Fed/State Project Number: NHY-022N(071) |
Project: 18850(04) |
Category: 0100/ROADWAY |
0001 |
CLEARING AND GRUBBING |
201(A) 0102 |
LSUM |
1.000 |
1.000 |
|
0.350 |
$40,000.00 |
$0.00 |
$14,000.00 |
0002 |
UNCLASSIFIED EXCAVATION |
202(A) 0183 |
CY |
105,443.000 |
105,443.000 |
9,843.300 |
40,225.760 |
$3.50 |
$34,451.55 |
$140,790.16 |
0003 |
UNCLASSIFIED BORROW |
202(D) 0184 |
CY |
113,382.000 |
113,382.000 |
13,645.000 |
62,154.000 |
$4.10 |
$55,944.50 |
$254,831.40 |
0004 |
TYPE A-SALVAGED TOPSOIL |
205(A) 4229 |
LSUM |
1.000 |
1.000 |
0.000 |
0.250 |
$75,000.00 |
$0.00 |
$18,750.00 |
0005 |
TEMPORARY SILT FENCE |
221(C) 2801 |
LF |
19,633.000 |
19,633.000 |
|
2,383.000 |
$2.90 |
$0.00 |
$6,910.70 |
0006 |
TEMPORARY SEDIMENT FILTER |
221(D) 2803 |
EA |
4.000 |
4.000 |
|
0.000 |
$298.00 |
$0.00 |
$0.00 |
0007 |
TEMPORARY SEDIMENT BASIN |
221(E) 2804 |
EA |
1.000 |
1.000 |
|
0.000 |
$478.00 |
$0.00 |
$0.00 |
0008 |
TEMPORARY SILT DIKE |
221(F) 0100 |
LF |
4,478.000 |
4,478.000 |
|
63.000 |
$10.00 |
$0.00 |
$630.00 |
0009 |
DITCH LINER PROTECTION |
229 4318 |
LF |
2,383.000 |
2,383.000 |
|
0.000 |
$1.55 |
$0.00 |
$0.00 |
0010 |
SOLID SLAB SODDING |
230(A) 2806 |
SY |
298,622.000 |
298,622.000 |
|
0.000 |
$1.30 |
$0.00 |
$0.00 |
0011 |
WATERING |
230(F) 2812 |
KGAL |
11,945.000 |
11,945.000 |
|
0.000 |
$5.10 |
$0.00 |
$0.00 |
0012 |
SEEDING METHOD B |
232(B) 2814 |
AC |
34.800 |
34.800 |
|
0.000 |
$555.00 |
$0.00 |
$0.00 |
0013 |
VEGETATIVE MULCHING |
233(A) 2817 |
AC |
22.500 |
22.500 |
|
0.000 |
$555.00 |
$0.00 |
$0.00 |
0014 |
FERTILIZING (10-20-10) |
234(A) 2824 |
TON |
41.000 |
41.000 |
|
0.000 |
$620.00 |
$0.00 |
$0.00 |
0015 |
FERTILIZING (0-46-0) |
234(A) 4406 |
TON |
5.000 |
5.000 |
|
0.000 |
$680.00 |
$0.00 |
$0.00 |
0016 |
MOWING |
241 2832 |
AC |
84.200 |
84.200 |
|
0.000 |
$69.00 |
$0.00 |
$0.00 |
0017 |
AGGREGATE BASE TYPE A |
303(A) 2100 |
CY |
49,244.000 |
49,244.000 |
|
0.000 |
$21.45 |
$0.00 |
$0.00 |
0018 |
LIME |
307(D) 4230 |
TON |
4,081.000 |
4,081.000 |
|
0.000 |
$130.65 |
$0.00 |
$0.00 |
0019 |
LIME STABILIZED SUBGRADE |
307(H) 4270 |
SY |
226,871.000 |
226,871.000 |
|
0.000 |
$1.16 |
$0.00 |
$0.00 |
0020 |
MOISTURE BARRIER MEMBRANE |
325 5280 |
SY |
290,164.000 |
290,164.000 |
|
0.000 |
$2.45 |
$0.00 |
$0.00 |
0021 |
TRAFFIC BOUND SURFACE COURSE TYPE E |
402(E) 0225 |
TON |
18,196.000 |
18,196.000 |
|
0.000 |
$9.75 |
$0.00 |
$0.00 |
0022 |
TACK COAT |
407(B) 0250 |
GAL |
20,713.000 |
20,713.000 |
