Fed/State Project Number: STPY-144C(121) |
Project: 24142(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
0.500 |
$53,000.00 |
$0.00 |
$26,500.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
144,000.000 |
144,000.000 |
456.000 |
24,280.000 |
$3.50 |
$1,596.00 |
$84,980.00 |
0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
63,800.000 |
63,800.000 |
6,360.000 |
8,664.000 |
$4.50 |
$28,620.00 |
$38,988.00 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.400 |
$46,000.00 |
$0.00 |
$18,400.00 |
0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
12,275.000 |
12,275.000 |
1,150.000 |
9,520.000 |
$1.43 |
$1,644.50 |
$13,613.60 |
0006 |
TEMPORARY SEDIMENT FILTER |
221(D) 2803 |
EA |
16.000 |
16.000 |
|
0.000 |
$79.50 |
$0.00 |
$0.00 |
0007 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
1,316.000 |
1,316.000 |
|
0.000 |
$6.89 |
$0.00 |
$0.00 |
0008 |
TEMPORARY ROCK FILTER DAM TYPE 1 |
221(G) 0150 |
CY |
350.000 |
350.000 |
|
0.000 |
$25.00 |
$0.00 |
$0.00 |
0009 |
TEMPORARY ROCK FILTER DAM TYPE 3 |
221(G) 0152 |
CY |
180.000 |
180.000 |
|
0.000 |
$25.00 |
$0.00 |
$0.00 |
0010 |
DITCH LINER PROTECTION |
229 4318 |
LF |
6,080.000 |
6,080.000 |
|
0.000 |
$1.65 |
$0.00 |
$0.00 |
0011 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
113,400.000 |
113,400.000 |
|
0.000 |
$1.37 |
$0.00 |
$0.00 |
0012 |
WATERING |
230(F) 2812 |
KGAL |
4,536.000 |
4,536.000 |
|
0.000 |
$6.35 |
$0.00 |
$0.00 |
0013 |
SEEDING METHOD B |
232(B) 2814 |
AC |
11.000 |
11.000 |
|
0.000 |
$320.00 |
$0.00 |
$0.00 |
0014 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
32.500 |
32.500 |
|
0.000 |
$210.00 |
$0.00 |
$0.00 |
0015 |
FERTILIZING (10-20-10) |
234(A) 2824 |
TON |
10.500 |
10.500 |
|
0.000 |
$740.00 |
$0.00 |
$0.00 |
0016 |
FERTILIZING (0-46-0) |
234(A) 4406 |
TON |
2.450 |
2.450 |
|
0.000 |
$850.00 |
$0.00 |
$0.00 |
0017 |
MOWING |
241 2832 |
AC |
32.500 |
32.500 |
8.000 |
8.000 |
$58.50 |
$468.00 |
$468.00 |
0018 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
16,810.000 |
16,510.000 |
|
0.000 |
$21.50 |
$0.00 |
$0.00 |
0019 |
FLY ASH |
307(A) 4200 |
TON |
6,039.000 |
6,039.000 |
0.000 |
679.530 |
$60.00 |
$0.00 |
$40,771.80 |
0020 |
LIME |
307(D) 4230 |
TON |
325.000 |
325.000 |
0.000 |
98.970 |
$165.00 |
$0.00 |
$16,330.05 |
0021 |
CEMENTITIOUS STABILIZED SUBGRADE |
307(E) 4240 |
SY |
111,821.000 |
111,821.000 |
|
15,396.600 |
$1.50 |
$0.00 |
$23,094.90 |
0022 |
LIME PRETREATMENT |
307(G) 4260 |
SY |
22,350.000 |
22,350.000 |
|
9,011.510 |
$2.00 |
$0.00 |
$18,023.02 |
0023 |
SEPARATOR FABRIC |
325 5271 |
SY |
89,397.000 |
89,397.000 |
|
0.000 |
$0.70 |
$0.00 |
$0.00 |
0024 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
11,647.000 |
11,647.000 |
42.060 |
246.820 |
$19.00 |
$799.14 |
$4,689.58 |
0025 |
TACK COAT |
407(B) 0250 |
GAL |
8,450.000 |
8,450.000 |
2,450.000 |
2,450.000 |
$2.00 |
$4,900.00 |
$4,900.00 |
0026 |
PRIME COAT |
408 5774 |
GAL |
28,750.000 |
28,750.000 |
4,300.000 |
4,300.000 |
$2.00 |
$8,600.00 |
$8,600.00 |
0027 |
