STOCKPILE PAYMENT HISTORY |
Project |
Line Nbr |
Stockpile Description |
Adjustment Type |
Estimate Nbr |
Adjusted Amount |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0003 |
$-3,555.16 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0028 |
$-46,651.19 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0005 |
$-1,127.28 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0006 |
$-7,594.13 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0007 |
$-4,309.60 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0008 |
$-10,352.40 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0009 |
$-32,073.76 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0012 |
$-9,080.08 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0013 |
$-28,115.42 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0014 |
$-10,892.06 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0015 |
$-16,506.13 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0016 |
$-2,198.27 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0017 |
$-5,269.53 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Closure |
0017 |
$-224,223.57 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Initial Payment |
0017 |
$224,223.57 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0018 |
$-6,815.65 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0019 |
$-12,482.98 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0020 |
$-27,734.47 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0021 |
$-28,881.01 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0022 |
$-33,188.29 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0023 |
$-6,067.15 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0024 |
$-29,033.69 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0025 |
$-12,370.42 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0026 |
$-7,515.85 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Adjustment |
0027 |
$-8,213.34 |
06374(44) |
0019 |
Separator Fabric |
Stockpiled Material Initial Payment |
0003 |
$350,027.86 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Initial Payment |
0003 |
$156,989.73 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0028 |
$-5,240.41 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0007 |
$-8,844.51 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0008 |
$-6,310.70 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0009 |
$-18,850.52 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0010 |
$-10,478.25 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0013 |
$-2,348.49 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0014 |
$-4,624.78 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0015 |
$-2,636.14 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0016 |
$-83.04 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0017 |
$-4,650.86 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Closure |
0017 |
$-102,813.30 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Closure |
0017 |
$-41,906.51 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Initial Payment |
0017 |
$144,719.81 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0018 |
$-7,177.08 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0019 |
$-3,052.37 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0020 |
$-9,938.00 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0021 |
$-571.72 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0022 |
$-1,750.61 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0024 |
$-6,062.27 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0025 |
$-10,068.52 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0026 |
$-10,972.85 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Adjustment |
0027 |
$-9,384.28 |
06374(44) |
0028 |
Dowel (Baskets) |
Stockpiled Material Initial Payment |
0006 |
$41,906.51 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Initial Payment |
0007 |
$483,443.45 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0028 |
$-25,323.28 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0015 |
$-64,739.09 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0016 |
$-11,900.30 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0017 |
$-54,468.71 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Closure |
0017 |
$-333,538.63 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Initial Payment |
0017 |
$333,538.63 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0018 |
$-49,382.67 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0019 |
$-6,854.63 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0020 |
$-11,624.03 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0023 |
$-127,634.09 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0024 |
$-32,020.66 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0025 |
$-23,495.41 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0027 |
$-2,735.11 |
