Contract ID: | 110016 | Estimate Number: | 0039 , Final | Spec Year: | 2009 | |||
Primary JP: | 23480(04) | Residency: | SAND SPRINGS (08400) | Contract No: | 611381 | |||
Date Created: | 10/08/2014 | Contractor FEI: | 730764097A | Account No: | 434800 |
Project Number(s): | CIRB-157C(083)RB | ||||||||
Contract Description: | BRIDGE AND APPROACHES COUNTY ROAD (E. STREET): OVER THE ARKANSAS RIVER, AT THE OSAGE/PAWNEE COUNTY LINE. PROJECT LENGTH = 2.065 MILES. | ||||||||
Primary County: | PAWNEE | ||||||||
Name of Road: | COUNTY ROAD | ||||||||
Prime Contractor: | MANHATTAN ROAD & BRIDGE COMPANY | Time Charged: | 320.00 | ||||||
5601 S. 122ND E. AVE. | Time Allowed: | 267.00 | |||||||
TULSA , OK 74146 | Percent Time: | 119.85 % |
Paid To Date: | $6,002,571.58 | Payable This Statement: | $0.00 |
CONTRACTOR AFFIDAVIT |
STATE OF ___________________ | ) | |
) § | ||
COUNTY OF __________________ | ) |
The undersigned contractor or duly authorized agent, of lawful age, being first duly sworn, on oath say that this claim is true and correct. |
Affiant further states that the work, services or materials as shown by this claim have been completed or supplied in accordance with the plans, specifications, orders, requests and all other terms of the contract. Affiant further states that (s)he is duly authorized agent of the contractor for the purpose of certifying the facts pertaining to the giving of things of value to government personnel in order to procure the contract or obtain payment; that (s)he is fully aware of the facts and circumstances surrounding the making of the contract and has been personally and directly involved in the proceedings leading to the procurement of the contract and the filing of this claim; and, neither the contractor nor anyone subject to the contractor's direction or control has been paid, given or donated or agreed to pay, give or donate to any officer or employee of the State of Oklahoma any money or other thing of value, either directly or |
indirectly, in procuring the contract or obtaining payment. The affiant further certifies that all laborers, mechanics, apprentices and trainees employed by him/her or by any subcontractor performing work under the contract on the project have been paid wages at rates not less than those required by the contract provisions, and that the work performed by each such laborer, mechanic, apprentice or trainee conformed to the classifications set forth in the contract or training program provisions applicable to the wage rate paid. |
Affiant hereby agrees that Contractor will accept this estimate as full compensation for all money due Contractor by the Department of Transportation, and hereby relinquish all claims, either in contract or in tort, which have arisen or which might arise out of the construction of said project. That to the best of my knowledge and belief, all indebtedness for labor, materials, fuel, equipment, equipment rental, parts, supplies, insurance premiums, and claims for items not specifically mentioned, which are attributable to performance of the work on this project or which were incorporated therein in any manner, have been paid in full, and that there are not now any presently outstanding, unpaid claims for such indebtedness; that my position with the company is such, that if there were any such outstanding claims of the nature specified herein, I would ordinarily be aware of them. |
Further affiant sayeth not. |
MANHATTAN ROAD & BRIDGE COMPANY |
_________________________________________________ |
Affiant Signature |
_________________________________________________ |
Affiant Printed Name |
PE Seal |
_________________________________________________ |
Affiant Company Position |
Subscribed and sworn to before me this ______ day of ____________, 20____ |
