Oklahoma Department of Transportation
Progressive Estimate Summary
Created:    06/07/2012
Contract ID: 100617   Estimate Number: 0030     Contract No: 610850
Residency: TULSA (08100)   Estimate Type: Progressive     Account No: 400800

Project Number(s): IMY-0044-2(396)225
Primary Job Piece No: 06374(44)
Contract Description: GRADE, DRAIN, SURFACE, AND BRIDGE I-44: FROM RIVERSIDE DRIVE TO EAST OF PEORIA AVENUE IN THE CITY OF TULSA. PROJECT LENGTH = 1.215 MILES.
Primary County: TULSA              
Name of Road: I-44              
Prime Contractor: BECCO CONTRACTORS, INC.              
    P.O. BOX 9159              
    TULSA , OK   74157              
Surety Company: MID-CONTINENT CASUALTY COMPANY              

Date Let: 11/18/2010 NTP Effective Date: 03/01/2011 Pay Period: 05/16/2012  TO  05/31/2012
Date Awarded: 12/06/2010 Date Work Began: 03/01/2011 Original Contract Time: 720
Date Contract Executed: 12/22/2010 Date Time Stopped: Current Time Charged: 458.00
Date NTP Issued: 01/05/2011 Completion Date: Current Time Allowed: 755.00
General Liability Expires: 03/01/2013 Workman's Comp Expires: 02/01/2013 Percent Time Used: 60.66 %
Specification Year: 1999     Date Approved:

Current Contract Amount: $33,000,066.25 Total to Date Prev to Date This Estimate
Bid Amount: $32,439,488.87 Participating: $29,494,809.29 $28,958,339.86 $536,469.43
Percent Complete: 89.03 % Non Participating: $130,603.09 $130,603.09 $0.00
Funds Available: $3,618,755.98 Total Earnings: $29,625,412.38 $29,088,942.95 $536,469.43
Unearned Balance: $3,058,178.60 Stockpiled Materials: $546,555.78 $644,125.72 $-97,569.94
Gross Earnings: $30,171,968.16 $29,733,068.67 $438,899.49
Other Adjustments: $-115,657.89 $-157,657.62 $41,999.73
Liq Dam/Disincentive: $-675,000.00 $-195,000.00 $-480,000.00
TOTAL: $29,381,310.27 $29,380,411.05 $899.22

Estimate Adjustment Detail

Contract ID: 100617   Estimate Number: 0030     Primary JP: 06374(44)



CHANGE ORDER HISTORY
Change Order Nbr. Change Order Description Status Approval Date Contract Time Adjustment Total Change Order Amount
001 Addendum to (SP) CA000002 Approved 07/12/2011 0.0 $0.00
002 Powder Coating Hwy. Lighting Approved 09/14/2011 0.0 $57,911.70
003 Class B bridge deck repair Approved 05/08/2012 0.0 $63,980.79
004 Structural steel Approved 12/06/2011 0.0 $3,184.00
005 Material for Joint repair Approved 12/06/2011 0.0 $109,115.89
006 Temporary Roadway Lighting Approved 12/06/2011 0.0 $262,500.00
007 Labor & Equipment River Joint Approved 03/05/2012 0.0 $21,487.20
008 Median Barrier Light Pole Footing Approved 05/08/2012 0.0 $35,737.80
009 Waffle house demolition Approved 06/04/2012 0.0 $6,660.00