|
0.000 |
$2.75 |
$0.00 |
$0.00 |
0023 |
PRIME COAT |
408 5774 |
GAL |
31,271.000 |
31,271.000 |
|
0.000 |
$4.65 |
$0.00 |
$0.00 |
0024 |
SUPERPAVE, TYPE S3(PG 76-28 OK) |
411(B) 5935 |
TON |
25,473.000 |
25,473.000 |
|
0.000 |
$53.30 |
$0.00 |
$0.00 |
0025 |
SUPERPAVE, TYPE S3(PG 64-22 OK) |
411(B) 5945 |
TON |
55,992.000 |
55,992.000 |
|
0.000 |
$43.65 |
$0.00 |
$0.00 |
0026 |
SUPERPAVE, TYPE S4(PG 76-28 OK) |
411(C) 5950 |
TON |
16,982.000 |
16,982.000 |
|
0.000 |
$61.55 |
$0.00 |
$0.00 |
0027 |
SUPERPAVE, TYPE S4(PG 64-22 OK) |
411(C) 5960 |
TON |
6,368.000 |
6,368.000 |
|
0.000 |
$50.10 |
$0.00 |
$0.00 |
0028 |
RUMBLE STRIP-METHOD HMA-CON |
413(A) 4861 |
LF |
93,400.000 |
93,400.000 |
|
0.000 |
$0.13 |
$0.00 |
$0.00 |
0029 |
STRUCTURAL EXCAVATION UNCLASSIFIED |
501(A) 0313 |
CY |
602.000 |
602.000 |
45.500 |
801.000 |
$10.00 |
$455.00 |
$8,010.00 |
0030 |
CLASS AA CONCRETE |
509(A) 0319 |
CY |
188.000 |
188.000 |
|
411.000 |
$440.00 |
$0.00 |
$180,840.00 |
0031 |
CLASS A CONCRETE |
509(B) 0321 |
CY |
1,274.000 |
1,274.000 |
179.900 |
605.700 |
$300.00 |
$53,970.00 |
$181,710.00 |
0032 |
CLASS A CONCRETE, SMALL STRUCTURES |
509(C) 0322 |
CY |
38.000 |
38.000 |
|
0.000 |
$550.00 |
$0.00 |
$0.00 |
0033 |
CLASS C CONCRETE |
509(D) 0325 |
CY |
278.000 |
278.000 |
|
0.000 |
$195.00 |
$0.00 |
$0.00 |
0034 |
REINFORCING STEEL |
511(A) 0332 |
LB |
230,401.000 |
230,401.000 |
32,497.100 |
162,340.400 |
$0.70 |
$22,747.97 |
$113,638.28 |
0035 |
TYPE I-A PLAIN RIPRAP |
601(B) 0536 |
TON |
1,160.000 |
1,160.000 |
|
0.000 |
$37.20 |
$0.00 |
$0.00 |
0036 |
TYPE I-A FILTER BLANKET |
601(C) 0538 |
TON |
387.000 |
387.000 |
|
0.000 |
$27.25 |
$0.00 |
$0.00 |
0037 |
INLET (SMD-TYPE 2) |
611(G) 6002 |
EA |
4.000 |
4.000 |
1.000 |
1.000 |
$1,201.00 |
$1,201.00 |
$1,201.00 |
0038 |
18" R.C.PIPE CLASS III |
613(A) 0491 |
LF |
1,242.000 |
1,242.000 |
230.000 |
502.000 |
$34.80 |
$8,004.00 |
$17,469.60 |
0039 |
18" CORR. GALV. STEEL PIPE |
613(B) 0689 |
LF |
462.000 |
462.000 |
37.000 |
37.000 |
$28.35 |
$1,048.95 |
$1,048.95 |
0040 |
21" X 15" CORR. GALV. STEEL PIPE ARCH |
613(B) 4527 |
LF |
575.000 |
575.000 |
|
0.000 |
$29.20 |
$0.00 |
$0.00 |
0041 |
28" X 20" CORR. GALV. STEEL PIPE ARCH |
613(B) 4528 |
LF |
84.000 |
84.000 |
|
72.000 |
$32.40 |
$0.00 |
$2,332.80 |
0042 |
6" PERFORATED PIPE UNDERDRAIN ROUND |
613(H) 6204 |
LF |
100.000 |
100.000 |
|
0.000 |
$26.00 |
$0.00 |
$0.00 |
0043 |
6" NON-PERF.PIPE UNDERDRAIN RND. |