My Commission Number: ____________ My Commission Expires: ______________ |
_________________________________________________ |
_________________________________________________ |
Professional Engineer Signature |
Oklahoma Department of Transportation |
Corporate Seal |
Notary Seal |
Contract ID: | 110016 | Estimate Number: | 0039 | Contract No: | 611381 | |||
Residency: | SAND SPRINGS (08400) | Estimate Type: | Final | Account No: | 434800 | |||
Project Number(s): | CIRB-157C(083)RB | ||||||||||||
Primary Job Piece No: | 23480(04) | ||||||||||||
Contract Description: | BRIDGE AND APPROACHES COUNTY ROAD (E. STREET): OVER THE ARKANSAS RIVER, AT THE OSAGE/PAWNEE COUNTY LINE. PROJECT LENGTH = 2.065 MILES. | ||||||||||||
Primary County: | PAWNEE | ||||||||||||
Name of Road: | COUNTY ROAD | ||||||||||||
Prime Contractor: | MANHATTAN ROAD & BRIDGE COMPANY | ||||||||||||
5601 S. 122ND E. AVE. | |||||||||||||
TULSA , OK 74146 | |||||||||||||
Surety Company: | FEDERAL INSURANCE COMPANY | ||||||||||||
Date Let: | 04/14/2011 | NTP Effective Date: | 10/03/2011 | Pay Period: | 10/07/2014 TO 10/08/2014 |
Date Awarded: | 05/02/2011 | Date Work Began: | 10/10/2011 | Original Contract Time: | 240 |
Date Contract Executed: | 05/18/2011 | Date Time Stopped: | 03/13/2014 | Current Time Charged: | 320.00 |
Date NTP Issued: | 05/25/2011 | Completion Date: | 03/13/2014 | Current Time Allowed: | 267.00 |
General Liability Expires: | 10/01/2014 | Workman's Comp Expires: | 10/01/2014 | Percent Time Used: | 119.85 % |
Specification Year: | 2009 | ||||
Bid Amount: | $6,197,488.90 | Total to Date | Prev to Date | This Estimate | |||
Funds Available (Bid + Positive C/O): | $6,254,203.79 | Participating: | $0.00 | $0.00 | $0.00 | ||
Percent Complete: | 95.98 % | Non Participating: | $6,031,714.29 | $6,031,714.29 | $0.00 | ||
Unearned Balance: | $251,632.21 | Total Earnings: | $6,031,714.29 | $6,031,714.29 | $0.00 | ||
Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||||
Gross Earnings: | $6,031,714.29 | $6,031,714.29 | $0.00 | ||||
Other Adjustments: | $23,857.29 | $23,857.29 | $0.00 | ||||
Liq Dam/Disincentive: | $-53,000.00 | $-53,000.00 | $0.00 | ||||
TOTAL: | $6,002,571.58 | $6,002,571.58 | $0.00 |
Contract ID: | 110016 | Estimate Number: | 0039 | Primary JP: | 23480(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
001 | Pier quantity revisions | Approved | 07/02/2012 | 0.0 | $51,264.00 |
002 | Special Inlet Drain Str. XD-2 | Approved | 04/01/2013 | 0.0 | $5,050.89 |
003 | Pile Splice | Approved | 08/04/2014 | 0.0 | $400.00 |
004 | Add additional contract time | Approved | 06/27/2014 | 27.0 | $0.00 |
005 | Final Quantity Change Order | Approved | 10/02/2014 | 0.0 | $-222,489.58 |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
23480(04) | 0039 | REBAR-GR60 | Stockpiled Material Closure | 0029 | $-8,032.21 |
23480(04) | 0039 | REBAR-GR60 | Stockpiled Material Initial Payment | 0007 | $13,092.51 |
23480(04) | 0039 | REBAR-GR60 | Stockpiled Material Adjustment | 0007 | $-5,060.30 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Closure | 0011 | $-170,180.52 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Initial Payment | 0001 | $170,180.52 |
23480(04) | 0045 | HC-III | Stockpiled Material Initial Payment | 0002 | $114,530.70 |
23480(04) | 0045 | HC-III | Stockpiled Material Closure | 0011 | $-114,530.70 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Initial Payment | 0004 | $454,491.29 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Closure | 0011 | $-454,491.29 |
23480(04) | 0045 | HC-III | Stockpiled Material Closure | 0011 | $-284,057.45 |