06374(44) |
0030 |
Reinforcing steel |
Stockpiled Material Adjustment |
0014 |
$-73,265.43 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Closure |
0017 |
$-2,234.21 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Closure |
0017 |
$-1,095.00 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Closure |
0017 |
$-500.00 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Closure |
0017 |
$-5,427.02 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Initial Payment |
0003 |
$1,774.78 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0027 |
$-2,150.78 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0025 |
$-2,150.78 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0005 |
$-386.87 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0006 |
$-193.43 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Initial Payment |
0006 |
$1,095.00 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Initial Payment |
0006 |
$5,427.02 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Initial Payment |
0006 |
$500.00 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Initial Payment |
0002 |
$5,920.59 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0024 |
$-1,075.39 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Initial Payment |
0007 |
$2,403.87 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0023 |
$-3,763.86 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Initial Payment |
0008 |
$2,234.21 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Initial Payment |
0008 |
$2,079.49 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0009 |
$-677.02 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0028 |
$-5,376.94 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0018 |
$-3,226.16 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Initial Payment |
0017 |
$24,093.45 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Initial Payment |
0010 |
$5,560.00 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0012 |
$-290.15 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Closure |
0003 |
$0.00 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0015 |
$-1,354.04 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Closure |
0017 |
$-5,560.00 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Closure |
0017 |
$-2,079.49 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Adjustment |
0017 |
$-1,075.39 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Closure |
0017 |
$-3,019.08 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Closure |
0017 |
$-1,774.78 |
06374(44) |
0057 |
Manhole (4') |
Stockpiled Material Closure |
0017 |
$-2,403.87 |
06374(44) |
0058 |
MH 5' |
Stockpiled Material Adjustment |
0012 |
$-868.74 |
06374(44) |
0058 |
MH 5' |
Stockpiled Material Adjustment |
0009 |
$-1,737.47 |
06374(44) |
0058 |
MH 5' |
Stockpiled Material Initial Payment |
0006 |
$2,266.62 |
06374(44) |
0058 |
MH 5' |
Stockpiled Material Adjustment |
0028 |
$-2,576.73 |
06374(44) |
0058 |
MH 5' |
Stockpiled Material Initial Payment |
0002 |
$4,691.20 |
06374(44) |
0058 |
MH 5' |
Stockpiled Material Adjustment |
0027 |
$-1,288.36 |
06374(44) |
0058 |
MH 5' |
Stockpiled Material Initial Payment |
0017 |
$4,351.61 |
06374(44) |
0058 |
MH 5' |
Stockpiled Material Closure |
0017 |
$-2,266.62 |
06374(44) |
0058 |
MH 5' |
Stockpiled Material Closure |
0017 |
$-2,084.99 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Initial Payment |
0002 |
$2,268.00 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Closure |
0017 |
$-5,121.06 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Closure |
0017 |
$-304.00 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Closure |
0017 |
$-2,118.08 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Closure |
0017 |
$-4,263.56 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Initial Payment |
0017 |
$11,806.70 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Adjustment |
0016 |
$-922.94 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Initial Payment |
0007 |
$2,118.08 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Initial Payment |
0006 |
$304.00 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Initial Payment |
0003 |
$6,044.00 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Adjustment |
0004 |
$-1,440.10 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Initial Payment |
0009 |
$4,263.56 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Adjustment |
0016 |
$-106.40 |
06374(44) |
0059 |
MH 6' |
Stockpiled Material Adjustment |
0009 |
$-720.05 |
06374(44) |
0062 |
Spe. inlet drain |
Stockpiled Material Initial Payment |
0002 |
$1,253.16 |
06374(44) |
0062 |
Spe. inlet drain |
Stockpiled Material Initial Payment |
0003 |
$1,093.07 |
06374(44) |
0062 |
Spe. inlet drain |
Stockpiled Material Initial Payment |
0006 |
$2,630.45 |
06374(44) |
0062 |
Spe. inlet drain |
Stockpiled Material Adjustment |
0020 |