STOCKPILE PAYMENT HISTORY
Project Line Nbr Stockpile Description Adjustment Type Estimate Nbr Adjusted Amount
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0003 $-3,555.16
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0028 $-46,651.19
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0005 $-1,127.28
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0006 $-7,594.13
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0007 $-4,309.60
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0008 $-10,352.40
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0009 $-32,073.76
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0012 $-9,080.08
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0013 $-28,115.42
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0014 $-10,892.06
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0015 $-16,506.13
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0016 $-2,198.27
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0017 $-5,269.53
06374(44) 0019 Separator Fabric Stockpiled Material Closure 0017 $-224,223.57
06374(44) 0019 Separator Fabric Stockpiled Material Initial Payment 0017 $224,223.57
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0018 $-6,815.65
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0019 $-12,482.98
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0020 $-27,734.47
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0021 $-28,881.01
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0022 $-33,188.29
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0023 $-6,067.15
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0024 $-29,033.69
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0025 $-12,370.42
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0026 $-7,515.85
06374(44) 0019 Separator Fabric Stockpiled Material Adjustment 0027 $-8,213.34
06374(44) 0019 Separator Fabric Stockpiled Material Initial Payment 0003 $350,027.86
06374(44) 0028 Dowel (Baskets) Stockpiled Material Initial Payment 0003 $156,989.73
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0028 $-5,240.41
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0007 $-8,844.51
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0008 $-6,310.70
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0009 $-18,850.52
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0010 $-10,478.25
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0013 $-2,348.49
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0014 $-4,624.78
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0015 $-2,636.14
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0016 $-83.04
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0017 $-4,650.86
06374(44) 0028 Dowel (Baskets) Stockpiled Material Closure 0017 $-102,813.30
06374(44) 0028 Dowel (Baskets) Stockpiled Material Closure 0017 $-41,906.51
06374(44) 0028 Dowel (Baskets) Stockpiled Material Initial Payment 0017 $144,719.81
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0018 $-7,177.08
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0019 $-3,052.37
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0020 $-9,938.00
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0021 $-571.72
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0022 $-1,750.61
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0024 $-6,062.27
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0025 $-10,068.52
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0026 $-10,972.85
06374(44) 0028 Dowel (Baskets) Stockpiled Material Adjustment 0027 $-9,384.28
06374(44) 0028 Dowel (Baskets) Stockpiled Material Initial Payment 0006 $41,906.51
06374(44) 0030 Reinforcing steel Stockpiled Material Initial Payment 0007 $483,443.45
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0028 $-25,323.28
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0015 $-64,739.09
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0016 $-11,900.30
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0017 $-54,468.71
06374(44) 0030 Reinforcing steel Stockpiled Material Closure 0017 $-333,538.63
06374(44) 0030 Reinforcing steel Stockpiled Material Initial Payment 0017 $333,538.63
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0018 $-49,382.67
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0019 $-6,854.63
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0020 $-11,624.03
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0023 $-127,634.09
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0024 $-32,020.66
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0025 $-23,495.41
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0027 $-2,735.11
06374(44) 0030 Reinforcing steel Stockpiled Material Adjustment 0014 $-73,265.43
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-2,234.21
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-1,095.00
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-500.00
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-5,427.02
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0003 $1,774.78
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0027 $-2,150.78
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0025 $-2,150.78
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0005 $-386.87
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0006 $-193.43
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0006 $1,095.00
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0006 $5,427.02
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0006 $500.00
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0002 $5,920.59
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0024 $-1,075.39
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0007 $2,403.87
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0023 $-3,763.86
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0008 $2,234.21
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0008 $2,079.49
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0009 $-677.02
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0028 $-5,376.94
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0018 $-3,226.16
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0017 $24,093.45
06374(44) 0057 Manhole (4') Stockpiled Material Initial Payment 0010 $5,560.00
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0012 $-290.15
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0003 $0.00
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0015 $-1,354.04
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-5,560.00
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-2,079.49
06374(44) 0057 Manhole (4') Stockpiled Material Adjustment 0017 $-1,075.39
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-3,019.08
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-1,774.78
06374(44) 0057 Manhole (4') Stockpiled Material Closure 0017 $-2,403.87
06374(44) 0058 MH 5' Stockpiled Material Adjustment 0012 $-868.74
06374(44) 0058 MH 5' Stockpiled Material Adjustment 0009 $-1,737.47
06374(44) 0058 MH 5' Stockpiled Material Initial Payment 0006 $2,266.62
06374(44) 0058 MH 5' Stockpiled Material Adjustment 0028 $-2,576.73
06374(44) 0058 MH 5' Stockpiled Material Initial Payment 0002 $4,691.20
06374(44) 0058 MH 5' Stockpiled Material Adjustment 0027 $-1,288.36
06374(44) 0058 MH 5' Stockpiled Material Initial Payment 0017 $4,351.61
06374(44) 0058 MH 5' Stockpiled Material Closure 0017 $-2,266.62
06374(44) 0058 MH 5' Stockpiled Material Closure 0017 $-2,084.99
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0002 $2,268.00
06374(44) 0059 MH 6' Stockpiled Material Closure 0017 $-5,121.06
06374(44) 0059 MH 6' Stockpiled Material Closure 0017 $-304.00
06374(44) 0059 MH 6' Stockpiled Material Closure 0017 $-2,118.08
06374(44) 0059 MH 6' Stockpiled Material Closure 0017 $-4,263.56
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0017 $11,806.70
06374(44) 0059 MH 6' Stockpiled Material Adjustment 0016 $-922.94
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0007 $2,118.08
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0006 $304.00
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0003 $6,044.00
06374(44) 0059 MH 6' Stockpiled Material Adjustment 0004 $-1,440.10
06374(44) 0059 MH 6' Stockpiled Material Initial Payment 0009 $4,263.56
06374(44) 0059 MH 6' Stockpiled Material Adjustment 0016 $-106.40
06374(44) 0059 MH 6' Stockpiled Material Adjustment 0009 $-720.05
06374(44) 0062 Spe. inlet drain Stockpiled Material Initial Payment 0002 $1,253.16