23480(04) | 0045 | HC-III | Stockpiled Material Initial Payment | 0006 | $284,057.45 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Initial Payment | 0011 | $170,180.52 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0011 | $-113,715.09 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Initial Payment | 0011 | $284,060.57 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0012 | $-56,465.43 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Initial Payment | 0011 | $114,530.70 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0018 | $-56,670.90 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0018 | $-171,587.64 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0019 | $-282,903.64 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0019 | $-284,060.57 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Initial Payment | 0011 | $454,491.28 |
23480(04) | 0045 | PC BR ITM FABS (AML) | Stockpiled Material Adjustment | 0012 | $-57,859.80 |
23480(04) | 0048 | SSTL FABS (AML) | Stockpiled Material Initial Payment | 0005 | $23,936.00 |
23480(04) | 0048 | SSTL FABS (AML) | Stockpiled Material Adjustment | 0023 | $-23,936.00 |
23480(04) | 0051 | SSTL FABS (AML) | Stockpiled Material Initial Payment | 0001 | $11,779.34 |
23480(04) | 0051 | SSTL FABS (AML) | Stockpiled Material Closure | 0006 | $-11,779.34 |
23480(04) | 0051 | SSTL FABS (AML) | Stockpiled Material Initial Payment | 0005 | $18,878.00 |
23480(04) | 0051 | SSTL FABS (AML) | Stockpiled Material Adjustment | 0019 | $-18,878.00 |
23480(04) | 0052 | SSTL FABS (AML) | Stockpiled Material Initial Payment | 0001 | $11,779.34 |
23480(04) | 0052 | SSTL FABS (AML) | Stockpiled Material Closure | 0006 | $-11,779.34 |
23480(04) | 0052 | SSTL FABS (AML) | Stockpiled Material Adjustment | 0019 | $-15,966.40 |
23480(04) | 0052 | SSTL FABS (AML) | Stockpiled Material Initial Payment | 0005 | $15,966.40 |
23480(04) | 0055 | REBAR-GR60 | Stockpiled Material Closure | 0007 | $-13,092.51 |
23480(04) | 0055 | REBAR-GR60 | Stockpiled Material Initial Payment | 0006 | $13,092.51 | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | ||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount |
System Application of Liquidated Damages | 0024 | --5.0 | $1,000.00 | $-5,000.00 |
System Application of Liquidated Damages | 0025 | --11 | $1,000.00 | $-11,000.00 |
System Application of Liquidated Damages | 0026 | --13 | $1,000.00 | $-13,000.00 |
System Application of Liquidated Damages | 0027 | --16 | $1,000.00 | $-16,000.00 |
System Application of Liquidated Damages | 0028 | --14 | $1,000.00 | $-14,000.00 |
System Application of Liquidated Damages | 0029 | --21 | $1,000.00 | $-21,000.00 |
System Application of Liquidated Damages | 0038 | -27.0 | $1,000.00 | $27,000.00 | Subtotals For Liquidated Damages | $-53,000.00 |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
23480(04) | 0005 | TEMPORARY SILT FENCE | * Missing Material Certification | 0002 | -1,215.00 | $1.95 | $-2,369.25 |
23480(04) | 0005 | TEMPORARY SILT FENCE | * Missing Material Certification | 0003 | 1,215.00 | $1.95 | $2,369.25 |
23480(04) | 0006 | TEMPORARY SILT DIKE | * Missing Material Certification | 0022 | -126.00 | $7.50 | $-945.00 |
23480(04) | 0006 | TEMPORARY SILT DIKE | * Missing Material Certification | 0038 | 126.00 | $7.50 | $945.00 |
23480(04) | 0008 | SOLID SLAB SODDING | * Permanent Erosion Control-Out of Season | 0029 | -5,700.00 | $1.40 | $-7,980.00 |
23480(04) | 0008 | SOLID SLAB SODDING | * Permanent Erosion Control-Out of Season | 0032 | 5,700.00 | $1.40 | $7,980.00 |
23480(04) | 0008 | SOLID SLAB SODDING | * Permanent Erosion Control-Out of Season | 0032 | -9,493.20 | $1.40 | $-13,290.48 |
23480(04) | 0008 | SOLID SLAB SODDING | * Permanent Erosion Control-Out of Season | 0035 | 9,493.20 | $1.40 | $13,290.48 |
23480(04) | 0012 | SEPARATOR FABRIC | * Missing Material Certification | 0021 | -1,382.78 | $1.25 | $-1,728.48 |
23480(04) | 0012 | SEPARATOR FABRIC | * Missing Material Certification | 0022 | -1,382.78 | $1.25 | $-1,728.48 |
