 | 1,712.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
| 0019 | SAWING PAVEMENT | 619(C) 0924 | LF | 1,904.000 | 1,904.000 | 0.000 | $3.65 | $0.00 | $0.00 | |
| 0020 | BEAM GUARDRAIL W-BEAM SINGLE | 623(A) 0932 | LF | 175.000 | 175.000 | 0.000 | $27.00 | $0.00 | $0.00 | |
| 0021 | GUARDRAIL ANCHOR UNIT (TYPE B) | 623(F) 4447 | EA | 1.000 | 1.000 | 0.000 | $1,600.00 | $0.00 | $0.00 | |
| 0022 | GUARDRAIL END TREATMENT (GET) | 623(G) 8571 | EA | 1.000 | 1.000 | 0.000 | $2,700.00 | $0.00 | $0.00 | |
| Subtotals For Category 0100/ROADWAY - BRFY-110B(170) | $72,574.05 | $72,574.05 | ||||||||
| Fed/State Project Number: BRFY-110B(170) | Project: 09477(08) | Category: 0200/BRIDGE 'A' - BRFY-110B(170) | ||||||||
| 0023 | UNCLASSIFIED EXCAVATION | 202(A) 1301 | CY | 3,045.000 | 3,045.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
| 0024 | STRUCTURAL EXCAVATION UNCLASSIFIED | 501(A) 1306 | CY | 161.000 | 161.000 | 0.000 | $11.00 | $0.00 | $0.00 | |
| 0025 | CLASS AA CONCRETE | 509(A) 1326 | CY | 441.700 | 441.700 | 0.000 | $310.00 | $0.00 | $0.00 | |
| 0026 | REINFORCING STEEL | 511(A) 1332 | LB | 77,120.000 | 77,120.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
| 0027 | TYPE I PLAIN RIPRAP | 601(A) 1351 | TON | 500.000 | 500.000 | 0.000 | $50.00 | $0.00 | $0.00 | |
| 0028 | REMOVAL OF EXISTING STRUCTURES | 619(B) 4778 | EA | 1.000 | 1.000 | 0.000 | $16,000.00 | $0.00 | $0.00 | |
| Subtotals For Category 0200/BRIDGE 'A' - BRFY-110B(170) | $0.00 | $0.00 | ||||||||
| Subtotals For Project BRFY-110B(170) /09477(08) | $72,574.05 | $72,574.05 | ||||||||
| Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
| Fed/State Project Number: STPY-110B(232) | Project: 23293(04) | Category: 0100/ROADWAY - STPY-110B(232) | ||||||||
| 0029 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 49,878.000 | 49,878.000 | 8,479.260 | 8,479.260 | $5.70 | $48,331.78 | $48,331.78 |
| 0030 | TYPE A-SALVAGED TOPSOIL | 205(A) 4229 | LSUM | 1.000 | 1.000 | 0.170 | 0.170 | $25,000.00 | $4,250.00 | $4,250.00 |
| 0031 | TEMPORARY SILT FENCE | 221(C) 2801 | LF | 1,000.000 | 1,000.000 | 373.000 | 373.000 | $1.10 | $410.30 | $410.30 |
| 0032 | TEMPORARY SEDIMENT FILTER | 221(D) 2803 | EA | 16.000 | 16.000 | 0.000 | $160.00 | $0.00 | $0.00 | |
| 0033 | TEMPORARY SILT DIKE | 221(F) 0100 | LF | 126.000 | 126.000 | 84.000 | 84.000 | $7.00 | $588.00 | $588.00 |
| 0034 | SOLID SLAB SODDING | 230(A) 2806 | SY | 63,418.000 | 63,418.000 | 0.000 | $1.35 | $0.00 | $0.00 | |
| 0035 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 14.000 | 14.000 | 0.000 | $320.00 | $0.00 | $0.00 | |
| 0036 | MOWING | 241 2832 | AC | 14.000 | 14.000 | 0.000 | $53.00 | $0.00 | $0.00 | |
| 0037 | AGGREGATE BASE TYPE A | 303(A) 2100 | CY | 7,023.000 | 7,023.000 | 0.000 | $34.00 | $0.00 | $0.00 | |
| 0038 | LIME | 307(D) 4230 | TON | 1,008.000 | 1,008.000 | 0.000 | $140.00 | $0.00 | $0.00 | |
| 0039 | LIME STABILIZED SUBGRADE | 307(H) 4270 | SY | 45,894.000 | 45,894.000 | 0.000 | $3.20 | $0.00 | $0.00 | |
| 0040 | CEMENT TREATED BASE | 317 4270 | SY | 38,051.000 | 38,051.000 | 0.000 | $14.00 | $0.00 | $0.00 | |
| 0041 | SEPARATOR FABRIC | 325 5271 | SY | 52,025.000 | 52,025.000 | 1,416.660 | 1,416.660 | $1.00 | $1,416.66 | $1,416.66 |
| 0042 | TRAFFIC BOUND SURFACE COURSE TYPE E | 402(E) 0225 | TON | 7,879.000 | 7,879.000 | 0.000 | $14.00 | $0.00 | $0.00 | |
| 0043 | PRIME COAT | 408 5774 | GAL | 17,745.000 | 17,745.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