$-1,841.97 |
06374(44) |
0062 |
Spe. inlet drain |
Stockpiled Material Closure |
0017 |
$-1,093.07 |
06374(44) |
0062 |
Spe. inlet drain |
Stockpiled Material Closure |
0017 |
$-2,630.45 |
06374(44) |
0062 |
Spe. inlet drain |
Stockpiled Material Initial Payment |
0017 |
$4,976.68 |
06374(44) |
0062 |
Spe. inlet drain |
Stockpiled Material Closure |
0017 |
$-1,253.16 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Initial Payment |
0002 |
$9,779.52 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Initial Payment |
0003 |
$4,883.72 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Adjustment |
0004 |
$-665.29 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Adjustment |
0005 |
$-887.06 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Adjustment |
0006 |
$-1,774.11 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Initial Payment |
0006 |
$2,420.72 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Initial Payment |
0006 |
$2,865.16 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Initial Payment |
0006 |
$8,917.47 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Initial Payment |
0007 |
$6,505.59 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Initial Payment |
0008 |
$2,873.53 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Adjustment |
0009 |
$-1,995.88 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Adjustment |
0015 |
$-1,108.82 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Adjustment |
0017 |
$-867.22 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Closure |
0017 |
$-3,348.36 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Closure |
0017 |
$-4,883.72 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Closure |
0017 |
$-2,420.72 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Closure |
0017 |
$-2,865.16 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Closure |
0017 |
$-8,917.47 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Closure |
0017 |
$-6,505.59 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Closure |
0017 |
$-2,873.53 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Initial Payment |
0017 |
$31,814.55 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Adjustment |
0018 |
$-3,468.90 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Adjustment |
0025 |
$-1,734.45 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Adjustment |
0027 |
$-2,601.67 |
06374(44) |
0063 |
CICI 2(std) |
Stockpiled Material Adjustment |
0028 |
$-3,468.90 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Initial Payment |
0007 |
$4,691.54 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Initial Payment |
0006 |
$5,604.16 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0009 |
$-1,883.74 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0012 |
$-538.21 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0019 |
$-3,881.32 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0022 |
$-1,940.66 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0023 |
$-3,881.32 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0024 |
$-1,940.66 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0025 |
$-2,910.99 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0027 |
$-2,910.99 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0028 |
$-6,792.32 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0015 |
$-1,076.42 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Closure |
0017 |
$-6,407.83 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Closure |
0017 |
$-5,775.00 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Closure |
0017 |
$-5,400.51 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Closure |
0017 |
$-7,751.82 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Closure |
0017 |
$-5,604.16 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Closure |
0017 |
$-4,691.54 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Closure |
0017 |
$-3,591.18 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Initial Payment |
0017 |
$39,222.04 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Initial Payment |
0002 |
$12,597.26 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0003 |
$-807.32 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Initial Payment |
0003 |
$5,775.00 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0004 |
$-1,076.42 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0005 |
$-538.21 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Adjustment |
0006 |
$-269.11 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Initial Payment |
0006 |
$5,400.51 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Initial Payment |
0006 |
$7,751.82 |
06374(44) |
0064 |
CICI 2(B) |
Stockpiled Material Initial Payment |
0008 |
$3,591.18 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Initial Payment |
0007 |
$4,482.49 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Adjustment |