FABRIC REINFORCEMENT |
409(A) 4242 |
SY |
16,660.000 |
14,600.000 |
|
0.000 |
$0.70 |
$0.00 |
$0.00 |
0028 |
BITUMINOUS BINDER |
409(B) 4268 |
GAL |
4,165.000 |
3,753.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0029 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
36,914.000 |
36,514.000 |
4,442.390 |
4,442.390 |
$47.00 |
$208,792.33 |
$208,792.33 |
0030 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
16,708.000 |
16,508.000 |
1,730.170 |
1,742.170 |
$52.00 |
$89,968.84 |
$90,592.84 |
0031 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
57,609.000 |
57,609.000 |
11,333.330 |
11,333.330 |
$0.50 |
$5,666.67 |
$5,666.67 |
0032 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
291.000 |
291.000 |
|
58.330 |
$10.60 |
$0.00 |
$618.30 |
0033 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
622.000 |
622.000 |
0.000 |
180.430 |
$295.50 |
$0.00 |
$53,317.07 |
0034 |
CLASS A CONCRETE |
509(B) 0321 |
CY |
375.000 |
375.000 |
67.700 |
118.630 |
$290.86 |
$19,691.22 |
$34,504.72 |
0035 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
812.000 |
812.000 |
|
0.000 |
$202.50 |
$0.00 |
$0.00 |
0036 |
REINFORCING STEEL |
511(A) 0332 |
LB |
109,800.000 |
109,800.000 |
9,269.970 |
41,630.170 |
$0.63 |
$5,840.08 |
$26,227.01 |
0037 |
TYPE I-A PLAIN RIPRAP |
601(B) 0536 |
TON |
65.000 |
65.000 |
|
0.000 |
$45.00 |
$0.00 |
$0.00 |
0038 |
2'-8" COMB. CURB & GUTTER (6" MNTBLE) |
609(B) 1524 |
LF |
4,504.000 |
4,504.000 |
|
0.000 |
$10.00 |
$0.00 |
$0.00 |
0039 |
6" CONCRETE DRIVEWAY |
610(B) 0604 |
SY |
631.000 |
631.000 |
|
0.000 |
$30.00 |
$0.00 |
$0.00 |
0040 |
INLET CI DES. 2 (B) |
611(G) 5113 |
EA |
6.000 |
6.000 |
0.000 |
6.000 |
$2,810.00 |
$0.00 |
$16,860.00 |
0041 |
INLET CDI RCB DES. 2 |
611(G) 5388 |
EA |
3.000 |
3.000 |
0.000 |
1.000 |
$2,385.00 |
$0.00 |
$2,385.00 |
0042 |
INLET CDI 45SK RCP DES.4 |
611(G) 5800 |
EA |
1.000 |
1.000 |
1.000 |
1.000 |
$2,279.00 |
$2,279.00 |
$2,279.00 |
0043 |
INLET W/SMALL JCT. BOX, CI, DES.2(D) |
611(G) 5974 |
EA |
1.000 |
1.000 |
0.000 |
1.000 |
$4,450.00 |
$0.00 |
$4,450.00 |
0044 |
INLET (SMD-TYPE 2) |
611(G) 6002 |
EA |
5.000 |
5.000 |
0.000 |
5.000 |
$2,332.00 |
$0.00 |
$11,660.00 |
0045 |
ADD'L DEPTH IN INLET CI DES. 2 |
611(H) 5325 |
VF |
1.000 |
1.000 |
|
0.000 |
$212.00 |
$0.00 |
$0.00 |
0046 |
18" R.C.PIPE CLASS III |
613(A) 0491 |
LF |
1,184.000 |
1,184.000 |
0.000 |
1,005.000 |
$36.50 |
$0.00 |
$36,682.50 |
0047 |
24" R.C.PIPE CLASS III |
613(A) 0492 |
LF |
1,059.000 |
1,059.000 |
34.170 |
1,102.170 |
$46.10 |
$1,575.24 |
$50,810.04 |
0048 |
36" R.C.PIPE CLASS III |
613(A) 0494 |
LF |
430.000 |
430.000 |
136.000 |
136.000 |
$71.55 |
$9,730.80 |
$9,730.80 |
0049 |
14" X 23" R.C.PIPE ELLIPTICAL CLASS HE-III |
613(A) 4503 |
LF |
51.000 |
51.000 |
|
0.000 |
$68.90 |
$0.00 |
$0.00 |
0050 |
24" X 38" R.C.PIPE ELLIPTICAL CLASS HE-III |
613(A) 4505 |
LF |
57.000 |
57.000 |
0.000 |
174.000 |
$78.15 |
$0.00 |
$13,598.10 |
0051 |
18" PRECOATED CORR. STEEL PIPE |
613(C) 5100 |
LF |
294.000 |
294.000 |
