Fed/State Project Number: BRFY-162B(118) |
Project: 21842(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
0.500 |
1.000 |
$10,500.00 |
$5,250.00 |
$10,500.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
20,454.000 |
20,454.000 |
|
11,500.000 |
$3.68 |
$0.00 |
$42,320.00 |
0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
1,669.000 |
1,669.000 |
|
0.000 |
$5.78 |
$0.00 |
$0.00 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.500 |
$10,694.25 |
$0.00 |
$5,347.13 |
0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
3,060.000 |
3,060.000 |
1,695.000 |
1,695.000 |
$2.10 |
$3,559.50 |
$3,559.50 |
0006 |
TEMPORARY SEDIMENT FILTER |
221(D) 2803 |
EA |
2.000 |
2.000 |
|
0.000 |
$630.00 |
$0.00 |
$0.00 |
0007 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
170.000 |
170.000 |
188.000 |
188.000 |
$7.35 |
$1,381.80 |
$1,381.80 |
0008 |
TEMPORARY ROCK FILTER DAM TYPE 1 |
221(G) 0150 |
CY |
4.000 |
4.000 |
|
0.000 |
$525.00 |
$0.00 |
$0.00 |
0009 |
DITCH LINER PROTECTION |
229 4318 |
LF |
345.000 |
345.000 |
|
0.000 |
$1.94 |
$0.00 |
$0.00 |
0010 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
18,385.000 |
18,385.000 |
|
0.000 |
$1.84 |
$0.00 |
$0.00 |
0011 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
3.500 |
3.500 |
|
0.000 |
$682.50 |
$0.00 |
$0.00 |
0012 |
MOWING |
241 2832 |
AC |
13.000 |
13.000 |
|
0.000 |
$42.00 |
$0.00 |
$0.00 |
0013 |
LIME |
307(D) 4230 |
TON |
271.000 |
271.000 |
72.490 |
72.490 |
$152.25 |
$11,036.60 |
$11,036.60 |
0014 |
LIME STABILIZED SUBGRADE |
307(H) 4270 |
SY |
10,552.000 |
10,552.000 |
4,681.650 |
4,681.650 |
$4.20 |
$19,662.93 |
$19,662.93 |
0015 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
82.000 |
82.000 |
|
22.140 |
$21.11 |
$0.00 |
$467.38 |
0016 |
FOG SEAL |
407(A) 4659 |
GAL |
53.000 |
53.000 |
|
0.000 |
$11.55 |
$0.00 |
$0.00 |
0017 |
TACK COAT |
407(B) 0250 |
GAL |
1,949.000 |
1,949.000 |
|
0.000 |
$3.15 |
$0.00 |
$0.00 |
0018 |
PRIME COAT |
408 5774 |
GAL |
2,340.000 |
2,340.000 |
|
0.000 |
$5.09 |
$0.00 |
$0.00 |
0019 |
SUPERPAVE, TYPE S3(PG 70-28 OK) |
411(B) 5940 |
TON |
499.000 |
499.000 |
|
0.000 |
$76.81 |
$0.00 |
$0.00 |
0020 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
3,817.000 |
3,817.000 |
|
0.000 |
$59.96 |
$0.00 |
$0.00 |
0021 |
SUPERPAVE, TYPE S4(PG 70-28 OK) |
411(C) 5955 |
TON |
383.000 |
383.000 |
|
0.000 |
$79.43 |
$0.00 |
$0.00 |
0022 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
856.000 |
856.000 |
|
0.000 |
$66.99 |
$0.00 |
$0.00 |
0023 |
COLD MILLING PAVEMENT |
412 5267 |
SY |
533.000 |
533.000 |
|
0.000 |
$15.75 |
$0.00 |
$0.00 |
0024 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
78.000 |
78.000 |
|
0.000 |
$262.50 |
$0.00 |
$0.00 |
0025 |
INLET (SMD-TYPE 2) |
611(G) 6002 |
EA |
2.000 |
2.000 |
|
0.000 |
$1,575.00 |
$0.00 |
$0.00 |
0026 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
278.000 |
278.000 |
|
106.000 |
$22.01 |
$0.00 |
$2,333.06 |
0027 |
96" CORR. GALV. STEEL PIPE |
613(B) 4819 |
LF |
420.000 |
420.000 |
|
420.000 |
$111.05 |
$0.00 |
$46,641.00 |
0028 |
TYPE A4 CULVERT END TREATMENT |
613(M) 7186 |
EA |
3.000 |
3.000 |
|
0.000 |
$1,890.00 |
$0.00 |
$0.00 |
0029 |
TYPE A6 CULVERT END TREATMENT |
613(M) 7196 |
EA |
3.000 |
3.000 |
|
0.000 |
$2,100.00 |
$0.00 |
$0.00 |
0030 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$2,625.00 |