23480(04) | 0012 | SEPARATOR FABRIC | * Missing Material Certification | 0025 | -5,849.78 | $1.25 | $-7,312.23 |
23480(04) | 0012 | SEPARATOR FABRIC | * Missing Material Certification | 0026 | 1,382.78 | $1.25 | $1,728.48 |
23480(04) | 0012 | SEPARATOR FABRIC | * Missing Material Certification | 0026 | 5,849.78 | $1.25 | $7,312.23 |
23480(04) | 0012 | SEPARATOR FABRIC | * Missing Material Certification | 0026 | 1,382.78 | $1.25 | $1,728.48 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * Material Discrepancy Adjustments | 0026 | -401.21 | $74.00 | $-29,689.54 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0026 | 401.21 | $2.88 | $1,156.39 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * Material Discrepancy Adjustments | 0027 | -662.54 | $74.00 | $-49,027.96 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0027 | 662.54 | $2.88 | $1,909.61 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0028 | 3,578.97 | $2.88 | $10,315.49 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * Material Discrepancy Adjustments | 0028 | 578.97 | $74.00 | $42,843.78 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * Material Discrepancy Adjustments | 0028 | 662.54 | $74.00 | $49,027.96 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * Material Discrepancy Adjustments | 0028 | 401.21 | $74.00 | $29,689.54 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * HMA Deduction as per Sec. 411 | 0028 | -1.00 | $740.00 | $-740.00 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * Material Discrepancy Adjustments | 0029 | -578.97 | $74.00 | $-42,843.78 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0029 | 930.34 | $2.88 | $2,681.47 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * HMA Deduction as per Sec. 411 | 0029 | 1.00 | $740.00 | $740.00 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | * HMA Deduction as per Sec. 411 | 0029 | -1.00 | $2,220.00 | $-2,220.00 |
23480(04) | 0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | Asphalt Binder Adjustment | 0038 | -2.63 | $4.98 | $-13.10 |
23480(04) | 0015 | SUPERPAVE, TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0026 | 286.52 | $3.29 | $943.80 |
23480(04) | 0015 | SUPERPAVE, TYPE S4(PG 64-22 OK) | * Material Discrepancy Adjustments | 0026 | -286.52 | $81.00 | $-23,208.12 |
23480(04) | 0015 | SUPERPAVE, TYPE S4(PG 64-22 OK) | * Material Discrepancy Adjustments | 0028 | -182.16 | $81.00 | $-14,754.96 |
23480(04) | 0015 | SUPERPAVE, TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0028 | 2,182.16 | $3.29 | $7,188.04 |
23480(04) | 0015 | SUPERPAVE, TYPE S4(PG 64-22 OK) | * Material Discrepancy Adjustments | 0028 | 286.52 | $81.00 | $23,208.12 |
23480(04) | 0015 | SUPERPAVE, TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0029 | 1,469.14 | $3.29 | $4,839.35 |
23480(04) | 0015 | SUPERPAVE, TYPE S4(PG 64-22 OK) | * Material Discrepancy Adjustments | 0029 | 182.16 | $81.00 | $14,754.96 |
23480(04) | 0015 | SUPERPAVE, TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0038 | -0.66 | $5.69 | $-3.76 |
23480(04) | 0019 | TYPE I-A PLAIN RIPRAP | * Missing Material Certification | 0025 | -85.72 | $37.50 | $-3,214.50 |
23480(04) | 0019 | TYPE I-A PLAIN RIPRAP | * Missing Material Certification | 0027 | 85.72 | $37.50 | $3,214.50 |
23480(04) | 0020 | TYPE I-A FILTER BLANKET | * Missing Material Certification | 0025 | -42.95 | $29.00 | $-1,245.55 |
23480(04) | 0020 | TYPE I-A FILTER BLANKET | * Missing Material Certification | 0027 | 42.95 | $29.00 | $1,245.55 |
23480(04) | 0021 | FILTER FABRIC (RIPRAP) | * Missing Material Certification | 0009 | -600.00 | $1.35 | $-810.00 |
23480(04) | 0021 | FILTER FABRIC (RIPRAP) | * Missing Material Certification | 0025 | -378.00 | $1.35 | $-510.30 |
