Fed/State Project Number: IMY-0040-6(369)265 |
Project: 20884(06) |
Category: 0100/ROADWAY |
0001 |
EARTHWORK |
202(G) 0185 |
LSUM |
1.000 |
1.000 |
0.050 |
0.100 |
$452,960.60 |
$22,648.03 |
$45,296.06 |
0002 |
TYPE A-SALVAGED TOPSOIL |
205 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.500 |
$60,000.00 |
$0.00 |
$30,000.00 |
0003 |
TEMPORARY SILT FENCE |
223 2801 |
LF |
3,000.000 |
3,000.000 |
|
3,466.000 |
$2.30 |
$0.00 |
$7,971.80 |
0004 |
TEMPORARY SILT DIKE |
227 0100 |
LF |
1,032.000 |
1,032.000 |
|
952.000 |
$8.68 |
$0.00 |
$8,263.36 |
0005 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
221,703.000 |
221,703.000 |
|
0.000 |
$1.17 |
$0.00 |
$0.00 |
0006 |
SEEDING METHOD B |
232(B) 2814 |
AC |
48.440 |
48.440 |
|
0.000 |
$201.05 |
$0.00 |
$0.00 |
0007 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
48.440 |
48.440 |
|
0.000 |
$144.35 |
$0.00 |
$0.00 |
0008 |
MOWING |
241 2832 |
AC |
186.000 |
186.000 |
|
0.000 |
$46.40 |
$0.00 |
$0.00 |
0009 |
AGGREGATE BASE |
303 0192 |
CY |
26,743.000 |
26,743.000 |
|
0.000 |
$24.40 |
$0.00 |
$0.00 |
0010 |
(SP)CEMENT TREATED BASE |
317(F) 4270 |
SY |
146,660.000 |
146,660.000 |
|
0.000 |
$8.28 |
$0.00 |
$0.00 |
0011 |
SEPARATOR FABRIC |
325 5271 |
SY |
129,714.000 |
129,714.000 |
|
0.000 |
$0.94 |
$0.00 |
$0.00 |
0012 |
(SP)LIME |
327(D) 4230 |
TON |
3,344.000 |
3,344.000 |
130.550 |
130.550 |
$135.00 |
$17,624.25 |
$17,624.25 |
0013 |
(SP)LIME STABILIZED SUBGRADE |
327(H) 4270 |
SY |
185,690.000 |
185,690.000 |
11,908.330 |
11,908.330 |
$0.95 |
$11,312.91 |
$11,312.91 |
0014 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
403(E) 0225 |
TON |
19,984.000 |
19,984.000 |
|
0.000 |
$17.68 |
$0.00 |
$0.00 |
0015 |
TACK COAT |
407 0250 |
GAL |
9,777.000 |
9,777.000 |
|
0.000 |
$2.10 |
$0.00 |
$0.00 |
0016 |
PRIME COAT |
408 5774 |
GAL |
61,145.000 |
61,145.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0017 |
(SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) |
411(S4) 5960 |
TON |
18,188.000 |
18,188.000 |
|
0.000 |
$59.50 |
$0.00 |
$0.00 |
0018 |
(SP)RUMBLE STRIP-METHOD PCC-CON |
413(D) 4868 |
LF |
105,325.000 |
105,325.000 |
|
0.000 |
$0.22 |
$0.00 |
$0.00 |
0019 |
(SP)P.C.CONCRETE PAVEMENT(PLACEMENT) |
414(A) 0210 |
SY |
159,055.000 |
159,055.000 |
12,624.300 |
12,624.300 |
$3.48 |
$43,932.56 |
$43,932.56 |
0020 |
(SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) |
414(A1) 5725 |
SY |
156,786.000 |
156,786.000 |
|
0.000 |
$8.23 |
$0.00 |
$0.00 |
0021 |
H.E.S. CONCRETE (FULL DEPTH PATCHING) |
414(B) 5913 |
SY |
3,130.000 |
3,130.000 |
|
3,168.160 |
$89.82 |
$0.00 |
$284,564.13 |
0022 |
(SP)P.C. CONCRETE FOR PAVEMENT (ONLY) |
414(I) 5270 |
CY |
86,271.000 |
86,271.000 |
2,993.160 |
2,993.160 |
$69.35 |
$207,575.65 |
$207,575.65 |
0023 |
COLD MILLING PAVEMENT |
