Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    07/18/2012
Contract ID: 100617   Estimate Number: 0032     Contract No: 610850
Residency: TULSA (08100)   Estimate Type: Progressive     Account No: 400800

Project Number(s): IMY-0044-2(396)225
Primary Job Piece No: 06374(44)
Contract Description: GRADE, DRAIN, SURFACE, AND BRIDGE I-44: FROM RIVERSIDE DRIVE TO EAST OF PEORIA AVENUE IN THE CITY OF TULSA. PROJECT LENGTH = 1.215 MILES.
Primary County: TULSA              
Name of Road: I-44              
Prime Contractor: BECCO CONTRACTORS, INC.              
    P.O. BOX 9159              
    TULSA , OK   74157              
Surety Company: MID-CONTINENT CASUALTY COMPANY              

Date Let: 11/18/2010 NTP Effective Date: 03/01/2011 Pay Period: 07/01/2012  TO  07/15/2012
Date Awarded: 12/06/2010 Date Work Began: 03/01/2011 Original Contract Time: 720
Date Contract Executed: 12/22/2010 Date Time Stopped: Current Time Charged: 503.00
Date NTP Issued: 01/05/2011 Completion Date: Current Time Allowed: 755.00
General Liability Expires: 03/01/2013 Workman's Comp Expires: 02/01/2013 Percent Time Used: 66.62 %
Specification Year: 1999     Date Approved:

Current Contract Amount: $33,000,066.25 Total to Date Prev to Date This Estimate
Bid Amount: $32,439,488.87 Participating: $32,114,672.48 $31,315,631.60 $799,040.88
Percent Complete: 92.49 % Non Participating: $130,603.09 $130,603.09 $0.00
Funds Available: $2,478,973.33 Total Earnings: $32,245,275.57 $31,446,234.69 $799,040.88
Unearned Balance: $1,918,395.95 Stockpiled Materials: $352,051.03 $389,900.42 $-37,849.39
Gross Earnings: $32,597,326.60 $31,836,135.11 $761,191.49
Other Adjustments: $-141,233.68 $-70,462.33 $-70,771.35
Liq Dam/Disincentive: $-1,935,000.00 $-1,575,000.00 $-360,000.00
TOTAL: $30,521,092.92 $30,190,672.78 $330,420.14

Estimate Adjustment Detail

Contract ID: 100617   Estimate Number: 0032     Primary JP: 06374(44)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 Addendum to (SP) CA000002 Approved 07/12/2011 0.0 $0.00
002 Powder Coating Hwy. Lighting Approved 09/14/2011 0.0 $57,911.70
003 Class B bridge deck repair Approved 05/08/2012 0.0 $63,980.79
004 Structural steel Approved 12/06/2011 0.0 $3,184.00
005 Material for Joint repair Approved 12/06/2011 0.0 $109,115.89
006 Temporary Roadway Lighting Approved 12/06/2011 0.0 $262,500.00
007 Labor & Equipment River Joint Approved 03/05/2012 0.0 $21,487.20
008 Median Barrier Light Pole Footing Approved 05/08/2012 0.0 $35,737.80
009 Waffle house demolition Approved 06/04/2012 0.0 $6,660.00
010 SS Manhole Pending 0 0.0 $7,989.36


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0003 $-3,555.16
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0028 $-46,651.19
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0005 $-1,127.28
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0006 $-7,594.13
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0007 $-4,309.60
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0008 $-10,352.40
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0009 $-32,073.76
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0012 $-9,080.08
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0013 $-28,115.42
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0014 $-10,892.06
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0015 $-16,506.13
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0016 $-2,198.27
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0017 $-5,269.53
06374(44) 0019 Separator Fabric Stockpiled Material Closure 0017 $-224,223.57
06374(44) 0019 Separator Fabric Stockpiled Material Initial Payment 0017 $224,223.57
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0018 $-6,815.65
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0019 $-12,482.98
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0020 $-27,734.47
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0021 $-28,881.01
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0022 $-33,188.29
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0023 $-6,067.15
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0024 $-29,033.69
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0025 $-12,370.42
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0026 $-7,515.85
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0027 $-8,213.34
06374(44) 0019 Separator Fabric Stockpiled Material Initial Payment 0003 $350,027.86
06374(44) 0028 Dowel (Baskets) Stockpiled Material Initial Payment 0003 $156,989.73
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0032 $-9,488.21
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0007 $-8,844.51
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0008 $-6,310.70
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0009 $-18,850.52
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0010 $-10,478.25
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0013 $-2,348.49
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0014 $-4,624.78
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0015 $-2,636.14