23480(04) | 0021 | FILTER FABRIC (RIPRAP) | * Missing Material Certification | 0027 | 600.00 | $1.35 | $810.00 |
23480(04) | 0021 | FILTER FABRIC (RIPRAP) | * Missing Material Certification | 0027 | 378.00 | $1.35 | $510.30 |
23480(04) | 0025 | 24" R.C.PIPE CLASS IV | * Missing Material Certification | 0023 | -80.00 | $50.00 | $-4,000.00 |
23480(04) | 0025 | 24" R.C.PIPE CLASS IV | * Missing Material Certification | 0024 | -48.00 | $50.00 | $-2,400.00 |
23480(04) | 0025 | 24" R.C.PIPE CLASS IV | * Missing Material Certification | 0026 | 48.00 | $50.00 | $2,400.00 |
23480(04) | 0025 | 24" R.C.PIPE CLASS IV | * Missing Material Certification | 0038 | 80.00 | $50.00 | $4,000.00 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0014 | -134.00 | $27.50 | $-3,685.00 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0015 | 134.00 | $27.50 | $3,685.00 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0021 | -249.00 | $27.50 | $-6,847.50 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0023 | -365.00 | $27.50 | $-10,037.50 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0026 | 249.00 | $27.50 | $6,847.50 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0026 | 365.00 | $27.50 | $10,037.50 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0026 | -69.00 | $27.50 | $-1,897.50 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Material Discrepancy Adjustments | 0027 | -62.00 | $27.50 | $-1,705.00 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0034 | -131.00 | $27.50 | $-3,602.50 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0036 | 69.00 | $27.50 | $1,897.50 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Missing Material Certification | 0036 | 131.00 | $27.50 | $3,602.50 |
23480(04) | 0026 | 18" CORR. GALV. STEEL PIPE | * Material Discrepancy Adjustments | 0036 | 62.00 | $27.50 | $1,705.00 |
23480(04) | 0041 | TYPE I-A FILTER BLANKET | * Missing Material Certification | 0014 | -175.81 | $29.00 | $-5,098.49 |
23480(04) | 0041 | TYPE I-A FILTER BLANKET | * Missing Material Certification | 0016 | 175.81 | $29.00 | $5,098.49 |
23480(04) | 0051 | WEATHERING STEEL FIXED BEARING ASSEMBLY | * Missing Material Certification | 0019 | -40.00 | $1,000.00 | $-40,000.00 |
23480(04) | 0051 | WEATHERING STEEL FIXED BEARING ASSEMBLY | * Missing Material Certification | 0020 | 40.00 | $1,000.00 | $40,000.00 |
23480(04) | 0052 | WEATHERING STEEL EXPANSION BEARING ASSEMBLY | * Missing Material Certification | 0019 | -32.00 | $1,000.00 | $-32,000.00 |
23480(04) | 0052 | WEATHERING STEEL EXPANSION BEARING ASSEMBLY | * Missing Material Certification | 0020 | 32.00 | $1,000.00 | $32,000.00 |
23480(04) | 0053 | CLASS AA CONCRETE | * COMPRESSIVE STRENGTH | 0025 | -1.00 | $2,940.00 | $-2,940.00 |
23480(04) | 0061 | WATER REPELLENT (VISUALLY INSPECTED) | * Missing Material Certification | 0034 | -456.00 | $6.00 | $-2,736.00 |
23480(04) | 0061 | WATER REPELLENT (VISUALLY INSPECTED) | * Missing Material Certification | 0037 | 456.00 | $6.00 | $2,736.00 |
23480(04) | 0072 | SHEET ALUMINUM SIGNS | * Missing Material Certification | 0029 | -81.26 | $16.00 | $-1,300.16 |
23480(04) | 0072 | SHEET ALUMINUM SIGNS | * Missing Material Certification | 0031 | 81.26 | $16.00 | $1,300.16 |
23480(04) | 0073 | 2 1/2" SQUARE TUBE POST | * Missing Material Certification | 0029 | -220.00 | $11.00 | $-2,420.00 |
23480(04) | 0073 | 2 1/2" SQUARE TUBE POST | * Missing Material Certification | 0031 | 220.00 | $11.00 | $2,420.00 |
23480(04) | 0075 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | * Missing Material Certification | 0032 | -43,464.00 | $0.55 | $-23,905.20 |
23480(04) | 0075 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | * Missing Material Certification | 0033 | 43,464.00 | $0.55 | $23,905.20 |
23480(04) | 0076 | TRAFFIC STRIPE(PLASTIC)(24" WIDE) | * Missing Material Certification | 0032 | -63.00 | $11.00 | $-693.00 |