0009 |
$-369.03 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Adjustment |
0012 |
$-369.03 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Adjustment |
0018 |
$-1,187.39 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Adjustment |
0024 |
$-1,187.39 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Adjustment |
0025 |
$-1,187.39 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Adjustment |
0027 |
$-2,374.78 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Adjustment |
0028 |
$-2,374.78 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Adjustment |
0015 |
$-1,476.11 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Closure |
0017 |
$-2,363.92 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Closure |
0017 |
$-4,416.07 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Closure |
0017 |
$-962.00 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Closure |
0017 |
$-1,924.00 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Closure |
0017 |
$-4,482.49 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Initial Payment |
0017 |
$14,148.48 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Initial Payment |
0002 |
$5,316.15 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Adjustment |
0003 |
$-369.03 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Initial Payment |
0003 |
$4,416.07 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Adjustment |
0004 |
$-369.03 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Initial Payment |
0006 |
$962.00 |
06374(44) |
0065 |
CICI 2(D) |
Stockpiled Material Initial Payment |
0006 |
$1,924.00 |
06374(44) |
0066 |
INLET CICI DES. 2(2B) |
Stockpiled Material Adjustment |
0028 |
$-2,880.00 |
06374(44) |
0066 |
INLET CICI DES. 2(2B) |
Stockpiled Material Initial Payment |
0017 |
$2,880.00 |
06374(44) |
0066 |
INLET CICI DES. 2(2B) |
Stockpiled Material Initial Payment |
0006 |
$825.00 |
06374(44) |
0066 |
INLET CICI DES. 2(2B) |
Stockpiled Material Closure |
0017 |
$-2,055.00 |
06374(44) |
0066 |
INLET CICI DES. 2(2B) |
Stockpiled Material Closure |
0017 |
$-825.00 |
06374(44) |
0066 |
INLET CICI DES. 2(2B) |
Stockpiled Material Initial Payment |
0009 |
$2,055.00 |
06374(44) |
0067 |
CICI DES. 3 (2B) |
Stockpiled Material Initial Payment |
0006 |
$2,634.50 |
06374(44) |
0067 |
CICI DES. 3 (2B) |
Stockpiled Material Initial Payment |
0006 |
$1,276.00 |
06374(44) |
0067 |
CICI DES. 3 (2B) |
Stockpiled Material Initial Payment |
0017 |
$3,910.50 |
06374(44) |
0067 |
CICI DES. 3 (2B) |
Stockpiled Material Closure |
0017 |
$-2,634.50 |
06374(44) |
0067 |
CICI DES. 3 (2B) |
Stockpiled Material Closure |
0017 |
$-1,276.00 |
06374(44) |
0067 |
CICI DES. 3 (2B) |
Stockpiled Material Adjustment |
0017 |
$-1,446.47 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Adjustment |
0028 |
$-1,528.68 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Initial Payment |
0010 |
$5,870.60 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Adjustment |
0022 |
$-4,586.04 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Adjustment |
0023 |
$-1,528.68 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Closure |
0017 |
$-5,870.60 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Closure |
0017 |
$-2,364.53 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Initial Payment |
0017 |
$9,186.66 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Adjustment |
0015 |
$-445.87 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Initial Payment |
0009 |
$951.53 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Initial Payment |
0006 |
$2,810.40 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Adjustment |
0017 |
$-1,528.68 |
06374(44) |
0068 |
GPI TYPE 2(DES. 8) |
Stockpiled Material Closure |
0017 |
$-951.53 |
06374(44) |
0069 |
GPI type 2 (des.10) |
Stockpiled Material Adjustment |
0009 |
$-443.49 |
06374(44) |
0069 |
GPI type 2 (des.10) |
Stockpiled Material Adjustment |
0009 |
$-1,069.34 |
06374(44) |
0069 |
GPI type 2 (des.10) |
Stockpiled Material Initial Payment |
0017 |
$1,166.45 |
06374(44) |
0069 |
GPI type 2 (des.10) |
Stockpiled Material Closure |
0017 |
$-1,166.45 |
06374(44) |
0069 |
GPI type 2 (des.10) |
Stockpiled Material Adjustment |
0003 |
$-1,335.21 |
06374(44) |
0069 |
GPI type 2 (des.10) |
Stockpiled Material Initial Payment |
0006 |
$1,609.94 |
06374(44) |
0069 |
GPI type 2 (des.10) |
Stockpiled Material Initial Payment |
0002 |
$2,405.00 |
06374(44) |
0070 |
GPI Type 2(Des.14) |
Stockpiled Material Initial Payment |
0006 |
$2,234.79 |
06374(44) |
0070 |
GPI Type 2(Des.14) |
Stockpiled Material Adjustment |
0009 |
$-2,234.79 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Adjustment |
0012 |
$-142.80 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Adjustment |
0024 |
$-157.92 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Initial Payment |
0007 |
$565.00 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Initial Payment |