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0016 $-83.04
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0017 $-4,650.86
06374(44) 0028 Dowel (Baskets) Stockpiled Material Closure 0017 $-102,813.30
06374(44) 0028 Dowel (Baskets) Stockpiled Material Closure 0017 $-41,906.51
06374(44) 0028 Dowel (Baskets) Stockpiled Material Initial Payment 0017 $144,719.81
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0018 $-7,177.08
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0019 $-3,052.37
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0020 $-9,938.00
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0021 $-571.72
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0022 $-1,750.61
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0024 $-6,062.27
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0025 $-10,068.52
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0026 $-10,972.85
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0027 $-9,384.28
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0028 $-5,240.41
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0031 $-66,362.64
06374(44) 0028 Dowel (Baskets) Stockpiled Material Initial Payment 0006 $41,906.51
06374(44) 0030 Reinforcing steel Stockpiled Material Initial Payment 0007 $483,443.45
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0028 $-25,323.28
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0015 $-64,739.09
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0016 $-11,900.30
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0017 $-54,468.71
06374(44) 0030 Reinforcing steel Stockpiled Material Closure 0017 $-333,538.63
06374(44) 0030 Reinforcing steel Stockpiled Material Initial Payment 0017 $333,538.63
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0018 $-49,382.67
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0019 $-6,854.63
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0020 $-11,624.03
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0023 $-127,634.09
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0024 $-32,020.66
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0025 $-23,495.41
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0027 $-2,735.11
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0014 $-73,265.43
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-2,234.21
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-5,427.02
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-500.00
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0003 $0.00
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0003 $1,774.78
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0027 $-2,150.78
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0025 $-2,150.78
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0005 $-386.87
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0006 $-193.43
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0006 $1,095.00
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0006 $5,427.02
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0006 $500.00
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0002 $5,920.59
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0024 $-1,075.39
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0007 $2,403.87
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0023 $-3,763.86
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0008 $2,234.21
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0008 $2,079.49
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0009 $-677.02
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0032 $-2,150.78
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0018 $-3,226.16
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0017 $24,093.45
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0010 $5,560.00
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0012 $-290.15
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0028 $-5,376.94
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0015 $-1,354.04
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-5,560.00
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-2,079.49
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0017 $-1,075.39
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-3,019.08
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-1,774.78
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-1,095.00
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-2,403.87
06374(44) 0058 MH 5' Stockpiled Material Adjustment 0012 $-868.74
06374(44) 0058 MH 5' Stockpiled Material Adjustment 0009 $-1,737.47
06374(44) 0058 MH 5' Stockpiled Material Initial Payment 0006 $2,266.62
06374(44) 0058 MH 5' Stockpiled Material Initial Payment 0002 $4,691.20
06374(44) 0058 MH 5' Stockpiled Material Adjustment 0028 $-2,576.73
06374(44) 0058 MH 5' Stockpiled Material Adjustment 0027 $-1,288.36
06374(44) 0058 MH 5' Stockpiled Material Initial Payment 0017 $4,351.61
06374(44) 0058 MH 5' Stockpiled Material Closure 0017 $-2,266.62