$0.00 |
$0.00 |
0031 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
7,775.000 |
7,775.000 |
|
0.000 |
$2.26 |
$0.00 |
$0.00 |
0032 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
556.000 |
556.000 |
|
0.000 |
$6.30 |
$0.00 |
$0.00 |
0033 |
BEAM GUARDRAIL W-BEAM SINGLE |
623(A) 0932 |
LF |
1,092.000 |
1,092.000 |
|
0.000 |
$15.75 |
$0.00 |
$0.00 |
0034 |
GUARDRAIL END TREATMENT (GET) |
623(G) 8571 |
EA |
4.000 |
4.000 |
|
0.000 |
$2,625.00 |
$0.00 |
$0.00 |
0035 |
GUARDRAIL BRIDGE CONNECTION-TYPE A |
623(I) 8675 |
EA |
4.000 |
4.000 |
|
0.000 |
$1,837.50 |
$0.00 |
$0.00 |
0036 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
1,311.000 |
1,311.000 |
|
1,412.000 |
$3.61 |
$0.00 |
$5,097.32 |
0037 |
MAILBOX INSTALLATION-SINGLE |
629(A) 4958 |
EA |
6.000 |
6.000 |
|
0.000 |
$52.50 |
$0.00 |
$0.00 |
0038 |
MAILBOX |
629(C) 4960 |
EA |
6.000 |
6.000 |
|
0.000 |
$21.00 |
$0.00 |
$0.00 |
0039 |
REMOVAL OF MAILBOX INSTALLATION |
629(D) 4961 |
EA |
6.000 |
6.000 |
|
0.000 |
$10.50 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$40,890.83 |
$148,346.72 |
|
Fed/State Project Number: BRFY-162B(118) |
Project: 21842(04) |
Category: 0200/BRIDGE 'A' |
0040 |
SUBSTRUCTURE EXCAVATION COMMON |
501(B) 1307 |
CY |
300.000 |
300.000 |
|
0.000 |
$12.60 |
$0.00 |
$0.00 |
0041 |
CLSM BACKFILL |
501(G) 6309 |
CY |
220.000 |
220.000 |
|
0.000 |
$114.44 |
$0.00 |
$0.00 |
0042 |
PRESTRESSED CONCRETE BEAMS (TYPE III) |
503(A) 1312 |
LF |
636.000 |
636.000 |
|
0.000 |
$194.01 |
$0.00 |
$0.00 |
0043 |
APPROACH SLAB |
504(A) 1304 |
SY |
337.400 |
337.400 |
|
0.000 |
$189.00 |
$0.00 |
$0.00 |
0044 |
SAW-CUT GROOVING |
504(B) 1305 |
SY |
920.000 |
920.000 |
|
0.000 |
$4.25 |
$0.00 |
$0.00 |
0045 |
SEALED EXPANSION JOINT |
504(C) 6250 |
LF |
48.640 |
48.640 |
|
0.000 |
$245.28 |
$0.00 |
$0.00 |
0046 |
CONCRETE RAIL (TR4) |
504(D) 6245 |
LF |
470.500 |
470.500 |
|
0.000 |
$57.62 |
$0.00 |
$0.00 |
0047 |
STRUCTURAL STEEL |
506(A) 1322 |
LB |
1,540.000 |
1,540.000 |
|
0.000 |
$1.71 |
$0.00 |
$0.00 |
0048 |
STAINLESS STEEL FIXED BEARING ASSEMBLY |
507(A) 6170 |
EA |
16.000 |
16.000 |
|
0.000 |
$1,856.52 |
$0.00 |
$0.00 |
0049 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY |
507(B) 6174 |
EA |
8.000 |
8.000 |
|
0.000 |
$1,856.52 |
$0.00 |
$0.00 |
0050 |
CLASS AA CONCRETE |
509(A) 1326 |
CY |
193.200 |
193.200 |
|
0.000 |
$428.93 |
$0.00 |
$0.00 |
0051 |
CLASS A CONCRETE |
509(B) 1328 |
CY |
188.300 |
188.300 |
|
0.000 |
$428.93 |
$0.00 |
$0.00 |
0052 |
REINFORCING STEEL |
511(A) 1332 |
LB |
560.000 |
560.000 |
|
0.000 |
$1.05 |
$0.00 |
$0.00 |
0053 |
EPOXY COATED REINFORCING STEEL |
511(B) 6010 |
LB |
83,380.000 |
83,380.000 |
|
0.000 |
$0.92 |
$0.00 |
$0.00 |
0054 |
PILES, FURNISHED (HP 10X42) |
514(A) 6010 |
LF |
174.000 |
174.000 |
|
0.000 |
$25.94 |
$0.00 |
$0.00 |
0055 |
PILES, FURNISHED (HP 12X53) |
514(A) 6011 |
LF |
564.000 |
564.000 |
|
0.000 |
$34.65 |
$0.00 |
$0.00 |
0056 |
PILES, DRIVEN (HP 10X42) |
514(B) 6292 |
LF |
174.000 |
174.000 |
|
0.000 |
$10.50 |
$0.00 |
$0.00 |
0057 |
PILES, DRIVEN (HP 12X53) |
514(B) 6294 |
LF |
564.000 |
564.000 |
|
0.000 |
$10.50 |
$0.00 |
$0.00 |
0058 |
WATER REPELLENT (VISUALLY INSPECTED) |
515(A) 6013 |
SY |
1,026.000 |
1,026.000 |
|
0.000 |
$3.31 |
$0.00 |
$0.00 |
0059 |
DRILLED SHAFTS 60" DIAMETER |
516(A) 6096 |
LF |