| 0044 | P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 14,682.000 | 14,682.000 | 1,080.440 | 1,080.440 | $11.50 | $12,425.06 | $12,425.06 |
| 0045 | DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(B) 5725 | SY | 19,092.000 | 19,092.000 | 0.000 | $12.00 | $0.00 | $0.00 | |
| 0046 | P.C. CONCRETE FOR PAVEMENT | 414(G) 5275 | CY | 8,266.000 | 8,266.000 | 271.110 | 271.110 | $95.00 | $25,755.45 | $25,755.45 |
| 0047 | CLASS C CONCRETE | 509(D) 0325 | CY | 465.000 | 465.000 | 0.000 | $215.00 | $0.00 | $0.00 | |
| 0048 | 2'-8" COMB. CURB & GUTTER (8" BARRIER) | 609(B) 1526 | LF | 2,866.000 | 2,866.000 | 0.000 | $18.00 | $0.00 | $0.00 | |
| 0049 | 6" CONCRETE DRIVEWAY | 610(B) 0604 | SY | 3,614.000 | 3,614.000 | 0.000 | $36.00 | $0.00 | $0.00 | |
| 0050 | MANHOLE (4' DIAMETER) | 611(A) 2657 | EA | 1.000 | 1.000 | 0.000 | $1,300.00 | $0.00 | $0.00 | |
| 0051 | REPLACEMENT OF MANHOLE FRAME & COVER | 611(C) 4215 | EA | 1.000 | 1.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
| 0052 | INLET CI DES. 2 (D) | 611(G) 5115 | EA | 3.000 | 3.000 | 0.000 | $4,240.00 | $0.00 | $0.00 | |
| 0053 | INLET CI DES. 3 (2D) | 611(G) 5125 | EA | 1.000 | 1.000 | 0.000 | $4,240.00 | $0.00 | $0.00 | |
| 0054 | INLET CDI RCP DES. 2 | 611(G) 5705 | EA | 13.000 | 13.000 | 0.000 | $4,770.00 | $0.00 | $0.00 | |
| 0055 | ADD'L DEPTH IN INLET CDI RCP DES. 2 | 611(H) 5790 | VF | 46.000 | 46.000 | 0.000 | $371.00 | $0.00 | $0.00 | |
| 0056 | REPLACEMENT OFINLET FRM&GRT (SSIF-FRM,CIG-GRT-VG-F) | 611(I) 4488 | EA | 10.000 | 10.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
| 0057 | REPLACEMENT OF CAST IRON HOOD | 611(M) 4488 | EA | 30.000 | 30.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
| 0058 | 24" R.C.PIPE CLASS III | 613(A) 0492 | LF | 2,090.000 | 2,090.000 | 0.000 | $53.00 | $0.00 | $0.00 | |
| 0059 | 18" CORR. GALV. STEEL PIPE | 613(B) 0689 | LF | 214.000 | 214.000 | 0.000 | $22.00 | $0.00 | $0.00 | |
| 0060 | 21" X 15" CORR. GALV. STEEL PIPE ARCH | 613(B) 4527 | LF | 854.000 | 854.000 | 812.000 | 812.000 | $24.00 | $19,488.00 | $19,488.00 |
| 0061 | 28" X 20" CORR. GALV. STEEL PIPE ARCH | 613(B) 4528 | LF | 60.000 | 60.000 | 0.000 | $29.00 | $0.00 | $0.00 | |
| 0062 | EDGE DRAIN CONDUIT-PERFORATED | 613(J) 5915 | LF | 3,045.000 | 3,045.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
| 0063 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 613(K) 5916 | LF | 150.000 | 150.000 | 0.000 | $30.00 | $0.00 | $0.00 | |
| 0064 | TYPE A4 CULVERT END TREATMENT | 613(M) 7186 | EA | 2.000 | 2.000 | 0.000 | $742.00 | $0.00 | $0.00 | |
| 0065 | TYPE A6 CULVERT END TREATMENT | 613(M) 7196 | EA | 10.000 | 10.000 | 0.000 | $848.00 | $0.00 | $0.00 | |
| 0066 | TYPE B6 CULVERT END TREATMENT | 613(M) 7197 | EA | 3.000 | 3.000 | 0.000 | $954.00 | $0.00 | $0.00 | |
| 0067 | OUTLET LATERAL HEADWALL | 613(Q) 5946 | EA | 3.000 | 3.000 | 0.000 | $1,590.00 | $0.00 | $0.00 | |
| 0068 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 0.170 | 0.170 | $25,000.00 | $4,250.00 | $4,250.00 |
| 0069 | REMOVAL OF HEADWALL | 619(B) 0291 | EA | 5.000 | 5.000 | 5.000 | 5.000 | $530.00 | $2,650.00 | $2,650.00 |
| 0070 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 1,107.000 | 1,107.000 | 0.000 | $6.00 | $0.00 | $0.00 | |
| 0071 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 17,246.000 | 17,246.000 | 788.350 | 788.350 | $3.30 | $2,601.56 | $2,601.56 |
| 0072 | REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 619(B) 4763 | SY | 12,824.000 | 12,824.000 | 2,289.450 | 2,289.450 | $5.00 | $11,447.25 | $11,447.25 |