417 5267 |
SY |
52,800.000 |
52,800.000 |
10,235.560 |
19,623.340 |
$2.03 |
$20,778.19 |
$39,835.38 |
0024 |
DIAMOND GRINDING CONCRETE PAVEMENT |
425 5195 |
SY |
23,734.000 |
23,734.000 |
|
23,905.380 |
$2.27 |
$0.00 |
$54,265.21 |
0025 |
DOWEL BAR RETROFIT |
436 0100 |
EA |
7,152.000 |
7,152.000 |
|
5,502.000 |
$21.75 |
$0.00 |
$119,668.50 |
0026 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
125.000 |
125.000 |
|
0.000 |
$275.00 |
$0.00 |
$0.00 |
0027 |
INLET (SMD-TYPE 2A) |
611(E) 6004 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,750.00 |
$0.00 |
$0.00 |
0028 |
28" X 18" R.C.PIPE ARCH CLASS A-III |
613(B) 4496 |
LF |
390.000 |
390.000 |
|
0.000 |
$145.00 |
$0.00 |
$0.00 |
0029 |
TYPE A4 CULVERT END TREATMENT |
613(CC) 7186 |
EA |
5.000 |
5.000 |
|
0.000 |
$630.00 |
$0.00 |
$0.00 |
0030 |
TYPE A6 CULVERT END TREATMENT |
613(CC) 7196 |
EA |
4.000 |
4.000 |
|
0.000 |
$825.00 |
$0.00 |
$0.00 |
0031 |
18" CORR. GALV. STEEL PIPE |
613(D) 0689 |
LF |
3,440.000 |
3,440.000 |
880.000 |
880.000 |
$18.00 |
$15,840.00 |
$15,840.00 |
0032 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$15,000.00 |
$0.00 |
$0.00 |
0033 |
REMOVAL OF CONCRETE PAVEMENT |
619(B) 4727 |
SY |
97,560.000 |
97,560.000 |
|
0.000 |
$1.67 |
$0.00 |
$0.00 |
0034 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
23,351.000 |
23,351.000 |
|
0.000 |
$1.73 |
$0.00 |
$0.00 |
0035 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
608.000 |
608.000 |
|
0.000 |
$2.25 |
$0.00 |
$0.00 |
0036 |
FENCE-STYLE WWF |
624(A) 4281 |
LF |
59,102.000 |
59,102.000 |
5,590.000 |
29,050.000 |
$7.00 |
$39,130.00 |
$203,350.00 |
Subtotals For Category 0100/ROADWAY |
$378,841.59 |
$1,089,499.81 |
|
Fed/State Project Number: IMY-0040-6(369)265 |
Project: 20884(06) |
Category: 0300/TRAFFIC CONTROL |
0037 |
RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN |
627(O) 4410 |
LF |
34,050.000 |
34,050.000 |
|
0.000 |
$1.80 |
$0.00 |
$0.00 |
0038 |
RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER |
627(P) 4425 |
LF |
35,075.000 |
35,075.000 |
|
0.000 |
$20.67 |
$0.00 |
$0.00 |
0039 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
856(A) 8839 |
LF |
305,000.000 |
305,000.000 |
|
0.000 |
$0.03 |
$0.00 |
$0.00 |
0040 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
856(G) 8887 |
EA |
22,763.000 |
22,763.000 |
|
0.000 |
$0.18 |
$0.00 |
$0.00 |
0041 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
859(A) 8006 |
LF |
158,718.000 |
158,718.000 |
|
0.000 |
$0.04 |
$0.00 |
$0.00 |
0042 |
(PL)TRUCK MOUNTED ATTENUATOR |
876(C) 8482 |
SD |
400.000 |
400.000 |
|
14.000 |
$5.16 |
$0.00 |
$72.24 |
0043 |
MODULAR GLARE SCREEN |
878(C) 8487 |
SD |
114,400.000 |
114,400.000 |
|
0.000 |
$0.03 |
$0.00 |
$0.00 |
0044 |
ARROW DISPLAY(TYPE C) |
880(A) 8812 |
SD |
800.000 |
800.000 |
30.000 |