0006 |
$565.00 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Initial Payment |
0006 |
$565.00 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Initial Payment |
0002 |
$1,158.00 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Initial Payment |
0017 |
$2,424.60 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Closure |
0017 |
$-565.00 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Closure |
0017 |
$-565.00 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Closure |
0017 |
$-565.00 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Closure |
0017 |
$-729.60 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Adjustment |
0017 |
$-2,267.70 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Adjustment |
0016 |
$-142.80 |
06374(44) |
0071 |
inlet Median Barr.Des 2 |
Stockpiled Material Adjustment |
0015 |
$-142.80 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Closure |
0017 |
$-1,103.83 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Adjustment |
0014 |
$-173.49 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Initial Payment |
0017 |
$15,106.94 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Closure |
0017 |
$-6,140.24 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Adjustment |
0019 |
$-1,409.39 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Initial Payment |
0002 |
$2,032.32 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Closure |
0017 |
$-4,185.60 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Closure |
0017 |
$-3,032.80 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Closure |
0017 |
$-644.43 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Adjustment |
0017 |
$-5,637.54 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Initial Payment |
0006 |
$4,185.60 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Initial Payment |
0006 |
$3,032.80 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Initial Payment |
0008 |
$6,140.24 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Initial Payment |
0007 |
$1,103.83 |
06374(44) |
0072 |
inlet median barr des 2-2 |
Stockpiled Material Adjustment |
0012 |
$-1,214.40 |
06374(44) |
0073 |
Inlet W/Lrg.JCT.Box |
Stockpiled Material Initial Payment |
0006 |
$2,969.85 |
06374(44) |
0073 |
Inlet W/Lrg.JCT.Box |
Stockpiled Material Initial Payment |
0017 |
$2,969.85 |
06374(44) |
0073 |
Inlet W/Lrg.JCT.Box |
Stockpiled Material Closure |
0017 |
$-2,969.85 |
06374(44) |
0074 |
Inlet W/small Juc.Box |
Stockpiled Material Adjustment |
0028 |
$-1,435.49 |
06374(44) |
0074 |
Inlet W/small Juc.Box |
Stockpiled Material Closure |
0017 |
$-3,182.02 |
06374(44) |
0074 |
Inlet W/small Juc.Box |
Stockpiled Material Closure |
0017 |
$-1,987.84 |
06374(44) |
0074 |
Inlet W/small Juc.Box |
Stockpiled Material Initial Payment |
0017 |
$5,115.86 |
06374(44) |
0074 |
Inlet W/small Juc.Box |
Stockpiled Material Initial Payment |
0006 |
$3,182.02 |
06374(44) |
0074 |
Inlet W/small Juc.Box |
Stockpiled Material Initial Payment |
0010 |
$1,987.84 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Closure |
0017 |
$-3,257.40 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Adjustment |
0015 |
$-337.04 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Adjustment |
0027 |
$-1,079.57 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Adjustment |
0005 |
$-337.04 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Initial Payment |
0002 |
$3,641.24 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Adjustment |
0023 |
$-1,079.57 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Closure |
0017 |
$-2,716.89 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Closure |
0017 |
$-1,619.00 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Initial Payment |
0006 |
$3,257.40 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Adjustment |
0017 |
$-1,079.57 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Initial Payment |
0003 |
$2,044.33 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Initial Payment |
0008 |
$2,716.89 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Adjustment |
0028 |
$-2,159.15 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Initial Payment |
0017 |
$9,637.62 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Adjustment |
0009 |
$-1,348.16 |
06374(44) |
0075 |
inlet smd-type1 |
Stockpiled Material Closure |
0017 |
$-2,044.33 |
06374(44) |
0076 |
inlet smd-type2 |
Stockpiled Material Adjustment |
0004 |
$-186.68 |
06374(44) |
0076 |
inlet smd-type2 |
Stockpiled Material Initial Payment |
0017 |
$1,113.78 |
06374(44) |
0076 |
inlet smd-type2 |
Stockpiled Material Adjustment |
0005 |
$-186.68 |
06374(44) |
0076 |
inlet smd-type2 |
Stockpiled Material Closure |
0017 |
$-560.00 |
06374(44) |
0076 |
inlet smd-type2 |
Stockpiled Material Closure |
0017 |
$-553.78 |
06374(44) |
0076 |
inlet smd-type2 |
Stockpiled Material Initial Payment |