| 0073 | SAWING PAVEMENT | 619(C) 0924 | LF | 8,032.000 | 8,032.000 | 1,565.000 | 1,565.000 | $3.65 | $5,712.25 | $5,712.25 |
| 0074 | MAILBOX INSTALLATION-SINGLE | 629(A) 4958 | EA | 2.000 | 2.000 | 0.000 | $70.00 | $0.00 | $0.00 | |
| 0075 | MAILBOX INSTALLATION-MULTIPLE | 629(B) 4959 | EA | 2.000 | 2.000 | 0.000 | $120.00 | $0.00 | $0.00 | |
| 0076 | MAILBOX | 629(C) 4960 | EA | 7.000 | 7.000 | 0.000 | $27.00 | $0.00 | $0.00 | |
| 0077 | REMOVAL OF MAILBOX INSTALLATION | 629(D) 4961 | EA | 4.000 | 4.000 | 0.000 | $6.00 | $0.00 | $0.00 | |
| Subtotals For Category 0100/ROADWAY - STPY-110B(232) | $139,326.31 | $139,326.31 | ||||||||
| Fed/State Project Number: STPY-110B(232) | Project: 23293(04) | Category: 0300/TRAFFIC - STPY-110B(232) | ||||||||
| 0078 | (SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 823 8478 | SD | 90.000 | 90.000 | 0.000 | $110.00 | $0.00 | $0.00 | |
| 0079 | CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 857(A) 8839 | LF | 23,000.000 | 23,000.000 | 0.000 | $0.16 | $0.00 | $0.00 | |
| 0080 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2 | 857(E) 8890 | EA | 3,000.000 | 3,000.000 | 306.000 | 306.000 | $2.00 | $612.00 | $612.00 |
| 0081 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 857(F) 8006 | LF | 6,500.000 | 6,500.000 | 0.000 | $0.30 | $0.00 | $0.00 | |
| 0082 | (SP)CONST.ZONE IMPACT ATTEN. | 871(B) 8705 | SD | 720.000 | 720.000 | 12.000 | 12.000 | $8.00 | $96.00 | $96.00 |
| 0083 | DELIVER PORTABLE LONGITUDINAL BARRIER | 877(B) 8484 | LF | 3,450.000 | 3,450.000 | 1,352.000 | 1,352.000 | $35.00 | $47,320.00 | $47,320.00 |
| 0084 | RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 877(C) 8486 | LF | 3,212.500 | 3,212.500 | 0.000 | $6.00 | $0.00 | $0.00 | |
| 0085 | MODULAR GLARE SCREEN (TEMPORARY) | 878(B) 8487 | SD | 17,640.000 | 17,640.000 | 0.000 | $0.30 | $0.00 | $0.00 | |
| 0086 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 720.000 | 720.000 | 38.000 | 38.000 | $3.20 | $121.60 | $121.60 |
| 0087 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 16,200.000 | 16,200.000 | 722.000 | 722.000 | $0.55 | $397.10 | $397.10 |
| 0088 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 8,640.000 | 8,640.000 | 399.000 | 399.000 | $0.80 | $319.20 | $319.20 |
| 0089 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 9,900.000 | 9,900.000 | 328.000 | 328.000 | $1.10 | $360.80 | $360.80 |
| 0090 | CONSTRUCTION BARRICADES(TYPE III) | 880(C) 8842 | SD | 7,920.000 | 7,920.000 | 288.000 | 288.000 | $0.55 | $158.40 | $158.40 |
| 0091 | WING BARRICADES | 880(C) 8848 | SD | 720.000 | 720.000 | 66.000 | 66.000 | $1.10 | $72.60 | $72.60 |
| 0092 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 22,860.000 | 22,860.000 | 816.000 | 816.000 | $0.11 | $89.76 | $89.76 |
| 0093 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 22,500.000 | 22,500.000 | 758.000 | 758.000 | $0.11 | $83.38 | $83.38 |
| 0094 | DRUMS | 880(F) 8878 | SD | 22,500.000 | 22,500.000 | 728.000 | 728.000 | $0.11 | $80.08 | $80.08 |
| 0095 | TUBE CHANNELIZERS | 880(G) 8884 | SD | 9,900.000 | 9,900.000 | 6,550.000 | 6,550.000 | $0.11 | $720.50 | $720.50 |
| 0096 | PORT.CHANGEABLE MESSAGE SIGN | 882(A) 8306 | SD | 360.000 | 360.000 | 0.000 | $26.50 | $0.00 | $0.00 | |
| Subtotals For Category 0300/TRAFFIC - STPY-110B(232) | $50,431.42 | $50,431.42 | ||||||||
| Fed/State Project Number: STPY-110B(232) | Project: 23293(04) | Category: 0301/TRAFFIC SIGNING AND STRIPING -STPY-110B(232) | ||||||||
| 0097 | 1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8338 | LF | 1,440.000 | 1,440.000 | 0.000 | $4.24 | $0.00 | $0.00 | |