06374(44) 0058 MH 5' Stockpiled Material Closure 0017 $-2,084.99
06374(44) 0059 MH 6' Stockpiled Material Closure 0017 $-5,121.06
06374(44) 0059 MH 6' Stockpiled Material Closure 0017 $-304.00
06374(44) 0059 MH 6' Stockpiled Material Closure 0017 $-2,118.08
06374(44) 0059 MH 6' Stockpiled Material Closure 0017 $-4,263.56
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0017 $11,806.70
06374(44) 0059 MH 6' Stockpiled Material Adjustment 0009 $-720.05
06374(44) 0059 MH 6' Stockpiled Material Adjustment 0016 $-922.94
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0006 $304.00
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0002 $2,268.00
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0003 $6,044.00
06374(44) 0059 MH 6' Stockpiled Material Adjustment 0004 $-1,440.10
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0009 $4,263.56
06374(44) 0059 MH 6' Stockpiled Material Adjustment 0016 $-106.40
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0007 $2,118.08
06374(44) 0062 Spe. inlet drain Stockpiled Material Initial Payment 0002 $1,253.16
06374(44) 0062 Spe. inlet drain Stockpiled Material Closure 0017 $-2,630.45
06374(44) 0062 Spe. inlet drain Stockpiled Material Adjustment 0032 $-3,132.91
06374(44) 0062 Spe. inlet drain Stockpiled Material Adjustment 0020 $-1,841.97
06374(44) 0062 Spe. inlet drain Stockpiled Material Initial Payment 0017 $4,976.68
06374(44) 0062 Spe. inlet drain Stockpiled Material Closure 0017 $-1,093.07
06374(44) 0062 Spe. inlet drain Stockpiled Material Closure 0017 $-1,253.16
06374(44) 0062 Spe. inlet drain Stockpiled Material Initial Payment 0006 $2,630.45
06374(44) 0062 Spe. inlet drain Stockpiled Material Initial Payment 0003 $1,093.07
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0006 $2,865.16
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0002 $9,779.52
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0007 $6,505.59
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0008 $2,873.53
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0009 $-1,995.88
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0015 $-1,108.82
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0028 $-3,468.90
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0025 $-1,734.45
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0032 $-4,336.12
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0027 $-2,601.67
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0017 $-867.22
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-3,348.36
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-4,883.72
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-2,420.72
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-2,865.16
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-8,917.47
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-6,505.59
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-2,873.53
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0006 $2,420.72
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0006 $-1,774.11
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0018 $-3,468.90
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0005 $-887.06
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0004 $-665.29
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0003 $4,883.72
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0017 $31,814.55
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0006 $8,917.47
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0002 $12,597.26
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0003 $-807.32
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0003 $5,775.00
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0004 $-1,076.42
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0005 $-538.21
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0006 $-269.11
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0006 $5,400.51
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0006 $7,751.82
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0006 $5,604.16
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0007 $4,691.54
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0008 $3,591.18
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0009 $-1,883.74
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0012 $-538.21
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0015 $-1,076.42
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-6,407.83
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-5,775.00
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-5,400.51
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-7,751.82
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-5,604.16
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-4,691.54
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-3,591.18
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0017 $39,222.04
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0019 $-3,881.32
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0022 $-1,940.66
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0023 $-3,881.32