06374(44) 0062 Spe. inlet drain Stockpiled Material Initial Payment 0003 $1,093.07
06374(44) 0062 Spe. inlet drain Stockpiled Material Initial Payment 0006 $2,630.45
06374(44) 0062 Spe. inlet drain Stockpiled Material Adjustment 0020 $-1,841.97
06374(44) 0062 Spe. inlet drain Stockpiled Material Closure 0017 $-1,093.07
06374(44) 0062 Spe. inlet drain Stockpiled Material Closure 0017 $-2,630.45
06374(44) 0062 Spe. inlet drain Stockpiled Material Initial Payment 0017 $4,976.68
06374(44) 0062 Spe. inlet drain Stockpiled Material Closure 0017 $-1,253.16
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0002 $9,779.52
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0003 $4,883.72
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0004 $-665.29
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0005 $-887.06
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0006 $-1,774.11
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0006 $2,420.72
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0006 $2,865.16
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0006 $8,917.47
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0007 $6,505.59
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0008 $2,873.53
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0009 $-1,995.88
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0015 $-1,108.82
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0017 $-867.22
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-3,348.36
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-4,883.72
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-2,420.72
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-2,865.16
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-8,917.47
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-6,505.59
06374(44) 0063 CICI 2(std) Stockpiled Material Closure 0017 $-2,873.53
06374(44) 0063 CICI 2(std) Stockpiled Material Initial Payment 0017 $31,814.55
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0018 $-3,468.90
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0025 $-1,734.45
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0027 $-2,601.67
06374(44) 0063 CICI 2(std) Stockpiled Material Adjustment 0028 $-3,468.90
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0007 $4,691.54
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0006 $5,604.16
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0009 $-1,883.74
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0012 $-538.21
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0019 $-3,881.32
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0022 $-1,940.66
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0023 $-3,881.32
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0024 $-1,940.66
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0025 $-2,910.99
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0027 $-2,910.99
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0028 $-6,792.32
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0015 $-1,076.42
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-6,407.83
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-5,775.00
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-5,400.51
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-7,751.82
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-5,604.16
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-4,691.54
06374(44) 0064 CICI 2(B) Stockpiled Material Closure 0017 $-3,591.18
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0017 $39,222.04
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0002 $12,597.26
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0003 $-807.32
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0003 $5,775.00
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0004 $-1,076.42
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0005 $-538.21
06374(44) 0064 CICI 2(B) Stockpiled Material Adjustment 0006 $-269.11
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0006 $5,400.51
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0006 $7,751.82
06374(44) 0064 CICI 2(B) Stockpiled Material Initial Payment 0008 $3,591.18
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0007 $4,482.49
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0009 $-369.03
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0012 $-369.03
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0018 $-1,187.39
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0024 $-1,187.39
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0025 $-1,187.39
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0027 $-2,374.78
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0028 $-2,374.78
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0015 $-1,476.11
06374(44) 0065 CICI 2(D) Stockpiled Material Closure 0017 $-2,363.92
06374(44) 0065 CICI 2(D) Stockpiled Material Closure 0017 $-4,416.07
06374(44) 0065 CICI 2(D) Stockpiled Material Closure 0017 $-962.00
06374(44) 0065 CICI 2(D) Stockpiled Material Closure 0017 $-1,924.00
06374(44) 0065 CICI 2(D) Stockpiled Material Closure 0017 $-4,482.49
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0017 $14,148.48
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0002 $5,316.15
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0003 $-369.03
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0003 $4,416.07
06374(44) 0065 CICI 2(D) Stockpiled Material Adjustment 0004 $-369.03
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0006 $962.00
06374(44) 0065 CICI 2(D) Stockpiled Material Initial Payment 0006 $1,924.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Adjustment 0028 $-2,880.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Initial Payment 0017 $2,880.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Initial Payment 0006 $825.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Closure 0017 $-2,055.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Closure 0017 $-825.00
06374(44) 0066 INLET CICI DES. 2(2B) Stockpiled Material Initial Payment 0009 $2,055.00
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Initial Payment 0006 $2,634.50
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Initial Payment 0006 $1,276.00
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Initial Payment 0017 $3,910.50
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Closure 0017 $-2,634.50
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Closure 0017 $-1,276.00
06374(44) 0067 CICI DES. 3 (2B) Stockpiled Material Adjustment 0017 $-1,446.47
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Adjustment 0028 $-1,528.68
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Initial Payment 0010 $5,870.60
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Adjustment 0022 $-4,586.04
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Adjustment 0023 $-1,528.68
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Closure 0017 $-5,870.60
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Closure 0017 $-2,364.53
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Initial Payment 0017 $9,186.66
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Adjustment 0015 $-445.87
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Initial Payment 0009 $951.53
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Initial Payment 0006 $2,810.40
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Adjustment 0017 $-1,528.68
06374(44) 0068 GPI TYPE 2(DES. 8) Stockpiled Material Closure 0017 $-951.53
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Adjustment 0009 $-443.49
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Adjustment 0009 $-1,069.34
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Initial Payment 0017 $1,166.45
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Closure 0017 $-1,166.45
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Adjustment 0003 $-1,335.21
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Initial Payment 0006 $1,609.94
06374(44) 0069 GPI type 2 (des.10) Stockpiled Material Initial Payment 0002 $2,405.00
06374(44) 0070 GPI Type 2(Des.14) Stockpiled Material Initial Payment 0006 $2,234.79
06374(44) 0070 GPI Type 2(Des.14) Stockpiled Material Adjustment 0009 $-2,234.79
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Adjustment 0012 $-142.80
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Adjustment 0024 $-157.92