150.000 |
150.000 |
|
0.000 |
$534.89 |
$0.00 |
$0.00 |
0060 |
SEALER CRACK PREPARATION |
523(A) 6550 |
LF |
46.000 |
46.000 |
|
0.000 |
$5.25 |
$0.00 |
$0.00 |
0061 |
SEALER RESIN |
523(B) 6560 |
GAL |
0.500 |
0.500 |
|
0.000 |
$420.00 |
$0.00 |
$0.00 |
0062 |
TYPE I-A PLAIN RIPRAP |
601(B) 1353 |
TON |
2,005.000 |
2,005.000 |
|
47.210 |
$35.99 |
$0.00 |
$1,699.09 |
0063 |
TYPE I-A FILTER BLANKET |
601(C) 1355 |
TON |
478.000 |
478.000 |
|
0.000 |
$28.50 |
$0.00 |
$0.00 |
0064 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
96.000 |
96.000 |
|
0.000 |
$21.00 |
$0.00 |
$0.00 |
0065 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 6207 |
LF |
46.000 |
46.000 |
|
0.000 |
$21.00 |
$0.00 |
$0.00 |
0066 |
REMOVAL OF EXISTING BRIDGE STRUCTURE |
619(D) 1397 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$7,875.00 |
$0.00 |
$0.00 |
8001 |
TYPE I-A PLAIN RIPRAP |
601(B) 1353 |
TON |
0.000 |
50.000 |
|
0.000 |
$55.00 |
$0.00 |
$0.00 |
Subtotals For Category 0200/BRIDGE 'A' |
$0.00 |
$1,699.09 |
|
Fed/State Project Number: BRFY-162B(118) |
Project: 21842(04) |
Category: 0302/TRAFFIC CONTROL |
0070 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
6,600.000 |
6,600.000 |
|
0.000 |
$0.26 |
$0.00 |
$0.00 |
0071 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) |
857(C) 8851 |
LF |
1,500.000 |
1,500.000 |
|
0.000 |
$0.68 |
$0.00 |
$0.00 |
0072 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
100.000 |
100.000 |
|
0.000 |
$1.05 |
$0.00 |
$0.00 |
0073 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
1,500.000 |
1,500.000 |
|
0.000 |
$0.26 |
$0.00 |
$0.00 |
0074 |
(SP)CONST.ZONE IMPACT ATTEN. |
871(B) 8705 |
SD |
240.000 |
240.000 |
|
0.000 |
$2.10 |
$0.00 |
$0.00 |
0075 |
DELIVER PORTABLE LONGITUDINAL BARRIER |
877(B) 8484 |
LF |
1,250.000 |
1,250.000 |
|
0.000 |
$18.90 |
$0.00 |
$0.00 |
0076 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER |
877(C) 8486 |
LF |
1,250.000 |
1,250.000 |
|
0.000 |
$4.20 |
$0.00 |
$0.00 |
0077 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
2,448.000 |
2,448.000 |
460.000 |
888.000 |
$1.05 |
$483.00 |
$932.40 |
0078 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
2,304.000 |
2,304.000 |
92.000 |
184.000 |
$0.11 |
$10.12 |
$20.24 |
0079 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
288.000 |
288.000 |
368.000 |
720.000 |
$5.25 |
$1,932.00 |
$3,780.00 |
0080 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
864.000 |
864.000 |
124.000 |
124.000 |
$2.10 |
$260.40 |
$260.40 |
0081 |
WING BARRICADES |
880(C) 8848 |
SD |
864.000 |
864.000 |
60.000 |
244.000 |
$0.11 |
$6.60 |
$26.84 |
0082 |
VERTICAL PANELS |
880(D) 8854 |
SD |
1,200.000 |
1,200.000 |
|
0.000 |
$1.05 |
$0.00 |
$0.00 |
0083 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
2,592.000 |
2,592.000 |
|
0.000 |
$0.05 |
$0.00 |
$0.00 |
0084 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
7,164.000 |
7,164.000 |
|
0.000 |
$0.05 |
$0.00 |
$0.00 |
0085 |
DRUMS |
880(F) 8878 |
SD |
5,400.000 |
5,400.000 |
|
0.000 |
$0.05 |
$0.00 |
$0.00 |
0086 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
1,500.000 |
1,500.000 |
|
0.000 |
$0.05 |
$0.00 |
$0.00 |
0087 |
PORT.CHANGEABLE MESSAGE SIGN |
882(A) 8306 |
SD |
360.000 |
360.000 |
|
0.000 |
$10.50 |
$0.00 |
$0.00 |
Subtotals For Category 0302/TRAFFIC CONTROL |
$2,692.12 |
$5,019.88 |
|