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0024 $-1,940.66
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0025 $-2,910.99
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0027 $-2,910.99
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0028 $-6,792.32
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0032 $-3,881.32
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0024 $-1,187.39
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0015 $-1,476.11
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0012 $-369.03
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0009 $-369.03
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0007 $4,482.49
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0006 $1,924.00
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0006 $962.00
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0004 $-369.03
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0003 $4,416.07
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0003 $-369.03
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0002 $5,316.15
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0018 $-1,187.39
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0017 $14,148.48
06374(44) 0065 CICI 2(D) Stockpiled Material Closure 0017 $-4,482.49
06374(44) 0065 CICI 2(D) Stockpiled Material Closure 0017 $-1,924.00
06374(44) 0065 CICI 2(D) Stockpiled Material Closure 0017 $-962.00
06374(44) 0065 CICI 2(D) Stockpiled Material Closure 0017 $-4,416.07
06374(44) 0065 CICI 2(D) Stockpiled Material Closure 0017 $-2,363.92
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0032 $-1,187.39
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0028 $-2,374.78
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0027 $-2,374.78
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0025 $-1,187.39
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Initial Payment 0017 $2,880.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Closure 0017 $-2,055.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Initial Payment 0009 $2,055.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Closure 0017 $-825.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Adjustment 0028 $-2,880.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Initial Payment 0006 $825.00
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Closure 0017 $-2,634.50
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Initial Payment 0017 $3,910.50
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Adjustment 0032 $-2,461.59
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Closure 0017 $-1,276.00
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Initial Payment 0006 $2,634.50
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Initial Payment 0006 $1,276.00
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Adjustment 0017 $-1,446.47
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Adjustment 0022 $-4,586.04
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Initial Payment 0006 $2,810.40
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Initial Payment 0017 $9,186.66
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Closure 0017 $-5,870.60
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Closure 0017 $-951.53
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Adjustment 0023 $-1,528.68
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Adjustment 0017 $-1,528.68
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Closure 0017 $-2,364.53
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Adjustment 0015 $-445.87
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Initial Payment 0010 $5,870.60
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Adjustment 0028 $-1,528.68
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Initial Payment 0009 $951.53
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Adjustment 0009 $-443.49
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Closure 0017 $-1,166.45
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Adjustment 0003 $-1,335.21
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Initial Payment 0017 $1,166.45
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Initial Payment 0006 $1,609.94
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Initial Payment 0002 $2,405.00
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Adjustment 0009 $-1,069.34
06374(44) 0070 GPI Type 2(Des.14) Stockpiled Material Initial Payment 0006 $2,234.79
06374(44) 0070 GPI Type 2(Des.14) Stockpiled Material Adjustment 0009 $-2,234.79
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Adjustment 0017 $-2,267.70
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Closure 0017 $-729.60
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Closure 0017 $-565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Closure 0017 $-565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Closure 0017 $-565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Initial Payment 0017 $2,424.60