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Initial Payment 0007 $565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Initial Payment 0006 $565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Initial Payment 0006 $565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Initial Payment 0002 $1,158.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Initial Payment 0017 $2,424.60
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Closure 0017 $-565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Closure 0017 $-565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Closure 0017 $-565.00
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Closure 0017 $-729.60
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Adjustment 0017 $-2,267.70
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Adjustment 0016 $-142.80
06374(44) 0071 inlet Median Barr.Des 2 Stockpiled Material Adjustment 0015 $-142.80
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Closure 0017 $-1,103.83
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Adjustment 0014 $-173.49
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0017 $15,106.94
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Closure 0017 $-6,140.24
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Adjustment 0019 $-1,409.39
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0002 $2,032.32
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Closure 0017 $-4,185.60
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Closure 0017 $-3,032.80
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Closure 0017 $-644.43
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Adjustment 0017 $-5,637.54
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0006 $4,185.60
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0006 $3,032.80
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0008 $6,140.24
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Initial Payment 0007 $1,103.83
06374(44) 0072 inlet median barr des 2-2 Stockpiled Material Adjustment 0012 $-1,214.40
06374(44) 0073 Inlet W/Lrg.JCT.Box Stockpiled Material Initial Payment 0006 $2,969.85
06374(44) 0073 Inlet W/Lrg.JCT.Box Stockpiled Material Initial Payment 0017 $2,969.85
06374(44) 0073 Inlet W/Lrg.JCT.Box Stockpiled Material Closure 0017 $-2,969.85
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Adjustment 0028 $-1,435.49
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Closure 0017 $-3,182.02
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Closure 0017 $-1,987.84
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Initial Payment 0017 $5,115.86
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Initial Payment 0006 $3,182.02
06374(44) 0074 Inlet W/small Juc.Box Stockpiled Material Initial Payment 0010 $1,987.84
06374(44) 0075 inlet smd-type1 Stockpiled Material Closure 0017 $-3,257.40
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0015 $-337.04
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0027 $-1,079.57
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0005 $-337.04
06374(44) 0075 inlet smd-type1 Stockpiled Material Initial Payment 0002 $3,641.24
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0023 $-1,079.57
06374(44) 0075 inlet smd-type1 Stockpiled Material Closure 0017 $-2,716.89
06374(44) 0075 inlet smd-type1 Stockpiled Material Closure 0017 $-1,619.00
06374(44) 0075 inlet smd-type1 Stockpiled Material Initial Payment 0006 $3,257.40
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0017 $-1,079.57
06374(44) 0075 inlet smd-type1 Stockpiled Material Initial Payment 0003 $2,044.33
06374(44) 0075 inlet smd-type1 Stockpiled Material Initial Payment 0008 $2,716.89
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0028 $-2,159.15
06374(44) 0075 inlet smd-type1 Stockpiled Material Initial Payment 0017 $9,637.62
06374(44) 0075 inlet smd-type1 Stockpiled Material Adjustment 0009 $-1,348.16
06374(44) 0075 inlet smd-type1 Stockpiled Material Closure 0017 $-2,044.33
06374(44) 0076 inlet smd-type2 Stockpiled Material Adjustment 0004 $-186.68
06374(44) 0076 inlet smd-type2 Stockpiled Material Initial Payment 0017 $1,113.78
06374(44) 0076 inlet smd-type2 Stockpiled Material Adjustment 0005 $-186.68
06374(44) 0076 inlet smd-type2 Stockpiled Material Closure 0017 $-560.00
06374(44) 0076 inlet smd-type2 Stockpiled Material Closure 0017 $-553.78
06374(44) 0076 inlet smd-type2 Stockpiled Material Initial Payment 0006 $560.00
06374(44) 0076 inlet smd-type2 Stockpiled Material Initial Payment 0002 $560.00
06374(44) 0076 inlet smd-type2 Stockpiled Material Adjustment 0015 $-184.80
06374(44) 0076 inlet smd-type2 Stockpiled Material Adjustment 0015 $-6.22
06374(44) 0076 inlet smd-type2 Stockpiled Material Initial Payment 0007 $560.00
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0015 $-985.18
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0014 $-70.37
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0013 $-140.74
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0027 $-633.33
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0025 $-774.07
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0020 $-879.63
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0019 $-703.70
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0018 $-140.74
06374(44) 0077 Fram Grate CICI Stockpiled Material Initial Payment 0017 $6,622.26
06374(44) 0077 Fram Grate CICI Stockpiled Material Closure 0017 $-6,622.26
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0017 $-1,337.03
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0028 $-844.44
06374(44) 0077 Fram Grate CICI Stockpiled Material Adjustment 0010 $-2,251.83
06374(44) 0077 Fram Grate CICI Stockpiled Material Initial Payment 0007 $10,070.38
06374(44) 0078 CICI Stockpiled Material Adjustment 0028 $-784.23
06374(44) 0078 CICI Stockpiled Material Adjustment 0010 $-2,004.16
06374(44) 0078 CICI Stockpiled Material Adjustment 0027 $-697.09
06374(44) 0078 CICI Stockpiled Material Adjustment 0025 $-914.93
06374(44) 0078 CICI Stockpiled Material Adjustment 0020 $-304.98
06374(44) 0078 CICI Stockpiled Material Adjustment 0019 $-304.98
06374(44) 0078 CICI Stockpiled Material Adjustment 0015 $-1,045.65
06374(44) 0078 CICI Stockpiled Material Initial Payment 0017 $5,742.19
06374(44) 0078 CICI Stockpiled Material Adjustment 0017 $-479.25
06374(44) 0078 CICI Stockpiled Material Initial Payment 0007 $9,096.98
06374(44) 0078 CICI Stockpiled Material Closure 0017 $-5,742.19
06374(44) 0078 CICI Stockpiled Material Adjustment 0013 $-217.84
06374(44) 0078 CICI Stockpiled Material Adjustment 0014 $-87.14
06374(44) 0078 CICI Stockpiled Material Adjustment 0018 $-87.14
06374(44) 0106 Impact att. Stockpiled Material Closure 0017 $-98,970.24
06374(44) 0106 Impact att. Stockpiled Material Adjustment 0029 $-36,651.99
06374(44) 0106 Impact att. Stockpiled Material Adjustment 0020 $-36,651.99
06374(44) 0106 Impact att. Stockpiled Material Initial Payment 0017 $98,970.24
06374(44) 0106 Impact att. Stockpiled Material Initial Payment 0008 $98,970.24
06374(44) 0116 18" ductileiron pipe Stockpiled Material Initial Payment 0004 $164,950.23
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0006 $-14,177.03
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0015 $-1,482.45
06374(44) 0116 18" ductileiron pipe Stockpiled Material Closure 0017 $-10,971.75
06374(44) 0116 18" ductileiron pipe Stockpiled Material Closure 0017 $-164,950.23
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0009 $-5,689.30
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0014 $-3,033.05
06374(44) 0116 18" ductileiron pipe Stockpiled Material Initial Payment 0017 $175,921.98
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0005 $-12,608.76
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0008 $-16,721.05
06374(44) 0116 18" ductileiron pipe Stockpiled Material Initial Payment 0004 $82,097.58
06374(44) 0116 18" ductileiron pipe Stockpiled Material Adjustment 0007 $-17,414.19
06374(44) 0119 6" DIP Stockpiled Material Adjustment 0006 $-1,026.14
06374(44) 0119 6" DIP Stockpiled Material Initial Payment 0004 $23,665.37
06374(44) 0119 6" DIP Stockpiled Material Adjustment 0007 $-76.96
06374(44) 0119 6" DIP Stockpiled Material Adjustment 0012 $-22,562.27
06374(44) 0121 12" DIP Stockpiled Material Adjustment 0012 $-13,876.89
06374(44) 0121 12" DIP Stockpiled Material Initial Payment 0004 $43,503.44
06374(44) 0121 12" DIP Stockpiled Material Closure 0017 $-19,797.09
06374(44) 0121 12" DIP Stockpiled Material Adjustment 0006 $-9,829.46
06374(44) 0122 16" DIP Stockpiled Material Adjustment 0012 $-10,615.79
06374(44) 0122 16" DIP Stockpiled Material Initial Payment 0004 $53,273.95