0006 |
$560.00 |
06374(44) |
0076 |
inlet smd-type2 |
Stockpiled Material Initial Payment |
0002 |
$560.00 |
06374(44) |
0076 |
inlet smd-type2 |
Stockpiled Material Adjustment |
0015 |
$-184.80 |
06374(44) |
0076 |
inlet smd-type2 |
Stockpiled Material Adjustment |
0015 |
$-6.22 |
06374(44) |
0076 |
inlet smd-type2 |
Stockpiled Material Initial Payment |
0007 |
$560.00 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0015 |
$-985.18 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0014 |
$-70.37 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0013 |
$-140.74 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0027 |
$-633.33 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0025 |
$-774.07 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0020 |
$-879.63 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0019 |
$-703.70 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0018 |
$-140.74 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Initial Payment |
0017 |
$6,622.26 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Closure |
0017 |
$-6,622.26 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0017 |
$-1,337.03 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0028 |
$-844.44 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Adjustment |
0010 |
$-2,251.83 |
06374(44) |
0077 |
Fram Grate CICI |
Stockpiled Material Initial Payment |
0007 |
$10,070.38 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0028 |
$-784.23 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0010 |
$-2,004.16 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0027 |
$-697.09 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0025 |
$-914.93 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0020 |
$-304.98 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0019 |
$-304.98 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0015 |
$-1,045.65 |
06374(44) |
0078 |
CICI |
Stockpiled Material Initial Payment |
0017 |
$5,742.19 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0017 |
$-479.25 |
06374(44) |
0078 |
CICI |
Stockpiled Material Initial Payment |
0007 |
$9,096.98 |
06374(44) |
0078 |
CICI |
Stockpiled Material Closure |
0017 |
$-5,742.19 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0013 |
$-217.84 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0014 |
$-87.14 |
06374(44) |
0078 |
CICI |
Stockpiled Material Adjustment |
0018 |
$-87.14 |
06374(44) |
0106 |
Impact att. |
Stockpiled Material Closure |
0017 |
$-98,970.24 |
06374(44) |
0106 |
Impact att. |
Stockpiled Material Adjustment |
0029 |
$-36,651.99 |
06374(44) |
0106 |
Impact att. |
Stockpiled Material Adjustment |
0020 |
$-36,651.99 |
06374(44) |
0106 |
Impact att. |
Stockpiled Material Initial Payment |
0017 |
$98,970.24 |
06374(44) |
0106 |
Impact att. |
Stockpiled Material Initial Payment |
0008 |
$98,970.24 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Initial Payment |
0004 |
$164,950.23 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Adjustment |
0006 |
$-14,177.03 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Adjustment |
0015 |
$-1,482.45 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Closure |
0017 |
$-10,971.75 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Closure |
0017 |
$-164,950.23 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Adjustment |
0009 |
$-5,689.30 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Adjustment |
0014 |
$-3,033.05 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Initial Payment |
0017 |
$175,921.98 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Adjustment |
0005 |
$-12,608.76 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Adjustment |
0008 |
$-16,721.05 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Initial Payment |
0004 |
$82,097.58 |
06374(44) |
0116 |
18" ductileiron pipe |
Stockpiled Material Adjustment |
0007 |
$-17,414.19 |
06374(44) |
0119 |
6" DIP |
Stockpiled Material Adjustment |
0006 |
$-1,026.14 |
06374(44) |
0119 |
6" DIP |
Stockpiled Material Initial Payment |
0004 |
$23,665.37 |
06374(44) |
0119 |
6" DIP |
Stockpiled Material Adjustment |
0007 |
$-76.96 |
06374(44) |
0119 |
6" DIP |
Stockpiled Material Adjustment |
0012 |
$-22,562.27 |
06374(44) |
0121 |
12" DIP |
Stockpiled Material Adjustment |
0012 |
$-13,876.89 |
06374(44) |
0121 |
12" DIP |
Stockpiled Material Initial Payment |
0004 |
$43,503.44 |
06374(44) |
0121 |
12" DIP |
Stockpiled Material Closure |
0017 |
$-19,797.09 |
06374(44) |
0121 |
12" DIP |
Stockpiled Material Adjustment |
0006 |
$-9,829.46 |
06374(44) |
0122 |
16" DIP |
Stockpiled Material Adjustment |
0012 |
$-10,615.79 |
06374(44) |
0122 |
16" DIP |
Stockpiled Material Initial Payment |
0004 |
$53,273.95 |
06374(44) |
0122 |
16" DIP |
Stockpiled Material Initial Payment |
0017 |
$42,658.16 |
06374(44) |
0122 |
16" DIP |
Stockpiled Material Closure |
0017 |
$-42,658.16 |
06374(44) |