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Initial Payment 0002 $1,158.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Initial Payment 0006 $565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Initial Payment 0006 $565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Initial Payment 0007 $565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Adjustment 0012 $-142.80
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Adjustment 0015 $-142.80
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Adjustment 0024 $-157.92
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Adjustment 0016 $-142.80
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Adjustment 0017 $-5,637.54
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Closure 0017 $-644.43
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Closure 0017 $-3,032.80
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Closure 0017 $-4,185.60
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Closure 0017 $-1,103.83
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Closure 0017 $-6,140.24
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0017 $15,106.94
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Adjustment 0019 $-1,409.39
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0002 $2,032.32
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0006 $3,032.80
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0006 $4,185.60
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0007 $1,103.83
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0008 $6,140.24
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Adjustment 0012 $-1,214.40
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Adjustment 0014 $-173.49
06374(44) 0073 Inlet W/Lrg.JCT.Box Stockpiled Material Adjustment 0032 $-2,969.85
06374(44) 0073 Inlet W/Lrg.JCT.Box Stockpiled Material Initial Payment 0006 $2,969.85
06374(44) 0073 Inlet W/Lrg.JCT.Box Stockpiled Material Initial Payment 0017 $2,969.85
06374(44) 0073 Inlet W/Lrg.JCT.Box Stockpiled Material Closure 0017 $-2,969.85
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Adjustment 0028 $-1,435.49
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Adjustment 0032 $-3,682.93
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Closure 0017 $-3,182.02
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Initial Payment 0010 $1,987.84
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Initial Payment 0017 $5,115.86
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Initial Payment 0006 $3,182.02
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Closure 0017 $-1,987.84
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0023 $-1,079.57
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0015 $-337.04
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0028 $-2,159.15
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0032 $-1,079.57
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0017 $-1,079.57
06374(44) 0075 inlet smd-type1 Stockpiled Material Closure 0017 $-1,619.00
06374(44) 0075 inlet smd-type1 Stockpiled Material Closure 0017 $-2,044.33
06374(44) 0075 inlet smd-type1 Stockpiled Material Closure 0017 $-3,257.40
06374(44) 0075 inlet smd-type1 Stockpiled Material Closure 0017 $-2,716.89
06374(44) 0075 inlet smd-type1 Stockpiled Material Initial Payment 0017 $9,637.62
06374(44) 0075 inlet smd-type1 Stockpiled Material Initial Payment 0002 $3,641.24
06374(44) 0075 inlet smd-type1 Stockpiled Material Initial Payment 0003 $2,044.33
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0005 $-337.04
06374(44) 0075 inlet smd-type1 Stockpiled Material Initial Payment 0006 $3,257.40
06374(44) 0075 inlet smd-type1 Stockpiled Material Initial Payment 0008 $2,716.89
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0009 $-1,348.16
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0027 $-1,079.57
06374(44) 0076 inlet smd-type2 Stockpiled Material Closure 0017 $-553.78
06374(44) 0076 inlet smd-type2 Stockpiled Material Closure 0017 $-560.00
06374(44) 0076 inlet smd-type2 Stockpiled Material Initial Payment 0017 $1,113.78
06374(44) 0076 inlet smd-type2 Stockpiled Material Initial Payment 0002 $560.00
06374(44) 0076 inlet smd-type2 Stockpiled Material Adjustment 0015 $-6.22
06374(44) 0076 inlet smd-type2 Stockpiled Material Adjustment 0005 $-186.68
06374(44) 0076 inlet smd-type2 Stockpiled Material Initial Payment 0006 $560.00
06374(44) 0076 inlet smd-type2 Stockpiled Material Initial Payment 0007 $560.00
06374(44) 0076 inlet smd-type2 Stockpiled Material Adjustment 0015 $-184.80
06374(44) 0076 inlet smd-type2 Stockpiled Material Adjustment 0004 $-186.68
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0025 $-774.07
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0015 $-985.18
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0028 $-844.44
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0032 $-1,308.98
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0017 $-1,337.03
06374(44) 0077 Fram Grate CICI Stockpiled Material Closure 0017 $-6,622.26
06374(44) 0077 Fram Grate CICI Stockpiled Material Initial Payment 0017 $6,622.26