613(I) 1096 |
LF |
100.000 |
100.000 |
|
0.000 |
$26.00 |
$0.00 |
$0.00 |
0044 |
18" PREFAB. CULVERT END SECTION, ROUND |
613(L) 5726 |
EA |
21.000 |
21.000 |
|
0.000 |
$455.00 |
$0.00 |
$0.00 |
0045 |
TYPE A6 CULVERT END TREATMENT |
613(M) 7196 |
EA |
30.000 |
30.000 |
|
0.000 |
$635.00 |
$0.00 |
$0.00 |
0046 |
TYPE B6 CULVERT END TREATMENT |
613(M) 7197 |
EA |
4.000 |
4.000 |
0.000 |
2.000 |
$750.00 |
$0.00 |
$1,500.00 |
0047 |
STANDARD BEDDING MATERIAL, CLASS A |
613(R) 1185 |
CY |
338.000 |
338.000 |
63.200 |
137.700 |
$21.00 |
$1,327.20 |
$2,891.70 |
0048 |
PIPE UNDERDRAIN COVER MAT'L. |
613(U) 1100 |
CY |
100.000 |
100.000 |
|
0.000 |
$28.00 |
$0.00 |
$0.00 |
0049 |
TRENCH EXCAVATION |
613(V) 1180 |
CY |
118.000 |
118.000 |
81.100 |
145.000 |
$8.00 |
$648.80 |
$1,160.00 |
0050 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS |
619(A) 0920 |
LSUM |
1.000 |
1.000 |
|
0.250 |
$5,000.00 |
$0.00 |
$1,250.00 |
0051 |
REMOVAL OF HEADWALL |
619(B) 0291 |
EA |
15.000 |
15.000 |
|
14.000 |
$500.00 |
$0.00 |
$7,000.00 |
0052 |
REMOVAL OF ASPHALT PAVEMENT |
619(B) 4728 |
SY |
102,976.000 |
102,976.000 |
|
6,252.550 |
$1.00 |
$0.00 |
$6,252.55 |
0053 |
REMOVAL OF DRAINAGE INLETS |
619(B) 4741 |
EA |
1.000 |
1.000 |
|
0.000 |
$1,000.00 |
$0.00 |
$0.00 |
0054 |
REMOVAL OF EXISTING PIPE |
619(B) 5918 |
LF |
895.000 |
895.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0055 |
SAWING PAVEMENT |
619(C) 0924 |
LF |
228.000 |
228.000 |
|
0.000 |
$6.00 |
$0.00 |
$0.00 |
0056 |
FENCE-STYLE SWF (5 BARBED WIRE) |
624(C) 4459 |
LF |
6,500.000 |
6,500.000 |
|
0.000 |
$3.40 |
$0.00 |
$0.00 |
0057 |
GATES-STYLE CLF (6'HIGH X 14'LONG) |
624(F) 5962 |
EA |
7.000 |
7.000 |
|
0.000 |
$825.00 |
$0.00 |
$0.00 |
0058 |
REMOVE AND RESET MAILBOX |
629(E) 5048 |
EA |
5.000 |
5.000 |
|
0.000 |
$25.40 |
$0.00 |
$0.00 |
Subtotals For Category 0100/ROADWAY |
$179,798.97 |
$962,217.14 |
|
Fed/State Project Number: NHY-022N(071) |
Project: 18850(04) |
Category: 0300/TRAFFIC |
0066 |
STRUCTURAL CONCRETE |
804(A) 2915 |
CY |
1.000 |
1.000 |
|
0.000 |
$250.00 |
$0.00 |
$0.00 |
0067 |
REINFORCING STEEL |
804(B) 2916 |
LB |
48.000 |
48.000 |
|
0.000 |
$2.00 |
$0.00 |
$0.00 |
0068 |
(PL)REMOVAL OF EXISTING SIGNS |
805(A) 8722 |
LSUM |
1.000 |
1.000 |
|
0.000 |
$55.00 |
$0.00 |
$0.00 |
0069 |
SHEET ALUMINUM SIGNS |
850(A) 8110 |
SF |
428.000 |
428.000 |
|
0.000 |
$22.00 |
$0.00 |
$0.00 |
0070 |
2 1/2"@5.79 GALV.STEEL PIPE POST |
851(B) 3217 |
LF |
126.000 |