| 0098 | 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8342 | LF | 110.000 | 110.000 | 0.000 | $5.30 | $0.00 | $0.00 | |
| 0099 | 3" PVC SCH.40 PLASTIC CONDUIT BORED | 802(B) 8344 | LF | 595.000 | 595.000 | 0.000 | $21.20 | $0.00 | $0.00 | |
| 0100 | 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8346 | LF | 100.000 | 100.000 | 0.000 | $8.48 | $0.00 | $0.00 | |
| 0101 | PULL BOX(SIZE I) | 803(A) 8065 | EA | 6.000 | 6.000 | 0.000 | $212.00 | $0.00 | $0.00 | |
| 0102 | PULL BOX(SIZE II) | 803(A) 8066 | EA | 4.000 | 4.000 | 0.000 | $265.00 | $0.00 | $0.00 | |
| 0103 | PULL BOX(SIZE III) | 803(A) 8067 | EA | 8.000 | 8.000 | 0.000 | $206.70 | $0.00 | $0.00 | |
| 0104 | 1/C NO.10 ELECTRICAL CONDUCTOR | 811 8044 | LF | 2,130.000 | 2,130.000 | 0.000 | $0.53 | $0.00 | $0.00 | |
| 0105 | LOOP DETECTOR WIRE | 828(B) 8136 | LF | 2,585.000 | 2,585.000 | 0.000 | $4.24 | $0.00 | $0.00 | |
| 0106 | 5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 834(A) 8207 | LF | 415.000 | 415.000 | 0.000 | $1.59 | $0.00 | $0.00 | |
| 0107 | 9/C TRAFFIC SIGNAL ELECTRICAL CABLE | 834(A) 8209 | LF | 450.000 | 450.000 | 0.000 | $2.12 | $0.00 | $0.00 | |
| 0108 | 12/C TRAFFIC SIGNAL ELECTRICAL CABLE | 834(A) 8210 | LF | 276.000 | 276.000 | 0.000 | $2.39 | $0.00 | $0.00 | |
| 0109 | 2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 834(B) 8220 | LF | 3,065.000 | 3,065.000 | 0.000 | $1.06 | $0.00 | $0.00 | |
| 0110 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 276.800 | 276.800 | 0.000 | $12.19 | $0.00 | $0.00 | |
| 0111 | 2" SQUARE TUBE POST | 851(C) 8324 | LF | 494.500 | 494.500 | 0.000 | $6.89 | $0.00 | $0.00 | |
| 0112 | 2 1/2" SQUARE TUBE POST | 851(C) 8330 | LF | 167.000 | 167.000 | 0.000 | $6.89 | $0.00 | $0.00 | |
| 0113 | TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 856(A) 8530 | LF | 45,316.000 | 45,316.000 | 0.000 | $0.45 | $0.00 | $0.00 | |
| 0114 | TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 856(B) 8525 | EA | 26.000 | 26.000 | 0.000 | $159.00 | $0.00 | $0.00 | |
| 0115 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 857(F) 8006 | LF | 10,349.000 | 10,349.000 | 0.000 | $0.27 | $0.00 | $0.00 | |
| Subtotals For Category 0301/TRAFFIC SIGNING AND STRIPING -STPY-110B(232) | $0.00 | $0.00 | ||||||||
| Subtotals For Project STPY-110B(232) /23293(04) | $189,757.73 | $189,757.73 | ||||||||
| Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
| Fed/State Project Number: CIRB-110C(204)RB | Project: 24806(04) | Category: 0100/ROADWAY - CIRB-110C(204)RB | ||||||||
| 0116 | CLEARING AND GRUBBING | 201(A) 0102 | LSUM | 1.000 | 1.000 | 0.000 | $5,000.00 | $0.00 | $0.00 | |
| 0117 | EARTHWORK | 202(H) 0185 | LSUM | 1.000 | 1.000 | 0.000 | $59,000.00 | $0.00 | $0.00 | |
| 0118 | TYPE A-SALVAGED TOPSOIL | 205(A) 4229 | LSUM | 1.000 | 1.000 | 0.000 | $8,000.00 | $0.00 | $0.00 | |
| 0119 | TEMPORARY SILT FENCE | 221(C) 2801 | LF | 4,400.000 | 4,400.000 | 0.000 | $1.10 | $0.00 | $0.00 | |
| 0120 | TEMPORARY SEDIMENT FILTER | 221(D) 2803 | EA | 26.000 | 26.000 | 0.000 | $160.00 | $0.00 | $0.00 | |
| 0121 | TEMPORARY SILT DIKE | 221(F) 0100 | LF | 105.000 | 105.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
| 0122 | SOLID SLAB SODDING | 230(A) 2806 | SY | 12,280.000 | 12,280.000 | 0.000 | $1.35 | $0.00 | $0.00 | |
| 0123 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 3.000 | 3.000 | 0.000 | $320.00 | $0.00 | $0.00 | |
| 0124 | AGGREGATE BASE TYPE A | 303(A) 2100 | CY | 2,221.000 | 2,221.000 | 0.000 | $34.00 | $0.00 | $0.00 | |