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0018 $-140.74
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0019 $-703.70
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0020 $-879.63
06374(44) 0077 Fram Grate CICI Stockpiled Material Initial Payment 0007 $10,070.38
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0010 $-2,251.83
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0013 $-140.74
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0014 $-70.37
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0027 $-633.33
06374(44) 0078 CICI Stockpiled Material Adjustment 0025 $-914.93
06374(44) 0078 CICI Stockpiled Material Adjustment 0014 $-87.14
06374(44) 0078 CICI Stockpiled Material Adjustment 0028 $-784.23
06374(44) 0078 CICI Stockpiled Material Adjustment 0032 $-2,169.74
06374(44) 0078 CICI Stockpiled Material Adjustment 0015 $-1,045.65
06374(44) 0078 CICI Stockpiled Material Adjustment 0017 $-479.25
06374(44) 0078 CICI Stockpiled Material Closure 0017 $-5,742.19
06374(44) 0078 CICI Stockpiled Material Initial Payment 0017 $5,742.19
06374(44) 0078 CICI Stockpiled Material Adjustment 0018 $-87.14
06374(44) 0078 CICI Stockpiled Material Adjustment 0019 $-304.98
06374(44) 0078 CICI Stockpiled Material Adjustment 0020 $-304.98
06374(44) 0078 CICI Stockpiled Material Initial Payment 0007 $9,096.98
06374(44) 0078 CICI Stockpiled Material Adjustment 0010 $-2,004.16
06374(44) 0078 CICI Stockpiled Material Adjustment 0013 $-217.84
06374(44) 0078 CICI Stockpiled Material Adjustment 0027 $-697.09
06374(44) 0106 Impact att. Stockpiled Material Initial Payment 0017 $98,970.24
06374(44) 0106 Impact att. Stockpiled Material Adjustment 0031 $-18,325.99
06374(44) 0106 Impact att. Stockpiled Material Adjustment 0029 $-36,651.99
06374(44) 0106 Impact att. Stockpiled Material Adjustment 0020 $-36,651.99
06374(44) 0106 Impact att. Stockpiled Material Closure 0017 $-98,970.24
06374(44) 0106 Impact att. Stockpiled Material Initial Payment 0008 $98,970.24
06374(44) 0116 18" ductileiron pipe Stockpiled Material Closure 0017 $-10,971.75
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0015 $-1,482.45
06374(44) 0116 18" ductileiron pipe Stockpiled Material Closure 0017 $-164,950.23
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0014 $-3,033.05
06374(44) 0116 18" ductileiron pipe Stockpiled Material Initial Payment 0017 $175,921.98
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0009 $-5,689.30
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0008 $-16,721.05
06374(44) 0116 18" ductileiron pipe Stockpiled Material Initial Payment 0004 $82,097.58
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0007 $-17,414.19
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0006 $-14,177.03
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0005 $-12,608.76
06374(44) 0116 18" ductileiron pipe Stockpiled Material Initial Payment 0004 $164,950.23
06374(44) 0119 6" DIP Stockpiled Material Adjustment 0006 $-1,026.14
06374(44) 0119 6" DIP Stockpiled Material Initial Payment 0004 $23,665.37
06374(44) 0119 6" DIP Stockpiled Material Adjustment 0012 $-22,562.27
06374(44) 0119 6" DIP Stockpiled Material Adjustment 0007 $-76.96
06374(44) 0121 12" DIP Stockpiled Material Adjustment 0012 $-13,876.89
06374(44) 0121 12" DIP Stockpiled Material Initial Payment 0004 $43,503.44
06374(44) 0121 12" DIP Stockpiled Material Adjustment 0006 $-9,829.46
06374(44) 0121 12" DIP Stockpiled Material Closure 0017 $-19,797.09
06374(44) 0122 16" DIP Stockpiled Material Closure 0017 $-42,658.16
06374(44) 0122 16" DIP Stockpiled Material Initial Payment 0017 $42,658.16
06374(44) 0122 16" DIP Stockpiled Material Adjustment 0012 $-10,615.79
06374(44) 0122 16" DIP Stockpiled Material Initial Payment 0004 $53,273.95
06374(44) 0124 6" PVC Stockpiled Material Adjustment 0007 $-1,119.14
06374(44) 0124 6" PVC Stockpiled Material Initial Payment 0004 $17,425.79
06374(44) 0124 6" PVC Stockpiled Material Adjustment 0004 $-11,191.36
06374(44) 0124 6" PVC Stockpiled Material Initial Payment 0017 $5,115.29
06374(44) 0124 6" PVC Stockpiled Material Closure 0017 $-5,115.29
06374(44) 0126 6" Gate Valve Stockpiled Material Adjustment 0007 $-398.26
06374(44) 0126 6" Gate Valve Stockpiled Material Initial Payment 0017 $995.78
06374(44) 0126 6" Gate Valve Stockpiled Material Closure 0017 $-995.78
06374(44) 0126 6" Gate Valve Stockpiled Material Adjustment 0012 $-7,566.86
06374(44) 0126 6" Gate Valve Stockpiled Material Initial Payment 0004 $8,960.90
06374(44) 0139 P.C. Beams Br. A Stockpiled Material Initial Payment 0017 $238,751.22
06374(44) 0139 P.C. Beams Br. A Stockpiled Material Closure 0017 $-238,751.22
06374(44) 0139 P.C. Beams Br. A Stockpiled Material Adjustment 0017 $-238,751.22
06374(44) 0139 P.C. Beams Br. A Stockpiled Material Initial Payment 0003 $376,455.15
06374(44) 0139 P.C. Beams Br. A Stockpiled Material Adjustment 0013 $-137,703.93
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Initial Payment 0017 $396,373.17
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Closure 0017 $-237,537.27