126.000 |
|
0.000 |
$23.00 |
$0.00 |
$0.00 |
0071 |
2" SQUARE TUBE POST |
851(C) 8324 |
LF |
245.000 |
245.000 |
|
0.000 |
$15.25 |
$0.00 |
$0.00 |
0072 |
2 1/4" SQUARE TUBE POST |
851(C) 8327 |
LF |
576.000 |
576.000 |
|
0.000 |
$15.25 |
$0.00 |
$0.00 |
0073 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) |
855(A) 8812 |
LF |
119,193.000 |
119,193.000 |
|
0.000 |
$0.38 |
$0.00 |
$0.00 |
0074 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) |
857(A) 8839 |
LF |
1,000.000 |
1,000.000 |
|
5,942.000 |
$1.00 |
$0.00 |
$5,942.00 |
0075 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) |
857(C) 8851 |
LF |
105,000.000 |
105,000.000 |
|
3,569.000 |
$1.00 |
$0.00 |
$3,569.00 |
0076 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 |
857(E) 8887 |
EA |
1,600.000 |
1,600.000 |
|
1,492.000 |
$2.00 |
$0.00 |
$2,984.00 |
0077 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) |
857(F) 8006 |
LF |
1,000.000 |
1,000.000 |
|
2,711.000 |
$1.50 |
$0.00 |
$4,066.50 |
0078 |
CONSTRUCTION SIGNS 0 TO 6.25 SF |
880(B) 8818 |
SD |
45,000.000 |
45,000.000 |
600.000 |
3,310.000 |
$0.03 |
$18.00 |
$99.30 |
0079 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF |
880(B) 8821 |
SD |
30,000.000 |
30,000.000 |
225.000 |
2,057.000 |
$0.03 |
$6.75 |
$61.71 |
0080 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF |
880(B) 8824 |
SD |
27,000.000 |
27,000.000 |
330.000 |
2,735.000 |
$0.03 |
$9.90 |
$82.05 |
0081 |
CONSTRUCTION BARRICADES(TYPE I) |
880(C) 8830 |
SD |
2,500.000 |
2,500.000 |
|
0.000 |
$0.25 |
$0.00 |
$0.00 |
0082 |
CONSTRUCTION BARRICADES(TYPE II) |
880(C) 8836 |
SD |
6,000.000 |
6,000.000 |
|
492.000 |
$0.25 |
$0.00 |
$123.00 |
0083 |
CONSTRUCTION BARRICADES(TYPE III) |
880(C) 8842 |
SD |
18,000.000 |
18,000.000 |
120.000 |
1,090.000 |
$0.25 |
$30.00 |
$272.50 |
0084 |
WING BARRICADES |
880(C) 8848 |
SD |
12,000.000 |
12,000.000 |
60.000 |
410.000 |
$0.05 |
$3.00 |
$20.50 |
0085 |
VERTICAL PANELS |
880(D) 8854 |
SD |
15,000.000 |
15,000.000 |
828.000 |
3,750.000 |
$0.35 |
$289.80 |
$1,312.50 |
0086 |
WARNING LIGHTS(TYPE A) |
880(E) 8860 |
SD |
69,000.000 |
69,000.000 |
555.000 |
4,237.000 |
$0.03 |
$16.65 |
$127.11 |
0087 |
WARNING LIGHTS(TYPE C) |
880(E) 8872 |
SD |
97,500.000 |
97,500.000 |
|
0.000 |
$0.03 |
$0.00 |
$0.00 |
0088 |
DRUMS |
880(F) 8878 |
SD |
90,000.000 |
90,000.000 |
1,275.000 |
9,844.000 |
$0.18 |
$229.50 |
$1,771.92 |
Subtotals For Category 0300/TRAFFIC |
$603.60 |
$20,432.09 |
|