110.000 |
174.000 |
$35.00 |
$3,850.00 |
$6,090.00 |
0052 |
24" PRECOATED CORR. STEEL PIPE |
613(C) 5102 |
LF |
24.000 |
24.000 |
|
56.000 |
$38.15 |
$0.00 |
$2,136.40 |
0053 |
48" PRECOATED CORR. STEEL PIPE |
613(C) 5110 |
LF |
23.000 |
23.000 |
35.000 |
725.710 |
$47.70 |
$1,669.50 |
$34,616.37 |
0054 |
EDGE DRAIN CONDUIT-PERFORATED |
613(J) 5915 |
LF |
3,277.000 |
3,277.000 |
|
0.000 |
$5.00 |
$0.00 |
$0.00 |
0055 |
24" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5730 |
EA |
5.000 |
5.000 |
|
1.000 |
$1,115.00 |
$0.00 |
$1,115.00 |
0056 |
36" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5734 |
EA |
4.000 |
4.000 |
1.000 |
1.000 |
$1,399.00 |
$1,399.00 |
$1,399.00 |
0057 |
TYPE A6 CULVERT END TREATMENT |
613(M) 7196 |
EA |
26.000 |
26.000 |
|
0.000 |
$1,470.00 |
$0.00 |
$0.00 |
0058 |
TYPE B6 CULVERT END TREATMENT |
613(M) 7197 |
EA |
6.000 |
6.000 |
|
0.000 |
$1,470.00 |
$0.00 |
$0.00 |
0059 |
SPECIAL END SECTION OF 24" X 38" RCP ELLIPTICAL |
613(O) 5100 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,007.00 |
$0.00 |
$0.00 |
0060 |
18" GALV. STEEL CULVERT END SECTION ROUND |
613(P) 0760 |
EA |
22.000 |
22.000 |
|
0.000 |
$370.00 |
$0.00 |
$0.00 |
0061 |
STANDARD BEDDING MATERIAL, CLASS C |
613(T) 1187 |
CY |
1,663.000 |
1,663.000 |
115.326 |
870.226 |
$10.45 |
$1,205.16 |
$9,093.86 |
0062 |
TRENCH EXCAVATION |
613(V) 1180 |
CY |
2,356.000 |
2,356.000 |
174.790 |
1,314.550 |
$3.20 |
$559.33 |
$4,206.56 |
0063 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.200 |
$40,000.00 |
$0.00 |
$8,000.00 |
0064 |
REMOVAL OF HEADWALL |
619(B) 0291 |
EA |
33.000 |
33.000 |
|
8.000 |
$265.00 |
$0.00 |
$2,120.00 |
0065 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
38,276.000 |
38,276.000 |
|
0.000 |
$0.75 |
$0.00 |
$0.00 |
0066 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
37,700.000 |
37,700.000 |
|
0.000 |
$1.50 |
$0.00 |
$0.00 |
0067 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
43.000 |
43.000 |
|
0.000 |
$14.85 |
$0.00 |
$0.00 |
0068 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
4.000 |
4.000 |
|
0.000 |
$2,120.00 |
$0.00 |
$0.00 |
0069 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
4.000 |
4.000 |
|
0.000 |
$1,569.00 |
$0.00 |
$0.00 |
0070 |
FENCE-STYLE WWF |
624(A) 4281 |
LF |
2,490.000 |
2,490.000 |
|
0.000 |
$4.20 |
$0.00 |
$0.00 |
0071 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
10,280.000 |
10,280.000 |
2,426.000 |
3,111.000 |
$3.15 |
$7,641.90 |
$9,799.65 |
0072 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
15.000 |
15.000 |
|
0.000 |
$68.90 |
$0.00 |
$0.00 |
0073 |
MAILBOX INSTALLATION-MULTIPLE |
629(B) 4959 |
EA |
2.000 |
2.000 |
|
0.000 |
$90.10 |
$0.00 |
$0.00 |
0074 |
MAILBOX |
629(C) 4960 |
EA |
19.000 |
19.000 |
|
0.000 |
$26.50 |
$0.00 |
$0.00 |
0075 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
17.000 |
17.000 |
|
3.000 |
$10.50 |
$0.00 |
$31.50 |
8002 |
36" PRECOATED CORR. STEEL PIPE |
613(C) 5105 |
LF |
0.000 |
408.000 |
576.000 |
576.000 |
$57.20 |
$32,947.20 |