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Closure 0017 $-158,835.90
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Initial Payment 0003 $158,835.90
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Initial Payment 0004 $237,537.27
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Adjustment 0026 $-232,119.30
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Adjustment 0020 $-164,253.93
06374(44) 0171 Reinf. steel for F-shape par. Stockpiled Material Adjustment 0029 $-10,860.92
06374(44) 0171 Reinf. steel for F-shape par. Stockpiled Material Initial Payment 0023 $10,860.92
06374(44) 0176 Br. Stockpiled Material Closure 0020 $-94,069.50
06374(44) 0176 Br. Stockpiled Material Initial Payment 0017 $94,069.50
06374(44) 0176 Br. Stockpiled Material Initial Payment 0012 $94,069.50
06374(44) 0176 Br. Stockpiled Material Closure 0017 $-94,069.50
06374(44) 0180 Epox. Reinf. Br. B Stockpiled Material Initial Payment 0023 $61,667.98
06374(44) 0180 Epox. Reinf. Br. B Stockpiled Material Adjustment 0023 $-17,338.03
06374(44) 0180 Epox. Reinf. Br. B Stockpiled Material Adjustment 0031 $-3,665.44
06374(44) 0180 Epox. Reinf. Br. B Stockpiled Material Adjustment 0028 $-27,118.45
06374(44) 0180 Epox. Reinf. Br. B Stockpiled Material Adjustment 0025 $-9,500.88
06374(44) 0200 Stru. steel Stockpiled Material Closure 0017 $-335,527.10
06374(44) 0200 Stru. steel Stockpiled Material Initial Payment 0017 $335,527.10
06374(44) 0200 Stru. steel Stockpiled Material Initial Payment 0006 $830,070.00
06374(44) 0200 Stru. steel Stockpiled Material Adjustment 0012 $-494,542.90
06374(44) 0200 Stru. steel Stockpiled Material Adjustment 0024 $-335,527.10
06374(44) 0212 Abut. bearing assembly Stockpiled Material Initial Payment 0013 $2,829.69
06374(44) 0212 Abut. bearing assembly Stockpiled Material Adjustment 0013 $846.43
06374(44) 0212 Abut. bearing assembly Stockpiled Material Adjustment 0024 $-1,451.09
06374(44) 0212 Abut. bearing assembly Stockpiled Material Initial Payment 0017 $3,676.12
06374(44) 0212 Abut. bearing assembly Stockpiled Material Closure 0017 $-3,676.12
06374(44) 0213 expansion bearing assembly Stockpiled Material Adjustment 0013 $-5,106.89
06374(44) 0213 expansion bearing assembly Stockpiled Material Adjustment 0024 $-13,134.47
06374(44) 0213 expansion bearing assembly Stockpiled Material Closure 0017 $-20,506.81
06374(44) 0213 expansion bearing assembly Stockpiled Material Initial Payment 0017 $20,506.81
06374(44) 0213 expansion bearing assembly Stockpiled Material Initial Payment 0013 $25,613.70
06374(44) 0245 Extruded Panel groundmount Stockpiled Material Adjustment 0030 $-2,580.48
06374(44) 0245 Extruded Panel groundmount Stockpiled Material Initial Payment 0020 $2,580.48
06374(44) 0246 Extruded Panel overhead Stockpiled Material Initial Payment 0020 $21,046.00
06374(44) 0246 Extruded Panel overhead Stockpiled Material Adjustment 0030 $-21,046.00
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0030 $-20,150.08
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0031 $-20,150.08
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0008 $15,080.00
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0008 $42,497.00
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0012 $56,989.29
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0013 $54,358.00
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0014 $-502.67
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0015 $12,727.86
06374(44) 0267 Ped. heads Stockpiled Material Closure 0017 $-14,577.33
06374(44) 0267 Ped. heads Stockpiled Material Closure 0017 $-42,497.00
06374(44) 0267 Ped. heads Stockpiled Material Closure 0017 $-56,989.29
06374(44) 0267 Ped. heads Stockpiled Material Closure 0017 $-54,358.00
06374(44) 0267 Ped. heads Stockpiled Material Closure 0017 $-12,727.86
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0017 $181,149.48
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0022 $-16,118.95
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0024 $-60,444.66
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0026 $-20,150.08
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0028 $-30,225.13
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0026 $-16,370.29
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0031 $-28,888.74
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0022 $-33,703.54
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0020 $-6,740.71
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Initial Payment 0015 $131,734.00
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0028 $-4,814.79
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Initial Payment 0017 $131,734.00
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Closure 0017 $-131,734.00
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0030 $-19,259.16
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0031 $-644.64
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0030 $-5,946.65
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0028 $-1,238.88