23480(04) | 0076 | TRAFFIC STRIPE(PLASTIC)(24" WIDE) | * Missing Material Certification | 0033 | 63.00 | $11.00 | $693.00 | Subtotals For Line Item Adjustments | $23,857.29 | * = User applied Line Item Adjustments |
MILESTONE INFORMATION | |||||||||
Milestone Number | Milestone Description | Start Date | End Date | Current Time Allowed | Rate | Milestone Closed | |||
No milestones exist for this contract. |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Adjustment Description | Estimate Nbr | Total | ||||||
No milestones adjustments exist for this contract. | Subtotals For Milestones | $ |
Contract ID: | 110016 | Estimate Number: | 0039 | Primary JP: | 23480(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: CIRB-157C(083)RB | Project: 23480(04) | Category: 0100/ROADWAY | ||||||||
0001 | CLEARING AND GRUBBING | 201(A) 0102 | LSUM | 1.000 | 1.000 | 1.000 | $220,000.00 | $0.00 | $220,000.00 | |
0002 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 23,782.000 | 23,782.000 | 23,782.000 | $5.50 | $0.00 | $130,801.00 | |
0003 | UNCLASSIFIED BORROW | 202(D) 0184 | CY | 9,793.000 | 9,793.000 | 9,793.000 | $11.00 | $0.00 | $107,723.00 | |
0004 | TYPE A-SALVAGED TOPSOIL | 205(A) 4229 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0005 | TEMPORARY SILT FENCE | 221(C) 2801 | LF | 11,300.000 | 3,609.000 | 3,609.000 | $1.95 | $0.00 | $7,037.55 | |
0006 | TEMPORARY SILT DIKE | 221(F) 0100 | LF | 888.000 | 126.000 | 126.000 | $7.50 | $0.00 | $945.00 | |
0007 | DITCH LINER PROTECTION | 229 4318 | LF | 3,844.000 | 0.000 | 0.000 | $1.40 | $0.00 | $0.00 | |
0008 | SOLID SLAB SODDING | 230(A) 2806 | SY | 50,720.000 | 33,704.590 | 33,704.590 | $1.40 | $0.00 | $47,186.43 | |
0009 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 10.700 | 0.000 | 0.000 | $350.00 | $0.00 | $0.00 | |
0010 | AGGREGATE BASE TYPE B | 303(B) 2110 | CY | 5,722.000 | 5,654.040 | 5,654.040 | $52.00 | $0.00 | $294,010.08 | |
0011 | SUBGRADE, METHOD B | 310(B) 0149 | SY | 21,168.000 | 21,297.330 | 21,297.330 | $1.15 | $0.00 | $24,491.93 | |
0012 | SEPARATOR FABRIC | 325 5271 | SY | 21,580.000 | 20,729.340 | 20,729.340 | $1.25 | $0.00 | $25,911.69 | |
0013 | TRAFFIC BOUND SURFACE COURSE TYPE E | 402(E) 0225 | TON | 962.000 | 1,179.430 | 1,179.430 | $27.25 | $0.00 | $32,139.48 | |
0014 | SUPERPAVE, TYPE S3(PG 64-22 OK) | 411(B) 5945 | TON | 5,795.000 | 5,570.430 | 5,570.430 | $74.00 | $0.00 | $412,211.82 | |
0015 | SUPERPAVE, TYPE S4(PG 64-22 OK) | 411(C) 5960 | TON | 3,910.000 | 3,937.160 | 3,937.160 | $81.00 | $0.00 | $318,909.96 | |
0016 | CLASS A CONCRETE | 509(B) 0321 | CY | 5.000 | 0.000 | 0.000 | $900.00 | $0.00 | $0.00 | |
0017 | CLASS C CONCRETE | 509(D) 1331 | CY | 242.000 | 206.710 | 206.710 | $220.00 | $0.00 | $45,476.20 | |
0018 | REINFORCING STEEL | 511(A) 0332 | LB | 350.000 | 0.000 | 0.000 | $1.25 | $0.00 | $0.00 | |
0019 | TYPE I-A PLAIN RIPRAP | 601(B) 1353 | TON | 2,064.000 | 556.900 | 556.900 | $37.50 | $0.00 | $20,883.75 | |
0020 | TYPE I-A FILTER BLANKET | 601(C) 1355 | TON | 411.000 | 499.920 | 499.920 | $29.00 | $0.00 | $14,497.68 | |
0021 | FILTER FABRIC (RIPRAP) | 601(I) 6312 | SY | 1,627.000 | 1,477.770 | 1,477.770 | $1.35 | $0.00 | $1,994.99 | |
0022 | INLET (SMD-TYPE 1) | 611(G) 6000 | EA | 2.000 | 4.000 | 4.000 | $2,000.00 | $0.00 | $8,000.00 | |
0023 | ADDITIONAL DEPTH IN INLET | 611(H) 5196 | VF | 3.000 | 0.000 | 0.000 | $300.00 | $0.00 | $0.00 | |
0024 | 24" R.C.PIPE CLASS III | 613(A) 0492 | LF | 267.000 | 133.000 | 133.000 | $47.50 | $0.00 | $6,317.50 | |
0025 | 24" R.C.PIPE CLASS IV | 613(A) 0583 | LF | 128.000 | 128.000 | 128.000 | $50.00 | $0.00 | $6,400.00 | |
0026 | 18" CORR. GALV. STEEL PIPE | 613(B) 0689 | LF | 681.000 | 470.000 | 470.000 | $27.50 | $0.00 | $12,925.00 | |