06374(44) 0122 16" DIP Stockpiled Material Initial Payment 0017 $42,658.16
06374(44) 0122 16" DIP Stockpiled Material Closure 0017 $-42,658.16
06374(44) 0124 6" PVC Stockpiled Material Initial Payment 0017 $5,115.29
06374(44) 0124 6" PVC Stockpiled Material Adjustment 0004 $-11,191.36
06374(44) 0124 6" PVC Stockpiled Material Initial Payment 0004 $17,425.79
06374(44) 0124 6" PVC Stockpiled Material Adjustment 0007 $-1,119.14
06374(44) 0124 6" PVC Stockpiled Material Closure 0017 $-5,115.29
06374(44) 0126 6" Gate Valve Stockpiled Material Initial Payment 0017 $995.78
06374(44) 0126 6" Gate Valve Stockpiled Material Initial Payment 0004 $8,960.90
06374(44) 0126 6" Gate Valve Stockpiled Material Adjustment 0012 $-7,566.86
06374(44) 0126 6" Gate Valve Stockpiled Material Closure 0017 $-995.78
06374(44) 0126 6" Gate Valve Stockpiled Material Adjustment 0007 $-398.26
06374(44) 0139 P.C. Beams Br. A Stockpiled Material Initial Payment 0003 $376,455.15
06374(44) 0139 P.C. Beams Br. A Stockpiled Material Initial Payment 0017 $238,751.22
06374(44) 0139 P.C. Beams Br. A Stockpiled Material Adjustment 0013 $-137,703.93
06374(44) 0139 P.C. Beams Br. A Stockpiled Material Closure 0017 $-238,751.22
06374(44) 0139 P.C. Beams Br. A Stockpiled Material Adjustment 0017 $-238,751.22
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Closure 0017 $-158,835.90
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Initial Payment 0004 $237,537.27
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Adjustment 0026 $-232,119.30
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Adjustment 0020 $-164,253.93
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Initial Payment 0017 $396,373.17
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Closure 0017 $-237,537.27
06374(44) 0168 P.C.Beams Br. B Stockpiled Material Initial Payment 0003 $158,835.90
06374(44) 0171 Reinf. steel for F-shape par. Stockpiled Material Initial Payment 0023 $10,860.92
06374(44) 0171 Reinf. steel for F-shape par. Stockpiled Material Adjustment 0029 $-10,860.92
06374(44) 0176 Br. Stockpiled Material Closure 0020 $-94,069.50
06374(44) 0176 Br. Stockpiled Material Initial Payment 0017 $94,069.50
06374(44) 0176 Br. Stockpiled Material Closure 0017 $-94,069.50
06374(44) 0176 Br. Stockpiled Material Initial Payment 0012 $94,069.50
06374(44) 0180 Epox. Reinf. Br. B Stockpiled Material Adjustment 0025 $-9,500.88
06374(44) 0180 Epox. Reinf. Br. B Stockpiled Material Adjustment 0023 $-17,338.03
06374(44) 0180 Epox. Reinf. Br. B Stockpiled Material Initial Payment 0023 $61,667.98
06374(44) 0180 Epox. Reinf. Br. B Stockpiled Material Adjustment 0028 $-27,118.45
06374(44) 0200 Stru. steel Stockpiled Material Closure 0017 $-335,527.10
06374(44) 0200 Stru. steel Stockpiled Material Initial Payment 0017 $335,527.10
06374(44) 0200 Stru. steel Stockpiled Material Initial Payment 0006 $830,070.00
06374(44) 0200 Stru. steel Stockpiled Material Adjustment 0012 $-494,542.90
06374(44) 0200 Stru. steel Stockpiled Material Adjustment 0024 $-335,527.10
06374(44) 0212 Abut. bearing assembly Stockpiled Material Initial Payment 0013 $2,829.69
06374(44) 0212 Abut. bearing assembly Stockpiled Material Adjustment 0013 $846.43
06374(44) 0212 Abut. bearing assembly Stockpiled Material Adjustment 0024 $-1,451.09
06374(44) 0212 Abut. bearing assembly Stockpiled Material Initial Payment 0017 $3,676.12
06374(44) 0212 Abut. bearing assembly Stockpiled Material Closure 0017 $-3,676.12
06374(44) 0213 expansion bearing assembly Stockpiled Material Adjustment 0013 $-5,106.89
06374(44) 0213 expansion bearing assembly Stockpiled Material Adjustment 0024 $-13,134.47
06374(44) 0213 expansion bearing assembly Stockpiled Material Closure 0017 $-20,506.81
06374(44) 0213 expansion bearing assembly Stockpiled Material Initial Payment 0017 $20,506.81
06374(44) 0213 expansion bearing assembly Stockpiled Material Initial Payment 0013 $25,613.70
06374(44) 0245 Extruded Panel groundmount Stockpiled Material Adjustment 0030 $-2,580.48
06374(44) 0245 Extruded Panel groundmount Stockpiled Material Initial Payment 0020 $2,580.48
06374(44) 0246 Extruded Panel overhead Stockpiled Material Initial Payment 0020 $21,046.00
06374(44) 0246 Extruded Panel overhead Stockpiled Material Adjustment 0030 $-21,046.00
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0030 $-20,150.08
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0008 $15,080.00
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0008 $42,497.00
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0012 $56,989.29
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0013 $54,358.00
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0014 $-502.67
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0015 $12,727.86
06374(44) 0267 Ped. heads Stockpiled Material Closure 0017 $-14,577.33
06374(44) 0267 Ped. heads Stockpiled Material Closure 0017 $-42,497.00
06374(44) 0267 Ped. heads Stockpiled Material Closure 0017 $-56,989.29
06374(44) 0267 Ped. heads Stockpiled Material Closure 0017 $-54,358.00
06374(44) 0267 Ped. heads Stockpiled Material Closure 0017 $-12,727.86
06374(44) 0267 Ped. heads Stockpiled Material Initial Payment 0017 $181,149.48
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0022 $-16,118.95
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0024 $-60,444.66
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0026 $-20,150.08
06374(44) 0267 Ped. heads Stockpiled Material Adjustment 0028 $-30,225.13
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Initial Payment 0015 $131,734.00
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0026 $-16,370.29
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0022 $-33,703.54
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0020 $-6,740.71
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0030 $-19,259.16
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Adjustment 0028 $-4,814.79
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Initial Payment 0017 $131,734.00
06374(44) 0276 40' MTG.Ht.Hl.PTP. Stockpiled Material Closure 0017 $-131,734.00
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0030 $-5,946.65
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0028 $-1,238.88
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0026 $-3,716.65
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0024 $-2,229.99
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0022 $-1,734.44
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0020 $-2,477.77
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0018 $-1,238.88
06374(44) 0277 Breakaway base Stockpiled Material Initial Payment 0017 $19,227.91
06374(44) 0277 Breakaway base Stockpiled Material Closure 0017 $-19,227.91
06374(44) 0277 Breakaway base Stockpiled Material Adjustment 0016 $-6,194.09
06374(44) 0277 Breakaway base Stockpiled Material Initial Payment 0015 $25,422.00
06374(44) 0278 Roadway Luminaire Stockpiled Material Closure 0017 $-92,834.00
06374(44) 0278 Roadway Luminaire Stockpiled Material Initial Payment 0012 $92,834.00
06374(44) 0278 Roadway Luminaire Stockpiled Material Adjustment 0028 $-3,327.39
06374(44) 0278 Roadway Luminaire Stockpiled Material Adjustment 0030 $-16,082.37
06374(44) 0278 Roadway Luminaire Stockpiled Material Adjustment 0026 $-52,683.62
06374(44) 0278 Roadway Luminaire Stockpiled Material Initial Payment 0017 $92,834.00
06374(44) 0279 Underpass Luminaire Stockpiled Material Adjustment 0030 $-6,376.56
06374(44) 0279 Underpass Luminaire Stockpiled Material Initial Payment 0012 $6,560.00
06374(44) 0279 Underpass Luminaire Stockpiled Material Closure 0017 $-6,560.00
06374(44) 0279 Underpass Luminaire Stockpiled Material Initial Payment 0017 $6,560.00
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0024 $-2,958.85
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0026 $-3,964.88
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0030 $-6,128.64
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0016 $-4,261.19
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Closure 0017 $-33,339.95
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Initial Payment 0008 $37,601.14
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0028 $-1,949.28
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0018 $-282.20
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0022 $-2,671.00
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Initial Payment 0017 $33,339.95
06374(44) 0281 1/C no.4 ele.conduit Stockpiled Material Adjustment 0020 $-7,186.88
Subtotals For Stockpile Payments $546,555.78