0124 |
6" PVC |
Stockpiled Material Initial Payment |
0017 |
$5,115.29 |
06374(44) |
0124 |
6" PVC |
Stockpiled Material Adjustment |
0004 |
$-11,191.36 |
06374(44) |
0124 |
6" PVC |
Stockpiled Material Initial Payment |
0004 |
$17,425.79 |
06374(44) |
0124 |
6" PVC |
Stockpiled Material Adjustment |
0007 |
$-1,119.14 |
06374(44) |
0124 |
6" PVC |
Stockpiled Material Closure |
0017 |
$-5,115.29 |
06374(44) |
0126 |
6" Gate Valve |
Stockpiled Material Initial Payment |
0017 |
$995.78 |
06374(44) |
0126 |
6" Gate Valve |
Stockpiled Material Initial Payment |
0004 |
$8,960.90 |
06374(44) |
0126 |
6" Gate Valve |
Stockpiled Material Adjustment |
0012 |
$-7,566.86 |
06374(44) |
0126 |
6" Gate Valve |
Stockpiled Material Closure |
0017 |
$-995.78 |
06374(44) |
0126 |
6" Gate Valve |
Stockpiled Material Adjustment |
0007 |
$-398.26 |
06374(44) |
0139 |
P.C. Beams Br. A |
Stockpiled Material Initial Payment |
0003 |
$376,455.15 |
06374(44) |
0139 |
P.C. Beams Br. A |
Stockpiled Material Initial Payment |
0017 |
$238,751.22 |
06374(44) |
0139 |
P.C. Beams Br. A |
Stockpiled Material Adjustment |
0013 |
$-137,703.93 |
06374(44) |
0139 |
P.C. Beams Br. A |
Stockpiled Material Closure |
0017 |
$-238,751.22 |
06374(44) |
0139 |
P.C. Beams Br. A |
Stockpiled Material Adjustment |
0017 |
$-238,751.22 |
06374(44) |
0168 |
P.C.Beams Br. B |
Stockpiled Material Closure |
0017 |
$-158,835.90 |
06374(44) |
0168 |
P.C.Beams Br. B |
Stockpiled Material Initial Payment |
0004 |
$237,537.27 |
06374(44) |
0168 |
P.C.Beams Br. B |
Stockpiled Material Adjustment |
0026 |
$-232,119.30 |
06374(44) |
0168 |
P.C.Beams Br. B |
Stockpiled Material Adjustment |
0020 |
$-164,253.93 |
06374(44) |
0168 |
P.C.Beams Br. B |
Stockpiled Material Initial Payment |
0017 |
$396,373.17 |
06374(44) |
0168 |
P.C.Beams Br. B |
Stockpiled Material Closure |
0017 |
$-237,537.27 |
06374(44) |
0168 |
P.C.Beams Br. B |
Stockpiled Material Initial Payment |
0003 |
$158,835.90 |
06374(44) |
0171 |
Reinf. steel for F-shape par. |
Stockpiled Material Initial Payment |
0023 |
$10,860.92 |
06374(44) |
0171 |
Reinf. steel for F-shape par. |
Stockpiled Material Adjustment |
0029 |
$-10,860.92 |
06374(44) |
0176 |
Br. |
Stockpiled Material Closure |
0020 |
$-94,069.50 |
06374(44) |
0176 |
Br. |
Stockpiled Material Initial Payment |
0017 |
$94,069.50 |
06374(44) |
0176 |
Br. |
Stockpiled Material Closure |
0017 |
$-94,069.50 |
06374(44) |
0176 |
Br. |
Stockpiled Material Initial Payment |
0012 |
$94,069.50 |
06374(44) |
0180 |
Epox. Reinf. Br. B |
Stockpiled Material Adjustment |
0025 |
$-9,500.88 |
06374(44) |
0180 |
Epox. Reinf. Br. B |
Stockpiled Material Adjustment |
0023 |
$-17,338.03 |
06374(44) |
0180 |
Epox. Reinf. Br. B |
Stockpiled Material Initial Payment |
0023 |
$61,667.98 |
06374(44) |
0180 |
Epox. Reinf. Br. B |
Stockpiled Material Adjustment |
0028 |
$-27,118.45 |
06374(44) |
0200 |
Stru. steel |
Stockpiled Material Closure |
0017 |
$-335,527.10 |
06374(44) |
0200 |
Stru. steel |
Stockpiled Material Initial Payment |
0017 |
$335,527.10 |
06374(44) |
0200 |
Stru. steel |
Stockpiled Material Initial Payment |
0006 |
$830,070.00 |
06374(44) |
0200 |
Stru. steel |
Stockpiled Material Adjustment |
0012 |
$-494,542.90 |
06374(44) |
0200 |
Stru. steel |
Stockpiled Material Adjustment |
0024 |
$-335,527.10 |
06374(44) |
0212 |
Abut. bearing assembly |
Stockpiled Material Initial Payment |
0013 |
$2,829.69 |
06374(44) |
0212 |
Abut. bearing assembly |
Stockpiled Material Adjustment |
0013 |
$846.43 |
06374(44) |
0212 |
Abut. bearing assembly |
Stockpiled Material Adjustment |
0024 |
$-1,451.09 |
06374(44) |
0212 |
Abut. bearing assembly |
Stockpiled Material Initial Payment |
0017 |
$3,676.12 |
06374(44) |
0212 |
Abut. bearing assembly |
Stockpiled Material Closure |
0017 |
$-3,676.12 |
06374(44) |
0213 |
expansion bearing assembly |
Stockpiled Material Adjustment |
0013 |
$-5,106.89 |
06374(44) |
0213 |
expansion bearing assembly |
Stockpiled Material Adjustment |
0024 |
$-13,134.47 |
06374(44) |
0213 |
expansion bearing assembly |
Stockpiled Material Closure |
0017 |
$-20,506.81 |
06374(44) |
0213 |
expansion bearing assembly |
Stockpiled Material Initial Payment |
0017 |
$20,506.81 |
06374(44) |
0213 |
expansion bearing assembly |
Stockpiled Material Initial Payment |
0013 |
$25,613.70 |
06374(44) |
0245 |
Extruded Panel groundmount |
Stockpiled Material Adjustment |
0030 |
$-2,580.48 |
06374(44) |
0245 |
Extruded Panel groundmount |
Stockpiled Material Initial Payment |
0020 |
$2,580.48 |
06374(44) |
0246 |
Extruded Panel overhead |
Stockpiled Material Initial Payment |
0020 |
$21,046.00 |
06374(44) |
0246 |
Extruded Panel overhead |
Stockpiled Material Adjustment |
0030 |
$-21,046.00 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Adjustment |
0030 |
$-20,150.08 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Initial Payment |
0008 |