0027 | 28" X 20" CORR. GALV. STEEL PIPE ARCH | 613(B) 4528 | LF | 646.000 | 864.000 | 864.000 | $32.50 | $0.00 | $28,080.00 | |
0028 | 24" PREFAB. CULVERT END SECTION, ROUND | 613(L) 5730 | EA | 7.000 | 4.000 | 4.000 | $600.00 | $0.00 | $2,400.00 | |
0029 | TYPE A4 CULVERT END TREATMENT | 613(M) 7186 | EA | 26.000 | 16.000 | 16.000 | $900.00 | $0.00 | $14,400.00 | |
0030 | TYPE B4 CULVERT END TREATMENT | 613(M) 7187 | EA | 24.000 | 21.000 | 21.000 | $950.00 | $0.00 | $19,950.00 | |
0031 | STANDARD BEDDING MATERIAL, CLASS C | 613(T) 1187 | CY | 153.000 | 100.750 | 100.750 | $47.50 | $0.00 | $4,785.63 | |
0032 | TRENCH EXCAVATION | 613(V) 1180 | CY | 235.000 | 138.280 | 138.280 | $10.00 | $0.00 | $1,382.80 | |
0033 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 1.000 | $25,000.00 | $0.00 | $25,000.00 | |
0034 | REMOVAL OF ASPHALT PAVEMENT | 619(B) 4728 | SY | 7,779.000 | 8,078.340 | 8,078.340 | $2.00 | $0.00 | $16,156.68 | |
0035 | SAWING PAVEMENT | 619(C) 0924 | LF | 131.000 | 145.000 | 145.000 | $4.00 | $0.00 | $580.00 | |
8000 | SPECIAL INLET DRAIN | 611(G) 4012 | EA | 0.000 | 1.000 | 1.000 | $5,650.89 | $0.00 | $5,650.89 | |
Subtotals For Category 0100/ROADWAY | $0.00 | $1,881,249.06 | ||||||||
Fed/State Project Number: CIRB-157C(083)RB | Project: 23480(04) | Category: 0200/BRIDGE 'A' | ||||||||
0036 | UNCLASSIFIED EXCAVATION | 202(A) 1301 | CY | 440.000 | 440.000 | 440.000 | $8.00 | $0.00 | $3,520.00 | |
0037 | STRUCTURAL EXCAVATION UNCLASSIFIED | 501(A) 1306 | CY | 110.000 | 110.000 | 110.000 | $20.00 | $0.00 | $2,200.00 | |
0038 | CLASS A CONCRETE | 509(B) 1328 | CY | 280.000 | 280.000 | 280.000 | $350.00 | $0.00 | $98,000.00 | |
0039 | REINFORCING STEEL | 511(A) 1332 | LB | 29,340.000 | 29,340.000 | 29,340.000 | $0.80 | $0.00 | $23,472.00 | |
0040 | TYPE I-A PLAIN RIPRAP | 601(B) 1353 | TON | 1,070.000 | 861.060 | 861.060 | $37.50 | $0.00 | $32,289.76 | |
0041 | TYPE I-A FILTER BLANKET | 601(C) 1355 | TON | 225.000 | 212.980 | 212.980 | $29.00 | $0.00 | $6,176.42 | |
0042 | FILTER FABRIC (RIPRAP) | 601(I) 6312 | SY | 898.000 | 827.870 | 827.870 | $1.35 | $0.00 | $1,117.62 | |
Subtotals For Category 0200/BRIDGE 'A' | $0.00 | $166,775.80 | ||||||||
Fed/State Project Number: CIRB-157C(083)RB | Project: 23480(04) | Category: 0201/BRIDGE 'B' | ||||||||
0043 | SUBSTRUCTURE EXCAVATION COMMON | 501(B) 1307 | CY | 240.000 | 240.000 | 240.000 | $40.00 | $0.00 | $9,600.00 | |
0044 | CLSM BACKFILL | 501(G) 6309 | CY | 148.000 | 148.000 | 148.000 | $105.00 | $0.00 | $15,540.00 | |
0045 | PRESTRESSED CONCRETE BEAMS (TYPE J BT) | 503(A) 6290 | LF | 5,208.000 | 5,208.000 | 5,208.000 | $265.00 | $0.00 | $1,380,120.00 | |
0046 | INSERTS | 504 6176 | EA | 280.000 | 280.000 | 280.000 | $25.00 | $0.00 | $7,000.00 | |
0047 | APPROACH SLAB | 504(A) 1304 | SY | 142.000 | 141.460 | 141.460 | $160.00 | $0.00 | $22,633.60 | |
0048 | SEALED EXPANSION JOINT | 504(C) 6250 | LF | 212.000 | 212.000 | 212.000 | $232.50 | $0.00 | $49,290.00 | |
0049 | CONCRETE RAIL (TR3) | 504(D) 6239 | LF | 2,688.000 | 2,696.000 | 2,696.000 | $57.50 | $0.00 | $155,020.00 | |
0050 | STRUCTURAL STEEL | 506(A) 1322 | LB | 8,820.000 | 8,820.000 | 8,820.000 | $2.00 | $0.00 | $17,640.00 | |
0051 | WEATHERING STEEL FIXED BEARING ASSEMBLY | 507(A) 6172 | EA | 40.000 | 40.000 | 40.000 | $1,000.00 | $0.00 | $40,000.00 | |
0052 | WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 507(B) 6176 | EA | 32.000 | 32.000 | 32.000 | $1,000.00 | $0.00 | $32,000.00 | |
0053 | CLASS AA CONCRETE | 509(A) 1326 | CY | 1,370.000 | 1,370.000 | 1,370.000 | $375.00 | $0.00 | $513,750.00 | |
0054 | CLASS A CONCRETE | 509(B) 1328 | CY | 392.000 | 460.400 | 460.400 | $600.00 | $0.00 | $276,240.00 | |
0055 | REINFORCING STEEL | 511(A) 1332 | LB | 285,570.000 | 285,570.000 | 285,570.000 | $0.90 | $0.00 | $257,013.01 | |