LIQUIDATED DAMAGES HISTORY
Adjustment Description Estimate Nbr Time Units Rate Adjustment Amount
No liquidated damages have been assessed on this contract.
Subtotals For Liquidated Damages $


CONTRACT ADJUSTMENTS HISTORY
Adjustment Description Estimate Nbr Adjustment Amount
No general contract adjustments have been created on this contract.
Subtotals For Contract Adjustments $0.00


LINE ITEM ADJUSTMENT HISTORY
Project Item Nbr Line Item Description Adjustment Type Estimate Nbr Adj Quantity Unit Price Adjusted Amount
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0005 -796.00 $1.50 $-1,194.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0014 -150.00 $1.50 $-225.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0017 -96.00 $1.50 $-144.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0019 -425.00 $1.50 $-637.50
06374(44) 0005 TEMPORARY SILT FENCE * Material Discrepancy Adjustments 0020 246.00 $1.50 $369.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0023 -100.00 $1.50 $-150.00
06374(44) 0005 TEMPORARY SILT FENCE * Missing Material Certification 0027 -210.00 $1.50 $-315.00
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0004 1,001.02 $0.42 $426.06
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0007 663.89 $2.80 $1,859.31
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0008 1,318.72 $2.80 $3,693.25
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0009 1,625.11 $2.80 $4,551.33
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0010 303.59 $2.80 $850.24
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0013 4,056.04 $2.80 $11,359.47
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0014 1,804.27 $2.80 $5,053.09
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0015 514.01 $2.67 $1,375.30
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0016 406.32 $2.67 $1,087.16
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0017 3,168.40 $2.23 $7,091.29
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0018 1,103.97 $2.23 $2,470.83
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0019 43.94 $2.23 $98.34
06374(44) 0018 OPEN GRADED BITUMINOUS BASE * Material Discrepancy Adjustments 0019 -43.94 $38.00 $-1,669.72
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0020 685.39 $2.23 $1,533.99
06374(44) 0018 OPEN GRADED BITUMINOUS BASE * Material Discrepancy Adjustments 0020 43.94 $38.00 $1,669.72
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0021 237.08 $2.23 $530.62
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0022 4,197.08 $2.23 $9,393.61
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0023 977.57 $2.30 $2,249.03
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0024 2,520.07 $2.30 $5,797.75
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0025 32.61 $2.30 $75.02
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0026 214.92 $2.30 $494.45
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0027 2,705.94 $2.92 $7,916.58
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0028 1,259.33 $2.92 $3,684.33
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0029 1,028.75 $3.42 $3,524.12
06374(44) 0018 OPEN GRADED BITUMINOUS BASE Asphalt Binder Adjustment 0030 1,560.30 $3.42 $5,345.01
06374(44) 0023 (SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) Asphalt Binder Adjustment 0016 1,089.45 $3.95 $4,314.15
06374(44) 0023 (SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) Asphalt Binder Adjustment 0021 132.58 $3.31 $439.16
06374(44) 0023 (SP)ASPHALT CONCRETE TYPE S2(PG 64-22 OK) Asphalt Binder Adjustment 0025 567.98 $3.40 $1,933.93
06374(44) 0024 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) Asphalt Binder Adjustment 0012 246.89 $4.70 $1,161.63
06374(44) 0024 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) Asphalt Binder Adjustment 0015 44.65 $4.49 $200.70
06374(44) 0024 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) Asphalt Binder Adjustment 0016 1,005.06 $4.49 $4,517.80
06374(44) 0024 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) Asphalt Binder Adjustment 0021 117.47 $3.76 $441.69
06374(44) 0024 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) Asphalt Binder Adjustment 0023 13.41 $3.86 $51.83
06374(44) 0024 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) Asphalt Binder Adjustment 0025 388.03 $3.86 $1,499.76
06374(44) 0024 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) Asphalt Binder Adjustment 0026 30.77 $3.86 $118.93
06374(44) 0024 (SP)ASPHALT CONCRETE TYPE S3(PG 70-28 OK) Asphalt Binder Adjustment 0029 114.18 $5.75 $657.11
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0006 30.14 $1.97 $59.53
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) * Asphalt Binder Adjustment 0006 0.00 $0.00 $-37.97
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0007 43.77 $4.70 $205.94
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0008 103.52 $4.70 $487.07
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0009 187.16 $4.70 $880.60
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0010 375.96 $4.70 $1,768.91
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0012 147.47 $4.70 $693.85
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0014 210.35 $4.70 $989.71
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0015 113.90 $4.49 $511.99
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0016 1,377.01 $4.49 $6,189.73
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0018 29.50 $3.76 $110.92
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0020 106.40 $3.76 $400.07
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0021 371.60 $3.76 $1,397.24
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0022 125.85 $3.76 $473.20
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0023 104.71 $3.86 $404.71
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0025 425.15 $3.86 $1,643.23
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0027 226.90 $4.91 $1,115.23
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) * Missing Material Certification 0030 -127.38 $48.00 $-6,114.24
06374(44) 0025 (SP)ASPHALT CONCRETE TYPE S3(PG 64-22 OK) Asphalt Binder Adjustment 0030 127.38 $5.75 $733.08
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) * Asphalt Binder Adjustment 0006 0.00 $0.00 $-6,152.78
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0006 2,774.83 $2.25 $6,263.35
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0008 56.20 $5.37 $302.20
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0009 177.24 $5.37 $953.06
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0010 363.63 $5.37 $1,955.31
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0011 160.99 $5.37 $865.68
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0012 183.28 $5.37 $985.53
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0014 14.06 $5.37 $75.60
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0015 126.96 $5.13 $652.22
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0016 883.08 $5.13 $4,536.56
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0018 15.31 $4.29 $65.79
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0020 108.34 $4.29 $465.56
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0021 528.44 $4.29 $2,270.81
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) * Material Discrepancy Adjustments 0021 -230.92 $66.00 $-15,240.72
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0022 67.08 $4.29 $288.26
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0023 56.58 $4.41 $249.93
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0025 281.19 $4.41 $1,242.07
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0027 4.10 $5.61 $23.03
06374(44) 0026 (SP)ASPHALT CONCRETE TYPE S4(PG 70-28 OK) Asphalt Binder Adjustment 0029 95.18 $6.57 $626.02
06374(44) 0042 SOUND BARRIER WALL * Missing Material Certification 0019 -1,337.22 $155.00 $-207,269.10
06374(44) 0042 SOUND BARRIER WALL * Material Discrepancy Adjustments 0020 1,337.22 $155.00 $207,269.10
06374(44) 0054 6" CONCRETE DIVIDING STRIP * Missing Material Certification 0026 -268.36 $38.00 $-10,197.68
06374(44) 0054 6" CONCRETE DIVIDING STRIP * Missing Material Certification 0030 268.36 $38.00 $10,197.68
06374(44) 0056 (PL)TACTILE WARNING DEVICE-NEW * Missing Material Certification 0025 -173.00 $35.00 $-6,055.00
06374(44) 0056 (PL)TACTILE WARNING DEVICE-NEW * Missing Material Certification 0028 -16.00 $35.00 $-560.00
06374(44) 0056 (PL)TACTILE WARNING DEVICE-NEW * Missing Material Certification 0030 -40.00 $35.00 $-1,400.00
06374(44) 0061 MANHOLE FRAME & COVER * Missing Material Certification 0017 -2.00 $350.00 $-700.00
06374(44) 0061 MANHOLE FRAME & COVER * Missing Material Certification 0018 -4.00 $350.00 $-1,400.00
06374(44) 0061 MANHOLE FRAME & COVER * Missing Material Certification 0019 -3.00 $350.00 $-1,050.00
06374(44) 0061 MANHOLE FRAME & COVER * Material Discrepancy Adjustments 0020 -14.00 $350.00 $-4,900.00
06374(44) 0061 MANHOLE FRAME & COVER * Material Discrepancy Adjustments 0027 23.00 $350.00 $8,050.00