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0026 $-3,716.65
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0024 $-2,229.99
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0022 $-1,734.44
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0020 $-2,477.77
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0018 $-1,238.88
06374(44) 0277 Breakaway base Stockpiled Material Initial Payment 0017 $19,227.91
06374(44) 0277 Breakaway base Stockpiled Material Closure 0017 $-19,227.91
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0016 $-6,194.09
06374(44) 0277 Breakaway base Stockpiled Material Initial Payment 0015 $25,422.00
06374(44) 0278 Roadway Luminaire Stockpiled Material Closure 0017 $-92,834.00
06374(44) 0278 Roadway Luminaire Stockpiled Material Adjustment 0026 $-52,683.62
06374(44) 0278 Roadway Luminaire Stockpiled Material Initial Payment 0012 $92,834.00
06374(44) 0278 Roadway Luminaire Stockpiled Material Adjustment 0031 $-14,973.24
06374(44) 0278 Roadway Luminaire Stockpiled Material Adjustment 0028 $-3,327.39
06374(44) 0278 Roadway Luminaire Stockpiled Material Initial Payment 0017 $92,834.00
06374(44) 0278 Roadway Luminaire Stockpiled Material Adjustment 0030 $-16,082.37
06374(44) 0279 Underpass Luminaire Stockpiled Material Closure 0017 $-6,560.00
06374(44) 0279 Underpass Luminaire Stockpiled Material Adjustment 0030 $-6,376.56
06374(44) 0279 Underpass Luminaire Stockpiled Material Initial Payment 0017 $6,560.00
06374(44) 0279 Underpass Luminaire Stockpiled Material Initial Payment 0012 $6,560.00
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0031 $-3,644.59
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Initial Payment 0008 $37,601.14
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0030 $-6,128.64
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0020 $-7,186.88
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0016 $-4,261.19
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0024 $-2,958.85
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0028 $-1,949.28
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0018 $-282.20
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Initial Payment 0017 $33,339.95
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Closure 0017 $-33,339.95
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0022 $-2,671.00
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0026 $-3,964.88
Subtotals For Stockpile Payments $352,051.03


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.
Subtotals For Liquidated Damages $


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0005 -796.00 $1.50 $-1,194.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0014 -150.00 $1.50 $-225.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0017 -96.00 $1.50 $-144.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0019 -425.00 $1.50 $-637.50
06374(44) 0005 TEMPORARY SILT FENCE * Material Discrepancy Adjustments 0020 246.00 $1.50 $369.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0023 -100.00 $1.50 $-150.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0027 -210.00 $1.50 $-315.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0032 1,815.00 $1.50 $2,722.50
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0004 1,001.02 $0.42 $426.06
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0007 663.89 $2.80 $1,859.31
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0008 1,318.72 $2.80 $3,693.25
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0009 1,625.11 $2.80 $4,551.33
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0010 303.59 $2.80 $850.24
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0013 4,056.04 $2.80 $11,359.47
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0014 1,804.27 $2.80 $5,053.09
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0015 514.01 $2.67 $1,375.30
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0016 406.32 $2.67 $1,087.16
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0017 3,168.40 $2.23 $7,091.29
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0018 1,103.97 $2.23 $2,470.83
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0019 43.94 $2.23 $98.34
06374(44) 0018 OPEN GRADED BITUMINOUS BASE * Material Discrepancy Adjustments 0019 -43.94 $38.00 $-1,669.72
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0020 685.39 $2.23 $1,533.99
06374(44) 0018 OPEN GRADED BITUMINOUS BASE * Material Discrepancy Adjustments 0020 43.94 $38.00 $1,669.72
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0021 237.08 $2.23 $530.62
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0022 4,197.08 $2.23 $9,393.61
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0023 977.57 $2.30 $2,249.03
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0024 2,520.07 $2.30 $5,797.75
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0025 32.61 $2.30 $75.02
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0026 214.92 $2.30 $494.45
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0027 2,705.94 $2.92 $7,916.58
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment