Contract ID: | 100604 | Estimate Number: | 0014 | Contract No: | 610748 | |||
Residency: | ARDMORE (07200) | Estimate Type: | Progressive | Account No: | 400700 | |||
Project Number(s): | IMY-0035-1(156)011, IMY-0035-1(157)014 | ||||||||||||
Primary Job Piece No: | 27166(04) | ||||||||||||
Contract Description: | GRADE, DRAIN, AND SURFACE I-35: FROM 11.75 MILES NORTH OF TEXAS STATE LINE, EXTEND NORTH. PROJECT LENGTH = 5.734 MILES | ||||||||||||
Primary County: | LOVE | ||||||||||||
Name of Road: | I-35 | ||||||||||||
Prime Contractor: | DUIT CONSTRUCTION COMPANY, INC./TTK CONSTRUCTION CO., INC JV | ||||||||||||
P.O. BOX 3788 | |||||||||||||
EDMOND , OK 73083 | |||||||||||||
Surety Company: | LIBERTY MUTUAL INSURANCE COMPANY | ||||||||||||
Date Let: | 10/21/2010 | NTP Effective Date: | 03/07/2011 | Pay Period: | 07/16/2011 TO 07/31/2011 |
Date Awarded: | 11/08/2010 | Date Work Began: | 12/13/2010 | Original Contract Time: | 300 |
Date Contract Executed: | 11/16/2010 | Date Time Stopped: | Current Time Charged: | 231.00 | |
Date NTP Issued: | 11/17/2010 | Completion Date: | Current Time Allowed: | 325.00 | |
General Liability Expires: | 03/01/2012 | Workman's Comp Expires: | 03/01/2012 | Percent Time Used: | 71.08 % |
Specification Year: | 1999 | Date Approved: | |||
Current Contract Amount: | $13,041,382.34 | Total to Date | Prev to Date | This Estimate | |||
Bid Amount: | $13,041,382.34 | Participating: | $10,772,371.17 | $8,973,956.91 | $1,798,414.26 | ||
Percent Complete: | 82.61 % | Non Participating: | $0.00 | $0.00 | $0.00 | ||
Funds Available: | $2,268,022.03 | Total Earnings: | $10,772,371.17 | $8,973,956.91 | $1,798,414.26 | ||
Unearned Balance: | $2,268,022.03 | Stockpiled Materials: | $0.00 | $0.00 | $0.00 | ||
Gross Earnings: | $10,772,371.17 | $8,973,956.91 | $1,798,414.26 | ||||
Other Adjustments: | $989.14 | $989.14 | $0.00 | ||||
Liq Dam/Disincentive: | $0.00 | $0.00 | $0.00 | ||||
TOTAL: | $10,773,360.31 | $8,974,946.05 | $1,798,414.26 |
Contract ID: | 100604 | Estimate Number: | 0014 | Primary JP: | 27166(04) | |||
CHANGE ORDER HISTORY | |||||
Change Order Nbr. | Change Order Description | Status | Approval Date | Contract Time Adjustment | Total Change Order Amount |
No change orders have been created for this contract. |
STOCKPILE PAYMENT HISTORY | |||||
Project | Line Nbr | Stockpile Description | Adjustment Type | Estimate Nbr | Adjusted Amount |
No material stockpiles have been created for this contract. | Subtotals For Stockpile Payments | $0.00 |
LIQUIDATED DAMAGES HISTORY | |||||||||
Adjustment Description | Estimate Nbr | Time Units | Rate | Adjustment Amount | |||||
No liquidated damages have been assessed on this contract. |
CONTRACT ADJUSTMENTS HISTORY | ||
Adjustment Description | Estimate Nbr | Adjustment Amount |
No general contract adjustments have been created on this contract. | Subtotals For Contract Adjustments | $0.00 |
LINE ITEM ADJUSTMENT HISTORY | |||||||
Project | Item Nbr | Line Item Description | Adjustment Type | Estimate Nbr | Adj Quantity | Unit Price | Adjusted Amount |
27166(04) | 0016 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0011 | 616.61 | $1.51 | $934.53 |
27166(06) | 0099 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | Asphalt Binder Adjustment | 0011 | 36.03 | $1.51 | $54.61 | Subtotals For Line Item Adjustments | $989.14 |
MILESTONE ADJUSTMENTS | |||||||||
Milestone Number | Milestone Description | Time Allowed | Time Used | Rate | Total | ||||
01 | Incentive/Disincentive 2011 Labor Day Weekend | 09/01/2011 | 0.00 | $0.00 | $0.00 | ||||
02 | Incentive/Disincentive 2011 OU/TX Weekend | 10/06/2011 | 0.00 | $4,000.00 | $0.00 |
Contract ID: | 100604 | Estimate Number: | 0014 | Primary JP: | 27166(04) | |||
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: IMY-0035-1(156)011 | Project: 27166(04) | Category: 0100/ROADWAY - IMY-35-1(156)011 | ||||||||
0001 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 1.000 | $6,000.00 | $0.00 | $6,000.00 | |
0002 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 140.000 | 140.000 | 0.000 | $6.00 | $0.00 | $0.00 | |
0003 | UNCLASSIFIED BORROW | 202(C) 0184 | CY | 189.000 | 189.000 | 170.000 | $7.50 | $0.00 | $1,275.00 | |
0004 | TYPE A-SALVAGED TOPSOIL | 205 4229 | LSUM | 1.000 | 1.000 | 0.000 | 0.500 | $50,000.00 | $0.00 | $25,000.00 |
0005 | TEMPORARY SILT FENCE | 223 2801 | LF | 2,450.000 | 2,450.000 | 0.000 | 190.000 | $1.07 | $0.00 | $203.30 |
0006 | TEMPORARY SEDIMENT FILTER | 224 2803 | EA | 3.000 | 3.000 | 3.000 | $90.53 | $0.00 | $271.59 | |
0007 | TEMPORARY SILT DIKE | 227 0100 | LF | 1,288.000 | 1,288.000 | 0.000 | $4.79 | $0.00 | $0.00 | |
0008 | SOLID SLAB SODDING | 230(A) 2806 | SY | 28,974.000 | 28,974.000 | 23,104.000 | $1.28 | $0.00 | $29,573.12 | |
0009 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 6.000 | 6.000 | 0.000 | $106.50 | $0.00 | $0.00 | |
0010 | AGGREGATE BASE | 303 0192 | CY | 5,963.000 | 5,963.000 | 0.000 | 6,053.430 | $23.00 | $0.00 | $139,228.89 |
0011 | (SP)CEMENT TREATED BASE | 317(F) 4270 | SY | 23,800.000 | 23,800.000 | 0.000 | 24,392.680 | $7.75 | $0.00 | $189,043.27 |
0012 | SEPARATOR FABRIC | 325 5271 | SY | 77,713.000 | 77,713.000 | 10,496.060 | 42,621.960 | $1.20 | $12,595.27 | $51,146.35 |
0013 | (SP)LIME | 327(D) 4230 | TON | 593.000 | 593.000 | 264.430 | $86.00 | $0.00 | $22,740.98 | |
0014 | (SP)LIME STABILIZED SUBGRADE | 327(H) 4270 | SY | 32,902.000 | 32,902.000 | 17,766.910 | $2.00 | $0.00 | $35,533.82 | |
0015 | PRIME COAT | 408 5774 | GAL | 9,527.000 | 9,527.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
0016 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 411(S4) 5960 | TON | 685.000 | 685.000 | 616.610 | $78.60 | $0.00 | $48,465.55 | |
0017 | (SP)RUMBLE STRIP-METHOD PCC-CON | 413(D) 4868 | LF | 68,104.000 | 68,104.000 | 0.000 | $0.26 | $0.00 | $0.00 | |
0018 | (SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 59,243.000 | 59,243.000 | 36,505.980 | $5.00 | $0.00 | $182,529.90 | |
0019 | (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(A1) 5725 | SY | 98,373.000 | 98,373.000 | 49,293.110 | 99,058.370 | $8.00 | $394,344.88 | $792,466.96 |
0020 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 47,744.000 | 47,744.000 | 15,712.850 | 42,383.630 | $64.64 | $1,015,678.62 | $2,739,677.83 |
0021 | COLD MILLING PAVEMENT | 417 5267 | SY | 133,593.000 | 133,593.000 | 140,832.100 | $0.53 | $0.00 | $74,641.01 | |
0022 | CLASS AA CONCRETE | 509(A) 1326 | CY | 82.000 | 82.000 | 54.450 | $915.90 | $0.00 | $49,870.76 | |
0023 | EPOXY COATED REINFORCING STEEL | 511(B) 6010 | LB | 12,780.000 | 12,780.000 | 0.000 | 6,366.000 | $1.98 | $0.00 | $12,604.68 |
0024 | 8" PERFORATED PIPE UNDERDRAIN ROUND | 613(P) 1092 | LF | 1,600.000 | 1,600.000 | 775.000 | $6.25 | $0.00 | $4,843.75 | |
0025 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 0.900 | $5,000.00 | $0.00 | $4,500.00 | |
0026 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 4,156.000 | 4,156.000 | 1,816.440 | $3.33 | $0.00 | $6,048.75 | |
0027 | REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 619(B) 4763 | SY | 19,867.000 | 19,867.000 | 17,619.560 | $1.88 | $0.00 | $33,124.77 | |
0028 | SAWING PAVEMENT | 619(C) 0924 | LF | 1,868.000 | 1,868.000 | 190.000 | $2.83 | $0.00 | $537.70 | |
0029 | BEAM GUARD RAIL-W-BEAM-SINGLE | 623(A) 0932 | LF | 3,000.000 | 3,000.000 | 3,275.000 | $15.44 | $0.00 | $50,566.00 | |
0030 | THRIE BEAM BRIDGE CONNECTION-TYPE A | 623(E) 7114 | EA | 6.000 | 6.000 | 2.000 | $1,331.25 | $0.00 | $2,662.50 | |
0031 | GUARD RAIL ANCHOR UNIT (TYPE B) | 623(F) 4447 | EA | 8.000 | 8.000 | 3.000 | $532.50 | $0.00 | $1,597.50 | |
0032 | (SP)G.E.T. GUARD RAIL END SECTION | 623(H) 8571 | EA | 18.000 | 18.000 | 7.000 | $2,225.85 | $0.00 | $15,580.95 | |
Subtotals For Category 0100/ROADWAY - IMY-35-1(156)011 | $1,422,618.77 | $4,519,734.93 | ||||||||
Fed/State Project Number: IMY-0035-1(156)011 | Project: 27166(04) | Category: 0300/TRAFFIC CONTROL - IMY-35-1(156)011 | ||||||||
0033 | RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN | 627(O) 4410 | LF | 22,120.000 | 22,120.000 | 18,793.000 | $1.57 | $0.00 | $29,505.01 | |
0034 | RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 627(P) 4425 | LF | 22,120.000 | 22,120.000 | 15,034.400 | $20.50 | $0.00 | $308,205.20 | |
0035 | CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 856(A) 8839 | LF | 126,400.000 | 126,400.000 | 141,939.000 | $0.07 | $0.00 | $9,935.73 | |
0036 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 856(G) 8887 | EA | 10,000.000 | 10,000.000 | 0.000 | $0.43 | $0.00 | $0.00 | |
0037 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 859(A) 8006 | LF | 60,000.000 | 60,000.000 | 18,908.000 | $0.11 | $0.00 | $2,079.88 | |
0038 | (PL)SAND FILLED IMPACT ATTENUATION SYSTEM | 870(A) 8490 | SD | 400.000 | 400.000 | 0.000 | $7.46 | $0.00 | $0.00 | |
0039 | (PL)CONST.ZONE IMPACT ATTEN. | 871 8705 | SD | 400.000 | 400.000 | 0.000 | $7.46 | $0.00 | $0.00 | |
0040 | (PL)TRUCK MOUNTED ATTENUATOR | 876(C) 8482 | SD | 600.000 | 600.000 | 48.000 | $7.46 | $0.00 | $358.08 | |
0041 | MODULAR GLARE SCREEN | 878(C) 8487 | SD | 78,400.000 | 78,400.000 | 1,600.000 | 15,000.000 | $0.12 | $192.00 | $1,800.00 |
0042 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 400.000 | 400.000 | 16.000 | 249.000 | $5.33 | $85.28 | $1,327.17 |
0043 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 24,800.000 | 24,800.000 | 608.000 | 8,031.000 | $0.11 | $66.88 | $883.41 |
0044 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 19,200.000 | 19,200.000 | 672.000 | 8,166.000 | $0.53 | $356.16 | $4,327.98 |
0045 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 11,200.000 | 11,200.000 | 320.000 | 3,970.000 | $3.20 | $1,024.00 | $12,704.00 |
0046 | BARRICADES(TYPE III) | 880(C) 8842 | SD | 12,000.000 | 12,000.000 | 192.000 | 2,377.000 | $0.16 | $30.72 | $380.32 |
0047 | WING BARRICADES | 880(C) 8848 | SD | 800.000 | 800.000 | 32.000 | 462.000 | $2.13 | $68.16 | $984.06 |
0048 | VERTICAL PANELS | 880(D) 8854 | SD | 114,000.000 | 114,000.000 | 272.000 | 2,550.000 | $0.04 | $10.88 | $102.00 |
0049 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 32,800.000 | 32,800.000 | 512.000 | 6,735.000 | $0.05 | $25.60 | $336.75 |
0050 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 159,200.000 | 159,200.000 | 944.000 | 10,849.000 | $0.02 | $18.88 | $216.98 |
0051 | DRUMS | 880(F) 8878 | SD | 80,000.000 | 80,000.000 | 1,568.000 | 17,742.000 | $0.09 | $141.12 | $1,596.78 |
0052 | CHANNELIZER CONES | 880(G) 8890 | SD | 58,600.000 | 58,600.000 | 768.000 | 34,303.000 | $0.07 | $53.76 | $2,401.21 |
0053 | TRAFFIC SURVEILLANCE, POLICE | 880(L) 8911 | HOUR | 200.000 | 200.000 | 0.000 | $56.70 | $0.00 | $0.00 | |
0054 | (SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 882 8370 | SD | 4,800.000 | 4,800.000 | 364.000 | 4,363.000 | $23.43 | $8,528.52 | $102,225.09 |
0055 | (SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 882 8372 | SD | 2,400.000 | 2,400.000 | 192.000 | 2,256.000 | $21.30 | $4,089.60 | $48,052.80 |
0056 | (SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 882 8374 | SD | 400.000 | 400.000 | 32.000 | 376.000 | $37.28 | $1,192.96 | $14,017.28 |
0057 | (SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 882 8376 | SD | 200.000 | 200.000 | 16.000 | 188.000 | $10.65 | $170.40 | $2,002.20 |
0058 | PORT.CHANGEABLE MESSAGE SIGN | 882(B) 8306 | SD | 800.000 | 800.000 | 64.000 | $15.98 | $0.00 | $1,022.72 | |
Subtotals For Category 0300/TRAFFIC CONTROL - IMY-35-1(156)011 | $16,054.92 | $544,464.65 | ||||||||
Fed/State Project Number: IMY-0035-1(156)011 | Project: 27166(04) | Category: 0301/TRAFFIC SIGNING & STRIPING - IMY-35-1(156)011 | ||||||||
0059 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 6.270 | 6.270 | 0.000 | $319.50 | $0.00 | $0.00 | |
0060 | REINFORCING STEEL | 804(B) 2916 | LB | 1,254.000 | 1,254.000 | 0.000 | $1.07 | $0.00 | $0.00 | |
0061 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 130.960 | 130.960 | 0.000 | $11.72 | $0.00 | $0.00 | |
0062 | EXTRUDED ALUMINUM PANEL SIGNS | 850(B) 8112 | SF | 618.400 | 618.400 | 0.000 | $18.11 | $0.00 | $0.00 | |
0063 | 4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 851(A) 3206 | LF | 37.800 | 37.800 | 0.000 | $21.30 | $0.00 | $0.00 | |
0064 | 6"@20 GALV.STEEL WIDE FLANGE BEAM POST | 851(A) 3208 | LF | 51.000 | 51.000 | 0.000 | $26.63 | $0.00 | $0.00 | |
0065 | 6"@25 GALV.STEEL WIDE FLANGE BEAM POST | 851(A) 3209 | LF | 155.750 | 155.750 | 0.000 | $31.95 | $0.00 | $0.00 | |
0066 | 3"@7.58 GALV.STEEL PIPE POST | 851(B) 3218 | LF | 15.000 | 15.000 | 0.000 | $17.04 | $0.00 | $0.00 | |
0067 | 2" SQUARE TUBE POST | 851(C) 8324 | LF | 171.000 | 171.000 | 0.000 | $5.33 | $0.00 | $0.00 | |
0068 | DELINEATORS(TYPE 1, CODE 1) | 853 9024 | EA | 72.000 | 72.000 | 0.000 | $12.78 | $0.00 | $0.00 | |
0069 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 854(C) 8530 | LF | 71,304.000 | 71,304.000 | 0.000 | $0.43 | $0.00 | $0.00 | |
0070 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | 854(C) 8535 | LF | 22,104.000 | 22,104.000 | 0.000 | $0.64 | $0.00 | $0.00 | |
0071 | (PL)REMOVE & RESET EXISTING SIGNS | 890A/B 8756 | EA | 9.000 | 9.000 | 0.000 | $266.25 | $0.00 | $0.00 | |
Subtotals For Category 0301/TRAFFIC SIGNING & STRIPING - IMY-35-1(156)011 | $0.00 | $0.00 | ||||||||
Fed/State Project Number: IMY-0035-1(156)011 | Project: 27166(04) | Category: 0304/CABLE BARRIER ITEMS - IMY-35-1(156)011 | ||||||||
0072 | CLASS AA CONCRETE | 509(A) 0319 | CY | 32.000 | 32.000 | 1.610 | $426.00 | $0.00 | $685.86 | |
0073 | (PL)CABLE END ANCHOR UNIT | 628 5110 | EA | 2.000 | 2.000 | 1.000 | $5,538.00 | $0.00 | $5,538.00 | |
0074 | HIGH-TENSION CABLE BARRIER(TL-4) | 628 5125 | LF | 750.000 | 750.000 | 0.000 | $25.56 | $0.00 | $0.00 | |
0075 | INSTALLATION OF CABLE BARRIER SYSTEM | 628 5180 | LF | 3,895.000 | 3,895.000 | 0.000 | $15.98 | $0.00 | $0.00 | |
0076 | REMOVAL OF CABLE BARRIER | 628 5190 | LF | 4,605.000 | 4,605.000 | 4,653.000 | $5.33 | $0.00 | $24,800.49 | |
0077 | GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 853 9066 | EA | 60.000 | 60.000 | 0.000 | $10.65 | $0.00 | $0.00 | |
Subtotals For Category 0304/CABLE BARRIER ITEMS - IMY-35-1(156)011 | $0.00 | $31,024.35 | ||||||||
Fed/State Project Number: IMY-0035-1(156)011 | Project: 27166(04) | Category: 0600/STAKING - IMY-35-1(156)011 | ||||||||
0078 | STAKING | 642 0098 | LSUM | 1.000 | 1.000 | 0.750 | $95,000.00 | $0.00 | $71,250.00 | |
Subtotals For Category 0600/STAKING - IMY-35-1(156)011 | $0.00 | $71,250.00 | ||||||||
Fed/State Project Number: IMY-0035-1(156)011 | Project: 27166(04) | Category: 0640/CONSTRUCTION - IMY-35-1(156)011 | ||||||||
0079 | (SP)SWPPP DOCUMENTATION AND MANAGEMENT | 220 2800 | LSUM | 1.000 | 1.000 | 0.500 | $3,500.00 | $0.00 | $1,750.00 | |
0080 | FIELD OFFICE | 640 1426 | EA | 1.000 | 1.000 | 0.600 | $8,810.00 | $0.00 | $5,286.00 | |
0081 | MOBILIZATION | 641 1552 | LSUM | 1.000 | 1.000 | 1.000 | $297,162.50 | $0.00 | $297,162.50 | |
0082 | (SP)CONTRACTORS QUALITY CONTROL | 643 0087 | LSUM | 1.000 | 1.000 | 0.250 | $94,945.00 | $0.00 | $23,736.25 | |
Subtotals For Category 0640/CONSTRUCTION - IMY-35-1(156)011 | $0.00 | $327,934.75 | ||||||||
Subtotals For Project IMY-0035-1(156)011 /27166(04) | $1,438,673.69 | $5,494,408.68 |
Line Item Number | Item Description | Item Number | Units | Bid Qty | Current Quantity | Quantity Paid This Est. | Quantity Paid To Date | Unit Price | Amount Paid This Est. | Amount Paid To Date |
Fed/State Project Number: IMY-0035-1(157)014 | Project: 27166(06) | Category: 0100/ROADWAY - IMY-35-1(157)014 | ||||||||
0083 | CLEARING AND GRUBBING | 201 0102 | LSUM | 1.000 | 1.000 | 1.000 | $6,000.00 | $0.00 | $6,000.00 | |
0084 | UNCLASSIFIED EXCAVATION | 202(A) 0183 | CY | 13,559.000 | 13,559.000 | 19,953.690 | $6.00 | $0.00 | $119,722.14 | |
0085 | UNCLASSIFIED BORROW | 202(C) 0184 | CY | 23,246.000 | 23,246.000 | 0.000 | 24,840.000 | $7.50 | $0.00 | $186,300.00 |
0086 | TYPE A-SALVAGED TOPSOIL | 205 4229 | LSUM | 1.000 | 1.000 | 0.000 | 0.500 | $50,000.00 | $0.00 | $25,000.00 |
0087 | TEMPORARY SILT FENCE | 223 2801 | LF | 3,490.000 | 3,490.000 | 0.000 | 318.000 | $1.07 | $0.00 | $340.26 |
0088 | TEMPORARY SEDIMENT FILTER | 224 2803 | EA | 4.000 | 4.000 | 4.000 | $90.53 | $0.00 | $362.12 | |
0089 | TEMPORARY SILT DIKE | 227 0100 | LF | 1,027.000 | 1,027.000 | 0.000 | 70.000 | $4.79 | $0.00 | $335.30 |
0090 | SOLID SLAB SODDING | 230(A) 2806 | SY | 67,033.000 | 67,033.000 | 22,208.000 | $1.28 | $0.00 | $28,426.24 | |
0091 | VEGETATIVE MULCHING | 233(A) 2817 | AC | 14.000 | 14.000 | 0.000 | $106.50 | $0.00 | $0.00 | |
0092 | MOWING | 241 2832 | AC | 16.000 | 16.000 | 0.000 | $106.50 | $0.00 | $0.00 | |
0093 | AGGREGATE BASE | 303 0192 | CY | 9,241.000 | 9,241.000 | 0.000 | 8,684.070 | $23.00 | $0.00 | $199,733.61 |
0094 | (SP)CEMENT TREATED BASE | 317(F) 4270 | SY | 51,089.000 | 51,089.000 | 0.000 | 48,018.640 | $7.75 | $0.00 | $372,144.46 |
0095 | SEPARATOR FABRIC | 325 5271 | SY | 65,097.000 | 65,097.000 | 7,023.610 | 51,043.450 | $1.20 | $8,428.33 | $61,252.14 |
0096 | (SP)LIME | 327(D) 4230 | TON | 1,462.000 | 1,462.000 | 0.000 | 828.100 | $86.00 | $0.00 | $71,216.60 |
0097 | (SP)LIME STABILIZED SUBGRADE | 327(H) 4270 | SY | 79,278.000 | 79,278.000 | 51,293.170 | $2.00 | $0.00 | $102,586.34 | |
0098 | PRIME COAT | 408 5774 | GAL | 21,834.000 | 21,834.000 | 0.000 | $1.00 | $0.00 | $0.00 | |
0099 | (SP)ASPHALT CONCRETE TYPE S4(PG 64-22 OK) | 411(S4) 5960 | TON | 152.000 | 152.000 | 36.030 | $78.60 | $0.00 | $2,831.96 | |
0100 | (SP)RUMBLE STRIP-METHOD PCC-CON | 413(D) 4868 | LF | 53,022.000 | 53,022.000 | 0.000 | $0.26 | $0.00 | $0.00 | |
0101 | (SP)P.C.CONCRETE PAVEMENT(PLACEMENT) | 414(A) 0210 | SY | 65,812.000 | 65,812.000 | 331.290 | 42,337.680 | $5.00 | $1,656.45 | $211,688.40 |
0102 | (SP)DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 414(A1) 5725 | SY | 88,422.000 | 88,422.000 | 12,258.750 | 86,365.620 | $8.00 | $98,070.00 | $690,924.96 |
0103 | (SP)P.C. CONCRETE FOR PAVEMENT | 414(P) 6000 | CY | 46,805.000 | 46,805.000 | 3,850.640 | 41,276.660 | $64.64 | $248,905.37 | $2,668,123.30 |
0104 | COLD MILLING PAVEMENT | 417 5267 | SY | 92,566.000 | 92,566.000 | 98,433.190 | $0.53 | $0.00 | $52,169.60 | |
0105 | CLASS AA CONCRETE | 509(A) 0319 | CY | 14.000 | 14.000 | 20.420 | $922.29 | $0.00 | $18,833.16 | |
0106 | EPOXY COATED REINFORCING STEEL | 511(B) 4269 | LB | 2,130.000 | 2,130.000 | 0.000 | 2,122.000 | $1.98 | $0.00 | $4,201.56 |
0107 | 24" R.C.PIPE CLASS III | 613(B) 0492 | LF | 24.000 | 24.000 | 0.000 | $84.15 | $0.00 | $0.00 | |
0108 | 18" CORR. GALV. STEEL PIPE | 613(D) 0689 | LF | 1,170.000 | 1,170.000 | 1,170.000 | $24.81 | $0.00 | $29,027.70 | |
0109 | 24" PREFAB. CULVERT END SECTION, ROUND | 613(M) 5730 | EA | 3.000 | 3.000 | 0.000 | $850.00 | $0.00 | $0.00 | |
0110 | REMOVAL OF STRUCTURES & OBSTRUCTIONS | 619(A) 0920 | LSUM | 1.000 | 1.000 | 1.000 | $3,500.00 | $0.00 | $3,500.00 | |
0111 | REMOVAL OF CONCRETE PAVEMENT | 619(B) 4727 | SY | 17,869.000 | 17,869.000 | 6,063.340 | $3.33 | $0.00 | $20,190.92 | |
0112 | REMOVAL OF CONCRETE PAVEMENT W/ASPHALT OVERLAY | 619(B) 4763 | SY | 42,801.000 | 42,801.000 | 27,155.980 | $1.88 | $0.00 | $51,053.25 | |
0113 | SAWING PAVEMENT | 619(C) 0924 | LF | 7,380.000 | 7,380.000 | 304.000 | $0.83 | $0.00 | $252.32 | |
0114 | BEAM GUARD RAIL-W-BEAM-SINGLE | 623(A) 0932 | LF | 575.000 | 575.000 | 175.000 | $15.44 | $0.00 | $2,702.00 | |
0115 | THRIE BEAM BRIDGE CONNECTION-TYPE A | 623(E) 7114 | EA | 4.000 | 4.000 | 1.000 | $1,331.25 | $0.00 | $1,331.25 | |
0116 | GUARD RAIL ANCHOR UNIT (TYPE D-BF) | 623(F) 5686 | EA | 4.000 | 4.000 | 0.000 | $1,304.63 | $0.00 | $0.00 | |
0117 | (SP)G.E.T. GUARD RAIL END SECTION | 623(H) 8571 | EA | 4.000 | 4.000 | 1.000 | $2,225.85 | $0.00 | $2,225.85 | |
Subtotals For Category 0100/ROADWAY - IMY-35-1(157)014 | $357,060.15 | $4,932,475.44 | ||||||||
Fed/State Project Number: IMY-0035-1(157)014 | Project: 27166(06) | Category: 0300/TRAFFIC CONTROL - IMY-35-1(157)014 | ||||||||
0118 | RELOCATION OF RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN | 627(O) 4410 | LF | 18,000.000 | 18,000.000 | 16,623.000 | $1.57 | $0.00 | $26,098.11 | |
0119 | RENTED PORTABLE TYPE PRECAST CONCRETE MEDIAN BARRIER | 627(P) 4425 | LF | 18,000.000 | 18,000.000 | 13,298.400 | $20.50 | $0.00 | $272,617.20 | |
0120 | CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 856(A) 8839 | LF | 90,000.000 | 90,000.000 | 148,868.000 | $0.07 | $0.00 | $10,420.76 | |
0121 | (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 856(G) 8887 | EA | 7,500.000 | 7,500.000 | 1,044.000 | $0.43 | $0.00 | $448.92 | |
0122 | PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 859(A) 8006 | LF | 45,000.000 | 45,000.000 | 19,149.000 | $0.11 | $0.00 | $2,106.39 | |
0123 | (PL)SAND FILLED IMPACT ATTENUATION SYSTEM | 870(A) 8490 | SD | 100.000 | 100.000 | 0.000 | $7.46 | $0.00 | $0.00 | |
0124 | (PL)CONST.ZONE IMPACT ATTEN. | 871 8705 | SD | 200.000 | 200.000 | 0.000 | $7.46 | $0.00 | $0.00 | |
0125 | (PL)TRUCK MOUNTED ATTENUATOR | 876(C) 8482 | SD | 200.000 | 200.000 | 0.000 | $7.46 | $0.00 | $0.00 | |
0126 | MODULAR GLARE SCREEN | 878(C) 8487 | SD | 23,000.000 | 23,000.000 | 1,600.000 | 15,000.000 | $0.12 | $192.00 | $1,800.00 |
0127 | ARROW DISPLAY(TYPE C) | 880(A) 8812 | SD | 400.000 | 400.000 | 16.000 | 209.000 | $5.33 | $85.28 | $1,113.97 |
0128 | CONSTRUCTION SIGNS 0 TO 6.25 SF | 880(B) 8818 | SD | 12,500.000 | 12,500.000 | 864.000 | 9,464.000 | $0.11 | $95.04 | $1,041.04 |
0129 | CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 880(B) 8821 | SD | 5,000.000 | 5,000.000 | 648.000 | 7,503.000 | $0.53 | $343.44 | $3,976.59 |
0130 | CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 880(B) 8824 | SD | 7,000.000 | 7,000.000 | 461.000 | 5,641.000 | $3.20 | $1,475.20 | $18,051.20 |
0131 | BARRICADES(TYPE III) | 880(C) 8842 | SD | 3,500.000 | 3,500.000 | 310.000 | 3,876.000 | $0.16 | $49.60 | $620.16 |