$15,080.00 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Initial Payment |
0008 |
$42,497.00 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Initial Payment |
0012 |
$56,989.29 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Initial Payment |
0013 |
$54,358.00 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Adjustment |
0014 |
$-502.67 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Initial Payment |
0015 |
$12,727.86 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Closure |
0017 |
$-14,577.33 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Closure |
0017 |
$-42,497.00 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Closure |
0017 |
$-56,989.29 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Closure |
0017 |
$-54,358.00 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Closure |
0017 |
$-12,727.86 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Initial Payment |
0017 |
$181,149.48 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Adjustment |
0022 |
$-16,118.95 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Adjustment |
0024 |
$-60,444.66 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Adjustment |
0026 |
$-20,150.08 |
06374(44) |
0267 |
Ped. heads |
Stockpiled Material Adjustment |
0028 |
$-30,225.13 |
06374(44) |
0276 |
40' MTG.Ht.Hl.PTP. |
Stockpiled Material Initial Payment |
0015 |
$131,734.00 |
06374(44) |
0276 |
40' MTG.Ht.Hl.PTP. |
Stockpiled Material Adjustment |
0026 |
$-16,370.29 |
06374(44) |
0276 |
40' MTG.Ht.Hl.PTP. |
Stockpiled Material Adjustment |
0022 |
$-33,703.54 |
06374(44) |
0276 |
40' MTG.Ht.Hl.PTP. |
Stockpiled Material Adjustment |
0020 |
$-6,740.71 |
06374(44) |
0276 |
40' MTG.Ht.Hl.PTP. |
Stockpiled Material Adjustment |
0030 |
$-19,259.16 |
06374(44) |
0276 |
40' MTG.Ht.Hl.PTP. |
Stockpiled Material Adjustment |
0028 |
$-4,814.79 |
06374(44) |
0276 |
40' MTG.Ht.Hl.PTP. |
Stockpiled Material Initial Payment |
0017 |
$131,734.00 |
06374(44) |
0276 |
40' MTG.Ht.Hl.PTP. |
Stockpiled Material Closure |
0017 |
$-131,734.00 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Adjustment |
0030 |
$-5,946.65 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Adjustment |
0028 |
$-1,238.88 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Adjustment |
0026 |
$-3,716.65 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Adjustment |
0024 |
$-2,229.99 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Adjustment |
0022 |
$-1,734.44 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Adjustment |
0020 |
$-2,477.77 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Adjustment |
0018 |
$-1,238.88 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Initial Payment |
0017 |
$19,227.91 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Closure |
0017 |
$-19,227.91 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Adjustment |
0016 |
$-6,194.09 |
06374(44) |
0277 |
Breakaway base |
Stockpiled Material Initial Payment |
0015 |
$25,422.00 |
06374(44) |
0278 |
Roadway Luminaire |
Stockpiled Material Closure |
0017 |
$-92,834.00 |
06374(44) |
0278 |
Roadway Luminaire |
Stockpiled Material Initial Payment |
0012 |
$92,834.00 |
06374(44) |
0278 |
Roadway Luminaire |
Stockpiled Material Adjustment |
0028 |
$-3,327.39 |
06374(44) |
0278 |
Roadway Luminaire |
Stockpiled Material Adjustment |
0030 |
$-16,082.37 |
06374(44) |
0278 |
Roadway Luminaire |
Stockpiled Material Adjustment |
0026 |
$-52,683.62 |
06374(44) |
0278 |
Roadway Luminaire |
Stockpiled Material Initial Payment |
0017 |
$92,834.00 |
06374(44) |
0279 |
Underpass Luminaire |
Stockpiled Material Adjustment |
0030 |
$-6,376.56 |
06374(44) |
0279 |
Underpass Luminaire |
Stockpiled Material Initial Payment |
0012 |
$6,560.00 |
06374(44) |
0279 |
Underpass Luminaire |
Stockpiled Material Closure |
0017 |
$-6,560.00 |
06374(44) |
0279 |
Underpass Luminaire |
Stockpiled Material Initial Payment |
0017 |
$6,560.00 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Adjustment |
0024 |
$-2,958.85 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Adjustment |
0026 |
$-3,964.88 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Adjustment |
0030 |
$-6,128.64 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Adjustment |
0016 |
$-4,261.19 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Closure |
0017 |
$-33,339.95 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Initial Payment |
0008 |
$37,601.14 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Adjustment |
0028 |
$-1,949.28 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Adjustment |
0018 |
$-282.20 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Adjustment |
0022 |
$-2,671.00 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Initial Payment |
0017 |
$33,339.95 |
06374(44) |
0281 |
1/C no.4 ele.conduit |
Stockpiled Material Adjustment |
0020 |
$-7,186.88 |
Subtotals For Stockpile Payments |
$546,555.78 |