06374(44) 0062 (PL)SPECIAL INLET DRAIN * Material Discrepancy Adjustments 0020 -1.00 $5,000.00 $-5,000.00
06374(44) 0064 INLET CICI DES. 2 (B) * Missing Material Certification 0028 -7.00 $2,800.00 $-19,600.00
06374(44) 0071 INLET MEDIAN BARRIER DES. 2 * Missing Material Certification 0024 -1.00 $3,100.00 $-3,100.00
06374(44) 0071 INLET MEDIAN BARRIER DES. 2 * Missing Material Certification 0027 -2.00 $3,100.00 $-6,200.00
06374(44) 0072 INLET MEDIAN BARRIER DES. 2-2 * Missing Material Certification 0019 -1.00 $5,100.00 $-5,100.00
06374(44) 0082 18" R.C.PIPE CLASS III * Material Discrepancy Adjustments 0012 -1,227.00 $50.00 $-61,350.00
06374(44) 0082 18" R.C.PIPE CLASS III * Material Discrepancy Adjustments 0013 1,227.00 $50.00 $61,350.00
06374(44) 0082 18" R.C.PIPE CLASS III * Missing Material Certification 0015 -347.00 $50.00 $-17,350.00
06374(44) 0082 18" R.C.PIPE CLASS III * Missing Material Certification 0016 -55.00 $50.00 $-2,750.00
06374(44) 0082 18" R.C.PIPE CLASS III * Missing Material Certification 0017 -797.00 $50.00 $-39,850.00
06374(44) 0082 18" R.C.PIPE CLASS III * Missing Material Certification 0018 -350.00 $50.00 $-17,500.00
06374(44) 0082 18" R.C.PIPE CLASS III * Material Discrepancy Adjustments 0022 1,549.00 $50.00 $77,450.00
06374(44) 0083 24" R.C.PIPE CLASS III * Missing Material Certification 0018 -274.00 $55.00 $-15,070.00
06374(44) 0083 24" R.C.PIPE CLASS III * Missing Material Certification 0023 274.00 $55.00 $15,070.00
06374(44) 0103 EDGE DRAIN CONDUIT-PERFORATED * Missing Material Certification 0015 -788.00 $5.00 $-3,940.00
06374(44) 0103 EDGE DRAIN CONDUIT-PERFORATED * Missing Material Certification 0016 -1,709.00 $5.00 $-8,545.00
06374(44) 0103 EDGE DRAIN CONDUIT-PERFORATED * Missing Material Certification 0017 -225.00 $5.00 $-1,125.00
06374(44) 0103 EDGE DRAIN CONDUIT-PERFORATED * Missing Material Certification 0019 -450.00 $5.00 $-2,250.00
06374(44) 0103 EDGE DRAIN CONDUIT-PERFORATED * Missing Material Certification 0023 15,860.00 $5.00 $79,300.00
06374(44) 0103 EDGE DRAIN CONDUIT-PERFORATED * Material Discrepancy Adjustments 0024 -12,688.00 $5.00 $-63,440.00
06374(44) 0140 APPROACH SLAB * Missing Material Certification 0019 -248.00 $130.00 $-32,240.00
06374(44) 0140 APPROACH SLAB * Material Discrepancy Adjustments 0025 124.00 $130.00 $16,120.00
06374(44) 0140 APPROACH SLAB * Material Discrepancy Adjustments 0027 124.00 $130.00 $16,120.00
06374(44) 0141 SEALED EXPANSION JOINT * Missing Material Certification 0019 -84.30 $215.00 $-18,124.50
06374(44) 0141 SEALED EXPANSION JOINT * Material Discrepancy Adjustments 0025 84.30 $215.00 $18,124.50
06374(44) 0142 42" F-SHAPED PARAPET * Missing Material Certification 0019 -981.60 $47.00 $-46,135.20
06374(44) 0142 42" F-SHAPED PARAPET * Material Discrepancy Adjustments 0025 490.80 $47.00 $23,067.60
06374(44) 0142 42" F-SHAPED PARAPET * Material Discrepancy Adjustments 0027 490.80 $47.00 $23,067.60
06374(44) 0143 STRUCTURAL STEEL * Missing Material Certification 0017 -2,710.00 $1.50 $-4,065.00
06374(44) 0143 STRUCTURAL STEEL * Missing Material Certification 0023 2,710.00 $1.50 $4,065.00
06374(44) 0147 SLOPE WALL (5") * Material Discrepancy Adjustments 0025 -387.00 $70.00 $-27,090.00
06374(44) 0147 SLOPE WALL (5") * Material Discrepancy Adjustments 0026 387.00 $70.00 $27,090.00
06374(44) 0154 WATER REPELLENT (VISUALLY INSPECTED) * Material Discrepancy Adjustments 0029 -2,474.00 $3.00 $-7,422.00
06374(44) 0158 (SP) SEALER RESIN * Material Discrepancy Adjustments 0020 -17.50 $80.00 $-1,400.00
06374(44) 0162 6" NON-PERF.PIPE UNDERDRAIN RND. * Missing Material Certification 0017 -25.00 $15.00 $-375.00
06374(44) 0162 6" NON-PERF.PIPE UNDERDRAIN RND. * Material Discrepancy Adjustments 0019 25.00 $15.00 $375.00
06374(44) 0167 CLSM BACKFILL * Missing Material Certification 0026 -278.00 $75.00 $-20,850.00
06374(44) 0167 CLSM BACKFILL * Material Discrepancy Adjustments 0027 178.00 $75.00 $13,350.00
06374(44) 0171 42" F-SHAPED PARAPET * Material Discrepancy Adjustments 0029 -1,082.00 $47.00 $-50,854.00
06374(44) 0171 42" F-SHAPED PARAPET * Material Discrepancy Adjustments 0030 1,082.00 $47.00 $50,854.00
06374(44) 0174 STRUCTURAL STEEL * Missing Material Certification 0026 -3,000.00 $1.50 $-4,500.00
06374(44) 0174 STRUCTURAL STEEL * Material Discrepancy Adjustments 0028 2,807.00 $1.50 $4,210.50
06374(44) 0180 EPOXY COATED REINFORCING STEEL * Missing Material Certification 0028 -109,348.60 $0.80 $-87,478.88
06374(44) 0185 WATER REPELLENT (VISUALLY INSPECTED) * Material Discrepancy Adjustments 0029 -2,971.00 $3.00 $-8,913.00
06374(44) 0189 (SP) SEALER RESIN * Material Discrepancy Adjustments 0029 -19.50 $80.00 $-1,560.00
06374(44) 0199 42" F-SHAPED PARAPET * Missing Material Certification 0017 -337.00 $47.00 $-15,839.00
06374(44) 0199 42" F-SHAPED PARAPET * Material Discrepancy Adjustments 0025 337.00 $47.00 $15,839.00
06374(44) 0208 WATER REPELLENT (VISUALLY INSPECTED) * Material Discrepancy Adjustments 0029 -2,121.00 $3.00 $-6,363.00
06374(44) 0211 (SP) SEALER RESIN * Material Discrepancy Adjustments 0029 -23.00 $80.00 $-1,840.00
06374(44) 0222 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) * Missing Material Certification 0027 -5,552.00 $0.45 $-2,498.40
06374(44) 0222 REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) * Material Discrepancy Adjustments 0029 -80.00 $0.45 $-36.00
06374(44) 0244 SHEET ALUMINUM SIGNS * Missing Material Certification 0030 -210.25 $12.00 $-2,523.00
06374(44) 0245 EXTRUDED ALUMINUM PANEL SIGNS * Missing Material Certification 0030 -401.50 $20.00 $-8,030.00
06374(44) 0246 EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) * Missing Material Certification 0030 -1,916.55 $20.00 $-38,331.00
06374(44) 0257 TRAFFIC STRIPE(PAINT)(4" WIDE) * Material Discrepancy Adjustments 0029 -13,283.00 $0.30 $-3,984.90
06374(44) 0257 TRAFFIC STRIPE(PAINT)(4" WIDE) * Material Discrepancy Adjustments 0030 13,283.00 $0.30 $3,984.90
06374(44) 0259 (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) * Missing Material Certification 0027 -4.00 $160.00 $-640.00
06374(44) 0259 (SP)TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) * Material Discrepancy Adjustments 0028 4.00 $160.00 $640.00
06374(44) 0260 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) * Missing Material Certification 0026 -3,000.00 $0.65 $-1,950.00
06374(44) 0260 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) * Material Discrepancy Adjustments 0028 3,000.00 $0.65 $1,950.00
06374(44) 0260 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) * Material Discrepancy Adjustments 0029 -14,993.00 $0.65 $-9,745.45
06374(44) 0260 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) * Missing Material Certification 0030 9,745.45 $0.65 $6,334.54
06374(44) 0261 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) * Missing Material Certification 0026 -1,848.00 $0.88 $-1,626.24
06374(44) 0261 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) * Material Discrepancy Adjustments 0028 1,280.00 $0.88 $1,126.40
06374(44) 0261 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) * Material Discrepancy Adjustments 0029 -8,784.00 $0.88 $-7,729.92
06374(44) 0261 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) * Missing Material Certification 0030 7,729.92 $0.88 $6,802.33
06374(44) 0262 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) * Missing Material Certification 0026 -1,347.00 $2.15 $-2,896.05
06374(44) 0262 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) * Material Discrepancy Adjustments 0029 -2,912.00 $2.15 $-6,260.80
06374(44) 0262 (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) * Missing Material Certification 0030 9,156.85 $2.15 $19,687.23
06374(44) 0272 JUNCTION BOX(6" X 6" X 4") * Material Discrepancy Adjustments 0020 -1.00 $450.00 $-450.00
06374(44) 0273 PULL BOX(SIZE I) * Missing Material Certification 0030 -9.00 $515.00 $-4,635.00
06374(44) 0275 REINFORCING STEEL * Missing Material Certification 0016 -400.80 $1.40 $-561.12
06374(44) 0275 REINFORCING STEEL * Material Discrepancy Adjustments 0020 -467.60 $1.40 $-654.64
06374(44) 0275 REINFORCING STEEL * Material Discrepancy Adjustments 0022 868.40 $1.40 $1,215.76
06374(44) 0275 REINFORCING STEEL * Missing Material Certification 0030 -647.00 $1.40 $-905.80
06374(44) 0281 1/C NO.4 ELECTRICAL CONDUCTOR * Missing Material Certification 0016 -6,040.00 $1.75 $-10,570.00
06374(44) 0281 1/C NO.4 ELECTRICAL CONDUCTOR * Missing Material Certification 0018 -400.00 $1.75 $-700.00
06374(44) 0281 1/C NO.4 ELECTRICAL CONDUCTOR * Material Discrepancy Adjustments 0019 6,440.00 $1.75 $11,270.00
06374(44) 0283 1/C NO.12 ELECTRICAL CONDUCTOR * Material Discrepancy Adjustments 0020 -1,000.00 $0.65 $-650.00
06374(44) 0283 1/C NO.12 ELECTRICAL CONDUCTOR * Material Discrepancy Adjustments 0022 -4,750.00 $0.65 $-3,087.50
06374(44) 0283 1/C NO.12 ELECTRICAL CONDUCTOR * Material Discrepancy Adjustments 0025 5,750.00 $0.65 $3,737.50
Subtotals For Line Item Adjustments $-115,657.89
* = User applied Line Item Adjustments