0056 | EPOXY COATED REINFORCING STEEL | 511(B) 4269 | LB | 76,030.000 | 87,390.000 | 87,390.000 | $0.90 | $0.00 | $78,651.00 | |
0057 | PILES, FURNISHED (HP 10X42) | 514(A) 6010 | LF | 179.000 | 174.000 | 174.000 | $40.00 | $0.00 | $6,960.00 | |
0058 | PILES, FURNISHED (HP 12X53) | 514(A) 6011 | LF | 693.000 | 699.730 | 699.730 | $45.00 | $0.00 | $31,487.85 | |
0059 | PILES, DRIVEN (HP 10X42) | 514(B) 6292 | LF | 179.000 | 171.000 | 171.000 | $11.00 | $0.00 | $1,881.00 | |
0060 | PILES, DRIVEN (HP 12X53) | 514(B) 6294 | LF | 693.000 | 699.730 | 699.730 | $11.00 | $0.00 | $7,697.03 | |
0061 | WATER REPELLENT (VISUALLY INSPECTED) | 515(A) 6013 | SY | 456.000 | 455.600 | 455.600 | $6.00 | $0.00 | $2,733.60 | |
0062 | DRILLED SHAFTS 72" DIAMETER | 516(A) 6098 | LF | 752.000 | 752.000 | 752.000 | $550.00 | $0.00 | $413,600.00 | |
0063 | TYPE I-A PLAIN RIPRAP | 601(B) 1353 | TON | 5,150.000 | 3,930.740 | 3,930.740 | $37.50 | $0.00 | $147,402.78 | |
0064 | TYPE I-A FILTER BLANKET | 601(C) 1355 | TON | 1,260.000 | 814.000 | 814.000 | $29.00 | $0.00 | $23,606.00 | |
0065 | FILTER FABRIC (RIPRAP) | 601(I) 6312 | SY | 4,849.000 | 1,777.890 | 1,777.890 | $1.35 | $0.00 | $2,400.15 | |
0066 | 6" PERFORATED PIPE UNDERDRAIN ROUND | 613(H) 6204 | LF | 64.000 | 64.000 | 64.000 | $22.00 | $0.00 | $1,408.00 | |
0067 | 6" NON-PERF.PIPE UNDERDRAIN RND. | 613(I) 6207 | LF | 40.000 | 40.000 | 40.000 | $20.00 | $0.00 | $800.00 | |
0068 | REMOVAL OF EXISTING BRIDGE STRUCTURE | 619(D) 1397 | LSUM | 1.000 | 1.000 | 1.000 | $70,000.00 | $0.00 | $70,000.00 | |
0069 | BEAM GUARDRAIL W-BEAM SINGLE | 623(A) 1418 | LF | 1,083.000 | 1,081.250 | 1,081.250 | $17.00 | $0.00 | $18,381.25 | |
0070 | GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 623(F) 5686 | EA | 4.000 | 4.000 | 4.000 | $1,350.00 | $0.00 | $5,400.00 | |
0071 | GUARDRAIL END TREATMENT (GET) | 623(G) 8571 | EA | 4.000 | 4.000 | 4.000 | $2,300.00 | $0.00 | $9,200.00 | |
8001 | PILE SPLICE, H-PILE (NON-BIDDABLE) | 514(L) 6220 | EA | 0.000 | 1.000 | 1.000 | $400.00 | $0.00 | $400.00 | |
Subtotals For Category 0201/BRIDGE 'B' | $0.00 | $3,597,855.27 | ||||||||
Fed/State Project Number: CIRB-157C(083)RB | Project: 23480(04) | Category: 0300/TRAFFIC | ||||||||
0072 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 71.000 | 81.260 | 81.260 | $16.00 | $0.00 | $1,300.16 | |
0073 | 2 1/2" SQUARE TUBE POST | 851(C) 8330 | LF | 220.000 | 220.000 | 220.000 | $11.00 | $0.00 | $2,420.00 | |
0074 | DELINEATORS(TYPE 2, CODE 1) | 853 9033 | EA | 13.000 | 13.000 | 13.000 | $17.50 | $0.00 | $227.50 | |
0075 | TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 855(A) 8812 | LF | 43,464.000 | 42,170.000 | 42,170.000 | $0.55 | $0.00 | $23,193.50 | |
0076 | TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 855(A) 8825 | LF | 65.000 | 63.000 | 63.000 | $11.00 | $0.00 | $693.00 | |
0077 | CONSTRUCTION TRAFFIC CONTROL | 880(J) 8905 | LSUM | 1.000 | 1.000 | 1.000 | $13,000.00 | $0.00 | $13,000.00 | |
Subtotals For Category 0300/TRAFFIC | $0.00 | $40,834.16 | ||||||||
Fed/State Project Number: CIRB-157C(083)RB | Project: 23480(04) | Category: 0600/STAKING | ||||||||
0078 | CONSTRUCTION STAKING LEVEL II | 642(B) 0096 | LSUM | 1.000 | 1.000 | 1.000 | $40,000.00 | $0.00 | $40,000.00 | |
Subtotals For Category 0600/STAKING | $0.00 | $40,000.00 | ||||||||
Fed/State Project Number: CIRB-157C(083)RB | Project: 23480(04) | Category: 0640/CONSTRUCTION | ||||||||
0079 | SWPPP DOCUMENTATION AND MANAGEMENT | 220 2800 | LSUM | 1.000 | 1.000 | 1.000 | $5,000.00 | $0.00 | $5,000.00 | |
0080 | MOBILIZATION | 641 1399 | LSUM | 1.000 | 1.000 | 1.000 | $300,000.00 | $0.00 | $300,000.00 | |
Subtotals For Category 0640/CONSTRUCTION | $0.00 | $305,000.00 | ||||||||
Subtotals For Project CIRB-157C(083)RB /23480(04) | $0.00 | $6,031,714.29 |