$32,947.20 |
8005 |
SELF ADH. STRESS RELIEF FAB. INTERLAYER |
409(A) 4245 |
SY |
0.000 |
1,030.000 |
|
0.000 |
$9.45 |
$0.00 |
$0.00 |
8006 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
0.000 |
200.000 |
0.000 |
200.000 |
$17.60 |
$0.00 |
$3,520.00 |
8007 |
18" PREFAB. CULVERT END SEC., ROUND |
613(L) 5726 |
EA |
0.000 |
2.000 |
0.000 |
2.000 |
$148.50 |
$0.00 |
$297.00 |
8008 |
CONSTRUCTION MISCELLANEOUS |
104 0600 |
EA |
0.000 |
2.000 |
|
2.000 |
$953.18 |
$0.00 |
$1,906.36 |
Subtotals For Category 0100/ROADWAY |
$439,443.91 |
$984,812.23 |
|
Fed/State Project Number: STPY-144C(121) |
Project: 24142(04) |
Category: 0300/TRAFFIC |
0081 |
(PL)REMOVAL OF EXISTING SIGNS |
805(A) 8722 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$530.00 |
$0.00 |
$0.00 |
0082 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
40,500.000 |
40,500.000 |
21,320.000 |
21,320.000 |
$0.15 |
$3,198.00 |
$3,198.00 |
0083 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
2,500.000 |
2,500.000 |
|
0.000 |
$0.69 |
$0.00 |
$0.00 |
0084 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
12,000.000 |
12,000.000 |
800.000 |
800.000 |
$0.07 |
$56.00 |
$56.00 |
0085 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
51,500.000 |
51,500.000 |
341.000 |
1,037.000 |
$0.03 |
$10.23 |
$31.11 |
0086 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
24,300.000 |
24,300.000 |
620.000 |
2,470.000 |
$0.16 |
$99.20 |
$395.20 |
0087 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
37,250.000 |
37,250.000 |
1,522.000 |
1,798.000 |
$0.21 |
$319.62 |
$377.58 |
0088 |
CONSTRUCTION BARRICADES(TYPE II) |
880(C) 8836 |
SD |
14,000.000 |
14,000.000 |
|
232.000 |
$0.03 |
$0.00 |
$6.96 |
0089 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
20,000.000 |
20,000.000 |
246.000 |
246.000 |
$0.03 |
$7.38 |
$7.38 |
0090 |
WING BARRICADES |
880(C) 8848 |
SD |
2,920.000 |
2,920.000 |
124.000 |
124.000 |
$0.03 |
$3.72 |
$3.72 |
0091 |
VERTICAL PANELS |
880(D) 8854 |
SD |
75,000.000 |
75,000.000 |
530.000 |
530.000 |
$0.03 |
$15.90 |
$15.90 |
0092 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
78,820.000 |
78,820.000 |
1,048.000 |
1,860.000 |
$0.03 |
$31.44 |
$55.80 |
0093 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
102,000.000 |
102,000.000 |
4,808.000 |
7,863.000 |
$0.03 |
$144.24 |
$235.89 |
0094 |
DRUMS |
880(F) 8878 |
SD |
27,000.000 |
27,000.000 |
4,278.000 |
7,333.000 |
$0.03 |
$128.34 |
$219.99 |
0095 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
37,500.000 |
37,500.000 |
|
0.000 |
$0.03 |
$0.00 |
$0.00 |
8001 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM |
823 8478 |
SD |
0.000 |
90.000 |
|
0.000 |
$363.00 |
$0.00 |
$0.00 |
8003 |
DELIVER PORTABLE LONGITUDINAL BARRIER |
877(B) 8484 |
LF |
0.000 |
400.000 |
253.600 |
253.600 |
$22.00 |
$5,579.20 |
$5,579.20 |
8004 |
RELOCATION OF PORT. LONGITUDINAL BARRIER |
877(C) 8486 |
LF |
0.000 |
800.000 |
|
0.000 |
$2.20 |
$0.00 |
$0.00 |
Subtotals For Category 0300/TRAFFIC |
$9,593.27 |
$10,182.73 |
|