105.000 |
$30.93 |
$927.90 |
$3,247.65 |
0045 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
40,000.000 |
40,000.000 |
15.000 |
56.000 |
$0.05 |
$0.75 |
$2.80 |
0046 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
24,000.000 |
24,000.000 |
1,170.000 |
4,022.000 |
$1.03 |
$1,205.10 |
$4,142.66 |
0047 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
30,000.000 |
30,000.000 |
900.000 |
4,161.000 |
$2.06 |
$1,854.00 |
$8,571.66 |
0048 |
BARRICADES(TYPE III) |
880(C) 8842 |
SD |
20,000.000 |
20,000.000 |
435.000 |
887.000 |
$0.05 |
$21.75 |
$44.35 |
0049 |
WING BARRICADES |
880(C) 8848 |
SD |
1,600.000 |
1,600.000 |
60.000 |
356.000 |
$2.06 |
$123.60 |
$733.36 |
0050 |
VERTICAL PANELS |
880(D) 8854 |
SD |
316,000.000 |
316,000.000 |
|
0.000 |
$0.01 |
$0.00 |
$0.00 |
0051 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
48,800.000 |
48,800.000 |
1,095.000 |
3,754.000 |
$0.02 |
$21.90 |
$75.08 |
0052 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
436,000.000 |
436,000.000 |
930.000 |
2,428.000 |
$0.01 |
$9.30 |
$24.28 |
0053 |
DRUMS |
880(F) 8878 |
SD |
120,000.000 |
120,000.000 |
930.000 |
2,802.000 |
$0.02 |
$18.60 |
$56.04 |
0054 |
CHANNELIZER CONES |
880(G) 8890 |
SD |
90,000.000 |
90,000.000 |
9,157.000 |
21,513.000 |
$0.02 |
$183.14 |
$430.26 |
0055 |
TRAFFIC SURVEILLANCE, POLICE |
880(L) 8911 |
HOUR |
500.000 |
500.000 |
|
168.000 |
$71.45 |
$0.00 |
$12,003.61 |
0056 |
PORT.CHANGEABLE MESSAGE SIGN |
882(B) 8306 |
SD |
1,600.000 |
1,600.000 |
6.000 |
6.000 |
$2.06 |
$12.36 |
$12.36 |
Subtotals For Category 0300/TRAFFIC CONTROL |
$4,378.40 |
$29,416.35 |
|
Fed/State Project Number: IMY-0040-6(369)265 |
Project: 20884(06) |
Category: 0301/TRAFFIC SIGNING AND STRIPING |
0057 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
6.070 |
6.070 |
|
0.000 |
$309.31 |
$0.00 |
$0.00 |
0058 |
REINFORCING STEEL |
804(B) 2916 |
LB |
978.000 |
978.000 |
|
0.000 |
$1.03 |
$0.00 |
$0.00 |
0059 |
DELINEATORS(TYPE 1, CODE 1) |
853 9024 |
EA |
108.000 |
108.000 |
|
0.000 |
$12.37 |
$0.00 |
$0.00 |
0060 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) |
854(C) 8530 |
LF |
131,303.000 |
131,303.000 |
|
0.000 |
$0.41 |
$0.00 |
$0.00 |
0061 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) |
854(C) 8535 |
LF |
38,688.000 |
38,688.000 |
|
0.000 |
$0.62 |
$0.00 |
$0.00 |
0062 |
(SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) |
854(C) 8540 |
LF |
1,750.000 |
1,750.000 |
|
0.000 |
$1.03 |
$0.00 |
$0.00 |
0063 |
(PL)REMOVE & RESET EXISTING SIGNS |
890A/B 8756 |
EA |
19.000 |
19.000 |
|
0.000 |
$128.93 |
$0.00 |
$0.00 |
0064 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN |
890A/B 8760 |
EA |
4.000 |
4.000 |
|
0.000 |
$1,327.12 |
$0.00 |
$0.00 |
Subtotals For Category 0301/TRAFFIC SIGNING AND STRIPING |
$0.00 |
$0.00 |
|