| 0125 | LIME | 307(D) 4230 | TON | 295.000 | 295.000 | 0.000 | $140.00 | $0.00 | $0.00 | |
| 0126 | LIME STABILIZED SUBGRADE | 307(H) 4270 | SY | 13,324.000 | 13,324.000 | 0.000 | $3.20 | $0.00 | $0.00 | |
| 0127 | TRAFFIC BOUND SURFACE COURSE TYPE E | 402(E) 0225 | TON | 318.000 | 318.000 | 0.000 | $14.00 | $0.00 | $0.00 | |
| 0128 | SUPERPAVE, TYPE S3(PG 70-28 OK) | 411(B) 5940 | TON | 2,275.000 | 2,275.000 | 0.000 | $66.00 | $0.00 | $0.00 | |
| 0129 | SUPERPAVE, TYPE S3(PG 64-22 OK) | 411(B) 5945 | TON | 159.000 | 159.000 | 0.000 | $60.00 | $0.00 | $0.00 | |
| 0130 | SUPERPAVE, TYPE S4(PG 70-28 OK) | 411(C) 5955 | TON | 1,136.000 | 1,136.000 | 0.000 | $77.00 | $0.00 | $0.00 | |
| 0131 | SUPERPAVE, TYPE S4(PG 64-22 OK) | 411(C) 5960 | TON | 80.000 | 80.000 | 0.000 | $90.00 | $0.00 | $0.00 | |
| 0132 | P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 882.000 | 882.000 | 0.000 | $22.00 | $0.00 | $0.00 | |
| 0133 | P.C. CONCRETE FOR PAVEMENT | 414(G) 5275 | CY | 147.000 | 147.000 | 0.000 | $95.00 | $0.00 | $0.00 | |
| 0134 | CLASS C CONCRETE | 509(D) 1331 | CY | 10.000 | 10.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
| 0135 | TYPE I PLAIN RIPRAP | 601(A) 0297 | TON | 2.520 | 2.520 | 0.000 | $50.00 | $0.00 | $0.00 | |
| 0136 | CONCRETE CURB (6" BARRIER-INTEGRAL) | 609(A) 0300 | LF | 386.000 | 386.000 | 0.000 | $9.00 | $0.00 | $0.00 | |
| 0137 | 1'-8" COMB. CURB & GUTTER (6" BARRIER) | 609(B) 1513 | LF | 4,518.000 | 4,518.000 | 0.000 | $13.00 | $0.00 | $0.00 | |
| 0138 | SPECIAL INLET DRAIN | 611(G) 4012 | EA | 11.000 | 11.000 | 0.000 | $4,240.00 | $0.00 | $0.00 | |
| 0139 | INLET CI DES. 2 (STD) | 611(G) 5112 | EA | 4.000 | 4.000 | 0.000 | $2,120.00 | $0.00 | $0.00 | |
| 0140 | INLET CI DES. 2 (B) | 611(G) 5113 | EA | 4.000 | 4.000 | 0.000 | $2,650.00 | $0.00 | $0.00 | |
| 0141 | INLET CI DES. 2 (D) | 611(G) 5115 | EA | 1.000 | 1.000 | 0.000 | $2,650.00 | $0.00 | $0.00 | |
| 0142 | INLET CI DES. 3 (STD) | 611(G) 5120 | EA | 3.000 | 3.000 | 0.000 | $2,120.00 | $0.00 | $0.00 | |
| 0143 | INLET CI DES. 3 (D) | 611(G) 5122 | EA | 3.000 | 3.000 | 0.000 | $2,650.00 | $0.00 | $0.00 | |
| 0144 | INLET (SMD-TYPE 1) | 611(G) 6000 | EA | 2.000 | 2.000 | 0.000 | $2,120.00 | $0.00 | $0.00 | |
| 0145 | INLET (SMD-TYPE 2B) | 611(G) 6006 | EA | 2.000 | 2.000 | 0.000 | $2,226.00 | $0.00 | $0.00 | |
| 0146 | ADDITIONAL DEPTH IN INLET | 611(H) 5196 | VF | 47.300 | 47.300 | 0.000 | $212.00 | $0.00 | $0.00 | |
| 0147 | 18" R.C.PIPE CLASS III | 613(A) 0491 | LF | 1,653.000 | 1,653.000 | 0.000 | $43.00 | $0.00 | $0.00 | |
| 0148 | 24" R.C.PIPE CLASS III | 613(A) 0492 | LF | 881.000 | 881.000 | 0.000 | $53.00 | $0.00 | $0.00 | |
| 0149 | 36" R.C.PIPE CLASS III | 613(A) 0494 | LF | 536.000 | 536.000 | 0.000 | $85.00 | $0.00 | $0.00 | |
| 0150 | 28 1/2" X 18" R.C.PIPE ARCH CLASS A-III | 613(A) 4410 | LF | 324.500 | 324.500 | 0.000 | $70.00 | $0.00 | $0.00 | |
| 0151 | 22" X 13" R.C.PIPE ARCH CLASS A-III | 613(A) 4495 | LF | 120.000 | 120.000 | 0.000 | $53.00 | $0.00 | $0.00 | |
| 0152 | 28 1/2" X 18" PREFAB. CULVERT END SECTION, ARCH | 613(L) 4584 | EA | 2.000 | 2.000 | 0.000 | $1,060.00 | $0.00 | $0.00 | |
| 0153 | 36" PREFAB. CULVERT END SECTION, ROUND | 613(L) 5734 | EA | 2.000 | 2.000 | 0.000 | $1,590.00 | $0.00 | $0.00 | |
| 0154 | SPECIAL END SECTION OF 22" X 13" RCP ARCH | 613(O) 4800 | EA | 4.000 | 4.000 | 0.000 | $848.00 | $0.00 | $0.00 | |
| 0155 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 0.000 | $7,000.00 | $0.00 | $0.00 | |
| 0156 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 7,469.000 | 7,469.000 | 0.000 | $3.00 | $0.00 | $0.00 | |