0132 | WING BARRICADES | 880(C) 8848 | SD | 400.000 | 400.000 | 32.000 | 462.000 | $2.13 | $68.16 | $984.06 |
0133 | VERTICAL PANELS | 880(D) 8854 | SD | 36,000.000 | 36,000.000 | 576.000 | 5,400.000 | $0.05 | $28.80 | $270.00 |
0134 | WARNING LIGHTS(TYPE A) | 880(E) 8860 | SD | 12,500.000 | 12,500.000 | 816.000 | 9,955.000 | $0.05 | $40.80 | $497.75 |
0135 | WARNING LIGHTS(TYPE C) | 880(E) 8872 | SD | 19,000.000 | 19,000.000 | 2,480.000 | 24,094.000 | $0.02 | $49.60 | $481.88 |
0136 | DRUMS | 880(F) 8878 | SD | 12,000.000 | 12,000.000 | 1,040.000 | 13,139.000 | $0.09 | $93.60 | $1,182.51 |
0137 | CHANNELIZER CONES | 880(G) 8890 | SD | 46,000.000 | 46,000.000 | 2,270.000 | 37,057.000 | $0.07 | $158.90 | $2,593.99 |
0138 | TRAFFIC SURVEILLANCE, POLICE | 880(L) 8911 | HOUR | 200.000 | 200.000 | 0.000 | $56.70 | $0.00 | $0.00 | |
0139 | PORT.CHANGEABLE MESSAGE SIGN | 882(B) 8306 | SD | 200.000 | 200.000 | 74.000 | $15.98 | $0.00 | $1,182.52 | |
Subtotals For Category 0300/TRAFFIC CONTROL - IMY-35-1(157)014 | $2,680.42 | $345,487.05 | ||||||||
Fed/State Project Number: IMY-0035-1(157)014 | Project: 27166(06) | Category: 0301/TRAFFIC - IMY-35-1(157)014 | ||||||||
0140 | STRUCTURAL CONCRETE | 804(A) 2915 | CY | 6.150 | 6.150 | 0.000 | $319.50 | $0.00 | $0.00 | |
0141 | REINFORCING STEEL | 804(B) 2916 | LB | 1,164.000 | 1,164.000 | 0.000 | $1.07 | $0.00 | $0.00 | |
0142 | SHEET ALUMINUM SIGNS | 850(A) 8110 | SF | 234.680 | 234.680 | 0.000 | $11.72 | $0.00 | $0.00 | |
0143 | EXTRUDED ALUMINUM PANEL SIGNS | 850(B) 8112 | SF | 539.900 | 539.900 | 0.000 | $18.11 | $0.00 | $0.00 | |
0144 | 4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 851(A) 3206 | LF | 35.000 | 35.000 | 0.000 | $21.30 | $0.00 | $0.00 | |
0145 | 6"@20 GALV.STEEL WIDE FLANGE BEAM POST | 851(A) 3208 | LF | 51.200 | 51.200 | 0.000 | $26.63 | $0.00 | $0.00 | |
0146 | 6"@25 GALV.STEEL WIDE FLANGE BEAM POST | 851(A) 3209 | LF | 102.500 | 102.500 | 0.000 | $31.95 | $0.00 | $0.00 | |
0147 | 3"@7.58 GALV.STEEL PIPE POST | 851(B) 3218 | LF | 15.000 | 15.000 | 0.000 | $17.04 | $0.00 | $0.00 | |
0148 | 2" SQUARE TUBE POST | 851(C) 8324 | LF | 436.000 | 436.000 | 0.000 | $5.33 | $0.00 | $0.00 | |
0149 | DELINEATORS(TYPE 1, CODE 1) | 853 9024 | EA | 61.000 | 61.000 | 0.000 | $12.78 | $0.00 | $0.00 | |
0150 | DELINEATORS(TYPE 1, CODE 2) | 853 9027 | EA | 24.000 | 24.000 | 0.000 | $14.91 | $0.00 | $0.00 | |
0151 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 854(C) 8530 | LF | 59,908.000 | 59,908.000 | 0.000 | $0.43 | $0.00 | $0.00 | |
0152 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(6" WIDE) | 854(C) 8535 | LF | 15,048.000 | 15,048.000 | 0.000 | $0.64 | $0.00 | $0.00 | |
0153 | (SP)TRAFFIC STRIPE(MULTI-POLYMER)(8" WIDE) | 854(C) 8540 | LF | 1,600.000 | 1,600.000 | 0.000 | $1.07 | $0.00 | $0.00 | |
0154 | (PL)REMOVE & RESET EXISTING SIGNS | 890A/B 8756 | EA | 9.000 | 9.000 | 0.000 | $266.25 | $0.00 | $0.00 | |
Subtotals For Category 0301/TRAFFIC - IMY-35-1(157)014 | $0.00 | $0.00 | ||||||||
Subtotals For Project IMY-0035-1(157)014 /27166(06) | $359,740.57 | $5,277,962.49 |