MILESTONE INFORMATION
Milestone Number Milestone Description Start Date End Date Current Time Allowed Rate Milestone Closed
01 TIME 'B' BID 03/01/2011 NOT ENTERED 430.00 DYS $15,000.00 N
02 TIME 'C' BID 08/17/2011 NOT ENTERED 270.00 DYS $15,000.00 N


MILESTONE ADJUSTMENTS
Milestone Number Milestone Adjustment Description Estimate Nbr Total
01 System Application of Disincentive Adj 0029 $-165,000.00
01 System Application of Disincentive Adj 0030 $-240,000.00
02 System Application of Disincentive Adj 0029 $-30,000.00
02 System Application of Disincentive Adj 0030 $-240,000.00
Subtotals For Milestones $-675,000.00

Line Item Detail

Contract ID: 100617   Estimate Number: 0030     Primary JP: 06374(44)



Line Item Number Item Description Item Number Units Bid Qty Current Quantity Quantity Paid This Est. Quantity Paid To Date Unit Price Amount Paid This Est. Amount Paid To Date
Fed/State Project Number:    IMY-0044-2(396)225 Project:    06374(44) Category:    0100/ROADWAY
0001 CLEARING AND GRUBBING 201 0102 LSUM 1.000 1.000   1.000 $100,000.00 $0.00 $100,000.00
0002 UNCLASSIFIED EXCAVATION 202(A) 0183 CY 132,993.000 132,993.000   127,801.000 $4.00 $0.00 $511,204.00
0003 UNCLASSIFIED BORROW 202(C) 0184 CY 73,890.000 73,890.000   59,041.920 $4.00 $0.00 $236,167.68
0004 TYPE A-SALVAGED TOPSOIL 205 4229 LSUM 1.000 1.000   0.750 $200,000.00 $0.00 $150,000.00
0005 TEMPORARY SILT FENCE 223 2801 LF 5,685.000 5,685.000   9,007.000 $1.50 $0.00 $13,510.50
0006 TEMPORARY SEDIMENT FILTER 224 2803 EA 50.000 50.000   2.000 $50.00 $0.00 $100.00
0007 TEMPORARY SEDIMENT BASIN 225 2804 EA 5.000 5.000   0.000 $300.00 $0.00 $0.00
0008 SOLID SLAB SODDING 230(A) 2806 SY 159,003.000 159,003.000 18,211.550 81,992.550 $1.10 $20,032.71 $90,191.82
0009 WATERING 230(F) 2812 MGAL 6,360.000 6,360.000 47.840 333.840 $3.00 $143.52 $1,001.52
0010 SEEDING METHOD A 232(A) 2813 AC 32.840 32.840   0.000 $200.00 $0.00 $0.00
0011 VEGETATIVE MULCHING 233(A) 2817 AC 68.000 68.000   0.000 $100.00 $0.00 $0.00
0012 FERTILIZING (10-20-10) 234(A) 2824