| 0157 | REMOVAL OF CONCRETE DRIVEWAY | 619(B) 4766 | SY | 274.000 | 274.000 | 0.000 | $8.00 | $0.00 | $0.00 | |
| 0158 | REMOVAL OF CURB | 619(B) 4791 | LF | 210.000 | 210.000 | 0.000 | $10.00 | $0.00 | $0.00 | |
| 0159 | SAWING PAVEMENT | 619(C) 0924 | LF | 760.000 | 760.000 | 0.000 | $3.65 | $0.00 | $0.00 | |
| Subtotals For Category 0100/ROADWAY - CIRB-110C(204)RB | $0.00 | $0.00 | ||||||||
| Fed/State Project Number: CIRB-110C(204)RB | Project: 24806(04) | Category: 0300/TRAFFIC - CIRB-110C(204)RB | ||||||||
| 0160 | 1 1/2" PVC SCH.40 PLASTIC CONDUIT BORED | 802(B) 8336 | LF | 30.000 | 30.000 | 0.000 | $21.20 | $0.00 | $0.00 | |
| 0161 | 1 1/2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8338 | LF | 60.000 | 60.000 | 0.000 | $4.24 | $0.00 | $0.00 | |
| 0162 | 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8342 | LF | 20.000 | 20.000 | 0.000 | $5.30 | $0.00 | $0.00 | |
| 0163 | 3" PVC SCH.40 PLASTIC CONDUIT BORED | 802(B) 8344 | LF | 20.000 | 20.000 | 0.000 | $21.20 | $0.00 | $0.00 | |
| 0164 | 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED | 802(B) 8346 | LF | 40.000 | 40.000 | 0.000 | $8.48 | $0.00 | $0.00 | |
| 0165 | PULL BOX(SIZE I) | 803(A) 8065 | EA | 1.000 | 1.000 | 0.000 | $212.00 | $0.00 | $0.00 | |
| 0166 | PULL BOX(SIZE II) | 803(A) 8066 | EA | 1.000 | 1.000 | 0.000 | $238.50 | $0.00 | $0.00 | |
| 0167 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 5.000 | 5.000 | 0.000 | $530.00 | $0.00 | $0.00 | |
| 0168 | REINFORCING STEEL | 804(B) 2916 | LB | 771.800 | 771.800 | 0.000 | $2.12 | $0.00 | $0.00 | |
| 0169 | (PL)REMOVAL OF TRAFFIC SIGNAL EQUIPMENT | 805(A) 8726 | LSUM | 1.000 | 1.000 | 0.000 | $1,590.00 | $0.00 | $0.00 | |
| 0170 | (PL)REMOVE & RESET TRAFFIC SIGNAL EQUIPMENT | 805(D) 8742 | LSUM | 1.000 | 1.000 | 0.000 | $1,590.00 | $0.00 | $0.00 | |
| 0171 | (PL)REMOVE & RESET GROUND MOUNTED SIGN | 805(D) 8760 | EA | 8.000 | 8.000 | 0.000 | $212.00 | $0.00 | $0.00 | |
| 0172 | 32'MH POLE 35'TS & 10'LMA(G.STL.) | 806(A) 8311 | EA | 1.000 | 1.000 | 0.000 | $5,803.50 | $0.00 | $0.00 | |
| 0173 | 32'MH POLE,20'TS & 10'LMA(G.STL.) | 806(A) 8352 | EA | 1.000 | 1.000 | 0.000 | $3,694.10 | $0.00 | $0.00 | |
| 0174 | ROADWAY LUMINAIRE | 809(A) 8090 | EA | 2.000 | 2.000 | 0.000 | $424.00 | $0.00 | $0.00 | |
| 0175 | 1/C NO.6 ELECTRICAL CONDUCTOR | 811 8040 | LF | 200.000 | 200.000 | 0.000 | $2.12 | $0.00 | $0.00 | |
| 0176 | 1/C NO.10 ELECTRICAL CONDUCTOR | 811 8044 | LF | 330.000 | 330.000 | 0.000 | $1.06 | $0.00 | $0.00 | |
| 0177 | SOL.STE.DIGITAL IND.VEH.LP.DET. | 828(A) 8135 | EA | 1.000 | 1.000 | 0.000 | $212.00 | $0.00 | $0.00 | |
| 0178 | LOOP DETECTOR WIRE | 828(B) 8136 | LF | 890.000 | 890.000 | 0.000 | $4.24 | $0.00 | $0.00 | |
| 0179 | 1WAY 3SEC. ADJ. SIG. HD. S-9 | 831 8252 | EA | 1.000 | 1.000 | 0.000 | $636.00 | $0.00 | $0.00 | |
| 0180 | 1WAY 4SEC. ADJ. SIG. HD. S-16 | 831 8274 | EA | 1.000 | 1.000 | 0.000 | $848.00 | $0.00 | $0.00 | |
| 0181 | BACKPLATE | 833 3030 | EA | 2.000 | 2.000 | 0.000 | $74.20 | $0.00 | $0.00 | |
| 0182 | 5/C TRAFFIC SIGNAL ELECTRICAL CABLE | 834(A) 8207 | LF | 250.000 | 250.000 | 0.000 | $1.59 | $0.00 | $0.00 | |
| 0183 | 7/C TRAFFIC SIGNAL ELECTRICAL CABLE | 834(A) 8208 | LF | 80.000 | 80.000 | 0.000 | $1.86 | $0.00 | $0.00 | |
| 0184 | 9/C TRAFFIC SIGNAL ELECTRICAL CABLE | 834(A) 8209 | LF | 330.000 | 330.000 | 0.000 | $2.12 | $0.00 | $0.00 | |
| 0185 | 12/C TRAFFIC SIGNAL ELECTRICAL CABLE | 834(A) 8210 | LF | 50.000 | 50.000 | 0.000 | $2.39 | $0.00 | $0.00 | |
| 0186 | 2/C SHIELDED LOOP DETECTOR LEAD-IN CABLE | 834(B) 8220 | LF | 250.000 | 250.000 | 0.000 | $1.06 | $0.00 | $0.00 | |
| 0187 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 122.500 | 122.500 | 0.000 | $12.19 | $0.00 | $0.00 | |
| 0188 | MAST ARM MOUNTED SIGNS(ALUMINUM) | 850(C) 8118 | SF | 27.600 | 27.600 | 0.000 | $37.10 | $0.00 | $0.00 | |
| 0189 | 2 1/4" SQUARE TUBE POST | 851(C) 8327 | LF | 221.000 | 221.000 | 0.000 | $6.89 | $0.00 | $0.00 | |
| 0190 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 6,171.000 | 6,171.000 | 0.000 | $0.85 | $0.00 | $0.00 | |
| 0191 | TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 855(A) 8814 | LF | 85.000 | 85.000 | 0.000 | $3.18 | $0.00 | $0.00 | |
| 0192 | TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 855(A) 8825 | LF | 83.000 | 83.000 | 0.000 | $6.36 | $0.00 | $0.00 | |
| 0193 | TRAFFIC STRIPE(PLASTIC)(ARROWS) | 855(B) 8818 | EA | 22.000 | 22.000 | 0.000 | $90.10 | $0.00 | $0.00 | |
| 0194 | TRAFFIC STRIPE(PLASTIC)(WORDS) | 855(B) 8821 | EA | 1.000 | 1.000 | 0.000 | $116.60 | $0.00 | $0.00 | |
| 0195 | CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 857(A) 8839 | LF | 2,800.000 | 2,800.000 | 0.000 | $0.53 | $0.00 | $0.00 | |
| 0196 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 5,535.000 | 5,535.000 | 0.000 | $0.27 | $0.00 | $0.00 | |
| 0197 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 225.000 | 225.000 | 0.000 | $3.18 | $0.00 | $0.00 | |
| 0198 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 770.000 | 770.000 | 0.000 | $3.18 | $0.00 | $0.00 | |
| 0199 | CONSTRUCTION BARRICADES(TYPE III) | 880(C) 8842 | SD | 4,300.000 | 4,300.000 | 0.000 | $0.11 | $0.00 | $0.00 | |
| 0200 | WING BARRICADES | 880(C) 8848 | SD | 180.000 | 180.000 | 0.000 | $1.06 | $0.00 | $0.00 | |
| 0201 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 8,685.000 | 8,685.000 | 0.000 | $0.11 | $0.00 | $0.00 | |
| 0202 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 4,770.000 | 4,770.000 | 0.000 | $0.11 | $0.00 | $0.00 | |
| 0203 | DRUMS | 880(F) 8878 | SD | 4,770.000 | 4,770.000 | 0.000 | $0.11 | $0.00 | $0.00 | |
| 0204 | CHANNELIZER CONES | 880(G) 8890 | SD | 9,450.000 | 9,450.000 | 0.000 | $0.11 | $0.00 | $0.00 | |
| 0205 | CONES(28" MEDIUM) | 880(H) 8890 | SD | 8,550.000 | 8,550.000 | 0.000 | $0.11 | $0.00 | $0.00 | |
| Subtotals For Category 0300/TRAFFIC - CIRB-110C(204)RB | $0.00 | $0.00 | ||||||||
| Subtotals For Project CIRB-110C(204)RB /24806(04) | $0.00 | $0.00 | ||||||||
| Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
| Fed/State Project Number: SSP-110B(218)SS | Project: 26499(04) | Category: 0100/ROADWAY - SSP-110B(218)SS | ||||||||
| 0206 | AGGREGATE BASE TYPE A | 303(A) 2100 | CY | 1,645.000 | 1,645.000 | 0.000 | $34.00 | $0.00 | $0.00 | |
| 0207 | LIME | 307(D) 4230 | TON | 215.000 | 215.000 | 15.290 | 15.290 | $140.00 | $2,140.60 | $2,140.60 |
| 0208 | LIME STABILIZED SUBGRADE | 307(H) 4270 | SY | 9,949.000 | 9,949.000 | 840.000 | 840.000 | $3.20 | $2,688.00 | $2,688.00 |
| 0209 | CEMENT TREATED BASE | 317 4270 | SY | 8,661.000 | 8,661.000 | 0.000 | $14.00 | $0.00 | $0.00 | |
| 0210 | SEPARATOR FABRIC | 325 5271 | SY | 11,096.000 | 11,096.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
| 0211 | TRAFFIC BOUND SURFACE COURSE TYPE E | 402(E) 0225 | TON | 1,691.000 | 1,691.000 | 0.000 | $14.00 | $0.00 | $0.00 | |
| 0212 | PRIME COAT | 408 5774 | GAL | 4,295.000 | 4,295.000 | 0.000 | $4.00 | $0.00 | $0.00 | |
| 0213 | P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 3,457.000 | 3,457.000 | 746.670 | 746.670 | $11.50 | $8,586.71 | $8,586.71 |
| 0214 | DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(B) 5725 | SY | 3,669.000 | 3,669.000 | 0.000 | $12.00 | $0.00 | $0.00 | |
| 0215 | P.C. CONCRETE FOR PAVEMENT | 414(G) 5275 | CY | 1,862.000 | 1,862.000 | 124.450 | 124.450 | $95.00 | $11,822.75 | $11,822.75 |
| 0216 | CLASS AA CONCRETE | 509(A) 1326 | CY | 92.000 | 92.000 | 0.000 | $310.00 | $0.00 | $0.00 | |
| 0217 | REINFORCING STEEL | 511(A) 0332 | LB | 13,717.000 | 13,717.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
| 0218 | 2'-8" COMB. CURB & GUTTER (8" BARRIER) | 609(B) 1526 | LF | 420.000 | 420.000 | 0.000 | $17.00 | $0.00 | $0.00 | |
| 0219 | INLET CDI RCP DES. 2 | 611(G) 5705 | EA | 4.000 | 4.000 | 0.000 | $4,770.00 | $0.00 | $0.00 | |
| 0220 | INLET (SMD-TYPE 2) | 611(G) 6002 | EA | 1.000 | 1.000 | 0.000 | $2,120.00 | $0.00 | $0.00 | |
| 0221 | 24" R.C.PIPE CLASS III | 613(A) 0492 | LF | 452.000 | 452.000 | 0.000 | $53.00 | $0.00 | $0.00 | |
| 0222 | 18" CORR. GALV. STEEL PIPE | 613(B) 0689 | LF | 96.000 | 96.000 | 0.000 | $22.00 | $0.00 | $0.00 | |
| 0223 | EDGE DRAIN CONDUIT-PERFORATED | 613(J) 5915 | LF | 420.000 | 420.000 | 0.000 | $7.00 | $0.00 | $0.00 | |
| 0224 | EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 613(K) 5916 | LF | 50.000 | 50.000 | 0.000 | $25.00 | $0.00 | $0.00 | |
| 0225 | TYPE A4 CULVERT END TREATMENT | 613(M) 7186 | EA | 2.000 | 2.000 | 0.000 | $742.00 | $0.00 | $0.00 | |
| 0226 | TYPE A6 CULVERT END TREATMENT | 613(M) 7196 | EA | 2.000 | 2.000 | 0.000 | $848.00 | $0.00 | $0.00 | |
| 0227 | OUTLET LATERAL HEADWALL | 613(Q) 5946 | EA | 1.000 | 1.000 | 0.000 | $1,590.00 | $0.00 | $0.00 | |
| 0228 | REMOVAL OF HEADWALL | 619(B) 0291 | EA | 1.000 | 1.000 | 1.000 | 1.000 | $530.00 | $530.00 | $530.00 |
| 0229 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 3,457.000 | 3,457.000 | 0.000 | $4.65 | $0.00 | $0.00 | |
| 0230 | REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 619(B) 4763 | SY | 2,964.000 | 2,964.000 | 0.000 | $6.00 | $0.00 | $0.00 | |
| 0231 | SAWING PAVEMENT | 619(C) 0924 | LF | 2,644.000 | 2,644.000 | 0.000 | $3.65 | $0.00 | $0.00 | |
| 0232 | MAILBOX INSTALLATION-SINGLE | 629(A) 4958 | EA | 1.000 | 1.000 | 0.000 | $70.00 | $0.00 | $0.00 | |
| 0233 | MAILBOX INSTALLATION-MULTIPLE | 629(B) 4959 | EA | 1.000 | 1.000 | 0.000 | $120.00 | $0.00 | $0.00 | |
| 0234 | MAILBOX | 629(C) 4960 | EA | 4.000 | 4.000 | 0.000 | $30.00 | $0.00 | $0.00 | |
| 0235 | REMOVAL OF MAILBOX INSTALLATION | 629(D) 4961 | EA | 2.000 | 2.000 | 0.000 | $6.00 | $0.00 | $0.00 | |
| Subtotals For Category 0100/ROADWAY - SSP-110B(218)SS | $25,768.06 | $25,768.06 | ||||||||
| Fed/State Project Number: SSP-110B(218)SS | Project: 26499(04) | Category: 0600/STAKING - SSP-110B(218)SS | ||||||||
| 0236 | CONSTRUCTION STAKING LEVEL II | 642(B) 0096 | LSUM | 1.000 | 1.000 | 0.170 | 0.170 | $35,000.00 | $5,950.00 | $5,950.00 |
| Subtotals For Category 0600/STAKING - SSP-110B(218)SS | $5,950.00 | $5,950.00 | ||||||||
| Fed/State Project Number: SSP-110B(218)SS | Project: 26499(04) | Category: 0640/CONSTRUCTION - SSP-110B(218)SS | ||||||||
| 0237 | SWPPP DOCUMENTATION AND MANAGEMENT | 220 2800 | LSUM | 1.000 | 1.000 | 0.170 | 0.170 | $10,000.00 | $1,700.00 | $1,700.00 |
| 0238 | MOBILIZATION | 641 1552 | LSUM | 1.000 | 1.000 | 0.360 | 0.360 | $205,000.00 | $73,800.00 | $73,800.00 |
| Subtotals For Category 0640/CONSTRUCTION - SSP-110B(218)SS | $75,500.00 | $75,500.00 | ||||||||
| Subtotals For Project SSP-110B(218)SS /26499(04) | $107,218.06 | $107,218.06 | ||||||||